utilities section-project assignment listing - ct.gov · 11/06/2018 · 004-0118 avon intersection...
TRANSCRIPT
Utilities Section-Project Assignment Listing
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
004-0116 AVON Bridge Replacement (PE 4-132) Old Farms Rd. CHHABRA, G. DESIGNPITEO, M. 5/9/2018
004-0118 AVON Intersection Improvements-Minor Old Farms Rd. / Rte. 10 CHHABRA, G. DESIGNPITEO, M. 5/9/2018
004-0123 AVON Reconstruction-Major Avon Mountain CHHABRA, G. AUDITPITEO, M. 9/6/2011
004-0128 AVON Truck Ramp Avon Mountain CHHABRA, G. AUDITPITEO, M. 11/18/2009
005-0110 BARKHAMSTEAD Overlay Robertsville Rd. VON HONE, K. AUDITMYSLIWIEC, A. 8/30/2010
005-0111 BARKHAMSTEAD Pavement Overlay Hillcrest Drive CHHABRA, G. CONSTRUCTIONPITEO, M. 11/4/2009
005-0114 BARKHAMSTEAD Operational Improvements Rtes. 219 & 318 CHHABRA, G. DESIGNPITEO, M. 5/20/2020
006-0117 BEACON FALLS Bridge Rehabilitation Depot St. Bridge HENDRICKSON, G. CONSTRUCTIONPITEO, M. 10/8/2008
006-0118 BEACON FALLS Streetscape Improvements Naugatuck River WALLACE, C. CONSTRUCTIONPITEO, M. 9/22/2010
006-0122 BEACON FALLS Replacement of Retaining Walls Route 42 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 3/6/2013
007-0168 BERLIN Railroad Bridge CT 372 WALLACE, C. AUDITPITEO, M.
007-0168 BERLIN Railroad Bridge CT 372 PITEO, M. AUDITPITEO, M.
007-0182 BERLIN Rail Line Facility Berlin Station Improvements HENDRICKSON, G. CONSTRUCTIONPITEO, M. 2/19/2014
007-0184 BERLIN Pavement Rehabilitation (ARRA) Episcopal Rd CHHABRA, G. CONSTRUCTIONPITEO, M. 11/18/2009
007-0185 BERLIN Bridge Replacement Farmington Ave over Mattabeset River HENDRICKSON, G. CONSTRUCTIONPITEO, M.
009-0088 BETHEL Bridge Replacement East Swamp Brook CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/9/2014
009-0091 BETHEL Bridge Replacement Walnut Hill Rd CHHABRA, G. CONSTRUCTIONPITEO, M.
009-0096 BETHEL Sidewalk Improvements Maple & Plumbtree Ave WALLACE, C. CONSTRUCTIONPITEO, M. 3/16/2011
009-0097 BETHEL ARRA - Pavement Preservation Old Hawletville Road HENDRICKSON, G. CONSTRUCTIONPITEO, M. 12/2/2009
009-0098 BETHEL Intersection Improvements-Minor Walnut Hill Rd HENDRICKSON, G. CONSTRUCTIONPITEO, M.
011-0151 BLOOMFIELD Intersection Improvements Rte. 189 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/13/2011
011-0152 BLOOMFIELD Multi-Use Trail Bloomfield Greenway CHHABRA, G. CONSTRUCTIONPITEO, M. 1/27/2016
011-0153 BLOOMFIELD Culvert Replacement - Emergency Decclaration Route 178 Over Filley Brook CHHABRA, G. CONSTRUCTIONPITEO, M.
011-0154 BLOOMFIELD Emergency Declaration Route 189 over Wash Brook BROWN, D. DESIGNMYSLIWIEC, A.
012-0092 ANDOVER P.E. for 1-101,1-102 Rte. 6 WALLACE, C. CONSTRUCTIONPITEO, M.
012-0095 BOLTON Safety Improvements Route 533 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 5/13/2015
012-0096 BOLTON Shared Use Path Charter Oak Greenway Ext. CHHABRA, G. CONSTRUCTIONPITEO, M. 11/9/2017
012-0098 BOLTON Shared Use Path Connection Hop River Trail Quarry Rd. SMITH, L. / BROWN, D. TBDMYSLIWIEC, A.
014-0157 BRANFORD Reconstruction Bridge U.S. 1 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 12/24/2008
014-0166 BRANFORD Minor Intersection Improvement Route 1 WALLACE, C. CONSTRUCTIONPITEO, M.
014-0167 BRANFORD Minor Intersection Improvement Route 1 WALLACE, C. CONSTRUCTIONPITEO, M.
014-0174 BRANFORD Realignment-Minor SR 740 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 7/12/2017
014-0177 BRANFORD Culvert Replacement CJM CLE Bridge 02675 over Rt 146 WALLACE, C. DESIGNPITEO, M. 6/20/2018
014-0179 BRANFORD Bridge Replacement Rte. 139 - Br. # 1358 BL COMPANIES CONSTRUCTIONUSHER, JEN 4/13/2016
014-0182 BRANFORD Pavement Improvements Cedar,Pine, Thimble CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/20/2011
014-0184 BRANFORD Shoreline Greenway Trail Segment B3 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 4/26/2017
014-0185 BRANFORD Bridge Replacement I-95 Bridge No. 00196 CME ASSOCIATES DESIGNNERVAIS, KIMERY 6/27/2018
014-0186 BRANFORD Bridge Rehabilitation Route 72 at 69 WALLACE, C. DESIGNPITEO, M. 2/26/2020
015-0248 BRIDGEPORT Bridge Replacement Route 1 over RR HENDRICKSON, G. DESIGNPITEO, M. 8/29/2018
015-0248 BRIDGEPORT Bridge Replacement Rte. 1 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 8/29/2018
015-0256 BRIDGEPORT Utility breakout of 15-268,269,270 I-95 CAI, X. CONSTRUCTIONMYSLIWIEC, A.
Monday, June 11, 2018 Page 1 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
015-0256 BRIDGEPORT Utility breakout of 15-268,269,270 I-95 PITEO, M. AUDITPITEO, M.
015-0271 BRIDGEPORT Upgrade Expressway I-95 PITEO, M. AUDITMYSLIWIEC, A.
015-0272 BRIDGEPORT Upgrade Expressway I-95 PITEO, M. AUDITMYSLIWIEC, A.
015-0296 BRIDGEPORT Reconstruction-Major MNRR-Fairfield Ave. CAI, X. CONSTRUCTIONMYSLIWIEC, A.
015-0312 BRIDGEPORT High Speed Ferry Ferry Facility HENDRICKSON, G. DESIGNPITEO, M. 4/18/2018
015-0334 BRIDGEPORT Safety Improvements Lindley Street VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 11/11/2014
015-0335 BRIDGEPORT Intersection Improvements-Minor Route 127 at Evers St CAI, X. DESIGNMYSLIWIEC, A. 4/17/2019
015-0336 BRIDGEPORT Safety Improvements CT 113 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 12/18/2013
015-0339 BRIDGEPORT Bridge Rehabilitation Rte. 130 - B. #2475 CLOSE, JENSEN & MILLER TBDMANGAN, THOMAS 11/11/2018
015-0343 BRIDGEPORT Pavement Rehabilitation Iranistan/Capitol BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 12/23/2009
015-0344 BRIDGEPORT I.M.S I-95 / RTE. 8/ RTE. 15 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 4/29/2015
015-0345 BRIDGEPORT I.M.S I-95 / RTE. 8 / RTE. 15 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 4/29/2015
015-0351 BRIDGEPORT Reconstruction-Major Steel Pointe Harbor Rd WALLACE, C. CONSTRUCTIONPITEO, M. 12/21/2011
015-0358 BRIDGEPORT Sidewalk Installation Iranistan Ave. VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 5/15/2013
015-0360 BRIDGEPORT Traffic Signal Improvements Main Street BROWN, D. DESIGNMYSLIWIEC, A. 7/15/2015
015-0363 BRIDGEPORT Superstructure Replacement Route 8 NB Bridge No. 03761, 03762, 0 CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 8/13/2014
015-0364 BRIDGEPORT Retaining Wall Replacement Routes 8 & 25 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 3/5/2014
015-0371 BRIDGEPORT Seaview Ave. Corridor Seaview Ave. SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 5/1/2019
015-0372 BRIDGEPORT Bridge Improvements Br. #03637 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 9/21/2016
015-0373 BRIDGEPORT New Rail Station Barnum Street CAI, X. TBDMYSLIWIEC, A. 11/11/2021
016-0098 BRIDGEWATER Safety Improvements-Minor Rte. 133 WALLACE, C. CONSTRUCTIONPITEO, M. 3/2/2016
017-0130 BRISTOL Major Widening US 6 @ Mix St. BROWN, D. AUDITMYSLIWIEC, A.
