    BIL  KOD MATA PELAJARAN NAMA MATA PELAJARAN MUKASURAT

    1 SBQ 2122/SBC 1142 STRUCTURAL DESIGN

    2 SBC 1422 ESTIMATING I

    3 SBQ 3522 LEGAL STUDIES III4 SBC 3842 BUILDING MAINTENANCE

    5 SBQ 4912 VALUES MANAGEMENT 

    6 SBQ 3314 CONSTRUCTION MEASUREMENT III

    7 SBC 2242 CONSTRUCTION TECHNOLOGY II

    8 SBQ 1223 CONSTRUCTION TECHNOLOGY I

    9 SBC 1222 CONSTRUCTION TECHNOLOGY I

    10 SBQ 4412 FINANCIAL MANAGEMENT 

    11 SBC 2443 FINANCIAL MANAGEMENT 

    12 SBC 1233 BUILDING SERVICES SYSTEM

    13 SBQ 2233 BUILDING SERVICES II

    14 SBQ 4314 UKUR BINAAN IV

    15 SBC 2273 CONSTRUCTION TECHNOLOGY AND DESIGN

    16 SBC 1512 PRINCIPLE OF LAW IN MALAYSIA

    1

    17 SBQ 3424 BUILDING ECONOMICS

    18 SBC 2344 CONSTRUCTION PROJECT MANAGEMENT 

    19 SBC 3533 CONSTRUCTION AND DEVELOPMENT LAW

    20 SBQ 3622 PRINCIPLES OF MANAGEMENT 

    21 SBC 1123 ENGINEERING SURVEY

    22 SBQ 4324 INFORMATION MANAGEMENT 

    23 SBQ 1712 PROFESSIONAL PRACTICE I

    24 SBQ 2314 UKUR BINAAN I

    25 SBQ 1322 INTRODCUTION TO CONSTRUCTION...

    26 SBC 2263 CONSTRUCTION PLANT AND TEMPORARY...

  • 8/17/2019 utm FAB April 2010

    3/175

    30000010222992

    UNIVERSITI TEKNOLOGI MALAYSIA

    Fakulti Alam Bina

    FINAL EXAMINATION 

    SEMESTER II SESSION 2009/2010

    COURSE CODE

    COURSE

    PROGRAM

     TIME

    DATE

    LECTURER

    PERCENTAGE

    SBQ 2122/SBC 1142

    STRUCTURAL DESIGN

    1 SBQ/1 SBC

    2 HOURS

    5 APRIL 2010

    IR. MOHAMAD SALLEH YASIN

    PROF. MADYA. BADRUL HISHAM

    AHMAD

    50 %

    INSTRUCTION: 

    1. Answer ONE (1) questions from Section A and ONE (1) question from  

    Section B.

    2. This is an open book examination.

     THIS QUESTION PAPER CONSIST OF 5 PAGES INCLUDING THE

    FRONT PAGE

  • 8/17/2019 utm FAB April 2010

    4/175

    SBQ 2122

    Section A

    Al. a)

    b)

    Explain the roles of structural designer in building construction project.

    (8 marks) 

    In the design process, engineers always use “partial safety factor” to

    converts characteristic values into design values. Explain why they

    need such factors and gives examples of the factors.

    A 250 x 600 mm rectangular reinforced concrete beam of span 9.0 m is

    shown in Figure Al. The beam is required to support an ultimate

    uniformly distributed load of 20 kN/m and two ultimate point loads of

    30’kN and 50 kN as shown in the figure. Use concrete grade C30 and

    steel grade 500 and concrete cover 30 mm.

    i. Sketch the shear force and bending moment diagrams of the

    beam by showing all the important values.

    ii. Design main reinforcement for bending.

    iii. Design shear reinforcementiv. Sketch the detailing of reinforcements designed in (b) and (c).

    (8 marks) 

    (34 marks) 

    30 kN 50 kN

    1 20 kN/m A

    650

    3m ^ 3m ^ j,,

    250

    Cross-section

    FIGURE Al

  • 8/17/2019 utm FAB April 2010

    5/175

    SBQ 2122 3

    A2. a) Reinforced concrete structure is a combination of several main elements.

    State three of the elements and explain the behavior of each element when

    subjected to loading. The explanation should be guided with sketch

    showing the deformed shape of the element and the location of mainreinforcement.

    (12 marks )

    b) Figure A2 shows a reinforced concrete slab 4.0 m x 5.0 m, simply

    supported on two reinforced concrete beams. This slab is required to

    support a uniformly distributed live load of 3.0 kN/m2 and floor finishes

    of 1.0 kN/m2. The design data are as follow:

    Characteristic strength of concrete,^Characteristic strength of reinforcement, f y  

    Concrete cover, c

    Bar size

    = 30 N/mm2

     500 N/mm2 

    = 25 mm

    = 12 mm

    A

    4 m

  • 8/17/2019 utm FAB April 2010

    6/175

    SBQ 2122 | 4

    Section B

    Bl. a) List down three differences between pre-tensioned and post-tensionedprestressed concrete beam.

    (10 marks) 

    b) Explain in your own words the reasons why there is a reduction in

    prestressing force after a long period of time.

    (10 marks) 

    c) A pre-tensioned prestressed concrete beam is simply supported over a

    span of 16 m and carries a total uniformly distributed service load of

    19.5 kN/m, in addition to its own self weight. A standard TY beam

    section as shown in Figure Bl is to be used. The following information

    is given:

    • Class 2 category; f ci = 40 N/mm2; f cu = 50 N/mm

    2

    • a = 0.9; (3 = 0.72

    i) Calculate the stress limits at transfer and service

    ii) Select the most economical section for the beam. (Choose between

     TY9 and TY10)

    (30 marks) 

    SECTJON PROPERTIES Design self weight per unit volume has been token ds 25 kN/m*

    Section No Depth mm Area mrn! Yb mm Zt mm1 * 106 Zb mm1 x 106App self weight 

    kN./m

    TY1 400 184155 140 6.5B 12.22 4.60

    TY2 450 195538 155 8.40 15.98 4.83

    TY3 500 207936 173 10.85 20.51 5.20

    TY4 550 221351 194 13.97 25.68 5.54

    W5 600 235780 216 47.70 31.47 5.90

    TT6 650 251225 240 22.11 37.77 6.28

    vn  700 267685 266 27.23 44.43 6,70TVS 750 285163 294 33,10 31.34 7.13

    TY9 800 303655 322 39-61 58.80 7.59

    TY10 850 323157 352 46.93 66*40 8.08

    FIGURE Bl

    4

  • 8/17/2019 utm FAB April 2010

    7/175

    SBQ 2122 I 5

    B2. a) Sketch the various stages of a structural steel beam undergoing

    bending until it collapse

    (10 marks) 

    b) Given two sections, one classified as plastic while the other as

    compact. Which section will carry bigger load at collapse and explain

    why?

    (10 marks) 

    c) The slab shown in Figure B2 has an overall depth of 200 mm is

    designed to carry an imposed load of 3 kN/m2 plus floor finishes and

    ceiling loads of 1 kN/m2. It is supported by structural steel beams

    457 x 191 x 82 UB (grade S275) and these beams are simply supported

    at their ends. All the beams are fully laterally restrained and there is

    nominal torsional restrain at supports.

    i) Calculate the total service and ultimate loads on beam B/l-2 and

    Beam 2/A-C

    ii) Check whether the bending and shear capacities for beam B/l-2 are

    adequate.

    iii) Calculate the deflection for beam 2/A-C and check whether it is

    within the allowable limit.

    (30 marks )

    |3.5 ro r . ! . , _________ .J-Sffl.

    FIGURE B2

  • 8/17/2019 utm FAB April 2010

    8/175

    UTMUNIVERSITI TEKNOLOGI MALAYSIA

    Fakulti Alam Bina

    FINAL EXAMINATION 

    SEMESTER II SESSION 2009/2010

    COURSE CODE

    COURSE

    PROGRAM

     TIME

    DATE

    LECTURER

    PERCENTAGE

    SBC 1422 

    ESTIMATING I

    1 SBC

    2 HOURS

    5 APRIL 2010 

    NORAZAM B. OTHMAN 

    50 %

    ARAHAN:

    INSTRUCTION: 

     Jawab mana-mana 4 (empat) soalan.

    Answer any 4 (four) questions.

    Markah setiap soalan adalah seperti yang dinyatakan.

    Marks for each question is as stated.

    r0

     THIS QUESTION PAPER CONSIST OF 7 PAGES INCLUDING THE FRONT PAGE

    1

  • 8/17/2019 utm FAB April 2010

    9/175

    SOALAN 1

     Jelaskan penggunaan kaedah anggaran unit dan kaedah anggaran keluasan

    lantai yang lazimnya digunakan dalam mendapatkan anggaran kos

    pembinaan termasuk kebaikan dan keburukannya.

    (25 markah)

    QUESTION 1

    Explain the usage of the unit and superficial area estimating methods  

    commonly used to derive the estimated cost of construction including its  

    advantages and disadvantages.

    (25 marks) 

    SOALAN 2

     Terangkan ciri-ciri tapak bina seperti lokasi, jenis dan saiz

    bangunan/pembinaan, kemudahan sedia ada, keadaan tanah serta

    topografi yang mungkin memberi kesan kepada penilaian keseluruhan kos

    projek dan harga tender.

    (25 markah)

    QUESTION 2 

    Explain the characteristics of the site such as location, type and size of the  

    building/construction, available existing services, ground conditions and  

    topography which may affect the overall assessment of the cost of project and  

    the tender price.

    (25 marks) 

    72

  • 8/17/2019 utm FAB April 2010

    10/175

    SOALAN 3

    Dengan menggunakan kaedah anggaran ‘superficial area’, tunjukkan

    pengiraan anggaran kos seterusnya harga tender pembinaan untuk projek

    dengan ciri-ciri berikut:

     Tajuk projek

    Lokasi

    Ketinggian

    Rekabentuk

    Lain-lain

    : Hotel 3 bintang untuk Budget™ Services Sdn Bhd

    : Tainan Universiti Skudai (bersebelahan kompleks

    membeli belah Jay a Jusco)

    : 5 tingkat (atas tanah), 1 tingkat (tempat letak

    kereta bawah tanah)

    : Bilangan bilik tetamu : 50

    Bentuk segiempat tepat

    Setiap tingkat 70.0m panjang x 20.0m lebar

     Tingkat 1 untuk lobi, restoren, dapur, pejabat

    pengurusan, bilik seminar, perkhidmatan cucian

    pakaian

    : Pembinaan akan bermula Julai 2010

     Jika setiap bilik direkabentuk untuk 2(dua) tetamu hotel, apakah kadar unit

    kos semasa setiap tetamu hotel jika kos perkhidmatan mekanikal dan

    elektrik (M&E) serta kos perkakasan dalaman adalah 40% dari kos

    pembinaan?

    Data projek lepas antara tahun 1998-2006 untuk lokasi Kuala Lumpur

    (Lampiran A) boleh digunakan sebagai rujukan dan pemilaian

    (25 markah)

    b

    3

  • 8/17/2019 utm FAB April 2010

    11/175

    QUESTION 3 

    Using ‘superficial area’ method of estimating, show the calculations of the  

    estimated cost and the tender price offer for the construction of a project with  

    the following characteristics: 

    Project title  

    Location 

    Height 

    Design 

    Others 

    : 3 star hotel for Budget?™ Services Sdn Bhd 

    : Taman Universiti Skudai (next to Jaya Jusco 

    Shopping complex) 

    : 5 floors (above ground), 1 floor (basement car park) 

    : Number of rooms : 50 

    Rectangular shape 

    Each floor 70. Om long x 20. Om wide 

    I st  floor for lobby, restaurant, kitchen, administrative  

    offices, seminar rooms, laundry services 

    : Construction will start in July 2010 

    If each room is designed to cater for 2(two) guests, what will be the present  

    unit cost rate for each guest if the cost of the mechanical and electrical  

    services (M&E) and the cost of interior decorations is 40% of the cost of  

    construction? 

    Data of previous projects for the year 1998-2006for Kuala Lumpur (Appendix  

    A) is given as reference and assessment 

    (25 marks) 

    9

    4

  • 8/17/2019 utm FAB April 2010

    12/175

    SOALAN 4

    Lakarkan hubungkait pihak-pihak yang terlibat dalam kaedah perolehan

    tradisional dan jelaskan bagaimana kaedah perolehan tersebut memberi

    implikasi kepada harga tender.

    (25 markah)

    QUESTION 4 

    Sketch out the relationship of all parties involved in a traditional procurement  

    method and explain how this procurement method affect the tender price.

