uwe fbl / ground floor plan (level 2) design / make / deliver...000 level 0 d uwe fbl / ground floor...
TRANSCRIPT
1600
1250
1250
1017
1800
900
1600
9901600
Workingheight table
Power totable leg
225 m²Team Entrepreneurship
2X102
Comms-Core C0.66
56.51 m²
Male Cyclist Fac.0.68
21.52 m²
Corridor0.134
18.30 m²
10 m²TE Office2X102A
48 m²Social Learning
2XC200A
Comms-Core C0.66
56.51 m²
Comms-Core C0.66
56.51 m²Circulation0.60
86.35 m²
Circulation0.60
86.35 m²
Riser to B10.64
2.12 m²
Comms-Core C0.66
56.51 m²
322 m²Lecture Theatre
2X112
322 m²Lecture Theatre
2X112
322 m²Lecture Theatre
2X112
Lobby0.72
12.94 m²
Riser0.33
3.25 m²
Store0.71
2.64 m²
44 m²Employability Open Zone
2XC110A
Void0.135
17.83 m²
14 m²Atrium Breakout
2XC200B
68 m²25P Teaching Room (TE)
2X116
14 m²Employability office
2X114
7 m²Employability Mtg
2X115
68 m²25P Teaching Room (TE)
2X117
67 m²25P Teaching Room (TE)
2X118
Store0.79
2.24 m²
Riser0.81
74.66 m²
StoreB27
2.60 m²
15 m²Employability Display Zone
2XC110B
59 m²Atrium Main Corridor
2XC200
Servery0.12
76.86 m²
Comms0.14
16.52 m²
Kitchen Plant0.107
5.87 m²Dry Store
0.16
4.37 m²
Dish Wash0.120
10.77 m²
Circulation0.20
3.47 m²
Bin Store0.56
6.66 m²WC0.22
2.82 m²Store0.21
1.93 m²
18 m²Post Room
2X231
20 m²Circulation2XC230
36 m²Staff Breakout
2X214
139 m²Harvard2X242
217 m²Cafe
2X20120 m²Mtg
2X203
Circulation-Core A0.01
19.54 m²
FF Lift-Core A0.06
5.32 m²
Riser-Core A0.07
8.61 m²Circulation-Core A
0.05A
11.82 m²
16 m²Mtg
2X213A 15 m²Social Learning
2X213
FF Stairs-Core A0.04
21.30 m²
7 m²Cleaner2X211
AWC0.09
4.71 m²
Plant Room0.24
105.59 m²
25 m²Social Learning
2XC244
31 m²Circulation
2X240
16 m²Pro Bono
2X247
14 m²Pro Bono Off
2X247A
Store0.30
46.20 m²
Store0.30
46.20 m²
17 m²Mtg
2X244A
39 m²Ext Org 5P Office
2X264
FF Lift-Core B0.48
5.32 m²
Riser-Core B0.49
11.19 m²
FF Stairs 02-Core B0.46
21.65 m²
3 m²Store
2X247B
Circulation0.42
3.27 m²4 m²Store
2X261A
11 m²Cleaner2X263
36 m²Social Learning
2XC26016 m²
Ext Org Mtg2X266
43 m²Ext Org 5P Office
2X265
62 m²Social Learning
2XC210
Power totable leg
Power totable leg
18 m²Ext Org Mtg
2X261
Desks, chairs & peds omitted.Tables & chairs added
Storage increasedfrom 4 to 8
Desk & ped added
Tables changed toCwtch
Tables changed toCwtch
Seating rotated dueto column
This drawing was created in AutoCAD 2010 and is the property of Godfrey SyrettLtd and therefore must not be copied or reproduced. Please ensure that alldimensions are checked on site before commencing work.
Rev Description Date
T0191268101001915683134
Client DateScale
DrawnProject
Description Drawing Number
Revision
ASM
Status Option
Planet Place Killingworth Newcastle Upon Tyne NE12 6DY
design / make / deliver
1 : 120
E H / M R
UWE 20/10/16
FBL
Ground Floor Plan 20558_P_000
Preliminary
1 : 120000 Level 0
D
UWE FBL / Ground Floor Plan (Level 2)
This drawing was created in AutoCAD 2010 and is the property of Godfrey SyrettLtd and therefore must not be copied or reproduced. Please ensure that alldimensions are checked on site before commencing work.
Rev Description Date
T0191268101001915683134
Client DateScale
DrawnProject
Description Drawing Number
Revision
ASM
Status Option
Planet Place Killingworth Newcastle Upon Tyne NE12 6DY
design / make / deliver
E H / M R
UWE 20/10/16
FBL
Ground Floor Images 20558_P_002
Preliminary
2X118 TE Teaching Room
2XC200 Reception Waiting Area2x200A Atrium Main Corridor
2X201 Cafe View A2X201 Cafe View B
2X214 Staff Breakout2XC110A Employability Open Zone 2XC200B Atrium Breakout
D
UWE FBL / Ground Floor Images (Level 2)