uttar pradesh state industrial development corporation...

22
Page 1 Uttar Pradesh State Industrial Development Corporation Limited Sharing Your Business Aspirations Invest North Summit - 2014

Upload: hacong

Post on 07-Feb-2018

224 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 1

Uttar Pradesh State Industrial Development Corporation Limited Sharing Your Business Aspirations

Invest North Summit - 2014

Page 2: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 2

UPSIDC- The Corporation

► Overview

Nodal Agency for Industrial Infrastructure development since 1961 Having ,13 Regional Offices, 2 Project offices, 1 SEZ Area Office and

Head office at Kanpur Having 10 Engineering construction divisions Industrial areas are grouped territorially under Regional Offices

► Significant Achievements

Developed more than 150 industrial areas in 51 districts More than 11300 units have been set up with an estimated investment

of over INR 20375 cores. Executed various specialized projects like, mango pack houses,agro-

parks and leather parks Developed more than 10 National Institute of Design (NIDs) and Growth

Centres.

Page 3: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 3

NEW INITIATIVES OF UPSIDC- FORTHCOMING PROJECTS

Page 4: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 4

Plastic City, Auraiya

► Overview Integrated Plastic Park in coordination with the, GAIL, NTPC, CIPET, MSME-DI &

financial institutions (HUDCO, SIDBI and NABARD and others) is being set up. Expected Investment in the project is of INR 4,000 Crore Gas Authority of India Ltd.(GAIL) is major producer of two Plastic raw materials in

Auraiya High Density Polyethylene (HDPE) – 1,00,000 tonnage per annum (TPA) Linear Low Density Polyethylene (LLDPE) – 1,60,000 tonnage per annum (TPA)

► Location Auraiya District in U.P. (about 135 km from Kanpur)

.

► Features Estimated cost of the project is INR.204 Crore encompassing the total area of around 300 Acre Industrial, Residential Township, Market, Bank, Hospitality, Schools, Hostel & Parks are

proposed Facilities like skill development centre, tool room, Treatment plant, warehouse also proposed

► Current Status Basic infrastructural facilities such as roads, power distribution lines, sewage and water

overhead tanks has been developed Memorandum of Understanding (MOU) signed with Gas Authority of India Ltd.(GAIL) for supply

of Plastic Raw Materials MOU signed with All India Plastic Manufacturers Association Allotment of industrial Plots in process

Page 5: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 5

Trans- Ganga Project- Kanpur-Unnao

► Overview Trans Ganga Project spreads over 1,151 Acre near Kanpur in Unnao district Expected investment in the project is INR 1,300 Crore It is being developed as an Industrial Model Township with industrial, residential

and commercial sectors Situated within burgeoning belt of Kanpur and Lucknow zone

► Location 70 KM from Lucknow Airport On the bank of river Ganga in Unnao district

► Features Automobile hub, planned with modern Auto Expo-mart Project to be equipped with state-of-the-art infrastructure having exhibition centers,

multiplexes, mega malls, parks, & group housing societies The township will be well-connected by Lucknow-Kanpur Highway.

Page 6: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 6

Mega Leather Cluster (MLC) project

► Overview Two green-field Mega Leather Cluster (MLC) projects to come up in Hardoi & Kanpur

respectively 150 & 625 Acre are dedicated to Hardoi & Kanpur Cluster respectively The MLCs will have world-class infrastructure with latest technology to meet the demands

of Indian and international markets A Special Purpose Vehicle (SPV) consisting of entrepreneurs engaged in leather industry

& willing to set up units, has been formed for both the projects

► Location Sandila Industrial Area in Hardoi district & Ramaipur in Kanpur district.

► Features 50 % of the land in both the parks are earmarked for small and medium sector units Facilities like effluent treatment plants, rain water harvesting, warehousing, raw material

banks, exhibition centre, design centre & human resource development Each park will have an investment of INR 1000 Crore and employment opportunities

for around 10,000 people

► Current Status UPSIDC has allotted 150 Acre of land to SPV for Sandila project

Page 7: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 7

Hi-Tech Industrial township (DMIC) Project

► Overview Delhi-Mumbai Industrial Corridor Development Corporation Ltd.(DMICDCL) will set up