    (25 marks) 

    SOALAN 5

     Terangkan setiap langkah yang terdapat dalam prosedur tender yang

    bermula dari perlawaan membuat tawaran sehinggalah surat setujuterima

    dikeluarkan kepada kontraktor.

    (25 markah)

    QUESTION 5 

    Explain each steps in the tendering procedure commencing from the invitation  

    to treat to the issuance of the letter of acceptance to the contractor.

    (25 marks) 

    1 05

  • 8/17/2019 utm FAB April 2010

    13/175

    SOALAN 6

     Terdapat berbagai-bagai sumber data kos yang boleh dirujuk dalam

    penyediaan anggaran kos seterusnya harga tender. Jelaskan bentuk sumber

    maklumat yang diterbitkan atau boleh diperolehi dari Jabatan Kerja Raya

    (JKR), Pertubuhan Juruukur Malaysia (ISM), firma perunding Juruukur

    Bah an, kontraktor lain dan Jabatan Perangkaan Malaysia.

    (25 markah)

    QUESTION 6 

    There are many types and sources of cost data that can be referred to when  

     preparing cost estimate and tender price. Explain these sources of information  

    that are produced by or obtainable from Jabatan Kerja Raya (JKR), 

    Pertubuhan Juruukur Malaysia (ISM), Quantity Surveying consultant firms, 

    other contractors and Jabatan Perangkaan Malaysia.

    (25 marks) 

    1 1

    6

  • 8/17/2019 utm FAB April 2010

    14/175

    LAMPIRAN A/APPENDIX A

    Hotels

    RMIm2

    Resort Hotel indusive of F.F.&E.*■■■*3‘Star budge! hotels, ditto**"*5-star luxury hotels, ditto*

    * Cost are at lower Tange cost

     Alcost are at anaverage level unlessotherwise stated

    12 

    7

  • 8/17/2019 utm FAB April 2010

    15/175

    SBQ 3522

    UTMUNIVERSITI TEKNOLOGI MALAYSIA

    Fakulti Alam Bina

    FINAL EXAMINATION SEMESTER II SESSION 2009/2010

    COURSE CODE

    COURSE

    PROGRAM

     TIME

    DATE

    LECTURER

    PERCENTAGE

    SBQ 3522 

    LEGAL STUDIES III 

    2 SBQ

    2 ya HOURS (2.30 PM - 5.00 PM)

    6 APRIL 2010 

    NOLIZA ISA 

    40 %

    ARAHAN:INSTRUCTION: 

    1. Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang

    sama.

    Answer four (4) questions only. All questions carry equal marks.

    2. Kanun Tanah Negara 1965 di sediakan.

    National Land Code 1965 is provided.

     THIS QUESTION PAPER CONSIST OF 6 PAGES INCLUDING THE FRONT PAGE

    1

    1 3

  • 8/17/2019 utm FAB April 2010

    16/175

    SBQ 3522

    Soalan 1

     Timbangtara sering dikatakan sebagai satu mekanisma penyelesaian

    pertikaian sivil yang berkesan yang dibuat secara judisial. Penimbangtara

    memperolehi kuasa menyelesaikan pertikaian dari persetujuan kedua-dua

    pihak yang bertikaian di bawah peijanjian timbangtara. Award

    penimbangtara adalah muktamat dan mengikat.

    Bincangkan kelebihan dan kekurangan timbangtara sebagai satu kaedah

    penyelesaian pertikaian.

    (25 markah)

    Question 1Arbitration is often said to be an efficient method of resolving civil disputes  

    conducted in judicial manner. The arbitrator derives his power to resolve  

    dispute from the consent of the disputing parties under the arbitration  

    agreement. The arbitrator’s award is final and binding on the parties.

    Discuss the advantages and disadvantages of arbitration as a method of  

    resolving disputes.

    (25 marks) 

    Soalan 2

    Seseorang pemegang Lesen Pendudukan Sementara di bawah Bab Dua,

    Bahagian Empat, Kanun Tanah Negara 1965 tidak “memiliki” tanah yang ia

    didudukinya sepertimana yang dimiliki oleh orang yang diberimilik tanah

    kerajaan atau pajakan negeri. Walaubagaimanapun, seksyen 44 Kanun

     Tanah Negara 1965 menjamin hak pemegang Lesen Pendudukan Sementara

    berhubung dengan kegunaan dan kenikmatan eksklusif, hak sokongantanah dan hak ekses.

    Dengan merujuk kepada peruntukan dalam Kanun Tanah Negara

    berhubung dengan Lesen Pendudukan Sementara dan kes-kes mahkamah

     yang berkaitan huraikan sifat-sifat Lesen Pendudukan Sementara dan hak-

    hak seseorang pemegang lesen tersebut.

    (25 markah)

    2

    1 k 

  • 8/17/2019 utm FAB April 2010

    17/175

    SBQ 3522

    Question 2 

    A holder of a Temporary Occupation License (“TOL”) under Part Four, Chapter  

    Two of the National Land Code 1965 does not “own” the land as in the case of  

    a person who has been alienated with a State land or a State lease. 

    Nevertheless, section 44 of the said Code guarantees the rights of such a TOL  

    holder with respect to exclusive use and enjoyment of the right of support and  

    the right of access.

    With reference to the provisions in the National Land Code 1965 and the  

    relevan case law, elaborate the nature of the Temporary Occupation License  

    and the rights of the holders.

    (25 marks) 

    Soalan 3

    Mengikut pengamatan Lord Diplock dalam kes ENG MEE YONG & ORS. v.

    LECHUMANAN (1979) 2 MLJ 212 sistem kaveat di Malaysia merupakan

    gantian setempat kepada doktrin notis ekuiti di bawah undang-undang

    Inggeris. Beliau juga menyamakan kaveat seperti injunksi interlokutori yangmenyekat penanggung kaveat daripada membuat sebarang urusniaga

    berhubung dengan tanahnya sehingga mahkamah memutuskan tuntutan

    pengkaveat terhadap tanah berkenaan. Matlamat kaveat adalah untuk

    memelihara atau mengekalkan status quo   pihak-pihak yang berkenaan

    sementara menunggu pertikaian mereka di putuskan oleh mahkamah.

    Dengan merujuk kepada kenyataan di atas, peruntukan yang berkaitan

    dalam Kanun Tanah Negara 1965 dan kes-kes yang relevan, huraikan

    fungsi kaveat.

    (25 markah)

    3

  • 8/17/2019 utm FAB April 2010

    18/175

    SBQ 3522

    Question 3 

    Lord Diplock observed in ENG MEE YONG & ORS. v. LECHUMANAN (1979) 2  

    MLJ 212 that the caveat system in Malaysia has served as a local substitute  

     for the equitable doctrine of notice under English land law. His lordship also  

    said that the caveat under the Torrens System has often been likened to a  

    statutory injunction of an interlocutory nature restraining the caveatee from  

    dealing with the land pending the determination by the court of the caveator’s  

    claim to title to the land. The caveat is principally aimed at maintaining the  

    status quo of the parties pending the resolution of their disputes by the court.  

    With reference to the above statement, the relevant sections in the National  

    Land Code and the case law, explain the functions of caveat.

    (25 marks) 

    Soalan 4

    Huraikan kes-kes berikut:-

    (i) TEH BEE v. K. MARUTHAMUTHU [1977] 2MLJ 7

    (10 markah)

    (ii) MOHAMMAD BUYONG v. PEMUNGGUT HASIL TANAH GOMBAK &

    ORS[1982] 2 MLJ 53

    (15 markah)

    Question 4 

    Elaborate on these cases:- 

    (i) TEH BEE v. K. MARUTHAMUTHU [1977] 2MU 7 

    (10 marks) 

    (ii) MOHAMMAD BUYONG v. PEMUNGUT HASIL TANAH GOMBAK & ORS  

    [1982] 2 MLJ 53 

    (15 marks) 

    1 G

  • 8/17/2019 utm FAB April 2010

    19/175

    SBQ 3522

    Soalan 5

    En. Ali adalah tuan punya berdaftar sekeping tanah di bawah kategori

    bangunan. Beliau adalah seorang usahawan dan mahu memperluaskan

    perniagaannya. En. Ali telah menggadaikan tanah tersebut kepada

    Maybank, Skudai sebagai sekuriti pinjaman. Di sebabkan kemelesetan

    ekomoni, En. Ali sukar untuk membuat pembayaran bulanannya. Maybank,

    Skudai telah melaksanakan suatu pengurusan kes untuk menolong En. Ali

    dalam membuat pembayaran bulanannya, namun En. Ali masih enggan,

    gagal dan cuai untuk membuat pembayaran balik pinjamannya.

    Nasihatkan Maybank, Skudai akan hak-hak mereka.

    (25 markah)

    Question 5 

    En. Ali is a registered proprietor of a piece of land held under building  

    category. He is a business man and intends to expand his business. He then  

    charged the land to Maybank, Skudai as a security for a loan. Due to the  

    economy recession, he found it difficult to service his monthly loan  

    instalments. Maybank, Skudai extended assistance to En. Ali in undergoing a  

    case management to enable him to pay the said monthly instalments, but En.  

    Ali still failed, refused and neglected to make the monthly repayment of his  loan.

    Advise Maybank, Skudai on their rights.

    (25 markah) 

    Soalan 6

    En. Ahmad adalah tuan punya tanah yang bersebelahan dengan jalan raya.

    Pihak Berkuasa Negeri, melalui Jabatan Keija Raya telah mewartakan

    melalui Seksyen 4 Akta Pengambilan Balik Tanah 1960 satu pengisytiharan

    pengambilan balik tanah untuk projek pelebaran jalan raya tersebut. Enam

    bulan selepas warta tersebut diterbitkan, suatu peristiharan melalui

    Seksyen 8 Akta tersebut di keluarkan. En. Ahmad tidak puas hati bahawa

    sebahagian daripada tanahnya terlibat dalam pengambilan balik tanah

    tersebut.

    r  _ 

    5 ;

    1 7

  • 8/17/2019 utm FAB April 2010

    20/175

    SBQ 3522

    Nasihatkan En. Ahmad tentang haknya untuk membantah pengambilan

    balik tanahnya.

    (25 markah)

    Question 6 

    En. Ahmad is a registered proprietor of land, adjacent to the main road. The  

    State Authority through its agency, Public Work Department has gazetted vide  

    Section 4 of the Land Acquisition Act 1960 a declaration for acquisition of land  

     for the purpose of the main road upgrading project. Six months after the  

     publication of the said gazette, a declaration was made vide Section 8 of the  

    Act. En. Ahmad was not happy that part of his land was identified to be  

    acquired under the acquisition.

    Advise En. Ahmad on his right to object against the acquisition of his land.

    (25 marks) 

  • 8/17/2019 utm FAB April 2010

    21/175

    SBC 3842

    UTMUNIVERSITI TEKNOLOGI MALAYSIA

    Fakulti Alam Bina

    FINAL EXAMINATION

    SEMESTER 2 SESSION 2009/2010

    COURSE CODE SBC 3842

    COURSE BUILDING MAINTENANCE

    PROGRAM 3 SBC

     TIME 2 HOURS (2.30 pm - 4.30 pm)

    DATE 6 APPRIL 2010

    LECTURER DR. YAHYA MOHAMAD YATIM

    PERCENTAGE 40 %

    ARAHAN:

    INSTRUCTION: 

     Jawab 4 SOALAN Sahaja.

    Answer 4 Questions Only.

    Di mana perlu, nyatakan andaian yang anda buat dengan jelas untuk

    disesuaikan dengan jawapan yang anda beri.

    Where necessary, please make your own assumptions on any aspects to suit 

    your answers.

    KERTAS SOALAN INI TERDIRI DARIPADA _4_ MUKA SURAT  TERMASUK

    MUKA SURAT HADAPAN.

    1 9

  • 8/17/2019 utm FAB April 2010

    22/175

    SBC 3842

    • Penyelenggaraan terdiri daripada beberapa aktiviti seperti memastikan

    setiap peralatan and peralatan kemudahan sentiasa berada dalam

    keadaan yang baik dan boleh beroperasi sekiranya diperlukan.

    • Penyelenggaran juga dikenali sebagai satu cabang dalam sistem

    pengurusan asset iaitu memastikan setiap asset tersebut sentiasa

    berada dalam keadaan boleh beroperasi pada tahap yang optimum.

    Berdasarkan kepada kedua-dua kenyataan diatas, patut atau tidak sebuah

    organisasi yang mempunyai jumlah asset yang banyak, contohnya bangunan,

    mengajikan staf untuk melakukan kerja-keija penyelenggaraan. Terangkan

    peranan yang perlu dilakukan oleh saorang pengurus penyelenggaraan yangdilantik oleh organisasi.