017-0140 BRISTOL Railroad Grade Crossing Emmett Street VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 3/27/2013
017-0143 BRISTOL Grade Crossing Central Street VON HONE, K. AUDITMYSLIWIEC, A. 11/23/2010
017-0148 BRISTOL Major Drainage U.S. 6 & 69 WALLACE, C. CONSTRUCTIONPITEO, M.
017-0148 BRISTOL Major Drainage U.S. 6 & 69 HENDRICKSON, G. CONSTRUCTIONPITEO, M.
017-0166 BRISTOL Reconstruction-Major Utility Breakout 17-137 PITEO, M. AUDITPITEO, M.
017-0174 BRISTOL Intersection Improvements-Minor South, Union, Church VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 6/19/2013
017-0177 BRISTOL Intersection Improvements-Minor Route 229 HENDRICKSON, G. AUDITPITEO, M. 1/14/2009
017-0182 BRISTOL Major Widening Route 6 SMITH, L. / BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/8/2016
017-0183 BRISTOL Intersection Improvements-Major Route 69 at Maple Ave WALLACE, C. CONSTRUCTIONPITEO, M. 4/27/2016
017-0184 BRISTOL Realignment-Minor Mix Street WALLACE, C. CONSTRUCTIONPITEO, M. 11/11/2009
017-0187 BRISTOL Intersection Improvements-Major Route 2 at Route 69 HENDRICKSON, G. DESIGNPITEO, M. 11/4/2020
018-0118 BROOKFIELD Intersection Improvements-Minor Rte. 202,Silvermine Rd.,Elbow Hill VON HONE, K. AUDITMYSLIWIEC, A.
018-0128 BROOKFIELD Multi-use Trail Route 202 BROWN, D. DESIGNMYSLIWIEC, A. 2/4/2015
018-0130 BROOKFIELD ARRA-Resurfacing Gray's Bridge Road VON HONE, K. AUDITMYSLIWIEC, A. 11/18/2009
018-0134 BROOKFIELD Bridge Rehabilitation Br. # 01343 - RTE. 133 CME ASSOCIATES DESIGNNERVAIS, KIMERY 7/18/2018
018-0135 BROOKFIELD Safety Improvements US 202 CHHABRA, G. DESIGNPITEO, M. 1/6/2021
018-0136 BROOKFIELD Sidewalk and Multi-use Trail 202 DESIGNMYSLIWIEC, A. 4/10/2019
019-0106 BROOKLYN Breakout for 19-92,93,94 Rte.6 WALLACE, C. AUDITPITEO, M.
020-0105 BURLINGTON ARRA - Multi-use Trail Trail WALLACE, C. CONSTRUCTIONPITEO, M. 12/23/2009
021-0107 CANAAN Resurfacing Route 63 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 1/12/2011
022-0104 CANTERBURY Resurfacing Route 169 CHHABRA, G. CONSTRUCTIONPITEO, M. 1/25/2012
023-0125 CANTON Trail farmington River trail WALLACE, C. CONSTRUCTIONPITEO, M. 11/25/2009
Monday, June 11, 2018 Page 2 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
025-0133 CHESHIRE Upgrade Expressway Rte. 84 BROWN, D. AUDITMYSLIWIEC, A.
025-0135 CHESHIRE Multi-use Trail Farmington Canal Greenway WALLACE, C. CONSTRUCTIONPITEO, MICHAEL
025-0137 CHESHIRE Bridge Restoration Rte. 70 / Broad Brook VON HONE, K. AUDITMYSLIWIEC, A. 1/20/2010
025-0138 CHESHIRE Realignment-Minor CT Route 42 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 12/5/2012
025-0140 CHESHIRE Culvert Replacement Route 68/70 WALLACE, C. CONSTRUCTIONPITEO, M. 10/20/2010
025-0144 CHESHIRE Farmington Canal Trail Cornwall Ave. WALLACE, C. CONSTRUCTIONPITEO, M. 3/4/2015
025-0145 CHESHIRE Trail Farmgtn. Canal Trail WALLACE, C. CONSTRUCTIONPITEO, M. 9/21/2016
026-0120 CHESTER Bridge Rehabilitation Rte. 148 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 1/21/2015
026-0122 CHESTER Culvert Repair/Extension Rte. 9 - Br. # 6639 BL COMPANIES CONSTRUCTIONUSHER, JEN 7/8/2015
026-0125 CHESTER Pavement Preservation Route 82 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A.
028-0192 COLCHESTER Emergency Declaration Comstock Bridge WALLACE, C. CONSTRUCTIONPITEO, M. 5/6/2009
028-0195 COLCHESTER Emergency Bridge Repairs Comstock Timber WALLACE, C. CONSTRUCTIONPITEO, M. 1/7/2009
028-0199 COLCHESTER Bridge Replacement Rte. 85 - Br. #6784 BL COMPANIES CONSTRUCTIONUSHER, JEN 11/11/2015
028-0200 COLCHESTER Pipe Lining Rte. 11 - Br.# 6736 CME ASSOCIATES DESIGNNERVAIS, KIMERY 7/13/2016
028-0202 COLCHESTER Bridge Rehabilitation Route 2 CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 6/27/2018
029-0099 COLEBROOK Pavement Preservation (ARRA) Riverton Rd. CHHABRA, G. CONSTRUCTIONPITEO, M. 11/4/2009
031-0127 CORNWALL Bridge Replacement Route 4 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 12/18/2013
031-0128 CORNWALL Bridge Replacement Route 43 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 10/16/2013
031-0130 CORNWALL Chip Sealing Great Hill Road VON HONE, K. AUDITMYSLIWIEC, A. 6/6/2012
031-0131 CORNWALL Bridge Rehabilitation Covered Bridge CAI, X. CONSTRUCTIONMYSLIWIEC, A. 5/31/2017
032-0130 COVENTRY Realignment-Minor CT 31 CHHABRA, G. CONSTRUCTIONPITEO, M. 6/17/2015
032-0144 COVENTRY Sidewalk Installations (ARRA) Route 31 CHHABRA, G. CONSTRUCTIONPITEO, M. 12/9/2009
032-0146 COVENTRY Safe Routes to School Progarm Route 31 CHHABRA, G. CONSTRUCTIONPITEO, M.
033-0126 CROMWELL Pavement Preserve Imp. (ARRA) Geer St. / Wilbrook Rd. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 12/2/2009
033-0127 CROMWELL Culvert Rehabilitation Route 9 (170-2815-PE) HENDRICKSON, G. CONSTRUCTIONPITEO, M. 9/19/2012
033-0128 CROMWELL Pavement Preservation Route 9 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 1/18/2012
033-0129 CROMWELL Reconstruction-Minor Route 372 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 5/31/2017
033-0130 CROMWELL Super/Substructure Repair Rte. 3 - Br. #3523 CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 9/17/2014
033-0131 CROMWELL Pavement Preservation Route 9 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 10/21/2015
034-0260 DANBURY Reconstruction-Major US 7 CHHABRA, G. CONSTRUCTIONPITEO, M. 6/4/2008
034-0288 DANBURY Widening U.S. 6 CAI, X. TBDMYSLIWIEC, A.
034-0305 DANBURY Intersection Improvements-Minor CT 37 WALLACE, C. CONSTRUCTIONPITEO, M. 5/24/2016
034-0309 DANBURY Intersection Improvements-Minor Route 806 WALLACE, C. CONSTRUCTIONPITEO, M. 5/17/2017
034-0313 DANBURY New Interchange I-84 WALLACE, C. CONSTRUCTIONPITEO, M.
034-0315 DANBURY Reconstruction-Major Route 7 BROWN, D. AUDITMYSLIWIEC, A.
034-0324 DANBURY Intersection Improvements-Major Rte. 53 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 10/19/2019
034-0325 DANBURY Traffic Signalization Backus Avenue CHHABRA, G. CONSTRUCTIONPITEO, M. 7/11/2012
034-0330 DANBURY Upgrade Expressway I-84 VON HONE, K. AUDITMYSLIWIEC, A. 5/5/2010
034-0338 DANBURY Traffic Signalization Route 6 and Route 202 CHHABRA, G. CONSTRUCTIONPITEO, M. 6/26/2013
034-0344 DANBURY Traffic Signalization Fifth Ave./ Osborne VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 10/3/2013
034-0345 DERBY Roadway Widening Rte. 37 / Barnum Rd. WALLACE, C. CONSTRUCTIONPITEO, M. 5/24/2017
034-0347 DANBURY Intersection Improvements-Minor Newtown Rd. (S.R.806) WALLACE, C. DESIGNPITEO, M. 8/29/2018
034-0349 DANBURY Reconstruction between Exists 3 &8 I-84 BROWN, D. TBDMYSLIWIEC, A.