Industrial Investment Zone (IIZ) at both side of the Western Freight Corridor 36,068 Sq KM (15%) of DMIC catchment area across 12 districts of UP UPSIDC has proposed an Integrated- Industrial Hi-tech Township in 2,800 Acre land under

IIZ Expected investment in the project is of INR 2,600 Crore

► Location In Chola (Bulandshahr District)

► Features World-class Integrated- Industrial Hi-tech Township is proposed with the funding of

DMICDCL Development of Township will be done by Special Purpose Vehicle (SPV) being setup with

the help of DMICDCL and UPSIDC DMICDCL will have 49% share and different organization of UP govt. will have 51% share

in the SPV

Page 8: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 8

Eastern Dedicated Freight Corridors Project

► Overview Industrial corridor on Eastern Dedicated Freight Corridor (EDFC) will have an

expected investment of Approx. INR 42,000 Crore up to 2018 Uttar Pradesh has highest share of around 57% (measuring 1,049 KM dissecting

the state) in Eastern Dedicated Freight Corridor project 5% equity approved by the state government

► Features juncTwo National Investment & Manufacturing Zones (NIMZs) and five Industrial

Zones in the industrial corridor are in UP Proposed NIMZs include Auraiya National Investment & Manufacturing Zone (6,043

Hectare) and Jhansi National Investment & Manufacturing Zone (5,567 Hectare) EDFC shall facilitate uninterrupted transportation of goods to sea ports Industrial Estates & Logistic Hubs along EDFC for the benefit of industries It shall reduce congestion at terminals and tion stations Five Industrial Zones have been proposed, viz:

Pashchimanchal Industrial Zone (2,000 Hectare) Braj Industrial Zone(2,000 Hectare) Kanpur Logistics hub (6,000 Hectare) Allahabad-Naini-Bara Investment Zone (3,000 Hectare) Mughalsari-Varansai-Mirjapur Investment Zone (3,000 Hectare)

Page 9: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 9

INVESTMENT OPPORTUNITIES IN COMPLETED PROJECTS

Page 10: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 10

Leather Technology Park, Unnao

► Overview Leather Technology Park is being developed on 232 Acres of land at a cost of INR 24

Crores for setting up tanneries and leather goods units Present Industrial land rates- INR 2500 sq m

► Location Banthar, Unnao (near Kanpur).

► Features Park facilitates Common Effluent Treatment Plant (CETP) set up by Tanners

Association Corporation M/s Banthar Industrial Pollution Control Company (BIPCC) will facilitate for Training

and Design Centre Technological Support Service, Quality Control for Saddlery and Export

Management is set up under Neighborhood Leadership Development Program (NLDP) supported by International Institute for Saddlery and Export Management.

► Current Status Environmental Clearance (EC) obtained Out of 233 Acre, 69 Acre of land is used for tanneries, 47 Acre for manufacturing

units of leather goods, 22 Acre for green belt and 30 Acre for CETP and Solid Waste Management Project

Page 11: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 11

Tronica City, Ghaziabad

► Overview Developed by the UPSIDC, it is divided into residential and industrial sectors Proper provision for group housing , commercial ,institutional & other facility plots

have been done to make it self sustainable Tronica City is conveniently approachable from Alipur-Bund road along river Yamuna

on the western side and Delhi-Saharanpur road on the east

► Location Loni, Ghaziabad (2.5 KM from Delhi Border)

► Features Integrated Industrial Township developed over 1,975 Acres land Land available in developed industrial, residential, institutional and commercial sectors Captive power plant (CPP) which provides 24-hour electricity Well developed parks and good green coverage

► Current Status Almost 750 Units have come up in Tronica and many other are under various stage of

completion Many modern multi- storied building units are also being completed.

Page 12: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 12

Agro Parks, Lucknow & Varanasi

► Overview Agro Parks for food processing industry at Lucknow & Varanasi have been designed to meet the

specific needs of the agro and food processing industry

► Location Lucknow - On Kursi Road, at about 20 KM from Lucknow Varanasi - On Jaunpur-Varanasi highway, at 30 KM from Vanarasi

► Features One agro park is developed over 180 Acre on the out skirts of Lucknow Second Agro Park is developed over 180 Acre in Varanasi near Babatpur Airport Specialized Infrastructure includes Multi Chamber Cold Store with Controlled Atmosphere facility

and Washing-sorting-grading line

Page 13: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 13

Moradabad Special Economic Zone

► Overview Moradabad special economic zone (SEZ) is spread over an area of 467 Acre and

captures the promising market of handicrafts in Moradabad The city is nicknamed Pital Nagri or City of Brass for its world renowned

brass handicrafts industry Moradabad exports handicraft goods worth INR 2,200 Crore every year

► Location

Situated at 160 KM from the New Delhi on Dhigarpur-Pakbara Road, Moradabad.