    (25 Markah)

    QUESTION 1

    • Maintenance encompasses all those activities that maintain facilities &  

    equipment in good working order so that systems can perform as  

    intended.

    • Maintenance can also be termed as asset management system which  

    keeps them in optimum operating condition.

    Based on the above statements, should or should not an organization with a  

    number of assets e.g. buildings, employ in-house maintenance staff. Describe  

    the role of in-house maintenance manager.

    (25 Marks) 

    SOALAN 2

    Berdasarkan kepada Kerangka Pengurusan Penyelenggaran, terangkan skop

    kerja bagi penyelenggaraan bangunan. Rancangkan kerja-keija

    penyelenggaran bagi membaikpulih sebuah rumah dua tingkat yang

    mengalami kerosakan bumbung, cat yang lusuh dan jubin lantai yang

    tertanggal.

    (25 Markah)

    SOALAN 1

    2 02

  • 8/17/2019 utm FAB April 2010

    23/175

    SBC 3842

    QUESTION 2 

    Based on the Maintenance Management Framework (MMF), explain the scopes  

    of work for the building maintenance. Write a maintenance plan to repair a  

    double storey house with roof defect, painting peeled and floor tiles broken.

    (25 Marks) 

    SOALAN 3

    Kebanyakan kecacatan bangunan adalah disebabkan oleh lembapan,

    penggunaan bah an binaan yang salah, rekabentuk bangunan yang lemah

    dan faktor alam sekitar. Akibatnya, selepas beberapa bulan bangunan

    diduduki oleh pembeli, keretakan dan kebocoran air akan mula kelihatan.

    (i) Terangkan jenis-jenis keretakan dan di mana ia biasanya

    berlaku di dalam bangunan.

    (10 Markah)

    (ii) Nasihatkan pembeli bagaimana masalah keretakan dan

    kebocoran air di dalam bangunan mereka boleh dibaikpulih.

    (15 Markah)

    QUESTION 3 

    Most building defects are caused by dampness, defective materials used, poor  

    building design and environmental factors. The obvious result was building  

    cracks and water leakage appeared after a few month of building being  

    occupied by the purchaser.

    (i) Explain the types of cracks and where it will normally be found in  

    a building.

    (10 Marks) 

    (ii) Advice purchaser how to rectify cracks and water leakage  

     problems in their building.

    (15 Marks) 

    SOALAN 4

    Bincangkan faktor-faktor yang perlu dipertimbangkan apabila membuat bajet

    bagi kerja-kerja penyelenggaraan.

    2 13

  • 8/17/2019 utm FAB April 2010

    24/175

    SBC 3842

    (25 Markah)

    QUESTION 4 

    Describe the factors to be considered when preparing budget for maintenance  

    works.

    (25 Marks) 

    SOALAN 5

    Bincangkan keperluan bagi menyediakan laporan penyiasatan dilapidation  

    bagi menyiasat tahap kondisi sesebuah bangunan dan terangkan perkara-

    perkara yang perlu dimasukkan dalam laporan tersebut.

    (25 Markah)

    QUESTIONS 

    Describe the necessity of having a dilapidation survey report in building  

    condition survey and explain the items that should be included in the report.

    (25 Marks) 

    SELAMAT MAJU JAYA 

    All the Best 

    2 24

  • 8/17/2019 utm FAB April 2010

    25/175

    SBQ 4912

    UTMUNIVERSITI TEKNOLOGI MALAYSIA

    Fakulti Alam Bina

    FINAL EXAMINATION 

    SEMESTER II SESSION 2009/2010

    COURSE CODE

    COURSE

    PROGRAM

     TIME

    DATE

    LECTURER

    PERCENTAGE

    SBQ 4912

    VALUE MANAGEMENT 

    2SBC/3SBQ

    2 HOURS (9.00 AM- 11.00 AM)

    9 APRIL 2010

    P.M. WAN YUSOFF WAN MAHMOOD 

    : 40 %

    ARAHAN:

    INSTRUCTION: 

     Jawab'empat (4) soalan sahaja.

    Soalan satu (1) adalah wajib.

    Semua soalan membawa markah yang sama.

    Answer four (4) questions only.

    Question one (1) is compulsory 

    All questions carry equal marks.

     THIS QUESTION PAPER CONSIST OF 12 PAGES INCLUDING THE FRONT PAGE

  • 8/17/2019 utm FAB April 2010

    26/175

    SBQ 4912

    Anda telah dilantik sebagai Perunding Pengurusan Nilai untuk projek

    cadangan pembinaan Rumah Kelab (Club House) bagi sebuah padang golf

    eklusif yang terletak berhampiran Lapangan Terbang Antarabangsa Sultan

    Ismail, Senai, Johor. Pihak klien telah meminta nasihat anda untuk

    memilih beberapa jenis penutup bumbung yang sesuai digunakan untuk

    rumah kelab berkenaan.

    Berdasarkan beberapa kriteria yang anda cadangkan, buat analisa

    pemilihan beberapa jenis penutup bumbung yang patut digunakan daripada

    beberapa jenis yang ada dipasaran. Gunakan borang-borang diLampiran ‘A’

    dan ‘B’ bagi membantu anda menilai cadangan yang terbaik.

    (25 markah)

    SOALAN 1

    QUESTION 1

    You are appointed as a Value Management Consultant for the proposed  

    construction of Club House for an exclusive golf course located adjencent to the  

    Sultan Ismail International Airport, Senai, Johor. The client seeks your advice  

     for the selection of a few type of suitable roof covering for the club house.

    Based on your own criteria, analyse the selection of various type of roof  

    covering available in the market. Used forms in the Appendix A and B to  

    evaluate the best proposal.(25 marks) 

    2

    2 4

  • 8/17/2019 utm FAB April 2010

    27/175

    SBQ 4912

    a) Fasa kreativiti merupakan peringkat yang penting didalam sesuatu

    bengkel pengurusan nilai. Bincangkan pendekatan yang perlu

    diambil oleh ahli kumpulan pengurusan nilai bagi memastikan ianya

    dilaksanakan secara efektif.

    (13 markah)

    b) Huraikan dua (2) jenis teknik yang biasa digunakan untuk

    meningkatkan pemikiran kreatif dikalangan ahli kumpulan

    pengurusan nilai.

    (12 markah)

    SOALAN 2

    QUESTION 2 

    a) Creativity phase is an important stage in value management workshop. 

    Discuss the approach to be taken by the value management team to  

    ensure it is effectively conducted.

    (13 marks) 

    b) Explain two (2) types of techniques used for promoting creative thinking  

    to members of the value management team.

    (12 marks) 

    3

  • 8/17/2019 utm FAB April 2010

    28/175

    SBQ 4912

    Borang kontrak FIDIC versi terkini telah memasukkan klausa berkaitan

    Pengurusan/ Kejuruteraan Nilai yang menyediakan peruntukan bagi

    ‘Cadangan Pertukaran Pengurusan Nilai’ (VMCP).

    a) Apakah yang dimaksudkan dengan ‘Cadangan Pertukaran

    Pengurusan Nilai’ (VMCP) serta terangkan kaedah perlaksanaannya.

    (10 Markah)

    b) Bincangkan elemen-elemen yang mesti dimasukkan didalaxn sebuah

    ‘Cadangan Pertukaran Pengurusan Nilai’ (VMCP).

    (15 Markah)

    SOALAN 3

    QUESTION 3 

    Latest FIDIC Form of Contract incorporates the Value Engineering/ 

    Management clause that caters for Value Management Change Proposal  

    (VMCP) provisions.

    a) What is meant by Value Management Change Proposal (VMCP) and  

    explain the method of their implementation.

    (10 Marks) 

    b) Discuss the elements that must be included in the Value Management  Change Proposal (VMCP).

    (15 Marks) 

  • 8/17/2019 utm FAB April 2010

    29/175

    SBQ 4912

    Universiti Teknologi Malaysia bercadang untuk membangunkan sebuah

    kampus cawangan baru di Desaru, Kota Tinggi, Johor. Pekeliling Unit

    Perancang Ekonomi, Jabatan Perdana Menteri Bilangan 3 Tahun 2009 telah

    memutuskan supaya semua program dan projek kerajaan yang bernilai

    RM50 juta dan ke atas perlu menggunakan pengurusan nilai. Oleh itu,

    pihak pejabat pengarah kerja, Universiti Teknologi Malaysia mahukan

    supaya cadangan konsep projek berkenaan dirujuk dan dinilai oleh

    perunding pengurusan nilai. Sebagai perunding pengurusan nilai yang

    dilantik untuk projek tersebut, anda dikehendaki menyediakan satu laporan

     yang menerangkan tentang bagaimana anda akan melaksanakan kajian

    berkenaan.

    (25 markah)

    SOALAN 4

    QUESTION 4 

    Universiti Teknologi Malaysia intends to develop a new branch campus at  

    Desaru, Kota Tinggi, Johor. Circular of Economy Planning Unit, Prime Minister  

    Department Number 3 Year 2009 decided that all government programs or  

     projects value RM 50 millions and above have to apply Value Management. 

    Hence, Work Director Office, Universiti Teknologi Malaysia wants the concept  

     proposal for the project to be referred and evaluated by a value management  

    consultant.  As an appointed consultant, you are required to prepare a report  

    explaining how you are going to implement the study.

    (25 marks) 

    5

  • 8/17/2019 utm FAB April 2010

    30/175

    SBQ 4912

    a) Apakah yang dimaksudkan dengan Kos kitaran hayat (LCC) dan

    terangkan mengapakah ia penting dalam kajian pengurusan nilai.

    (10 markah) 

    b) Anda dikehendaki mencadangkan sistem penyaman udara kepada

    klien anda. Terdapat dua pilihan yang ada untuk dinilai dan

    maklumatnya adalah seperti berikut: (Kadar diskaun yang digunakan

    adalah 10% - Rujuk lampiran C untuk jadual yang berkaitan).

    SOALAN 5

    Sistem A Sistem B

    Kos Permulaan termasuk

    Pemasangan.

    RM50.000 RM75,000

    Caj Tenaga Tahunan RM2.400 RM 1,500

    Persenggaraan (Setiap 5 Tahun) RM2,500 RM 1,500

     Jangka Hayat Sistem 20 Tahun 20 Tahun

    Berdasarkan kesamaan tahunan (annual equivalent) pebelanjaan

     yang terlibat sistem manakah yang akan anda cadangkan kapada

    klien anda.

    (15 markah) 

    QUESTION 5 

    a) What is meant by Life cycle costing (LCC) and explain why is it  

    important in Value Management study.

    (10 marks) 

  • 8/17/2019 utm FAB April 2010

    31/175

    SBQ 4912

    b) You are required to recommend an air-conditioning system to your  

    client Two choices are available for assessment and the information  

    available are as follows: ( a 10% discount rate is applied ) - Refer  appendix C for related tables.) 

    System A  System B 

    Initial cost including installation  RM50,000  RM75,000 

    Annual Energy Charges  RM2,400  RM1,500 

    Maintenance (every 5 years)  RM2,500 RM 1,500  

    Life of system  20 years 20 years  

    Based on the annual equivalent of the expenses incurred, which system  

    would you recommend to your client? 

    (15 marks) 

    SOALAN 6

    a) Terangkan bagaimana model kos disediakan dan bincangkan

    kepentingan kos model dalam kajian pengurusan nilai.

    (15 markah)

    b) Apakah yang anda faham tentang Hukum ‘Pareto’ serta terangkan

    bagaimanakah ia boleh membantu didalam kajian pengurusan nilai.

    (10 markah)

    QUESTION 6 

    a) Explain how to prepare a cost model and discuss the importance of cost  

    model in value management study.

    (15 marks) 

    b) What is meant by Pareto Law and explain how they can help during  

    value management study.

    (10 marks) 

    2 V

  • 8/17/2019 utm FAB April 2010

    32/175

    Appendix A

    JUDICIAL PHASE   DETERMINING WEIGHTS FOR  EVALUATION

    STUDY TITLE

    GOALS, DESIRED, CRITERIA, F FEATURES

    UNCTIONS,   RAWSCORE

    ASSIGNEDWEIGHT

    A.

    B.

    C.

    D.

    E. ,

    ■F.

    ..

    G. /

    H.

    J.