034-0351 DANBURY Intersection Improvements Beckerlee Street DESIGNPITEO, M. 9/8/2021
Monday, June 11, 2018 Page 3 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
035-0188 DARIEN Upgrade Expressway I-95 VON HONE, K. AUDITMYSLIWIEC, A.
035-0192 DARIEN Facility Improvements Noroton Heights RR Station HENDRICKSON, G. CONSTRUCTIONPITEO, M. 8/12/2009
035-0194 DARIEN Deck Replacement Old Kings Hwy Br. No. 00047 CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 8/17/2016
036-0179 DERBY Interchange Improvements Route 8/34 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 5/7/2014
036-0182 DERBY Bridge Rehabilitation Route 34 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 9/18/2013
036-0184 DERBY Reconstruction Route 34 (bridge st. to Ausonoio Dr CHHABRA, G. DESIGNPITEO, M. 1/9/2019
036-0191 DERBY Pavement Rehabilitation Hawthorne Ave CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/6/2011
036-0195 DERBY Operational Improvements Route 34 CHHABRA, G. CONSTRUCTIONPITEO, M. 10/11/2017
036-0198 DERBY Bridge Rehabilitation Bluff Street CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 10/23/2019
037-0102 DURHAM Road Pavement Preservation Pent Road VON HONE, K. AUDITMYSLIWIEC, A. 7/18/2012
039-0088 EAST GRANBY Major Intersection CT 20 BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
039-0099 EAST GRANBY Bridge Replacement Rte. 20 / Br. # 06705 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 3/30/2016
040-0129 EAST HADDAM Mobility Improvements Route 82 & Route 149 WALLACE, C. CONSTRUCTIONPITEO, M. 7/10/2013
040-0132 EAST HADDAM Culvert Replacement Route 151 CHHABRA, G. CONSTRUCTIONPITEO, M. 7/15/2009
040-0136 EAST HADDAM Bridge Replacement Rte. 82 - Br. #2507 BL COMPANIES CONSTRUCTIONUSHER, JEN 6/15/2016
040-0138 EAST HADDAM Bridge Replacement Rte. 82 - Br. # 2506 BL COMPANIES CONSTRUCTIONUSHER, JEN 6/15/2016
040-0141 EAST HADDAM Bridge Rehabilitation Route 82 CME ASSOCIATES DESIGNNERVAIS, KIMERY 1/16/2019
040-0146 EAST HADDAM Bridge Replacement # 02510 Rte. 82 over Strongs Brook CAI, X. DESIGNMYSLIWIEC, A. 12/2/2020
041-0112 EAST HAMPTON Intersection Improvement Rte. 66 @ N. Main St. WALLACE, C. CONSTRUCTIONPITEO, M.
041-0113 EAST HAMPTON Intersection Improvements-Minor US 66 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 4/30/2014
041-0115 EAST HAMPTON Culvert Replacement N. Main Street VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 6/24/2015
041-0116 EAST HAMPTON Pavement Rehabilitation Brewer Road VON HONE, K. AUDITMYSLIWIEC, A. 7/3/2013
041-0118 EAST HAMPTON Bridge Replacement Route 66 Bridge No. 00250 CME ASSOCIATES DESIGNNERVAIS, KIMERY 4/25/2018
042-0268 EAST HARTFORD RR-Highway Grade Crossing Prospect Street BROWN, D. AUDITMYSLIWIEC, A.
042-0269 EAST HARTFORD RR-Highway Grade Crossing Burnham Street BROWN, D. AUDITMYSLIWIEC, A.
042-0280 EAST HARTFORD Reconstruction Park Avenue BROWN, D. AUDITMYSLIWIEC, A.
042-0291 EAST HARTFORD Reconstruction Prospect Street BROWN, D. AUDITMYSLIWIEC, A.
042-0292 EAST HARTFORD Realignment-Minor RTE.44 VON HONE, K. AUDITMYSLIWIEC, A. 11/24/2010
042-0297 EAST HARTFORD Intersection Improvements-Major Silver La./Forbes VON HONE, K. AUDITMYSLIWIEC, A. 11/11/2009
042-0299 EAST HARTFORD Reconstruction-Minor Governor Street WALLACE, C. CONSTRUCTIONPITEO, M. 7/23/2008
042-0300 EAST HARTFORD Trail Route 2 / Simmons Rd. HENDRICKSON, G. CONSTRUCTIONPITEO, M.
042-0301 EAST HARTFORD Multi-use Trail Charter Oak Greenway HENDRICKSON, G. CONSTRUCTIONPITEO, M. 7/9/2014
042-0304 EAST HARTFORD Bridge Replacement SR 500 - Br. # 2374 BL COMPANIES CONSTRUCTIONUSHER, JEN 11/19/2014
042-0305 EAST HARTFORD Superstructure Repair SR 500 - Br. # 2375 BL COMPANIES CONSTRUCTIONUSHER, JEN 11/19/2014
042-0307 EAST HARTFORD Pavement Rehabilitation Roberts St. CHHABRA, G. CONSTRUCTIONPITEO, M. 7/22/2009
042-0308 EAST HARTFORD Bicycle Rehabilitation Forbes/Spencer/I-84 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 11/4/2009
042-0309 EAST HARTFORD ARRA - Resurfacing Main & School Streets HENDRICKSON, G. CONSTRUCTIONPITEO, M. 10/21/2009
042-0309 EAST HARTFORD ARRA-Resurfacing Main St. / School St. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 10/21/2009
042-0312 EAST HARTFORD Resurfacing I-84 CHHABRA, G. CONSTRUCTIONPITEO, M. 11/9/2011
042-0313 EAST HARTFORD Reconstruction-Minor Riverside Dr. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 5/21/2014
042-0315 EAST HARTFORD Bicycle / Pedestrian Improvements Burnside Avenue HENDRICKSON, G. CONSTRUCTIONPITEO, M. 11/26/2014
042-0316 EAST HARTFORD Superstructure Replacement I-84 - Br. #2376 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 11/19/2014
042-0317 EAST HARTFORD Bridge Rehabilitation Route 2 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 5/18/2018
043-0122 EAST HAVEN Breakout for 92-533 I-95 BROWN, D. AUDITMYSLIWIEC, A.
Monday, June 11, 2018 Page 4 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
043-0124 EAST HAVEN Traffic Signalization Main Street HENDRICKSON, G. CONSTRUCTIONPITEO, M. 7/28/2010
043-0128 EAST HAVEN Bridge Rehabilitation Bridge # 01665 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 3/12/2014
044-0147 EAST LYME Bridge Replacement Rte. 1 / Niantic River CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/1/2015
044-0148 EAST LYME Bridge Replacement CJM-CLE Br. # 02973- Rte.1 CHHABRA, G. CONSTRUCTIONPITEO, M. 10/28/2015
044-0151 EAST LYME Resurfacing I-95 WALLACE, C. CONSTRUCTIONPITEO, M. 9/23/2009
044-0152 EAST LYME Bridge Replacement Society Rd. - Br. # 249 BL COMPANIES CONSTRUCTIONUSHER, JEN 1/29/2014
044-0156 EAST LYME Interchange Ramps I-95 CAI, X. DESIGNMYSLIWIEC, A. 9/9/2020
047-0116 ELLINGTON Intersection Improvements-Minor CT 74 / 286 CHHABRA, G. CONSTRUCTIONPITEO, M. 7/14/2010
047-0117 ELLINGTON Intersection Improvements-Minor CT 74 / 286 CHHABRA, G. AUDITPITEO, M. 7/1/2015
047-0119 ELLINGTON Bridge Replacement Route 140 CAI, X. DESIGNMYSLIWIEC, A. 10/23/2019
048-0184 ENFIELD Bicycle Facility Route 190 BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
048-0186 ENFIELD Reconstruction-Major Post Office Road VON HONE, K. AUDITMYSLIWIEC, A. 3/17/2010
048-0189 ENFIELD Safety Improvements-Minor Freshwater Boulevard CHHABRA, G. CONSTRUCTIONPITEO, M. 11/18/2009
048-0190 ENFIELD Preliminary Engineering Study CT River Access CAI, X. TBDMYSLIWIEC, A. 5/22/2019
048-0191 ENFIELD Reconstruction-Minor Raffia Road WALLACE, C. CONSTRUCTIONPITEO, M. 2/24/2010
048-0192 ENFIELD Bridge Reconstruction South Maple St. CHHABRA, G. CONSTRUCTIONPITEO, M. 3/31/2010
048-0196 ENFIELD Superstructure Replacement Rte. 5 - Br. #3361 CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 12/17/2014
048-0197 ENFIELD Bridge Replacement (05579) Rte. 190 / Terry Brook BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 10/26/2016
049-0108 ESSEX Pedestrian Safety Improvements Main Street CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/8/2015
050-0212 FAIRFIELD Bridge Replacement Mill Plain Rd CHHABRA, G. CONSTRUCTIONPITEO, M. 6/17/2009
050-0213 FAIRFIELD Reconstruction-Minor Mill Plain Rd WALLACE, C. CONSTRUCTIONPITEO, M. 5/5/2010
050-0214 FAIRFIELD Intersection Improvements-Minor Various Locations HENDRICKSON, G. CONSTRUCTIONPITEO, M. 10/21/2009
050-0218 FAIRFIELD Roadway Enhancement Route 1 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 6/28/2017
050-0219 FAIRFIELD Pavement Preservation I-95 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 1/13/2016
051-0258 FARMINGTON Bridge Replacement 4 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 1/30/2013
051-0260 FARMINGTON Reconstruction-Major Route 4 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 7/1/2015
051-0262 FARMINGTON Intersection Improvements-Minor Farmington @ Farm WALLACE, C. CONSTRUCTIONPITEO, M.