► Features Caters to handicrafts manufacturing industry such as:

Animal bone and horn industry Brass handicrafts.

Excellent infrastructure facilities such as greenbelt, internal development, security system, power substation, Common Effluent Treatment Plant CETP, inland container depot, design and training center, helipad, school, canteen

► Current Status In phase-I, 421.56 Acre area has been developed consisting 469 plots. Efforts are being made to broaden the scope of manufacturing and convert it into

multi product zone

Page 14: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 14

Apparel & Textile Park

► Overview To promote Apparel & Textile Industry, UPSIDC has setup Apparel Parks at

Tronica City, Ghaziabad, and Textile & Hosiery Park at Rooma District Kanpur

Both the parks have industry specific infrastructure

► Location Ghaziabad- Apparel Park in Tronica City, Ghaziabad at 2.5 Km. from

Delhi border Kanpur- Textile Hosiery Park at Rooma, Dist. Kanpur at 10 Km. from

Kanpur city

► Features

Facilities like ,Textile training center, fashion design center, quality control laboratory, workshop cum tool room, common effluent treatment plant, conference hall, women hostel

Textile-Training Centers by Apparel training & Design Centre (ATDC) are in operation at both the Parks

ALT Ltd. Bangalore is setting up Training College/ Fashion design Center/ Quality Control laboratories at both Locations

► Current Status Infrastructure facilities such as Road, Drain and Culverts, Internal Electrification

and Water Distribution Pipe Line have been completed in both the projects

Page 15: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 15

Export Promotion Industrial Park (EPIP)

► Overview Two Export Promotion Industrial Parks (EPIP) - Gautam Budh Nagar & EPIP Agra

have been set up to promote exports from UP EPIP Gautam Budh Nagar has been developed on 200 Acre of land at cost of INR

20 Crore. Present Industrial land rate- INR 5000 per sq m EPIP Agra has been developed on 102 Acre of land at cost of INR 21 Crore to

provide industrial infrastructure for export oriented units. Present industrial land rate – INR 4500 sq m

► Location Gautam Buddh Nagar & Agra

► Features Infrastructure facilities to boost up export of various commodities and services Units in EPIP will have a minimum export commitment of 33% of their

production Built up space is available in flatted factory at EPIP, Gautam Buddh Nagar

► Current Status EPIP Gautam Budh Nagar - 169 units have started production and exports &

36 units have started plant construction

Page 16: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 16

INVESTMENT OPPORTUNITIES IN ONGOING PROJECTS

Page 17: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 17

Leather Park, Agra

► Overview Leather Park, Agra will promote Leather oriented Industries for finished Leather

Goods or Footwear/ Shoe Industries. It will be developed with sectoral layout in an area of approx. 283 Acres at cost of

INR 200 Crore

► Location On Agra-Jaipur Highway(NH-11) about 17 Km from Agra

► Features Infrastructure includes Administrative Building & other amenities like Roads,

Power, Telecom, External Drainage & Water Supply Technical assistance proposed by Central Footwear Training Institute (CFTI)

& Central Leather research Institute(CLRI).

► Current Status In 1st Phase, 71.07 Acre of land is being developed Various sizes of plots would be available ranging from 1000, 2100 and 4000

Sq. Mtr.