    TOTAL

    B'   C   D   E F   G   H   J

    HOW IMPORTANT A IB

    3. MAJOR PREFERENCE-

    c

    2. MEDIUM PREFERENCE •0

    1. MiRMOR PREFERENCE   E

    % EQUAL PREFERENCE

    G

    H

  • 8/17/2019 utm FAB April 2010

    33/175

    I Appendix B

    EVALUATION MATRIX

    List the best ideas 

    to see 

    which has best 

    trade-off or 

    optimm ization 

    potential

    -

    .

    IDEAS   WTASSIGNED VALUE

    TOTAL 

    PRESENT WAY   5   E   E E   E   E   E   E E . E RANK4   VG   VG   VG   VG VG   VG   VG VG VG3   G   G   G G'   G   G   G G G2   F   F   F F F   F   F F F1   P   P P   P P   P   P P   P

    SUBTOTAL

    IDEA1

    5 E   E   E E E   E   E E E RANK4   VG   VG   VG VG VG   VG   VG   VG   VG3   G   G   G G G   G   G G G2   F   F F   F   F F   F   F F1   P   P   P   P P   P   P P P

    SUB

    TOTAL

    IDEA 2   5 E   E   E   • E   E   E   E E E RANK4   VG VG r   VG   VG   VG   VG   VG VG   VG3   G   G   G G G   G   G   G G

    2   F   F F F F   F   F F   F1   P   P P P P   P   P P P

    SUB

    TOTAL

    IDEA 3   5   E   E   E   E E   E   E .   E E RANK4   VG   VG   VG VG VG   VG VG VG VG

    3   G   G   G   G G   G   G G   G2   F   F F F F   F   F   F F1   P P   P   P P   P   P P   P •

    SUBTOTAL

    IDEA 4   5   E E E   E E   E   E   E   E RANK

    4   VG   VG   VG   VG VG   VG VG VG VG

    3   G   G G   G G   G G G G2   F   F   F F F   F F F   F

    1   P   P   P P P   P   P   P   P

    SUB

    TOTAL ....

    IDEAS   5   E E   E E E   E E   E E RANK

    4   VG VG VG VG VG VG VG VG   VG

    3   G G G G G G G G   G

    2   F   F   F   F F   F   F   F F

    1   P   P   P P P   P P   P P

    SUB

    TOTAL

    SEEK THE BEST - NOT PERFECTION

    9  3 1

  • 8/17/2019 utm FAB April 2010

    34/175

    *OLE B Pi e i o n i  Value of $1 Duo ot the End of n Potions

    PVlf, „ = -------- !—-(I < M

    Period

    n 1 % 2 v. 3% 4 V. 5% 6 V. 7% 8 % 9 V. 1 0 % 1  1 V. 12 V.

    I 99C 900J 9709 9615 9524 9434 9346 9259 9174 9091 9009 0929

    2 90:3 9612 9426 92-iC 9070 0900 8734 0573 8-117 026-1 81 16 7972

    3 9*:6. 9423 9! 51 8H90 6638 0396 0163 7930 7722 7513 "731 2 7 I 10

    4 9C-!0 9238 B8D5 8 S« 8 0227 7921 7629 7350 7084 6030 6507 6355

    5 95>5 9057 8626 0219 7035 7473 7130 6806 6499 6209 5935 5674

    6 9-«?0 nnoo 0375 7003 7462 7050 6063 6302 :.nr>3 5(i-l5 5316 SHOO7 93:' 8700 ni3t 7099 7107 6G51 6227 51)35 54 70 -- 502 ■1017 4523

    8 9 rjs P535 ?R'J4 7307 6  ’ 6 8 6274 5B20 5103 5019 •1065 4 339 ■1039

    9 91  3 U360 7664 7026 G-1-1G 5910 5409 5002 •1604 .1 2 -1 1 3903 30U6

    1 0 9K3 8203 74.11 6756 6139 55U4 5003 4632 4224 \1 U0 S- 3522 3220

    1 1 eye: 8043 7224 6-196 SH4 7 52C0 4751 4209 3875 35C5 317."1 28/5

    ' 2 0 D'-. 7005 7014 6246 0560 4070 4440 3971 3555 3186 205B 2507

    13 8767 7730 GfltU   610G 5303 460(1 4150 3677 3262 2897 2575 22921 0 8700 7579 6 6 1  1 5775 5051 4123 3878 3405 2992 2633 2320 2016

    v’ 58 6 : 3 7430 6419 5553 4810 4173 3624 3152 2745 . 2394 2090 1027

     ye r - 0520 7284 0232 £339 4501 393C 3387 2UI9 2519 2176 1883 IG31

    17 ^   e-ua 71.126030

    5i344363

    37m3IG6 2703 2311 I97B 1696 141.6

    IB 1 03g: 7002 5874 •1936 4155 3503 2959 2502 2120 1 799 1520 1309

    l‘J  0?” 6961 5703 4 ,v.6 3957 3305 2765 231/ 19-15 1635 1377 1 16i

    20 8‘35 6/30 5537 4564 3769 3110 2504 2145 I7B4 I486 1240 1037

    ?' 0 1 4 6598 5375 •131)0 3589 2942 2-115 191*7 16.17 I3M 1117 OU26

    :? 0034 6468 5219 4 220 3410 2775 2257 1839 1502 l?28 1007 0026

    2J  ?9b-: 6342 5007 4057 3256 2610 2109 1/03 1378 IH7 090/ 0/30

    7B'6 6217 4919 3901 3101 24 70 1971. 1577 1  ?r,.i 1015 0017 0059

    25 7798 6095 4776 3751 2953 23J0 1842 1400 1 160 0923 0730 0580

    26 7 720 5976 4637 3607 2012 21‘JO 1722 13!,2 106-1 0(139 01-63 0525

    27 70*14 5859 4502 3468 2670 2074 ICO!) 1252 0376 0763 059/ 0469

    20 7568 5744 •1371 3335 2551 1950 1504 ) 159 01195 0093 0530 04 19

    .29 7.153 5631 4243 3207 2429 18-16 1406 1073 0022 0630 0405 0374

    30 7 . 1 1 9 5521 4 130 OOB3 231-1 1 741 in 1 4 0!I!I4 07.VI   nr ,n (1-1.3/ 111 14

    .If): * V •- •

    7  059 5000 3554 2534 10 in 1301 093 7 00 7 6 0-190 o;if.f. 0259 OlOU

    40 6? ' ? •1529 3066 2083 1420 0972 0668 0160 0310 .0221 0 1 5-1 0107

    45 CTT  4 10?2044 1712 . 1 1 13 0727 04 7G o:n n 020/ 0 1 .1 / OHO 1 (Kir. 1

    50 c:c: 3715  27  81 1407 0872 05-13 0339 0213 0134 0005 005-1 0035

  • 8/17/2019 utm FAB April 2010

    35/175

    3% 14% 15"/. 16% 17% IBV. 19% 20% 2SV. 30%

    ------- t R-

    35% 4,0%

    050

    0.11

    931

    3J

    428

    87 72

    7G95

    n/!,0

    ;>P21

    5 > y.i

    eonr.

    7501

    or.75

    0/10

    4972

    0021

    7 132

    GI07

    5523

    4 7Cy  1

    054 7

    7305

    0244

    5337

    4‘  jGI

    04 75

    7102

    fiOllli

    5150

    437 1

    0103

    7062

    5!i:M

    4' jo?

    ■1190

    n333

    6941

    57Q7

    •1023

    4019

    0000

    6400

    5120

    40%

    327 7

    7692

    5917

    0

    0000

    A p p en d i  

    x

  • 8/17/2019 utm FAB April 2010

    36/175

    B(_£ d Prevtnl Valu* ol on Annuity of 51 por P»flod lor n P»ilcxJ»

    i

    eriod

    n 1% 2% 3% 4% 5% 6% 7% 8% 9% 10% 11% 12% 13% 14% 15% 16% 17% 18% 19% 20% 25% 30% 35% 40%

    1 0 9901 0 9804 0 9700 09GI5 0 9524 0 9434 0 9346 0 9259 09174 0 9091 0 9009 0 0029 0 0050 00772 0 0G96 011021 0 0547 0 0475 0 0403 0 8333 0 nooo 0 7602 0 7407 0 7143

    2 1 9704 1 9416 1 9135 11)001 1 0594 ) B334 1 B0B0 1 7633 1 7591 1 7355 1 7)25 1 G90I 1 6681 1 6467 1 6257 1 6052 1 5B52 1 5G5G 1 5405 1 5278 1 4400 1 3609 1 2894 1 2245

    3 2 94 10 2 8839 2 8286 2 7?5l 2 7232 2 6730 2 6243 2 5771 2 5313 2 4869 2 4437 2 4010 2 3612 2 3216 2 2632 2 2459 2 2006 2 1743 2 1399 2 1065 1 9520 10161 1 6959 1 5089

    4 '3 9020 3 0077 3 7171 3 6299 3 5460 3 465) . P 3072 3 3121 3 2397 3 IG99 3 >024 3 0373 2 0745 2 9137 2 0550 2 7902 2 7432 ? 6901 2 0300 2 5007 2 3GIG 2 I6G2 1 9909 1 8492

    5 4 8534 4 7135 4 5797 4 4518 •1 3295 •1 2124 4 1002 3 9927 3 0097 3 7908 3 G959 3 6048 3 5172 3 4331 3 3522 3 2743 3 >993 3 1272 3 0576 2 9906 2 6B93 2 4356 2 2200 2 0352

    6 5 7955 56014 5 4172 5 24?) 5 0757 4.9173 4 7065 4 0229 4 4059 4 3553 4 2305 4 1114 3 9975 3 8007 3 7045 3 684 7 3 5002 3 4076 3 4090 3 3255 2 9514 2 6427 2 3052 2 IGOO

    7 6 7202 6 4 720 6 2303 G 3021 5 7064 5 5024 5 31 )93 5 2064 5 0330 4 0G04 4 7122 4 5636 4 4226 4 2083 4 1604 4 038G 3 9224 3 Bl 15 3 7057 3 604G 3 1611 2 0021 2 5075 2 2628

    8 7 6517 7 3255 70197 fi 7327 G 4632 6 2098 5 9713 5 74G6 5 5348 5 3349 5 1461 4 9076 4 7908 4 6309 4 4873 4 3436 4 2072 4 0770 3 95-14 3 83/2 3 3289 2 9247 2 5982 2 3306

    9 6 5660 0 1622 7 7861 7 4353 7 1070 6 R017 G 5152 6 2469 5 9952 5 7590 5 5370 5 3282 5 1317 4 9464 4 7716 4 6065 4 4506 4 3030 4 1633 . 4 0310 3 >1631 3 0190 2 6653 2 3790

    10 94713 8 9826 0.5302 8 1! 09 7 721 7 7 3601 7 0236 G 7101 64177 6 1446 5B092 5 G502 5 4262 5 2161 S01R8 4 0332 4 G50G 4 494 1 4 33U0 4 1025 3 5705 3 0915 2 7150 2 4138

    11 10 368 9 78GB 9 2526 8 7G05 8 3004 7 BB69 7 -1987 7 1300 G nos? 0 4951 6 2005 5 9377 5 G0G9 5 4527 5 2337 5 0206 4 B304 4 0500 4 4005 .1 3271 3 0504 3 1473 2 7510 2 4.1113

    12 11 255 10 575 9 9540 9 3051 0 0G.13 t i niun 7 9427 7 53G1 7 1007 G 6137 G 4024 G 1944 5 0170 5 0003 5 420G 5 1971 4 911114 4 703? 4 0105 4 4:i!)2 3 7251 3 1903 2 779? 2 4!,59

    13^ ^

    ««5^

    12 134 11 340 10G35 9 9nso 9 3030 8 8527 0 3577 7 90311 7 4000 7 1034 fi 7499 6 4235 0 1218 5 0424 5 :>o: j 1 5 3423 5 1 1113 4 9095 4 /147 4 5327 3 7001 3 2233 2 7994 2 4GII5

    13 004 12 I0G II 29G 10 503 9 Wlllfi 9 ?u:.o 0 7455 n ?4.|;| 7 7Bli2 7 3007 G 9010 0 0202 G 3025 G 0021 5 7245 5 4675 5 2293 5 001)1 4 11023 ■I 0100 3 024 I 3 2487 2 8I4.| 2 47/5

    IS''1-' I3 0GS 12 849 11 030 ii tie 10 3110 9 71^2 9 1079 8 5595 0 0007 7 0061 7 1900 6B109 6 4624 6 142? 5 04 74 5 5755 5 3242 5 OHIO 4 0750 4 0755 3 0593 3 2G02 2 0255 2 4039