051-0265 FARMINGTON Reconstruction-Major Middle Road VON HONE, K. AUDITMYSLIWIEC, A. 6/24/2009
051-0267 FARMINGTON Pavement Preservation Route 4 WALLACE, C. CONSTRUCTIONPITEO, M. 12/19/2012
051-0268 FARMINGTON Multi-Use Trail Canal Heitage Grnwy. HENDRICKSON, G. CONSTRUCTIONPITEO, M. 12/30/2015
051-0269 FARMINGTON Intersection Improvements-Minor Rte. 177 - S. Main St. HENDRICKSON, G. DESIGNPITEO, M. 4/25/2018
051-0272 FARMINGTON Bridge Rehabilitation Br. 01487 / Farmington River BL COMPANIES DESIGNUSHER, JEN 10/23/2020
052-0090 FRANKLIN Bridge Replacement (06777) Rte. 207 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 5/25/2016
052-0091 FRANKLIN Bridge Rehabilitation Route 207 CME ASSOCIATES DESIGNNERVAIS, KIMERY 6/6/2018
053-0165 GLASTONBURY Realignment CT 94 PITEO, M. AUDITPITEO, M.
053-0175 GLASTONBURY Bridge Rehabilitation Putnam Bridge CAI, X. CONSTRUCTIONMYSLIWIEC, A. 9/12/2012
053-0177 GLASTONBURY Resurfacing Route 2 CHHABRA, G. CONSTRUCTIONPITEO, M. 11/27/2013
053-0181 GLASTONBURY Traffic Signal Modernization Main Street VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 2/20/2013
053-0185 GLASTONBURY Pavement Preservation Main Street WALLACE, C. CONSTRUCTIONPITEO, M. 6/20/2012
053-0186 GLASTONBURY Resurfacing Route 2 CHHABRA, G. CONSTRUCTIONPITEO, M. 3/13/2013
053-0187 GLASTONBURY Safety Improvements-Minor Griswold Street HENDRICKSON, G. CONSTRUCTIONPITEO, M. 2/11/2015
053-0189 GLASTONBURY Bridge Rehabilitation Br. # 00388 on CT 17 NB CME ASSOCIATES DESIGNNERVAIS, KIMERY 12/12/2018
053-0190 GLASTONBURY/WETH Trail Connections Route 3 CAI, X. DESIGNMYSLIWIEC, A. 2/13/2019
053-0193 GLASTONBURY Intersection Roudabout Hebron Ave ( 94) HENDRICKSON, G. CONSTRUCTIONPITEO, M. 10/11/2017
Monday, June 11, 2018 Page 5 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
054-0086 GOSHEN Pavement Rehabilitation Milton Road HENDRICKSON, G. DESIGNPITEO, M.
055-0141 GRANBY Roundabout Routes 10/202 HENDRICKSON, G. DESIGNPITEO, M. 10/2/2019
055-0142 GRANBY Intersection Improvements-Major 202/10 DESIGNMYSLIWIEC, A. 1/1/2020
056-0293 GREENWICH Bridge Deck Repairs I-95 CHHABRA, G. CONSTRUCTIONPITEO, M. 11/11/2011
056-0301 GREENWICH Bridge Replacement Riverside Rd. CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/25/2012
056-0305 GREENWICH Bridge Replacement Rte. 1 - Br. # 1872 BL COMPANIES DESIGNUSHER, JEN 9/25/2019
056-0305 GREENWICH Bridge Replacement Bridge # 01872 USHER, JEN DESIGNUSHER, JEN 7/3/2019
056-0306 GREENWICH Culvert Repair/Extension Rte. 15 - Br. #2135 BL COMPANIES CONSTRUCTIONUSHER, JEN 7/15/2015
056-0307 GREENWICH Culvert Repair/Extension Rte. 15 - Br. #2138 BL COMPANIES CONSTRUCTIONUSHER, JEN 2/22/2017
056-0308 GREENWICH Pavement Improvements (ARRA) Various Roads CHHABRA, G. CONSTRUCTIONPITEO, M. 10/21/2009
056-0309 GREENWICH Bridge Rehabilitation Lake Ave. over Merritt Pkwy CAI, X. DESIGNMYSLIWIEC, A. 6/27/2018
056-0310 GREENWICH Pavement Improvements Milbank / E. Elm St. CAI, X. CONSTRUCTIONMYSLIWIEC, A. 6/15/2011
056-0312 GREENWICH Traffic Improvements Arch St. CAI, X. DESIGNMYSLIWIEC, A. 9/12/2018
056-0316 VARIOUS TOWNS Bridge Rehabilitation &Safety Imp. I-95 BROWN, D. DESIGNMYSLIWIEC, A. 10/28/2020
057-0113 GRISWOLD Bridge Replacement Route 165 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 9/19/2012
057-0116 GRISWOLD Intersection Improvements-Major Stone Hill Rd CHHABRA, G. CONSTRUCTIONPITEO, M. 2/22/2012
057-0117 GRISWOLD Pavement Preservation I-395 VON HONE, K. AUDITMYSLIWIEC, A. 12/7/2011
058-0285 GROTON Reconstruction-Minor CT 349 HENDRICKSON, G. AUDITPITEO, M.
058-0294 GROTON Streetscape Improvements Mystic Ext. (parent proj is 58-316) WALLACE, C. CONSTRUCTIONPITEO, M. 1/6/2010
058-0307 GROTON Safety Improvements (PE) I-95 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 10/9/2019
058-0316 GROTON Streetscape Improvements Mystic Ext. (UTL Proj. 0294) WALLACE, C. CONSTRUCTIONPITEO, M. 1/6/2010
058-0317 GROTON Safety Improvements I-95 (Construction) VON HONE, K. AUDITMYSLIWIEC, A. 5/11/2011
058-0318 GROTON Streetscape Improvements Bridge Street WALLACE, C. CONSTRUCTIONPITEO, M. 1/6/2010
058-0322 GROTON Retaining Wall Thames Street (Emergency Relief) CAI, X. AUDITMYSLIWIEC, A. 8/24/2011
058-0325 GROTON Pavement Preservation Route 12 VON HONE, K. AUDITMYSLIWIEC, A. 2/8/2012
058-0326 GROTON Mystic Streetscape Phase 2 WALLACE, C. CONSTRUCTIONPITEO, M. 7/18/2012
058-0327 GROTON Roadway Reconstruction Crystal Lake Rd. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/22/2016
058-0332 GROTON Superstructure Replacement Rte. 349 - Br. #3330,3331 CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 4/19/2017
058-0336 GROTON Bridge Rehabilitation Bridge # 03903 / Amtrak CME ASSOCIATES DESIGNNERVAIS, KIMERY 2/6/2019
059-0152 GUILFORD Drainage Improvements CT 146 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 3/10/2010
059-0152 GUILFORD Drainage Improvements CT 146 HENDRICKSON, G. AUDITPITEO, M. 3/10/2010
059-0157 GUILFORD Bridge Replacement Bridge # 02677 CAI, X. DESIGNMYSLIWIEC, A. 4/15/2020
059-0159 GUILFORD Bridge Replacement Durham Road VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 12/11/2013
059-0161 GUILFORD Reconstruction-Minor Long Hill Road CHHABRA, G. CONSTRUCTIONPITEO, M. 6/1/2016
059-0162 GUILFORD Mutli - Use Trail Boston Post Road WALLACE, C. DESIGNPITEO, M. 4/25/2018
059-0163 GUILFORD Culvert Rehabilitation I-95 over Spining Mill CAI, X. CONSTRUCTIONMYSLIWIEC, A. 11/4/2015
059-0164 GUILFORD Modern Roundabout Routes 1 and 22 CAI, X. DESIGNMYSLIWIEC, A. 8/21/2019
060-0151 HADDAM Bridge Replacement Rte. 154 / Candlewood CAI, X. CONSTRUCTIONMYSLIWIEC, A. 12/10/2014
060-0155 HADDAM Culvert Replacement Route 82 CHHABRA, G. CONSTRUCTIONPITEO, M. 3/2/2011
060-0160 HADDAM Roundabout Route 82 / Route 154 CHHABRA, G. DESIGNPITEO, M. 2/19/2020
061-0138 HAMDEN Intersection Improvements-Minor Rte. 10 BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
061-0143 HAMDEN Intersection Improvements-Minor Ives St. @ Dickerman St. WALLACE, C. CONSTRUCTIONPITEO, M.
