Utility M&A:A Case Study in the Sale of a Utility’s Service Area
NARUC Accounting and Finance Meeting, March 8, 2016
Victor Prep, P.E.
Byron S. Watson, CFA
Energy & Resource Consulting Group, LLC
Denver, Colorado
www.ergconsulting.com
© 2016, Energy & Resource Consulting Group, LLC
Introduction
o Victor Prep, P.E. – Executive Consultant
BSME from OU, MBA from Univ. of PA, Wharton
Registered P.E. in CO, LA, and PA, and Certified Energy Manager
Retired Nuclear Submarine Naval Officer
o Byron S. Watson, CFA, CRRA – Senior Consultant
BSEE from SMU, MBA from Emory University
o Members of the Firm act as Advisors to the Council of the Cityof New Orleans (“Council”). Our Services as Advisors are inCertain Ways Comparable to Those of a Commission’s Staff
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
1
Introduction: Background
o Prior to September 1, 2015, Retail Electric Service in the City of NewOrleans was Provided by two Separate Entergy Operating Companies
In the 15th Ward of New Orleans (a.k.a. “Algiers” or the “West Bank”),Entergy Louisiana, LLC (“ELL” or “Seller”) Provided Retail ElectricService to 22,187 Customers
In New Orleans, Except for Algiers, Entergy New Orleans, Inc. (“ENO”or “Seller”) Provided Retail Electric Service to 169,856 Customers
o The Council was the Retail Regulator of both Utilities
Each Utility had Separate and Different Rates, a Different AllowedROE, and Separate Rate Actions Before the Council
Each Utility Owned or Contracted for its own Generating Capacity,Largely From Different Generating Units
Each Utility had Separate Transmission and Distribution Plant
O&M-Related Services Were Provided to Both Utilities by a SingleEnergy Subsidiary (Entergy Services, Inc.)
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
3
Introduction: Background
o As a Result of Negotiations, Seller (ELL) Agreed to Transfer itsElectric Service Operations to Buyer (ENO) and Also SellRelated Utility Plant and Rights to Generating Capacity
Buyer Would Become the Single Retail Electric Utility Provider forAll of New Orleans
The Council Would be the Retail Regulator of One Electric Utility,the Buyer, and Would No Longer Regulate the Seller
Buyer Would own, Operate, and Maintain all Electric Utility PlantPreviously Owned by Seller in Algiers
Franchise Rights to Operate in New Orleans Would be Transferredform Seller to Buyer
Buyer Would Enter into a Purchased Power Agreement (PPA) withSeller to Continue Access to an Agreed-Upon Portion of Seller’sGenerating Resources
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
4
Introduction: Background
o On October 30, 2014, Buyer and Seller Jointly Filed for Approval to:
Sell Seller’s Assets Located in Algiers to Buyer at Net Book Value
Transfer all Franchise Rights to Provide Retail Service to Buyer so thatSeller Would Have no Remaining Operations in New Orleans
Create a New PPA Providing Buyer a “Slice” of Seller’s GeneratingFleet Capacity and Energy (1.84% of Each of Seller’s Units for the Lifeof Each Unit)
Leave Retail Base Rates Unchanged (i.e., Two Separate RateStructures) Until a Later Combined Rate Case Could Set a New SingleSet of Retail Rates for All of New Orleans
Receive other Related Relief, Such as Modifications to Franchises
o The Filing’s Requested Relief was Collectively Called the “AlgiersTransaction” (“Transaction”)
o Separately, ELL (Seller) and Another Entergy Operating Company,Entergy Operating Company, Entergy Gulf States Louisiana, L.L.C.(“EGSL”) were Merging
Closing the Merger After the Transaction was Critical
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
5
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
6
I. PUBLIC GOOD – THE CASE FORREGULATORY CONSOLIDATION
Net Ratepayer Savings
o Increased Costs are Offset by Administrative Savings Averaging an Estimated $1.6 million per Year
Regulation at both the FERC and in Local Jurisdiction
Avoided Duplicative Rate Cases and FRP Evaluations
o Annual Revenue Requirement Related to Service Algiers is Expected to Increase by Approximately $1.5 Million (Average)
Algiers PPA is Based on FERC ROE of 11% vs. Seller’s Allowed ROE of 9.95%.