    16 . 14 718 13 570 12 561 11 652 io bub 10 >06 9 446G 0 8514 0 3126 7 8237 * 7 3792 6 9740 6G039 6 2G5I 5 9542 5 6GB5 5 4053 5 1024 4 9377 4 /2‘IC» 311074 3 2032 2 8337 2 4885

    I? 15 562 14 292 13 166 12 166 11 274 10 477 9 7632 9 .104.17 44 12 0 0007 C 5335 G 1520 5 UO'IO 5 5010 5 ??:‘n 4 '100/ 3 9*J?3 3 3312 2 0505 2 40*10

    29 25 066 21 844 19 mo 1G‘JB4 IS Ml 13 591 12 278 11 150 10 190 9 3696 B 6501 0 02)0 7 4 7QI 6 9830 6 5509 0 16565 8204 5 5000 5 2292 4 9747 3 99311 3 3317 2 B5G7 2 4999

    30 25 808 22 396 19 600 17 292 15 372 13 705 12 409 II ?5B 10 274' 0 4269 R 093B 8 055? 7 40577 0027 0 5600 0 1 77? 5 0294 5 5100 5 2.14 7 4 97nn 3 0050 .13321 ? nr,Oil ? 4909

    35 29 409 24 999 21 407 18 065 10 374 14 490 1? 94| l 11 055 10 5G7 9 0442 B 0552 8 1755 7 505G 7 0700 0 GIGC 0 2153 5 8502 5 5306 52512 4 99153 9904 3 3330 2 8571 2 5000

    40 32 835 27 355 23 115 19 793 17 159 15 046 13 332 1) 925 10 757 9 7791 0 951) 0 24307 0344 7 1050 G 04 10 6 2335 5 07)3 5 5402 5 2502 4 99G0 3 9995 3 3332 2B57I 2 5000

  • 8/17/2019 utm FAB April 2010

    37/175

    Appendix C

    TABLE A.4 ANNUAL EQUIVALENT OF AN INITIAL PAYMENTo f £ i ( I N £ l * S )  

     No. Rate of interest 

    of  -------------------------------------------------------- ------!------ ------------yean 4% 5% 6% 7%8% 9% • ZO%

    I-06000 1*07000 1*08000 1*09000 1*10000

    0*54544 0*55309 0*56079 0*56847 0*576200*37411 0*38105 0*38805 0*39507 0*402x2

    X 1*04000 2*05000

    2 0*53020 0-53781

    3 0*36035 0*36721

    4 0*27549 0*282015 0*22463 0*23098xo 0*12329 0'12951

    25 0*08994 0*0963420 0-07358 0*08024

    25 0*06401 0*07095

    30 0*05783 0*06505

    35 0*05358 0*0620740 0*05052 0*05828

    45. 0*04826 0*05626

    50 0*04655 0*0547855 0*04523 0*0536760 0*04420 0-05283

    70 0*04275 0*05x70So 0*04x81 0*05x0390 0*04221 0*05063

    100   l     0     0

          O   £   0     0

    0*10955 0*12746

    0*09022 0*100130*09009 0*100040*09004 0*100020*09002' 0*20002

    12

    3 4

  • 8/17/2019 utm FAB April 2010

    38/175

    SBC2242

    UNIVERSITI TEKNOLOGI MALAYSIA

    Fakulti Alam Bina

    FINAL EXAMINATION 

    SEMESTER II SESSION 2009/2010

    COURSE CODE

    COURSE

    PROGRAM

     TIME

    DATE

    LECTURER

    PERCENTAGE

    SBC 2242

    CONSTRUCTION TECHNOLOGY II

    1 SBC

    2 y2 HOURS (9.00 AM - 11.30 AM)

    12 APRIL 2010

    EN. SYAMSUL HENDRA B. MAHMUD 

    40 %

    ARAHAN:

    INSTRUCTION: 

     Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang sama.

    Answer four (4) questions only. All questions carry equal marks.

    1.  Di mana perlu, nyatakan andaian anda berkenaan dengan saiz elemen

    dan kaedah kerja yang dijalankan.

    Where necessary, please make your own assumptions on the size of the  

    items and relevant construction work/activities.

    2. Semua lukisan perlu disertakan dengan huraian dan label lengkap.

    All drawings must be completed with annotation and side notes.

     THIS QUESTION PAPER CONSIST OF 7 PAGES INCLUDING THE FRONT PAGE

    1

  • 8/17/2019 utm FAB April 2010

    39/175

    SBC2242

    Sebuah bangunan komersil setinggi 35 tingkat berkerangka keluli akan

    dibina di pusat bandaraya Kuala Lumpur yang bakal menempatkan menara

    pejabat dan pusat membeli-belah.

    a) Terangkan berserta lakaran yang bersesuaian mengenai sambungan-

    sambungan bagi struktur-struktur berikut menggunakan kaedah

    kimpalan dan kaedah bolt:

    i) Tiang ke tapak tiang

    ii) Tiang ke tiang

    iii) Rasuk ke tiang

    (15 markah)

    b) Terangkan berserta lakaran yang bersesuaian mengenai kaedah

    perlindungan api untuk struktur kerangka keluli tersebut.

    (10 markah)

    QUESTION 1

    A 35 storey steel structure commercial building will be built in Kuala Lumpur  

    city centre which consists of an office tower and shopping complex.

    a) Explain with appropriate sketches the connections for these structures using  

    welding and bolting techniques: 

    i) Column to column base ii) Column to column 

    iii) Beam to column 

    (15 marks) 

    b) Explain with appropriate sketches the fire protection techniques for the steel  

    structures.

    SOALAN 1

    (10 marks) 

    2

    5 2

  • 8/17/2019 utm FAB April 2010

    40/175

    SBC2242

    a) Huraikan berserta lakaran tentang konsep serta pembinaan bumbung

    kerangka portal jenis keluli.

    (15 markah)

    b) Huraikan kebaikan dan keburukan penggunaan struktur bumbung

    cengkerang dan bumbung berlipat.

    (10 markah)

    QUESTION 2 

    a) Explain with sketches the concept and construction of steel portal frame  

    roof 

    (15 marks) 

    b) Explain the advantages and disadvantages of shell roof and folded slab roof  

    structure.

    (10 marks) 

    SOALAN 2

    3

  • 8/17/2019 utm FAB April 2010

    41/175

    SBC2242

    a) Syarikat Crospax telah ditawarkan kontrak untuk kerja perobohan sebuah

    bangunan rumah kedai 2 tingkat sedia ada di kawasan Taman Mutiara

    Rini, Johor Bahru bagi membina bangunan pejabat 5 tingkat di atas

    tanah tersebut. Lokasinya adalah berhampiran kawasan perumahan sedia

    ada. Berikan penerangan ringkas kepada pihak klien mengenai:

    i) Kriteria-kriteria yang perlu diambil kira sebelum sesuatu teknik

    perobohan tersebut dipilih.

    (15 markah)

    ii) Langkah-langkah keselamatan yang bersesuaian dengan kerja

    perobohan tersebut.

    (10 markah)

    QUESTION 3 

    a) Contractor Crospax has been offered a contract for demolition works of a  

    double storey shop house in Taman Mutiara Rini, Johor Bahru in order to  build a new 5 storey office building in the proposed area. The location of the  

    site is nearby the existing residential area. Explain briefly to the client  

    about: 

    i) The criterias need to be considered before choosing any types of  

    demolition techniques.

    (IS marks) 

    ii) The suitable safety precautions for the demolition project.

    SOALAN 3

    (10 marks) 

    4

    5 4

  • 8/17/2019 utm FAB April 2010

    42/175

    a) Huraikan faktor-faktor yang mempengaruhi pemilihan lantai atas.

    (10 markah)

    b) Huraikan berserta lakaran mengenai pembinaan papak rata dan lantai

    waffle.

    (15 markah)

    QUESTION 4 

    a) Describe what are the factors influencing the selection of upper floors.

    (10 marks) 

    b) Explain with sketches the construction of flat slab and Waffle floor.

    (15 marks) 

    SBC2242

    SOALAN 4

    5

  • 8/17/2019 utm FAB April 2010

    43/175

    SBC2242

    a) Cadang dan lakarkan komponen perabot dalaman yang sesuai untuk

    ruang tamu rumah kediaman untuk memuatkan buku, majalah, alat

    sistem hiburan rumah dan barang hiasan.

    (15 markah)

    b] Terangkan fungsi perabot dalaman bagi sebuah kediaman mewah dua

    tingkat.

    (10 markah)

    QUESTION 5 

    a) Suggest and sketch the suitable components for built in fitment suitable for  

    living area in residential houses for books, magazines, home theatre system  

    and decorations.

    (1 Smarks) 

    a) Explain the function of built in fitment for a luxury two storey house 

    (10 marks) 

    SOALAN 5

    6

    5 6

  • 8/17/2019 utm FAB April 2010

    44/175

    SBC2242

    a) Cadangkan dua jenis kemasan lantai, satu jenis kemasan siling dan dua

     jenis kemasan dinding yang sesuai bagi sebuah apartment mewah setinggi

    10 tingkat. Berikan justifikasi terhadap pemilihan kemasan - kemasan

    tersebut.

    (25 markah)

    QUESTION 6 

    a) Suggest two types of floor finishes, one type of ceiling finishes and two  

    types of wall finishes suitable for a 10 storey luxury apartment. Justify your  

    choices on the finishes.

    (25 marks) 

    SOALAN 6

    SELAMAT MENJAWAB DAN SELAMAT MAJU JAYA

  • 8/17/2019 utm FAB April 2010

    45/175

    SBQ 1223

    UNIVERSITI TEKNOLOGI MALAYSIA

    Fakulti Alam Bina

    FINAL EXAMINATION SEMESTER II SESSION 2009/2010

    COURSE CODE SBQ 1223

    COURSE CONSTRUCTION TECHNOLOGY I

    PROGRAM 1 SBQ

     TIME 2 HOURS (9.00 AM - 11.00 AM)

    DATE 12 APRIL 2010

    LECTURER EN. SYAMSUL HENDRA B. MAHMUD

    PERCENTAGE 40 %

    ARAHAN:

    INSTRUCTION: 

     Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang sama.

    Answer four (4) questions only. All questions carry equal marks.

    1.  Di mana perlu, nyatakan andaian anda berkenaan dengan saiz elemen

    dan kaedah kerja yang dijalankan.

    Where necessary, please make your own assumptions on the size of the  

    items and relevant construction work/activities.

    2. Semua lukisan perlu disertakan dengan huraian dan label lengkap.

    All drawings must be completed with annotation and side notes.

     THIS QUESTION PAPER CONSIST OF 6 PAGES INCLUDING THE FRONT PAGE

    1

    5 8

  • 8/17/2019 utm FAB April 2010

    46/175

    SBQ 1223

    a) Lakarkan lima (5) jenis susun atur binaan tangga yang biasa digunakan.

    (10 markah)

    b) Berbantukan lakaran berlabel, lakarkan proses pembinaan terperinci

    sebuah tangga lurus konkrit tuang in-situ.

    (15 markah)

    QUESTION 1

    a) Sketch five (5) types of staircase layout which are commonly used.

    (10 marks) 

    b) Aided with annotated sketches, sketch the details components of an in-situ  

    straight concrete staircase.

    (15 marks) 

    SOALAN 2

    a) Berbantukan lakaran berlabel, terangkan mengenai perbezaan di antara

    tingkap ram tetap dan tingkap ram boleh laras.

    (15 markah)

    b) Pintu panel biasa digunakan di rumah-rumah kediaman. Huraikan

    berserta lakaran yang bersesuaian tentang komponen-komponen pintu

    panel tersebut.

    SOALAN 1

    (10 markah) .

    2

    5 9

  • 8/17/2019 utm FAB April 2010

    47/175

    SBQ 1223

    a) Aided with annotated sketches, explain the difference between fixed  

    louvered window and adjustable louvered window.

    (15 marks)

    bj Paneled door are commonly used in residential buildings. Explain using  

    appropriate sketches the components of the paneled door.

    (10 marks)

    SOALAN 3

    a) Bincangkan dengan ringkas kelebihan dan kelemahan tiga (3) jenis

    kemasan lantai dan dua (2) jenis kemasan dinding yang biasa digunakan

    bagi bangunan sekolah.

    (15 markah)

    b) Bincangkan dengan ringkas faktor pemilihan bagi kemasan lantai yang

    biasa digunakan bagi rumah kediaman.

    (10 markah)

    QUESTION 3 

    a) Briefly discuss the advantages and disadvantages of three (3) types of floor  

     finishes and two (2) types of wall finishes commonly used for school  

    buildings.

    (15 marks) 

    b) Briefly discuss the functional requirements for floor finishes which is  

    commonly used for residential housing.