061-0145 HAMDEN Traffic Signalization Whitney Avenue VON HONE, K. AUDITMYSLIWIEC, A. 7/1/2009
061-0146 HAMDEN Intersection Improvements-Major Rte. 10 @ Woods Rd. BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
Monday, June 11, 2018 Page 6 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
061-0148 HAMDEN Pedestrian Tunnel Skiff Street CHHABRA, G. CONSTRUCTIONPITEO, M. 1/26/2011
061-0151 HAMDEN Traffic Signalization Whitney and Dixwell Avenue CAI, X. DESIGNMYSLIWIEC, A. 7/19/2017
061-0152 HAMDEN Bridge Rehabilitation Skiff Street Bridge No. 00783 CME ASSOCIATES DESIGNNERVAIS, KIMERY 11/21/2018
063- ANSONIA Pedestrian Bridge Metro-North Rail BROWN, D. DESIGNMYSLIWIEC, A. 11/2/2016
063-0560 HARTFORD Minor Widening Newington Ave. BROWN, D. AUDITMYSLIWIEC, A.
063-0570 HARTFORD Major Widening Asylum Church BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
063-0601 HARTFORD Bridge Replacement SR 504 NB on-ramp CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 1/16/2013
063-0618 HARTFORD Resurfacing Broad Street, Park St to Capitol Ave BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/25/2014
063-0626 HARTFORD Pedestrian Walkway Huyshope Ave. SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 7/18/2018
063-0628 HARTFORD Bridge Rehabilitation Grove Street Overpass WALLACE, C. CONSTRUCTIONPITEO, M. 5/28/2008
063-0633 HARTFORD Safety Improvements-Major Route 44 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 8/31/2016
063-0641 HARTFORD Resurfacing Broad St, Capitol Ave to Farmington Av VON HONE, K. AUDITMYSLIWIEC, A. 6/15/2011
063-0643 WEST HARTFORD Busway - C3, Flatbush Flatbush - Grade Separate HENDRICKSON, G. CONSTRUCTIONPITEO, M. 12/29/2010
063-0643 WEST HARTFORD Busway - C3, Flatbush Flatbush - Grade Separate BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 12/29/2010
063-0644 HARTFORD Aetna Viaduct Replacement I-84 HENDRICKSON, G. DESIGNPITEO, M. 7/1/2020
063-0644 HARTFORD Aetna Viaduct Replacement I-84 WALLACE, C. DESIGNPITEO, M. 7/1/2020
063-0653 HARTFORD Super/Substructure Repair I-91 - Br. #01428D BL COMPANIES CONSTRUCTIONUSHER, JEN 1/11/2017
063-0654 HARTFORD Super Replace/Substructure Repair I-84 - Br. # 01686B BL COMPANIES DESIGNUSHER, JEN 10/24/2018
063-0660 HARTFORD Streetscape Improvements Park Street CHHABRA, G. CONSTRUCTIONPITEO, M. 11/25/2009
063-0669 HARTFORD Utility Breakout Flatbush Ave. HENDRICKSON, G. CONSTRUCTIONPITEO, M. 12/31/2010
063-0669 HARTFORD Utility Breakout Flatbush Avenue BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 12/31/2010
063-0670 HARTFORD Busway - C4 Sigourney St. to Asylum BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 4/1/2010
063-0670 HARTFORD Busway - C4 Sigourney St. to Asylum Ave. HENDRICKSON, G. CONSTRUCTIONPITEO, M. 10/1/2010
063-0671 HARTFORD Busway - C5 Broad Street Bridge HENDRICKSON, G. CONSTRUCTIONPITEO, M. 3/1/2010
063-0671 HARTFORD Busway - C5 Broad St. Bridge BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 10/1/2010
063-0675 HARTFORD Streetscape Improvements Park Street VON HONE, K. AUDITMYSLIWIEC, A. 9/25/2013
063-0678 HARTFORD Intersection Roundabout Park, Russ, Sigourney WALLACE, C. DESIGNPITEO, M. 1/16/2019
063-0690 HARTFORD Traffic Control Sytem Upgrade Various Locations CAI, X. TBDMYSLIWIEC, A. 7/17/2019
063-0691 HARTFORD Streetscape Improvements Coltsville - Phase I VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 12/12/2012
063-0692 HARTFORD Bridge Repairs I-95/ S.R. 598 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 7/6/2016
063-0694 HARTFORD Bearing Replacement I-84, TR 823 - Br.# 03400D CME ASSOCIATES DESIGNNERVAIS, KIMERY 12/20/2017
063-0695-A HARTFORD Bridge Replacement I-84, TR 824 - Br.#03399D CME ASSOCIATES DESIGNNERVAIS, KIMERY 8/27/2014
063-0695-B HARTFORD Bearing Replacement & Repair SR 503 - Br.#03402A CME ASSOCIATES DESIGNNERVAIS, KIMERY 8/27/2014
063-0696 HARTFORD Intersection Improvements-Minor Maple St. / Retreat St. SMITH, L. / BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 9/21/2016
063-0699 HARTFORD Rehabilitation of I-84 AMTRAK . Local Roads WALLACE, C. CONSTRUCTIONPITEO, M. 7/7/2016
063-0700 HARTFORD Bridge Rehabilitation I-84 EB Bridge No. 01765 CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 7/6/2016
063-0701 HARTFORD Bridge Rehabilitation I-84 Bridge No. 01766 CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 7/6/2016
063-0703 HARTFORD Interchange Improvements -Major I-91 BROWN, D. DESIGNMYSLIWIEC, A. 6/6/2018
063-0703 HARTFORD Intersection Interchange-Major I-91 Intechange CHHABRA, G. DESIGNPITEO, M. 6/6/2018
063-0704 HARTFORD Bridge Rehabilitation Airport Rd Bridge No. 00481 CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 5/18/2016
063-0705 HARTFORD Bridge Rehabilitation I-84 EB Bridge No. 03367 CME ASSOCIATES DESIGNNERVAIS, KIMERY 7/12/2017
063-0707 HARTFORD Bridge Rehabilitation I-84 Bridge No. 01686A CME ASSOCIATES DESIGNNERVAIS, KIMERY 7/5/2017
063-0708 HARTFORD Bridge Rehabilitations - Various Sisson Ave. Interchange CME ASSOCIATES DESIGNNERVAIS, KIMERY 12/20/2017
063-0712 HARTFORD Bridge Rehabilitation Br. #00980B o/CT River I-84 CME ASSOCIATES DESIGNNERVAIS, KIMERY 3/6/2019
Monday, June 11, 2018 Page 7 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
063-0714 HARTFORD Intersection Improvements Weston Street @ Jennings Road SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 6/20/2018
063-0717 HARTFORD Design Of Communications for Traffic Manageme Various WALLACE, C. DESIGNPITEO, M. 3/27/2019
063-0718 HARTFORD Traffic Signalization Various CHHABRA, G. DESIGNPITEO, M. 7/17/2018
065-0112 HARWINTON Superstructure Replacement Rte. 4 - Br.#425 CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 11/16/2016
067-0115 KENT Bridge Replacement Route 341 WALLACE, C. CONSTRUCTIONPITEO, M. 1/13/2010
068-0209 KILLINGLY Intersection Improvements-Minor Route 12 CHHABRA, G. CONSTRUCTIONPITEO, M. 10/7/2009
068-0211 KILLINGLY Super Replace/Substructure Repair I-395 - Br. # 3469 BL COMPANIES CONSTRUCTIONUSHER, JEN 7/8/2015
068-0214 KILLINGLY Resurfacing Route 101 WALLACE, C. CONSTRUCTIONPITEO, M. 1/26/2011
069-0077 KILLINGWORTH Bridge Replacement Route 79 CAI, X. CONSTRUCTIONMYSLIWIEC, A.