• FERC May Reduce the ROE as Part of Docket ER13-1508
Recovery of Transaction Implementation Costs
Increased Costs Related to Changes in Participation in RTO Markets
o Net Measurable and Expected Ratepayer Savings Average Approximately $0.1 Million Annually
o Additional Ratepayer Savings Related to Future Regulatory Actions –Difficult to Quantify
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
7
Advantages –Other
o Reduce Customer Confusion Relating to Differing Rates and Rate Schedules in the Same City
o Eliminate Uneconomic Signals Presented by Differing Commercial and Industrial Rates in Same Geographic Area
o Eliminate any Perceived Inequity due to Different Allowed ROEs
o Reduce Administrative Burden on Local Regulators
o Fewer Interventions at FERC Proceedings
o Allow Relatively Small Algiers to Participate in Economies Available to Larger Buyer
Direct Ownership of Generating Units
Securitization of Storm Costs
Access to A Large (i.e., $75 Million ) Storm Reserve
Our Review Suggested no new Procurement Economies
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
8
Transaction: Steps
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
10
o Transaction in Three Steps, Each Occurring in Immediate Sequenceo Step 1: Create New Subsidiary to Receive Plant Located in Algiers
o A Key Transaction Objective was to Maintain Book Value Basis for Assets Sold to Buyer
Transaction: Steps
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
11
o Step 2: Seller Sells the New Subsidiary to Buyer At Assets Net-book Value
Transaction: Steps
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
12o Transaction Maintains Book Value for Assets
o Step 3: Merge New Subsidiary into Buyer
Transaction Balance Sheets
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
13
Algiers Asset Summary
Seller Balance Sheet Illustration
($000)
Account Categories / Titles
Seller Pre-Transaction
Algiers Assets Seller Additions
to Algiers Assets Algiers LLC
Utility Plant 9,947,569 88,956 1,700 90,656
Accumulated Provision for Depreciation, Amort, Depl (3,943,655) (28,527) (28,527)
Nuclear Fuel - Net 147,385
Net Utility Plant 6,151,299 60,429 1,700 62,129
Other Property and Investments 1,160,798
Current and Accrued Assets 680,844 3,500 3,500
Deferred Debits (Regulatory Assets) 2,371,276 877 23,698 24,575
Total Assets 10,364,217 64,806 25,398 90,204
Common Equity and Preferred Stock 2,975,652 60,051 60,051
Long-Term Debt 2,961,670
Other Noncurrent Liabilities 664,861 2,106 2,106
Current and Accrued Liabilities 368,612
Accumulated Deferred Income Tax 2,492,629 19,150 8,501 27,651
Deferred Credits 900,793 396 396
Total Liabilities and Stockholder Equity 10,364,217 21,652 68,552 90,204
Transaction Balance Sheets
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
14
Algiers Asset Summary
Buyer Balance Sheet Illustration
($000)
Account Categories / Titles Buyer Pre-
Transaction Algiers LLC
Buyer Post-Transaction
Utility Plant 1,141,404 90,656 1,232,060
Accumulated Provision for Depreciation, Amort, Depl (532,067) (28,527) (560,594)
Net Utility Plant 609,337 62,129 671,466
Other Property and Investments 11,533 11,533
Current and Accrued Assets 143,942 3,500 147,442
Accumulated Deferred Income Tax - Step-up 27,651 27,651
Deferred Debits (Regulatory Assets) 201,784 24,575 226,359
Total Assets 966,596 117,855 1,084,451
Common Equity 226,063 28,275 254,338
Long-Term Debt 225,944 28,275 254,219
Other Noncurrent Liabilities 10,253 2,106 12,359
Current and Accrued Liabilities 121,274 121,274
Short-Term Debt (Money Pool or Credit Facility) 3,500 3,500
Accumulated Deferred Income Tax 27,651 27,651
Intercompany Payable (due to Seller) 27,651 27,651
Deferred Credits 383,062 397 383,459
Total Liabilities and Stockholder Equity 966,596 117,855 1,084,451
Tax Considerations
o Transaction had to Close Prior to The ELL/EGSL Merger to Avoid Loss of ADIT and Related Tax Recapture (i.e., Maintain Tax Deferral Represented In ADIT Balance)
o ADIT as Of Transaction Close Date Associated With Algiers Assets is Retained by Seller
Seller Must Eventually Pay Taxes Equal to ADIT
Buyer Must Eventually Pay Taxes Equal to any new ADIT That Accumulates After Transaction Close
o Buyer Records Offsetting ADIT Debits And Credits Associated With Step-Up ADIT – Substantially Equal to The Algiers Assets’ ADIT as of The Transaction Close (i.e., Zero Effect on Owner Equity)
o Zero-Interest Note Payable From Buyer to Seller Equal to Step-Up ADIT.