    /■"N

    b(J

    QUESTION 2 

    (10 marks) 

    3

  • 8/17/2019 utm FAB April 2010

    48/175

    SBQ 1223

    a) Huraikan berserta lakaran mana - mana lima (5) komponen bumbung

    cerun yang berikut:

    i. “Battem” 

    ii. “Valley Board” 

    iii. “Verge” 

    iv. “Wall Plate” 

    v. “Rain Water Down Pipe” 

    vi. “Common Rafter” 

    vii. “Gutter" 

    (15 markah)

    b) Berbantukan lakaran berlabel, terangkan mengenai komponen-komponen

    terperinci bagi ‘lean to roof   dan ‘monopitch roof.

    (10 markah)

    QUESTION 4 

    a) Explain with sketches any five (5) of the following components of staircase: 

    i. “Battem” 

    ii. “Valley Board” 

    iii. “Verge” 

    iv. “Wall Plate” 

    v. “Rain Water Down Pipe” 

    vi. “Common Rafter” 

    vii. “Gutter” 

    (15 marks) 

    b) Aided with annotated sketches, explain the detail components for lean to roof  

    and monopitch roof 

    SOALAN 4

    (10 marks) 

    4

    6 1

  • 8/17/2019 utm FAB April 2010

    49/175

    SBQ 1223

    a) Huraikan perbezaan di antara dinding galas beban dan dinding tidak

    galas beban.

    (10 markah)

    b) Berbantukan lakaran bernota, huraikan proses pembinaan dinding bata

    dengan menggunakan ikatan Flemish.

    (15 markah)

    QUESTION 5 

    a) Describe the differences between load bearing wall and non-load bearing  

    wall.

    (10 marks) 

    b) Aided with annotated sketches, explain the construction process for  

    brickworks using Flemish bonding.

    (15 marks) 

    SOALAN 6

    a) Bincangkan dengan ringkas keperluan fungsi bagi siling yang biasa

    digunakan bagi rumah teres dua tingkat.

    (10 markah)

    b) Berbantukan lakaran bernota, terangkan mengenai komponen siling

    gantung.

    SOALAN 5

    (15 markah)

  • 8/17/2019 utm FAB April 2010

    50/175

    SBQ 1223

    a) Briefly discuss the functional requirements for ceiling which is commonly  

    used for two storey terrace housing.

    (10 marks) 

    b) Aided with annotated sketches, explain the component for suspended  

    ceiling.

    (15 marks) 

    QUESTION 6 

    SELAMAT MENJAWAB DAN SELAMAT MAJU JAYA

  • 8/17/2019 utm FAB April 2010

    51/175

    SBC1222

    UNIVERSITI TEKNOLOGI MALAYSIA

    Fakulti Alam Bina

    FINAL EXAMINATION SEMESTER II SESSION 2009/2010

    COURSE CODE SBC 1222

    COURSE CONSTRUCTION TECHNOLOGY I

    PROGRAM 1 SBC

     TIME 2 HOURS (9.00 AM - 11.00 AM)

    DATE 12 APRIL 2010

    LECTURER EN. SYAMSUL HENDRA B. MAHMUD

    PERCENTAGE 40 %

    ARAHAN:

    INSTRUCTION: 

     Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang sama.

    Answer four (4) questions only. All questions carry equal marks.

    1.  Di mana perlu, nyatakan andaian anda berkenaan dengan saiz elemen

    dan kaedah kerja yang dijalankan.

    Where necessary, please make your own assumptions on the size of the  

    items and relevant construction work/activities.

    2. Semua lukisan perlu disertakan dengan huraian dan label lengkap.

    All drawings must be completed with annotation and side notes.

     THIS QUESTION PAPER CONSIST OF 6 PAGES INCLUDING THE FRONT PAGE

    1

    6 k

  • 8/17/2019 utm FAB April 2010

    52/175

    SB Cl 222

    a) Lakarkan lima (5) jenis susun atur binaan tangga yang biasa digunakan.

    (10 markah)

    b) Dengan bantuan lakaran berlabel, lakarkan proses pembinaan terperinci

    sebuah tangga lurus konkrit tuang in-situ.

    (15 markah)

    QUESTION 1

    a) Sketch five (5) types of staircase layout which are commonly used.

    (10 marks) 

    b) Aided with annotated sketches, sketch and label the construction process of  

    an in-situ straight concrete staircase.

    (15 marks) 

    SOALAN 2

    a) Bincangkan dengan ringkas keperluan fungsi bagi tingkap yang biasa

    digunakan bagi rumah kediaman.

    (5 markah)

    b) Dengan bantuan lakaran berlabel, terangkan mengenai perbezaan di

    antara pintu panel dan pintu rata.(20 markah)

    SOALAN 1

    2

  • 8/17/2019 utm FAB April 2010

    53/175

    SBC1222

    a) Briefly discuss the functional requirements for windows which are commonly  

    used for residential housing.

    (5 marks)

    b) Aided with annotated sketches, explain the difference between panelled door  

    and flat flush door.

    (20 marks)

    SOALAN 3

    a) Dengan bantuan lakaran berlabel, terangkan mengenai proses

    pemasangan kemasan dinding jenis jubin seramik bersaiz 200mm x

    200mm bagi bilik air sebuah rumah teres dua tingkat.

    (15 markah)

    b) Bincangkan dengan ringkas faktor pemilihan bagi kemasan lantai yang

    biasa digunakan bagi rumah kediaman satu tingkat.

    (10 markah)

    QUESTION 3 

    a) Aided with annotated sketches, explain the installation process for 200mm x  

    200mm ceramic tiles finishes for a double storey terrace houses bathroom.

    (15 marks) 

    b) Briefly discuss the selection factors for floor finishes which is commonly  

    used in single storey residential housing.

    QUESTION 2 

    (10 marks) 

    3

    6 6

  • 8/17/2019 utm FAB April 2010

    54/175

    SBC1222

    a) Huraikan berserta lakaran mana - mana lima (5) komponen-komponen

    bumbung cerun yang berikut:

    i. “Hip Rafter” 

    ii. “Jack Rafter” 

    Hi. “Valley Rafter” 

    iv. “Wall Plate” 

    v. “Rain Water Down Pipe” 

    vi. “Ridge Board” 

    vii. “Verge” 

    (25 markah)

    QUESTION 4 

    a) Explain with sketches any five (5) of the following components of staircase: 

    i. “Hip Rafter” 

    ii. “Jack Rafter” 

    iii. “Valley Rafter” 

    iv. “Wall Plate” 

    v. “Rain Water Down Pipe” 

    vi. “Ridge Board” 

    vii. “Verge” 

    (25 marks) 

    SOALAN 4

    4

    6 7

  • 8/17/2019 utm FAB April 2010

    55/175

    SBC1222

    a) Dengan bantuan lakaran bernota, terangkan mengenai sistem kerangka

     yang bersesuaian bagi sebuah rumah banglo dua tingkat.

    (15 markah)

    b) Dengan bantuan lakaran bernota, huraikan proses pembinaan dinding

    bata dengan menggunakan ikatan Flemish.

    (10 markah)

    QUESTION 5 

    a) Aided with annotated sketches, explain the frame system suitable for a  

    double storey bungalow.

    (15 marks) 

    b) Aided with annotated sketches, explain the construction process for  

    brickworks using Flemish bonding.

    (10 marks) 

    SOALAN 5

    6b

    5

  • 8/17/2019 utm FAB April 2010

    56/175

    a) Dengan bantuan lakaran bernota, terangkan mengenai komponen siling

    gantung.

    (25 markah)

    QUESTION 6 

    a) Aided with annotated sketches, explain the component of suspended  

    ceiling.

    (25 marks) 

    SBC1222

    SOALAN 6

    SELAMAT MENJAWAB DAN SELAMAT MAJU JAYA

  • 8/17/2019 utm FAB April 2010

    57/175

    SBC 1233

    UTMUNJVERSITl TEKNOLOGI MALAYSIA

    Fakulti Alam Bina

    FINAL EXAMINATION 

    SEMESTER 2 SESSION 2009/2010

    COURSE CODE

    COURSE

    PROGRAM

     TIME

    DATE

    LECTURER

    PERCENTAGE

    SBC 1233 

    BUILDING SERVICES SYSTEM 

    1 SBC

    2 HOURS (9.00 pg - 11.00 pg) 

    13 APRIL 2010

    DR. YAHYA MOHAMAD YATIM 

    40 %

    ARAHAN:

    INSTRUCTION: 

     Jawab 4 SOALAN Sahaja.

    Answer 4 Questions Only.

    Di mana perlu, nyatakan andaian yang anda buat dengan jelas untuk

    disesuaikan dengan jawapan yang anda beri.

    Where necessary, please make your own assumptions on any aspects to suit your  answers.

    KERTAS SOALAN INI TERDIRI DARIPADA _4_ MUKA SURAT  TERMASUK MUKA

    SURAT HADAPAN.

    7 0

    i

  • 8/17/2019 utm FAB April 2010

    58/175

    SBC 1233

     Terangkan fungsi komponen-komponen berikut yang berkaitan dengan sistem

    kumbahan di dalam bangunan.

    (i) Paip air kumbahan dan paip air buangan

    (ii) Perangkap Air

    (iii) Paip pengudaraan

    (iv) Peralatan Kumbahan

    (v) Peralatan Air buangan

    (25 Markah)

    QUESTION 1

    Explain the function of sewerage components in building as follows:

    (i) Soil and waste stack pipe

    (ii) Water trap

    (iii) Vent pipe

    (iv) Soil Appliances

    (v) Waste Appliances

    (25 Marks) 

    SOALAN 2

    (i) Terangkan perbezaan diantara sistem pengudaraan semulajadi dengan

    pengudaraan makanikal.

    (10 Markah)

    (ii) Terangkan bagaimana pengudaran semulajadi bagi bangunan satu

    tingkat boleh diperolehi dangan berkesan.

    (15 Markah)

    QUESTION 2 

    (i) Explain the distinctions of mechanical and natural ventilation system.

    (10 Marks) 

    (ii) Explain how natural ventilation can effectively be achieved in a single  

    storey house.

    (15 Marks) 

    SOALAN 3:

    (i) Lakar dan terangkan bagaimana kitaran refrigeren di dalam penyaman

    udara jenis tingkap.

    (10 Markah)

    (ii) Dengan berbantu lakaran, terangkan bagaimana sistem penyaman udara

    unit terpisah dipasang pada bangunan

    (15 Markah)

    SOALAN 1

    7 12

  • 8/17/2019 utm FAB April 2010

    59/175

    SBC 1233

    QUESTION 3 

    (i) Sketch and explain the refrigerant cycle in window type air-conditioning  

    system.

    (10 Marks) 

    (ii) With the aid of sketches, explain how split air-conditioning system be  

    installed in buildings.

    (15 Marks) 

    SOALAN 4

    Lakar (tidak mengikut sekala) rajah pendawaian bagi rumah kediaman bermula

    dari fius pemotong bekalan sehingga ke litar akhir serta namakan dan

    terangkan fungsi bagi setiap komponen tersebut.

    (25 Markah)

    QUESTION 4 

    Sketch (not to scale), name and explain the function of the main component of the  

    domestic electrical diagram from cutout fuse to the final circuit.

    (25Marks) 

    SOALAN 5

    (i) Terangkan keperluan pemasangan lift bagi bangunan tinggi seperti yang

    dikehendaki oleh Undang-Undang Bangunan Seragam 1984

    (10 Markah)

    (ii) Namakan dan terangkan fungsi utama komponen lif electrik.

    (15 Markah)

    QUESTION 5 

    (i) Explain the requirement of lift in high-rise buildings as ruled out in Uniform  

    Building By-Laws 1984.

    (10 Marks) 

    (ii) Name and explain the main component of electric lifts.

    (15 Marks) 

    SOALAN 6

    (i) Apakah definisi eskalator.

    (5 Markah)

    (ii) Terangkan kelebihan dan kekurangan sudut kecondongan eskalator.

    (10 Markah)

    (iii) Terangkan tiga jenis susunatur eskalator yang biasa dipasang pada

    kompleks membeli belah.

    (10 Markah).

    7 23

  • 8/17/2019 utm FAB April 2010

    60/175

    QUESTION 6 

    (i) What is the definition of escalator? 

    (5 Marks) 

    (ii) Explain the advantages and disadvantages of the escalator slope.

    (10 Marks) 

    (Hi) Explain three types of escalator layout commonly installed in a shopping  

    complex.