069-0078 KILLINGWORTH Bridge Replacement Rte. 81 - Br. #2498 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 6/18/2014
069-0079 KILLINGWORTH Bridge Replacement Route 148 Br. 2680 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 10/15/2014
073-0172 LITCHFIELD Pavement Overlay Milton Rd. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/18/2008
073-0173 LITCHFIELD Culvert Rehabilitation Rte. 8 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 1/11/2012
073-0174 LITCHFIELD Bridge Rehabilitation Rte. 8 / Campfield Rd. VON HONE, K. AUDITMYSLIWIEC, A. 7/13/2011
073-0177 LITCHFIELD Bridge Replacement Rte. 202 - Br. #908 BL COMPANIES DESIGNUSHER, JEN 4/4/2018
073-0178 LITCHFIELD Culvert Repair/Extension Rte. 202 - Br.#6656 BL COMPANIES CONSTRUCTIONUSHER, JEN 6/17/2015
073-0179 LITCHFIELD Bridge Replacement Rte. 202 - Br. #6657 BL COMPANIES CONSTRUCTIONUSHER, JEN 6/17/2015
073-0182 LITCHFIELD Deck Replacement Route 8 over R.R. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 3/11/2015
073-0183 LITCHFIELD Pavement Improvements White Woods Rd. VON HONE, K. AUDITMYSLIWIEC, A. 7/20/2011
073-0186 LITCHFIELD Bridge Replacement Br. # 02232 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/8/2016
076-0193 MANCHESTER Declaration Lane I-84/ Rte. 83/ Rte. 80 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 6/24/2015
076-0205 MANCHESTER Intersection Improvements-Major Routes 6 and 44 WALLACE, C. CONSTRUCTIONPITEO, M. 10/26/2009
076-0206 MANCHESTER Safety Improvements-Minor West Middle Tpke. WALLACE, C. CONSTRUCTIONPITEO, M. 12/10/2008
076-0207 MANCHESTER Trail Charter Oak Greenway BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/16/2010
076-0209 MANCHESTER Sidewalk Improvements Woodbridge/Green Rd. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 2/27/2008
076-0210 MANCHESTER Traffic Signalization rt 120 & 165 WALLACE, C. CONSTRUCTIONPITEO, M. 12/10/2008
076-0212 MANCHESTER Reconstruction-Major North Main St HENDRICKSON, G. CONSTRUCTIONPITEO, M. 5/2/2012
076-0213 MANCHESTER Pavement Rehabilitation Bucland Hills Dr. CHHABRA, G. CONSTRUCTIONPITEO, M. 7/1/2009
076-0214 MANCHESTER Resurfacing I-84 WALLACE, C. CONSTRUCTIONPITEO, M. 1/5/2011
076-0216 MANCHESTER Resurfacing Route 6 CHHABRA, G. CONSTRUCTIONPITEO, M. 12/7/2011
076-0217 MANCHESTER Shared Use Path Various CHHABRA, G. CONSTRUCTIONPITEO, M. 3/4/2015
076-0218 MANCHESTER Rehabilitation Tolland Turnpike CAI, X. CONSTRUCTIONMYSLIWIEC, A. 6/13/2012
076-0220 MANCHESTER Roundabouts 2x Route 83 (CSO RR) HENDRICKSON, G. DESIGNPITEO, M. 11/20/2019
076-0220 MANCHESTER Roundabouts 2x Route 83 WALLACE, C. DESIGNPITEO, M. 11/20/2019
076-0221 MANCHESTER Intersection Improvements Buckland Street HENDRICKSON, G. DESIGNPITEO, M. 9/12/2018
077-0206 MANSFIELD Intersection Improvements-Minor CT 195 CHHABRA, G. CONSTRUCTIONMYSLIWIEC, A. 3/9/2011
077-0211 MANSFIELD Intersection Improvements-Minor US 44 CHHABRA, G. CONSTRUCTIONPITEO, M. 5/26/2010
077-0215 MANSFIELD New Expressway North Hillside Rd. WALLACE, C. CONSTRUCTIONPITEO, M. 10/31/2012
077-0217 MANSFIELD Safety Improvements-Minor Rte. 195 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 9/24/2014
077-0223 MANSFIELD Streetscape Improvements Route 195 VON HONE, K. AUDITMYSLIWIEC, A. 10/26/2011
077-0224 MANSFIELD Bicycle Facility Bikeway WALLACE, C. CONSTRUCTIONPITEO, M. 11/11/2009
077-0225 MANSFIELD ARRA-resurfacing various roads WALLACE, C. CONSTRUCTIONPITEO, M. 12/30/2009
077-0227 MANSFIELD Roadway Improvements Dog Lane VON HONE, K. AUDITMYSLIWIEC, A. 10/26/2011
077-0228 MANSFIELD Resurfacing Route 89 CHHABRA, G. CONSTRUCTIONPITEO, M. 1/12/2011
Monday, June 11, 2018 Page 8 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
077-0236 MANSFIELD Safe Route to School Southeast Elementry SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 8/22/2018
078-0090 MARLBOROUGH Pipe Lining Rte. 66 - Br. #6690 CME ASSOCIATES DESIGNNERVAIS, KIMERY 7/13/2016
079-0202 MERIDEN Realignment Britannia St./N. Colony Rd. PITEO, M. AUDITPITEO, M.
079-0210 MERIDEN Reconstruction Gravel St. WALLACE, C. CONSTRUCTIONPITEO, M. 7/3/2013
079-0212 MERIDEN Bridge Rehabilitation Center Street Bridge CAI, X. DESIGNMYSLIWIEC, A.
079-0222 MERIDEN Bridge Replacement Columbus Avenue VON HONE, K. AUDITMYSLIWIEC, A. 2/27/2013
079-0226 MERIDEN Trail River Trail, Phase 2 WALLACE, C. CONSTRUCTIONPITEO, M. 11/11/2016
079-0229 MERIDEN Bridge Replacement Rte. 71 - Br. # 1081 BL COMPANIES DESIGNUSHER, JEN 1/24/2018
079-0231 MERIDEN Reconstruction-Minor West Main St HENDRICKSON, G. CONSTRUCTIONPITEO, M. 6/15/2011
079-0235 MERIDEN Super/Substructure Repair I-691 - Br. #2114 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 10/22/2014
079-0238 MERIDEN Traffic Signalization Coe Ave at Centennial Ave/ Oregon Rd CAI, X. CONSTRUCTIONMYSLIWIEC, A. 11/25/2017
079-0240 MERIDEN Interchange Recongiguration I-91, I-691, RTE. 15 SMITH, L. / BROWN, D. TBDMYSLIWIEC, A. 11/11/2019
079-0241 MERIDEN Traffic Signal Modernization Various WALLACE, C. DESIGNPITEO, M. 2/26/2020
079-0243 MERIDEN Replacement of Guiderail Various WALLACE, C. DESIGNPITEO, M. 9/18/2019
080-0128 WATERBURY Upgrade Expressway I-84 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 3/25/2020
080-0129 MIDDLEBURY Bridge Rehabilitation Br. # 06691 CHHABRA, G. CONSTRUCTIONPITEO, M. 12/28/2016
080-0130 MIDDLEBURY Bridge Rehabilitation Br. # 06692 CHHABRA, G. CONSTRUCTIONPITEO, M. 11/2/2016
080-0131 MIDDLEBURY Bridge Rehabilitation - #01160 Benson Rd. / I-84 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 6/24/2020
081-0083 MIDDLEFIELD Reconstruction CT 66 BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
081-0088 MIDDLEFIELD Bridge Restoration Rte. 147 / Coginchaug WALLACE, C. CONSTRUCTIONPITEO, M. 5/2/2012
081-0091 MIDDLEFIELD Bridge Replacement Rte. 147 - Br. #2719 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 7/15/2015
082-0287 MIDDLETOWN Intersection Improvements-Minor Route 66 CHHABRA, G. CONSTRUCTIONPITEO, M.