Intercompany Payable Recreates Effect of ADIT Liability on Buyer’s Books and Compensates Seller for Increased Tax Liability
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
15
Purchase Price
o Purchase Price of Seller’s Assets was Net Book Value
Basis of Rate Base in Ratemaking, Provides Continuity
Accumulated Depreciation Represents Capital Costs Already Recovered by Ratepayers, So a Higher Amount Could Result in Double-Recovery of Costs
o Sale at Net-Book Value (Gross Cost less Accumulated Book Depreciation) Raises Tax Basis
Pre-Transaction, Tax Basis of Assets Were Lower Than Book Basis
Tax Basis is Increased by Related ADIT (Transaction Debits Tax Basis by ADIT Amount)
ADIT Debit is Paid By Zero-interest Note of Same Amount Payable to Seller. Note Amortizes as ADIT Balance Reverses
Neither ADIT Debit nor Note Payable are to be Included in Buyer’s Future Rate Action Cost Studies
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
17
Evaluation Issues
o Prior to the Transaction, the Cost to Provide Service in Algiers was Determined in Large Part by an Allocation of the Seller’s Overall Costs Throughout its Entire Service Territory
Algiers Represented About 2-3% of Seller’s Overall Costs of Service
o Also, Seller was in the Process of Merging with EGSL
Merger was Scheduled to Close After the Transaction, in Part to Prevent a Taxable Gain on ADIT Step-Up
o At the Time of the Transaction, Seller’s Algiers Area was Subject to a FRP, With Four Annual Evaluations Remaining
o Transaction Made Such FRP Evaluations Unfeasible
Merger of Algiers Assets and Operations into Buyer’s Accounts Fatally Clouds any Algiers-Specific Accounting
o Parties Agreed to Suspend the Algiers FRP and Freeze Rates
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
18
Transaction Conditions
o Conditions on Transaction Approval to Protect the Public Interest
Buyer Not to Request Rate Action that Singles Out One Service Area, to Prevent “Cherry Picking” Service Areas to Maximize Revenues
Rate Freeze Until the Mid-2018 Combined Rate Case Filing (Discussed Later)
• Transaction-related Changes To Algiers Base Rate Revenue Requirement are not Reflected in Rates Until the Combined Rate Case
No Algiers FRP Evaluations (Discussed Later)
• Regulatory Cost Reduced By Eliminating Three FRP Evaluations Previously Scheduled in Recent Rate Case Settlement
o Transaction Had to Close Prior to The ELL/EGSL to Avoid Loss of ADIT and Related Tax Recapture
o ADIT Step-up and Intercompany Payable not to be Included in Future Buyer Rate Action Cost Studies
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
19
Rate Making Issues
o The Transaction Closed On September 1, 2015
o The First Full-year Test Year Available for a Cost Of Service Study on Buyer’s Combined Operations Would be CY 2016
In Our Experience, a Split-Year Test Year had Proven to be Problematic
o Seller was in The Second Step of a 4-Step Annual Algiers Retail Rate Ramp-up Scheduled to Finish In 2017
At the End of the 4-step Rate Ramp-up, Algiers Rates Will be Roughly Comparable to Those Currently Charged by Buyer
o In the Interest of Rate Stability, Parties Negotiated a Rate Freeze Through 2018, When a Combined Rate Case Based on a 2017 TY For the Buyer’s Combined Operations May Set New Rates
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
20
Interim Ratemaking Issues
o Until New Rates can be Established for all of New Orleans Through a Combined Rate Case, the Following Interim Provisions Were Adopted
A Combined Fuel Adjustment Clause
• Important Rate Differences Between Algiers and Buyer’s Original Service Area