    (10 Marks) 

    SBC 1233

    SELAMAT MAJU JAYA All the Best 

    4

    7 3

  • 8/17/2019 utm FAB April 2010

    61/175

    SBQ 2233

    UTMUNIVERSITI TEKNOLOGI MALAYSIA

    Fakulti Alam Bina

    FINAL EXAMINATION SEMESTER II SESSION 2009/2010

    COURSE CODE

    COURSE

    PROGRAM

     TIME

    DATE

    LECTURER

    PERCENTAGE

    SBQ 2233

    BUILDING SERVICES II

    1 SBQ

    2 HOURS (2.30 PM - 4.30 PM)

    13 APRIL 2010

    ISMAIL BIN HARON 

    40 %

    ARAHAN:INSTRUCTION: 

     Jawab empat (4) soalan sahaja. Semua soalan membawa markah yangsama.

    Answer four (4) questions only. All questions carry equal marks.

     THIS QUESTION PAPER CONSIST OF 6 PAGES INCLUDING THE FRONT PAGE

    1

  • 8/17/2019 utm FAB April 2010

    62/175

    SBQ 2233

    a) Terangkan dengan ringkas klasifikasi risiko yang digunapakai

    pada sistem semburan.

    ( 7 markah )

    b) Dengan berbantukan lakaran, terangkan komponen-komponen

    asas serta teknik pemasangan sebuah sistem semburan.

    ( 18 markah)

    SOALAN 1

    QUESTION 1

    a) Briefly describe the risk classification used in a sprinkler system.

    ( 7 marks ) 

    b) With the aid of sketches, describe the basic components and  

    installation techniques of a sprinkler system.

    (18 marks ) 

    SOALAN 2

    a) Terangkan perbezaan antara sistem penyaman udara kemas-siap

    penyejukkan udara dengan sistem kemas siap penyejukkan air.

    ( 5 markah )

    b) Dengan berbantukan lakaran, terangkan prinsip operasi sistem

    penyaman udara menggunakan sistem logi pusat air sejuk.

    ( 20 markah )

  • 8/17/2019 utm FAB April 2010

    63/175

    SBQ 2233

    a) Describe the difference between an air cooled packaged and water  

    cooled packaged air conditioning system.

    (5 marks ) 

    b) With athe aid of sketches, describe the operation principles of a  

    central water chiller air conditioning system.

    ( 20 marks ) 

    QUESTION 2 

    SOALAN 3

    a) Terangkan apa yang dimaksudkan dengan Population Equivalents  

    (PE)  dalam perawatan kumbahan.

    ( 5 markah )

    b)   Dengan berbantukan lakaran, terangkan prinsip operasi sistem

     Turas Pencucur Kadar Tinggi.

    ( 20 markah )

    QUESTION 3 

    a) Explain what is meant by Population Equivalents (PE) in the sewage  

    treatment.

    ( 5 marks ) 

    b) With the aid of sketches, describe the operation principles of the  

    High Rate Trickling Filter (HRTF) system.

    (20 marks ) 

    3

    7 6

  • 8/17/2019 utm FAB April 2010

    64/175

    SBQ 2233

    a) Terangkan ciri-ciri yang menentukan kecekapan sesebuah sistem

    lif.

    ( 10 markah )

    b) Terangkan komponen-komponen asas sebuah sistem lif elektrik.

    ( 15 markah )

    QUESTION 4 

    a) Describe the characteristics that determines the efficiency of a lift  

    system.

    (10 marks ) 

    b) Describe the basic components of an electric lift.

    (15 marks ) 

    SOALAN 5

    a. Terangkan kelebihan penggunaan tangga gerak berbanding lif di

    dalam bangunan.

    ( 5 markah )

    b. Terangkan dengan ringkas fungsi komponen tangga gerak berikut:

    i) Kerangka penyokong utama

    ii) Motor tarikan

    iii) Anak tangga dan rantai anak tangga

    iv) Susur tangga

    SOALAN 4

    ( 20 markah )

    7 7

  • 8/17/2019 utm FAB April 2010

    65/175

    SBQ 2233

    a) Describe the advantages of the use of escalators compared to lift in  

    building.

    ( 5 marks ) 

    b) Briefly describe the function of the following components of an  

    escalator: 

    i) Main support truss 

    ii) Traction motor 

    iii) Steps and step chain 

    iv) Balustrade 

    (20 marks ) 

    QUESTION 5 

    SOALAN 6

     Terangkan dengan ringkas perkara-perkara berikut:

    a) Sistem automasi bangunan

    b) Sistem penyaman udara jenis unit pisah

    c) Sistem melawan kebakaran jenis pemasangan tetap CO2

    d) Sistem perlupusan kumbahan jenis parit pengoksidaan

    e)   Perbezaan antara eskalator, travelator  dan walkalator 

    ( 25 markah )

    5

    7 6

  • 8/17/2019 utm FAB April 2010

    66/175

    SBQ 2233

    Briefly describe the followings: 

    a) Building automation system 

    b) Split unit air conditioning system 

    c) Fixed C02 fire supression system 

    d) Oxidation ditch sewage disposal system 

    e) Difference between escalator, travelator and walkalator 

    ( 25 marks ) 

    QUESTION 6 

  • 8/17/2019 utm FAB April 2010

    67/175

    SBQ 4314

    UTMUNIVERSITI TEKNOLOGI MALAYSIA

    Fakulti Alam Bina

    UNIVERSITI TEKNOLOGI MALAYSIA FAKULTI ALAM BINA

    PEPERIKSAAN AKHIR SEMESTER II 

    SESI 2009/2010

    KOD MATA PELAJARAN 

    MATA PELAJARAN 

    KURSUS 

    MASA 

    TARIKH 

    PENSYARAH 

    MARKAH

    SBQ 4314 

    UKUR BINAAN IV 

    3 SBQ

    3 JAM (9.00 AM-12.00 PM)

    14 APRIL 2010

    DR. MOHD SAIDIN BIN MISNAN 

    40%

    ARAHAN KEPADA CALON :

    1. Sila j awab SEMUA soalan.

    2. Sila baca dan fahami soalan serta lukisan dengan teliti sebelum

    menjawab.

    3. Pelajar diminta membuat andaian/ as sumption yang munasabah jika

    terdapat percangahan maklumat atau maklumat yang disediakan

    tidak mencukupi. Andaian-andaian hendaklah dinyatakan di dalam

    Senarai Kemusykilan dan dihantar bersama-sama kertas jawapan.

    4. Markah akan diberikan berdasarkan kepada pemahaman terhadap

    prinsip pengukuran, ketepatan ukuran, kejelasan huraian dan

    keteraturan kerja.5. Semua keija pengukuran hendaklah merujuk kepada MCESMM.

    6. Semua lukisan hendaklah dikembalikan bersama kertas jawapan

    KERTAS SOALAN INI TERDIRI DARI PAD A _7_ MUKA SURAT  TERMASUKMUKA SURAT HADAPAN.

    I

    8 0

  • 8/17/2019 utm FAB April 2010

    68/175

    «

    Berdasarkan kepada Lukisan No. KPKR/J/R/149336/AM7, AM8 dan AM9,

    KPKR/J/R/ 149336/ST1, ST2, ST3 dan ST4, ukur kuantiti bagi semua kerja yang

    berkaitan dengan Pembinaan Lintasan Keretapi Bertingkat di Kampung Selamat,

    Pantai Dalam, Kuala Lumpr (KTM-Pakej 7). Skop kerja termasuk kerja-kerja

    cerucuk, jambatan {prestressed beam), dan pembinaan jalan.

    (60 markah)

    QUESTION 1

    Based on the drawing No.  KPKR/J/R/149336/AM7’, AM8 and AM9,

    KPKR/J/R/ 149336/ST1, ST2, ST3 and ST4, take-off the quantities of all related  

    works to   Pembinaan Lintasan Keretapi Bertingkat di Kampung Selamat, Pantai

    Dalam, Kuala Lumpr (KTM-Pakej 7). Scope of works involved are piling works, 

    bridge works (prestressed beam), and roadworks.

    (60 marks) 

    SOALAN 2

    Berdasarkan kepada Lukisan No. KPKR/J/R/149336/ ST8, ukur kuantiti bagi

    semua keija yang berkaitan dengan Precast Vechicular Box Culvert and Sewer  

    Protection,  Projek Pembinaan Lintasan Keretapi Bertingkat di Kampung Selamat,

    Pantai Dalam, Kuala Lumpr (KTM-Pakej 7).

    (40 markah)

    QUESTION 2 

    Based on the drawing No.  KPKR/J/R/149336/ ST8, take-off the quantities of all  

    related works to Precast Vechicular Box Culvert and Sewer Protection,  Pembinaan

    Lintasan Keretapi Bertingkat di Kampung Selamat, Pantai Dalam, Kuala Lumpr

    (KTM-Pakej 7).

    SBQ 4314

    SOALAN 1

    (40. marks) 

    2

    8 1

  • 8/17/2019 utm FAB April 2010

    69/175

    SBC 2273

    UNIVERSITI TEKNOLOGI MALAYSIA

    Fakulti Alam Bina

    FINAL EXAMINATION 

    SEMESTER II SESSION 2009/2010

    COURSE CODE SBC 2273

    COURSE CONSTRUCTION TECHNOLOGY AND 

    DESIGN

    PROGRAM 2 SBC

     TIME 2 HOURS 30 MINUTES 

    (9.00AM - 11.30AM)

    DATE 14 APRIL 2010

    LECTURER NURSHIKIN BINTI MOHAMAD 

    SHUKERY

    PERCENTAGE 40 %

    ARAHAN:

    INSTRUCTION: 

     Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang sama.

    Answer four (4) questions only. All questions carry equal marks.

    1.  Di mana perlu, nyatakan andaian anda berkenaan dengan saiz elemen

    dan kaedah kerja yang dijalankan.

    Where necessary, please make your own assumptions on the size of the  

    items and relevant construction work/activities.

    2. Semua lukisan perlu disertakan dengan huraian dan label lengkap.

    All drawings must be completed with annotation and side notes.

     THIS QUESTION PAPER CONSIST OF 10 PAGES INCLUDING THE FRONT PAGE

    1

    8 I 

  • 8/17/2019 utm FAB April 2010

    70/175

    SBC 2273

    a) Terdapat dua (2) implikasi terhadap defmisi kebolehbinaan. Huraikan

    implikasi-implikasi tersebut dengan jelas.

    (6 markah)

    b) Mengapa perlunya rekabentuk kebolehbinaan dalam projek pembinaan?

    (6 Markah)

    c) Huraikankan 16 prinsip-prinsip kebolehbinaan dengan terperinci.

    (13 Markah)

    SOALAN 1

    QUESTION 1

    a) There are two (2) implications of buildability definition. Elaborate those  

    implications clearly.

    (6 marks) 

    b) Why design for buildabilty in construction project? 

    (6 Marks) 

    c) Elaborate 16 principles of buildability in detail.

    (13 marks) 

    SOALAN 2

     Terangkan dengan terperinci aktiviti-aktiviti yang terlibat dalam proses

    rekabentuk arkitek dan rekabentuk struktur.

    (25 markah)

    2

    8 b

  • 8/17/2019 utm FAB April 2010

    71/175

    SBC 2273

    Explain in detail the activities involved in architectural design and structural  

    design process.

    (25 marks) 

    QUESTION 2 

    SOALAN 3

    a) Terangkan dan lakarkan dengan terperinci sistem lantai berikut:

    i) Papak berusuk

    ii) Sistem lantai rasuk jalur

    iii) Sistem lantai pratuang

    iv) Plat rata

    v) Papak rata

    (15 Markah)

    b) Huraikan hanya tiga (3) faktor-faktor yang mempengaruhi pemilihan

    sistem lantai yang sesuai.

    (10 Markah)

    QUESTION 3 

    a) Explain and sketch in detail each of following flooring system: 

    i) Ribbed slab 

    ii) Band beam floor system 

    iii) Precast floor system 

    iv) Flat plate 

    v) Flat slab 

    (15 Marks) 

    b) Elaborate only three (3) factors that influenced in selecting an  

    appropriate flooring system.

    (10 Marks) 

    < 3 v

  • 8/17/2019 utm FAB April 2010

    72/175

    SBC 2273

    Sebuah rasuk konkrit bertetulang mempunyai 300mm lebar dan kedalaman

    efektif 552mm diperlukan untuk merentang sepanjang 6m. Rasuk tersebut

    membawa momen rekabentuk maksimum (M) sebanyak 321.5 kNm dan daya

    ricih muktamad (V) sebanyak 214.4kN. Anggapkan diameter penyambung

    ialah 10mm, f cu = 30 N/mm2, f  y  = 460 N/mm

    2, fvy = 250 N/mm2 dan keadaan

    dedahan (cuaca) adalah ringan, rekabentukkan rasuk ini. Rumus dan jadual

    rekabentuk yang berkaitan terdapat di dalam LAMPIRAN.