082-0294 MIDDLETOWN Reconstruction-Minor Saybrook Rd. CHHABRA, G. CONSTRUCTIONPITEO, M. 7/14/2010
082-0299 MIDDLETOWN Bridge Rehabilitation Arrigoni Bridge WALLACE, C. CONSTRUCTIONPITEO, M. 1/26/2011
082-0299 MIDDLETOWN Bridge Rehabilitation Arrigoni Bridge HENDRICKSON, G. CONSTRUCTIONPITEO, M. 1/26/2011
082-0302 MIDDLETOWN Guide Rail I-91 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 4/20/2011
082-0304 MIDDLETOWN Utility Breakout 82-287 Route 66 CHHABRA, G. CONSTRUCTIONPITEO, M. 9/3/2008
082-0305 MIDDLETOWN Bridge Replacement West St. - Br. # 3993 BL COMPANIES DESIGNUSHER, JEN 12/6/2017
082-0306 MIDDLETOWN ARRA - milling&paving Industrial Park Road VON HONE, K. AUDITMYSLIWIEC, A. 12/2/2009
082-0309 MIDDLETOWN On-Ramp Configuration Rte. 17 CAI, X. TBDMYSLIWIEC, A.
082-0310 MIDDLETOWN Replace Retaining Wall Local CHHABRA, G. CONSTRUCTIONPITEO, M. 12/18/2013
082-0311 MIDDLETOWN Multi-Use Trail Wesleyan Hills CHHABRA, G. DESIGNPITEO, M. 6/14/2017
082-0312 MIDDLETOWN Bridge Rehabilitation Br. # 00524 HENDRICKSON, G. DESIGNPITEO, M. 12/12/2018
082-0312 MIDDLETOWN 1 Br # 00524 WALLACE, C. DESIGNPITEO, M. 12/12/2018
082-0314 MIDDLETOWN Bridge Replacement- Emergency Declaration I-91 SB/NB CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 7/22/2015
082-0316 MIDDLETOWN Traffic Improvements Route 17 On- Ramp SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 9/16/2020
082-0318 MIDDLETOWN Traffic Improvements Route 9 HENDRICKSON, G. DESIGNPITEO, M. 10/30/2019
082-0319 MIDDLETOWN Sidewalk Bump-outs Main Street HENDRICKSON, G. DESIGNPITEO, M. 5/2/2018
082-0320 MIDDLETOWN Intersection Improvements-Major St. John's Square / Main St. HENDRICKSON, G. DESIGNPITEO, M. 10/31/2018
082-1111 MIDDLETOWN Bridge Rehabilitation Br. # 06853 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 10/12/2016
083-0216 MILFORD Bridge Reconstruction CT 15 PITEO, M. AUDITPITEO, M.
083-0230 MILFORD Operational Lanes Various BROWN, D. TBDMYSLIWIEC, A.
083-0233 MILFORD Grade Crossing Oronoque Street HENDRICKSON, G. CONSTRUCTIONPITEO, M. 8/1/2012
083-0246 MILFORD Widening US 1 CAI, X. TBDMYSLIWIEC, A.
Monday, June 11, 2018 Page 9 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
083-0247 MILFORD Intersection Improvements-Minor Meadow/High Sts. BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
083-0258 MILFORD Bridge Replacement US 1 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 7/10/2013
083-0261 MILFORD Culvert Replacement I-95 - Br. # 145 BL COMPANIES CONSTRUCTIONUSHER, JEN 11/12/2014
083-0262 MILFORD Drainage Improvements Naugatuck Avenue. CAI, X. CONSTRUCTIONMYSLIWIEC, A.
083-0263 MILFORD Bridge Replacement Rte. 162 - Br. # 6755 BL COMPANIES DESIGNUSHER, JEN 1/23/2019
083-0264 MILFORD Bridge Replacement Replace Bridge 01446 CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 10/24/2018
084-0093 MONROE Bridge Replacement CT 34, Stevenson Dam BROWN, D. TBDMYSLIWIEC, A.
084-0099 MONROE Bridge Replacement Bridge 2220 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 9/28/2016
084-0100 MONROE Bridge Replacement CT 25 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 9/28/2016
084-0102 MONROE Intersection Improvements-Minor CT 25 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 7/7/2010
084-0105 MONROE Bridge Replacement Rte. 111 Br. #02629 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 1/22/2014
084-0106 MONROE Bridge Replacement Rte. 111 - Br. #2627 BL COMPANIES CONSTRUCTIONUSHER, JEN 10/28/2015
084-0108 MONROE Roundabout Rte. 110 / Rte. 111 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 12/7/2016
084-0109 MONROE Reconstruction-Minor Pepper St. SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 7/13/2017
084-0111 MONROE UTILITY BREAKOUT FOR84-108 Rtes. 110 and 111 CAI, X. CONSTRUCTIONMYSLIWIEC, A.
084-0112 MONROE Utility Breakout (84-99, 84-100) Route 25 CAI, X. CONSTRUCTIONMYSLIWIEC, A.
085-0141 MANSFIELD Retaining Wall Rt 32 at Rt 163 CHHABRA, G. CONSTRUCTIONPITEO, M. 5/5/2011
085-0144 MONTVILLE Culvert Replacement Old Colchester Rd HENDRICKSON, G. DESIGNPITEO, M. 4/11/2018
086-0091 MORRIS Bridge Replacement Br. 01309 o/Wigwam Rervoir CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 10/24/2018
087-0142 NAUGATUCK Super Replace & Sub Repair Rte. 68 - Br. #596 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 7/15/2015
087-0143 NAUGATUCK Pedestrian Greenway Pedestrian Greenway WALLACE, C. CONSTRUCTIONPITEO, M. 7/6/2011
087-0144 NAUGATUCK Traffic Signalization Maple St. & Old Firehouse Rd. WALLACE, C. CONSTRUCTIONPITEO, M. 12/8/2010
087-0145 NAUGATUCK Intersection Improvements-Minor Cross Street/Cotton Hollow Road CAI, X. DESIGNMYSLIWIEC, A. 6/20/2018
087-0146 NAUGATUCK Intersection Improvements Rubber Avenue CHHABRA, G. DESIGNPITEO, M. 6/20/2018
088-0166 NEW BRITAIN Bridge Replacement (In-Place) S.R. 555 - Br. #1615 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 6/18/2014
088-0169 NEW BRITAIN Traffic Signalization Myrtle Street WALLACE, C. CONSTRUCTIONPITEO, M. 10/6/2010
088-0172 NEW BRITAIN Pedestrian Improvements Glenn Street WALLACE, C. CONSTRUCTIONPITEO, M. 10/16/2013
088-0174 NEW BRITAIN Reconstruction-Major Beaver Street WALLACE, C. CONSTRUCTIONPITEO, M. 7/20/2011
088-0175 NEW BRITAIN ARRA - resurfacing Corbin, East , Ellis and Stanly Sts. HENDRICKSON, G. CONSTRUCTIONPITEO, M. 11/18/2009
088-0177 NEW BRITAIN Busway - New Britain N. Britain Sta./East. St. Sta. HENDRICKSON, G. AUDITPITEO, M. 7/1/2010
088-0177 NEW BRITAIN Busway - 11 Stations New Britain to Hartford CHHABRA, G. AUDITPITEO, M. 12/1/2009
088-0177 NEW BRITAIN Busway - New Britain N. Britain Sta./East. St. Sta. VON HONE, K. AUDITMYSLIWIEC, A. 7/1/2010
088-0178 NEWINGTON Busway - Newington East St. Sta. to Willard A HENDRICKSON, G. AUDITPITEO, M. 8/1/2010
088-0178 NEWINGTON Busway - Newington East St. Sta. to Willard Ave. VON HONE, K. AUDITMYSLIWIEC, A. 8/1/2010
088-0180 NEW BRITAIN Resurfacing I-84 CHHABRA, G. CONSTRUCTIONPITEO, M. 1/5/2011
088-0183 NEW BRITAIN Streetscape Improvements TCSP WALLACE, C. CONSTRUCTIONPITEO, M.
088-0185 NEW BRITAIN Reconstruction-Minor Hart Street CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/13/2016
088-0186 NEW BRITAIN Superstructure Replacement Curtis St. - Br. #2917 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 10/14/2015
088-0187 NEW BRITAIN Bridge Rehabilitation Route 71 CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 9/21/2016
088-0188 NEW BRITAIN Intersection Roundabout Columbus / Bank WALLACE, C. CONSTRUCTIONPITEO, M. 7/20/2016
088-0188 NEW BRITAIN Intersection Roundabout Columbus / Bank HENDRICKSON, G. CONSTRUCTIONPITEO, M. 7/20/2016
088-0191 NEW BRITAIN Traffic Safety Improvements Eddy Glover Boulevard WALLACE, C. DESIGNPITEO, M. 4/18/188
088-0194 NEW BRITAIN Traffic Safety Improvements Main Street WALLACE, C. DESIGNPITEO, M. 9/19/2018
089-0124 NEW CANAAN Resurfacing Various Town Roads VON HONE, K. AUDITMYSLIWIEC, A. 10/21/2009
Monday, June 11, 2018 Page 10 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
089-0125 NEW CANAAN Bridge Rehabilitation South Ave. Br. # 712 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 2/13/2013
089-0126 NEW CANAAN Bridge Rehabilitation Ponus Ridge . Br. # 708 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 1/30/2013
089-0128 NEW CANAAN Bridge Replacement - # 06695 Rose Brook BL COMPANIES DESIGNUSHER, JEN 12/18/2019
090-0096 NEW FAIRFIELD Streetscape Improvements (ARRA) North BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 11/11/2009
091-0108 NEW HARTFORD Spot Safety Improvement CT 219 BROWN, D. AUDITMYSLIWIEC, A.