A Combined (Blended) Environmental Adjustment Clause
Separate RTO (i.e., MISO) Cost Recovery Riders
Phase-in Of Previously Approved Rate Increases in Algiers to Continue
Separate Energy Efficiency / DSM Program Budgets and Funding Sources En
ergy
& R
eso
urc
e C
on
sult
ing
Gro
up
, LLC
21
Accounting Methodologies
o Objective to Determine Net-book Value of Assets Sold to Buyer
o Complications
Most Distribution Assets Were Accounted for With Mass PropertyAccounting Where Individual Assets were not Identified
• The Original Cost of Most Distribution Assets Physically in Algiers wasUnknowable
• The Sales Price of Most Distribution Assets was Established by Allocatinga Portion of all Of Seller’s Distribution Assets
• Allocation was Based on the Same Factors From the Most Recent RateCase for Algiers
Some Transmission Assets Carried Across the Boundary BetweenBuyer and Seller
• Asset Purchase Price and Related O&M was Divided Between Buyer andSeller Based on Length of Transmission on Either Side of Boundary
Accounts Receivable based on Differing Billing Cycles and DifferentCollection Rates
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
23
Accounting Methodologies
o Complications (Cont.)
Seller and Buyer Have Different Depreciation Rates. Upon Closeof Transaction, Algiers Assets Begin Depreciation According toBuyer’s Approved Depreciation Rates
Regulatory Assets Were Transferred at Their Book Value net ofAmortization
Property Right to Collect Securitization Bonds’ Servicing CostsExtends to Algiers
ADIT is Substantially Eliminated on Buyer’s Books due to Tax BasisStep-up
• Effect of ADIT is Recreated Through Intercompany Note
Algiers Benefits from Buyer’s Existing Storm Reserve
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
24
Compliance Filing
o Within Three Months of Close of the Transaction, Buyer wasRequired to Make an Accounting Compliance Filing
Identifying and Valuing the Algiers Assets as of Transaction Close
Showing Supporting Data
Showing all Assumptions and Computations, and Formulae
o 60-day Review Period Following Filing of AccountingCompliance Filing
Upon Completion of Review Period, Parties may File List ofUnresolved Issues
o 6-month Period to Resolve Issues With AccountingCompliance Filing
Unresolved Issues may Call for Supplemental Procedural Schedule
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
25
Considerations for Regulators
o In M&A Activity, How is the Public Interest Determined? Determination of Regulators of Both Buyer and Seller Required
How to Determine What Benefits Reasonably will Materialize
o How to Treat Seller Assets That are Difficult to PhysicallyIdentify Allocate Based on Factors From Recent Rate Action
Physical Plant Survey
Detailed Audit of a Statistical Sample of Property AccountingEntries
o How to Provide Generating Capacity to Sold Region PPA of Slice Of Seller’s System
PPA or Ownership Interest in Specific Generating Units
Buyer to Purchase Capacity / Energy in RTO Auctions / Markets
Ener
gy &
Res
ou
rce
Co
nsu
ltin
g G
rou
p, L
LC
27
Considerations for Regulators
o What are the Tax Effects of an M&A Transaction?
How to Properly Allocate Affected Tax Costs to Appropriate Party
How to Avoid New Tax Expenses
o Prevent Double-Recovery of Plant Investment
Is Accumulated Depreciation Balance Maintained?
If Purchase Price is Above Net Book Value, Should Goodwill beRecovered?
o What Regulatory Assets, Including Regulatory Assets Relatedto Stranded Assets, are Appropriately Transferrable in UtilityM&A? En
ergy
& R
eso
urc
e C
on
sult
ing
Gro
up
, LLC
28