    (25 Markah) 

    QUESTION 4 

    A reinforced concrete beam which is 300mm wide and effective depth is 552mm  

    is required to span 6m. The beam carries a maximum design moment (M) of  

    321.5 kNm and ultimate shear force (V) of 214.4kN. Assuming the diameter of  

    links is 10mm, fcu = 30 N/mm 2 , f y  = 460 N/mm 2 , f vy  = 250 N/mm 

    2  and the  

    exposure conditions (weather) are mild, design the beam. Relevant design  

     formulas and tables are in the APPENDIX.

    (25 Marks)  

    SOALAN 5

    Rajah 1 menunjukkan, 400mm tiang segiempat sama membawa beban mati

    sebanyak lOOOkN dan beban hidup sebanyak 250kN. Keupayaan galas

    selamat tanah ialah 168kN/m2. Rekabentukkan tapak pad segiempat sama

    bagi menanggung beban tersebut. Anggapkan kekuatan bahan-bahan

    berikut.

    Ketumpatan konkrit = 24kN/m3 

    fcu = 35 N/mm2 

    f  y  = 460 N/mm2

    20mm diameter bar bagi tetulang lenturan di kedua-dua arah. Rumus dan

     jadual rekabentuk yang berkaitan terdapat di dalam LAMPIRAN.

    SOALAN 4

    (25 Markah)

    4

    9 0

  • 8/17/2019 utm FAB April 2010

    73/175

    SBC 2273

     Axial load: Dead = 1000kN

    Imposed = 250kN

    Rajah 1/Figure 1

    QUESTION 5 

    Figure 1 shows, a 400mm square column carries a dead load of lOOOkN and  

    imposed load of250kN. The safe bearing capacity of soil is 168kN/m 2 . Design a  

    square pad footing to resist the loads. Assuming the following materials  

    strength.

    Concrete density = 24kN/m 3  

     feu = 35 N/mm 2  

     f y  = 460 N/mm 2 

    20mm diameter bars for bending reinforcement for both directions. Relevant  

    design formulas and tables are in the APPENDIX.

    (25 Marks)  

    SOALAN 6

    Rajah 2 menunjukkan, 6m rentang sebuah rasuk segiempat tepat disokong

    mudah membawa beban mati (gk ) sebanyak lOkN/m. Rekabentukkan

    tetulang ricih bagi rasuk tersebut menggunakan penyambung keluli lembut

    (fvy = 250 N/mm2) bagi kes-kes beban hidup (qk)  berikut;

    i) 0 kN/m

    ii) 10 kN/m

    iii) 29 kN/m

    iv) 45 kN/m

    5

    9 1

  • 8/17/2019 utm FAB April 2010

    74/175

    Dimensi ukur lebar rasuk (b) ialah 300mm dan kedalaman efektif (d) ialah

    547mm. Anggapkan f cu =25N/mm2 dan saiz bar 4T25 (As= 1960mm

    2). Rumus

    dan jadual rekabentuk yang berkaitan terdapat di dalam LAMPIRAN.

    (25 Markah)

    b=300mm

    H r~qk=Varies

    gk=10kN/m

    Rajah 2/Figure 2 

    QUESTION 6

    Figure 2 shows, a simply supported rectangular beam of 6m span carries a  

    characteristic dead load (gk ) of lOkN/m. Design the shear reinforcement for the  beam using mild steel (f vy  = 250 N/mm 

    2 ) link for the following imposed load (qk)  

    cases;

    v)  0 kN/m 

    vi)  10 kN/ m 

    vii)  29 kN/ m 

    viii)  45 kN/ m 

    The beam dimensions are breadth b, 300mm and effective depth d, 547mm. 

    Assuming fu =25N/mm 2  and bar size is 4T25 (A s  = 1960mm 2 ). Relevant design  

     formulas and tables are in the APPENDIX.

    (25 Marks) 

    SELAMAT MENJAWAB DAN SELAMAT MAJU JAYA

  • 8/17/2019 utm FAB April 2010

    75/175

    SBC 2273

    LAMPIRAN / APPENDIX

    Mu €.156 bd2f cu 

    MAs 0.87f  y z

    z :rf[o.5 + 7(0.25-&/0.9)J< 0.95 

    M

    k  fcubd2

    V

    v M

    Ultimate load, W = (1.4gk + 1.6qk) x span

    i) Deflection criteria

    Support ConditionsSpan/Effective depth(rectangular section)

    For Initial design

    Cantilever 7 < 7 could be a problemSimply Supported 20 20 but be cautiousContinuous 26 26 or maybe more for a cont. slab

    ii) The code (BS8110) requires the final design to pay attention to:

    Min and Max reinforcement as a percentage of the gross CSA. (Cl. 3.12.5.3. &3.12.6.1) - This will on the one hand, help the control of cracking, increasedurability, while on the other assist placing and compaction.

    0.24%bh

  • 8/17/2019 utm FAB April 2010

    76/175

    SBC 2273

    iv) Form and area of links in beams.

    ix. Where v < 0.5vcNo links required but provide nominal links for the whole length:

    0 87

    /„ x. Where 0.5vc < v < (vc + 0.4)Provide: nominal links for the whole length0-87

     xi. Where (vc + 0.4) < v < 0.8\/f cu or 5 N/mm2

    Provide: nominal links and design links

    AJSt =  KL̂ L 0.87 

    A further limitation placed on the spacing of links by the BS is that the

    maximum spacing should be less than 0.75d, which is obviously necessary toavoid a failure plane forming which misses the links altogether.

    v) Table for design concrete shear stress vc

    100A,

    bvd

    Effective depth (mm)

    150 175 200 225 250

    1 300!

    ii >400i

  • 8/17/2019 utm FAB April 2010

    77/175

    vi) Table of modification factor for tensile reinforcement:

    SBC 2273

    Service  _____________________ M/bd2 ____________________ stress ________ 0.50 0.75 1.00 1.50 2.00 3.00 4.00 5.00 6.00

    1.00 2.00 2.00 2.00 1.86 1.63 1.36 1.19 1.08 1.011.50 2.00 2.00 1.98 1.69 1.49 1.25 1.11 1.01 0.94

    (f  y =250) 1.56 2.00 2.00 1.96 1.66 1.47 1.24 1.10 1.00 0.942.00 2.00 1.95 1.76 1.51 1.35 1.14 1.02 0.94 0.882.50 1.90 1.70 1.55 1.34 1.20 1.04 0.94 0.87 0.82

    (f  y =460) 2.88 1.68 1.50 1.38 1.21 1.09 0.95 0.87 0.82 0.783.00 1.60 1.44 1.33 1.16 1.06 0.93 0.85 0.80 0.76

    vii) Table of nominal depths of cover to be used for a variety of  exposure conditions.

    Conditions of exposure Nominal cover (mm)

    Mild - protected from weather 25 20 20 20 20

    Moderate - sheltered from weather 35 30 25 20

    Severe - exposed to severe rain 40 30 25

    Veiy Severe - salts, fumes etc. 50 40 30

    Extreme - abrasives e.g. sea water 60 50

    Max. Free water/cement ratio 0.65 0.60 0.55 0.50 0.45

    Min. Cement Content kg/m3 275 300 325 350 400

    Lowest grade C30 C35 C40 C45 C50

    viii) Cross-sectional areas of group of bars, As (mm2)

    Dia. Areas in mm2 for groups of bars(mm) 1 2 3 4 5 6   7  i 8 9 10....[

    283 ;

    11 ^ 126 28 57 85 113 142 170 ! 198 i 226 255 1 311 340

    8 50 rioi 151 201 252 302 1 352 402 453 | 503 i 553 60410 79 157 236 314 392 471 ! 550 i 628 707 785 ! 864 94212 113 226 339 452 566 679 ; 792 | 905 1020 ; 1130 j 1240 136016 201 402 603 804 1010 1210 j 1410 j 1610 1810 ; 2010 12210 241020 314 628 943 1260 1570 1890 |2200 ; 2510 2830 T  3140 ! 3460 377025 h491 982 1470 I960 2450 2950 ; 3440 1 3930 4420 : 4910 ! 5400 589032 804 1610 2410 3220 4020

    6280

    4830 j 5630 ! 6430 7240 : 8040 8850 965040 1260 2510 3770 5030 7540 ! 8800 i 10100 11300, 12600;13800 1510050 196013930 j5890 i 78501 982011800!13700! 15700 17700; 19600!21600 23600

    9

    9 b

  • 8/17/2019 utm FAB April 2010

    78/175

    SBC 2273

    ix) Cross-sectional area per meter width for various bar spacing (mm2)

    - Foundation design

    Bar size  

    (mm) 

    Spacin g of bars 

    50  75 100 ■ 125 150 175 200   250 300  

    6 566 377 283 226 189 162 142 113 94.3

    8 1 010 671 503 402 335 287 252 201 168

    10 1 570 1 050 785 628 523 449 393 314 262

    12 2 260 1 510 1 130 905 754 646 566 452 377

    16 4 020 2 680 2010 1 610 1 340 1 150 1 010 804 670

    20 6 280 4 190 3 140 2 510 2 090 1 800 1 570 1 260 1 050

    25 9 820 6 550 4910 3 930 3 270 2 810 2 450 1 960 1 640

    32 16 100 10 700 8 040 6 430 5 360 4 600 4 020 3 220 2 680

    40 25 100 16 800 12 600 •10 100 8 380 7 180 6 280 5 030 4 190

    10

  • 8/17/2019 utm FAB April 2010

    79/175

    SBC 1512

    UTMUNIVERSITI TEKNOLOGI MALAYSIA

    Fakulti Alam Bina

    FINAL EXAMINATION 

    SEMESTER II SESSION 2009/2010

    SUBJECT CODE

    COURSE

    PROGRAM

     TIME

    DATE

    LECTURER

    PERCENTAGE

    SBC 1512

    PRINCIPLE OF LAW IN MALAYSIA

    1 SBC

    3 HOURS (9.00 AM - 12.00 PM)

    14 APRIL 2010

     TN. HAJI ROSLI BIN KAMARUDDIN

    50%

    ARAHAN: 

    INSTRUCTION: 

    1. ANSWER QUESTION NO 1 AND 3 OTHERS

    (Jawab soalan No 1 dan 3 soalan yang lain).

    2. CANDIDATES WILL BE PROVIDED WITH CONTRACT ACT 1950

    (Calon-calon akan dibekalkan dengan Akta Kontrak 1950).

    3. ANSWER MUST BE SUPPORTED WITH LAW AUTHORITIES(LAW PROVISIONS AND CASES)

    (Jawapan-jawapan hendaklah disokong dengan Otoriti dan Kes  

    Undang-Undang).

     THIS QUESTION PAPER CONSIST OF 5 PAGES INCLUDING THE

    FRONT PAGE

    1

    9 7

  • 8/17/2019 utm FAB April 2010

    80/175

    Prinsip jiran merujuk kepada penghakiman klasik dalam Kes Donoghue v 

    Stevenson [1932] AC 562. Hakim Lord Atkin dalam penghakimannya telah

    menyatakan seperti berikut

    “The rule that you are to love your neighbour becomes in law you 

    must not injure your neighbour; and the lawyer’s question ‘Who is my 

    neighbour’ receives a restricted reply. You must take reasonable care to 

    avoid acts or omissions which you can reasonably foresee would be likely 

    to injure your neighbour. Who, then, in law is my neighbour? The answer  

    seems to be persons who are so closely and directly affected by my act 

    that I ought reasonably to have them in my contemplation as being so 

    affected when I am directing my mind to the acts or omissions which are 

    called in question...”

    Berdasarkan prinsip di atas, bincangkan perkara-perkara berikut

    a) Tugas atau kewajipan beijaga-jaga. (10 markah)

    b) Pemecahan kewajipan berjaga-jaga. (8 markah)

    c) Satu (1) kes tempatan yang menerimapakai

    prinsip dalam Donoghue v Stevenson. (7 markah)

    QUESTION 1

    Neighbour principle refer to the classical judgment in Donoghue v Stevenson  

     [1932] AC 562 Lord Atkin in delivering the judgment has quoted the following: 

    “The rule that you are to love your neighbour becomes in law you  

    must not injure your neighbour; and the lawyer’s question ‘Who is my  

    neighbour >   receives a restricted reply. You must take reasonable care to  

    avoid acts or omissions which you can reasonably foresee would