Page 18: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 18

Greater Mathura (Kosi-Kotwan Extension) Project

► Overview Greater Mathura (Kosi-Kotwan Extension ) Project in an area of 237.57 Acre is on the anvil Kosi-Kotwan Extension has a quick access with national capital Excellent Road and Rail connectivity at Kosi Delhi-Mathura broad gauge

► Location On NH-2 (Delhi-Agra) about 96 Km. from Delhi & 2 Km. from Haryana- UP Border

► Features Infrastructure like Power, Telecom, External Drainage, Administrative Building & Water Supply Air Transport Facility between Delhi - Agra Post Office, Bank, Public Call Office (PCO)., Schools, Hospital/Nursing Homes, and Shopping

Center are available at Kosi Township Hotels such as Country Inn, Maharaja Motels, Ashoka Resort are also available in vicinity Different size of plots ranging 600, 800, 1000, 1800 & 4000 Sq. Mtr

Page 19: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 19

Proposed Investment in UP through UPSIDC

S.No. Company Proposed Investment (INR Crores)

Nature of Enterprise

Position of land

1 HINDUSTAN PAPER MILLS, Jagdishpur 4000 GOI 180 acres of land allotted

2. AMUL, Lucknow 200 Pvt. Company Land Allotted

3. AMUL, Kanpur 200 Pvt. Company Land Allotted

4. AMUL, Varanasi 200 Pvt. Company Land Allotted

5. Solar Project, Lalitpur 150 Pvt. Company 115 Acres land allotted

6. Jackson Pvt. Ltd., Kosi Solar Thermal Pannel 105 Pvt. Company 15 Acres Land reserved

7. GAIL Gas, JV with UPSIDC 500 GOI Industrial/ City gas distribution

8. THDC, 1320 MV Super Critical Thermal Power Plant

10000 GOI 1300 Acres of land , MOU Signed.

9. Paswara paper Mills Expansion at Muzaffarnagar

250 Pvt. Company _

10. Indian Oil Bottling Plant, Saharanpur 75 GOI Land allocation is in process

11. Hindustan Petroleum, Allahabad 125 GOI 30 Acres of land allocation in process

12. Maruti Udyog, Allahabad - Pvt. Company Land allocation in Industrial township at Naini.

Page 20: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 20

S.No. Company Proposed Investment

(INR Crores) Nature of Enterprise

Position of land

13. Aamrapali Cement Plant, Banda 480 Pvt. Company Land allotted

14. Mega Food park, Jagdishpur 148 GOI sanctioned

15 Shri Cement, Sikandrabad 600 Pvt. Company Project Sanctioned

16. Rail Coach Factory, Raibareilly 300 GOI Allotted

17. CRPF Training Centre, Utelwa, Amethi 600 GOI Allotted

18. Indian Oil Corporation, Amethi 100 GOI Allotted

19. Hotel Training Institute, Trishundi, Amethi 28 Pvt. Land allotted

20. Kribhco Logistic Centre, Modinagar 250 GOI Project completed

21. Kribhco, Shahjanpur GOI Project Sanctioned

22. Creative Thermo light , Barhgarh, Chitrakoot 3440 Pvt. Company Land allotted

23. Mathura Refinery Extension, Mathura 11000 GOI In Process

24. Mega Leather Cluster Project, Sandila, Hardoi 500 SPV Land allotted

Proposed Investment in UP through UPSIDC

Page 21: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 21

S.No. Company Proposed Investment (INR Crores)

Nature of Enterprise

Position of land

25. Mega Leather Cluster Project, Ramaipur, Kanpur 500 SPV Land available

26. Plastic City, Auariya 30 Pvt./ SPV In process

27. Bharat Electronics Ltd. , Extension proposal at Ghaziabad

500 GOI Section 4 Declared

28. RAIL NEER Project, Raibareilly, Ghaziabad 30 GOI Land allotted/ earmarked

29. Maize Processing Plant, Kannauj 125 Pvt. Land allotted

30. NATRIP, Trishundi 125 GOI Land allotted

31. Milk Processing Plant, Akbarpur, Kanpur Dehat 110 Pvt. Under construction

32. Sparsh Industries (Polyester Film), Jainpur, Kanpur Dehat

110 Pvt. Land allotted

33. Maize Processing Plant, Rania, Kanpur Dehat 120 Pvt. Under construction

34. Bio Mass Energy & Ethenol Unit, Umarda, Kannauj 140 Pvt. Land allotted

35. Theme Park, Agra 5000 SPV Land acquisition/ possession work in process

Total Investment proposed 40191 (Crores)

Proposed Investment in UP through UPSIDC

Page 22: Uttar Pradesh State Industrial Development Corporation Limitedinvestnorth.in/Editor/ckfinder/core/connector/userfiles/files... · Uttar Pradesh State Industrial Development Corporation

Page 22

Thank You