091-0113 NEW HARTFORD Bridge Replacement US 202 WALLACE, C. AUDITPITEO, M.
091-0119 NEW HARTFORD Bridge Painting Route 219 over Farmington River WALLACE, C. CONSTRUCTIONPITEO, M. 12/2/2009
092-0464 NEW HAVEN Grade Crossing Grand Avenue HENDRICKSON, G. CONSTRUCTIONPITEO, M. 4/30/2014
092-0522 NEW HAVEN Bridge Replacement Br# 00163A-West River CAI, X. CONSTRUCTIONMYSLIWIEC, A. 2/6/2013
092-0527 NEW HAVEN Bridge Replacement Br# 00333 BROWN, D. AUDITMYSLIWIEC, A.
092-0531 NEW HAVEN Upgrade Expressway I-95/I-91/Rte.34 Int.- "Q" BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 3/31/2011
092-0532 NEW HAVEN Upgrade Expressway "Q" Bridge Replace/Demol. PITEO, M. CONSTRUCTIONPITEO, M.
092-0532 NEW HAVEN Upgrade Expressway "Q" Bridge Replace/Demol. BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
092-0533 NEW HAVEN Upgrade Expressway East Approach-"Q" Bridge BROWN, D. AUDITMYSLIWIEC, A.
092-0533 NEW HAVEN Upgrade Expressway East Approach-"Q" Bridge PITEO, M. AUDITPITEO, M.
092-0538 NEW HAVEN Advance Utility Relocation -"Q" I-95 BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
092-0541 NEW HAVEN Reconstruction-Major Waterfront St. HENDRICKSON, G. CONSTRUCTIONPITEO, M. 11/30/2011
092-0541 NEW HAVEN Reconstruction-Major Waterfront St. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 1/11/2012
092-0547 NEW HAVEN Reconstruction-Major, UTL 92-625 CT 63 WALLACE, C. CONSTRUCTIONPITEO, M.
092-0558 NEW HAVEN Utility Breakout-Contract "C" I-95 PITEO, M. AUDITPITEO, M.
092-0558 NEW HAVEN Utility Breakout-Contract "C" I-95 BROWN, D. AUDITMYSLIWIEC, A.
092-0561 NEW HAVEN Bridge Replacement State Street- 3748 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 8/13/2008
092-0570 NEW HAVEN Facility Boathouse Bldg. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 5/20/2015
092-0581 NEW HAVEN Intersection Improvements-Major I-91/I-95 Contract E1 BROWN, D. AUDITMYSLIWIEC, A.
092-0585 NEW HAVEN Reconstruction-Major Quinnipiac Ave. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/17/2009
092-0586 NEW HAVEN Advanced Railroad Project I-95 BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
092-0586 NEW HAVEN Advanced Railroad Project I-95 PITEO, M. CONSTRUCTIONPITEO, M.
092-0588 NEW HAVEN Pavement Rehabilitation Whitney, Derby, Congress BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/4/2008
092-0603 NEW HAVEN Bridge Replacement Howard Avenue VON HONE, K. AUDITMYSLIWIEC, A.
092-0612 NEW HAVEN Bridge Rehabilitation Rte.5 / Ferry Street HENDRICKSON, G. CONSTRUCTIONPITEO, M. 10/30/2013
092-0612 NEW HAVEN Bridge Rehabilitation Rte. 5 / Ferry Street WALLACE, C. CONSTRUCTIONPITEO, M. 12/11/2013
092-0614 NEW HAVEN Realignment-Major Route 34 Phase 1 BROWN, D. TBDMYSLIWIEC, A. 11/11/2018
092-0618 NEW HAVEN Bridge Replacement I-95 BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
092-0618 NEW HAVEN Bridge Replacement I-95 PITEO, M. CONSTRUCTIONPITEO, M.
092-0619 NEW HAVEN Flyover and Temp. Tie Breakout of 92-531 BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
092-0621 NEW HAVEN Improvements Farmington Canal Greenway BROWN, D. DESIGNMYSLIWIEC, A. 5/23/2018
092-0622 NEW HAVEN Two Lane Connector I-95/I-91 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 2/3/2010
092-0622 NEW HAVEN Two Lane Connector I-95/I-91 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 2/3/2010
092-0625 NEW HAVEN Utility Break-out of 92-547 Whalley Ave WALLACE, C. CONSTRUCTIONPITEO, M.
092-0640 NEW HAVEN Safety Improvements Route 10 CHHABRA, G. CONSTRUCTIONPITEO, M. 12/5/2012
092-0641 NEW HAVEN Breakout of 92-585 Quinnipiac Ave. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 12/29/2009
092-0642 NEW HAVEN Pavement Rehabilitation Congress Street BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 12/16/2009
092-0646 NEW HAVEN I.M.S. Upgrade Various SMITH, L. / BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 3/29/2017
092-0647 NEW HAVEN I.M.S. Upgrade Various BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 3/29/2017
Monday, June 11, 2018 Page 11 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
092-0649 NEW HAVEN I-95 Corridor - Northbound Long Wharf BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/6/2012
092-0650 NEW HAVEN Sidewalk Improvement Grand Ave, Exchange&Pearl St's HENDRICKSON, G. CONSTRUCTIONPITEO, M. 11/11/2012
092-0651 NEW HAVEN Facility Boathouse Platform BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 1/4/2012
092-0655 NEW HAVEN Sidewalk Ramp Upgrade Various VON HONE, K. AUDITMYSLIWIEC, A. 2/22/2012
092-0659 NEW HAVEN Downtown Crossing Route 34 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 7/31/2012
092-0665 NEW HAVEN Bridge Rehabilitation Rte. 34 - Br. #5593 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 12/10/2014
092-0666 NEW HAVEN Traffic Signalization Various SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 4/26/2017
092-0668 NEW HAVEN Deck/Steel Repairs I-95 - Br. # 3093 CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 6/1/2016
092-0669 NEW HAVEN Super/Substructure Repair I-91 - Br. # 03014A CME ASSOCIATES DESIGNNERVAIS, KIMERY 7/8/2015
092-0672 NEW HAVEN Operational Improvements Route 69 WALLACE, C. CONSTRUCTIONPITEO, M. 10/18/2017
092-0675 NEW HAVEN Bridge Rehabilitation Br 03094 o/Amtrak CME ASSOCIATES DESIGNNERVAIS, KIMERY 5/9/2018
092-0681 NEW HAVEN Intersection Improvements Rte. 10 & SSR 745 CHHABRA, G. TBDPITEO, M. 11/11/2019
092-TBD NEW HAVEN Downtown Crossing - Phase 3 Route 34 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 9/29/2019
092-XXXX NEW HAVEN Roadway Enhancement Route 34 - Phase 2 BROWN, D. TBDMYSLIWIEC, A.
093-0153 NEWINGTON Intersection Improvements-Minor CT 175 BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
093-0154 NEWINGTON Intersection Improvements-Minor CT 175 CHHABRA, G. CONSTRUCTIONPITEO, M. 11/11/2011
093-0166 NEWINGTON Bridge Replacement Rt 175 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 2/16/2011
093-0169 NEWINGTON Resurfacing Kelsey and Church St. WALLACE, C. CONSTRUCTIONPITEO, M. 7/1/2009
093-0180 HARTFORD Busway - Hartford South Oakwood Ave to Sigourney St HENDRICKSON, G. CONSTRUCTIONPITEO, M. 7/1/2010
093-0180 WEST HARTFORD Busway - West Hartford Willard Ave to Oakwood HENDRICKSON, G. CONSTRUCTIONPITEO, M. 9/1/2010
093-0180 WEST HARTFORD Busway - West Hartford Willard Ave to Oakwood Ave VON HONE, K. AUDITMYSLIWIEC, A. 1/5/2011
093-0180 NEWINGTON Busway - Amtrak Access Road Amtrak Access Rd HENDRICKSON, G. CONSTRUCTIONPITEO, M. 3/10/2010
093-0180 NEWINGTON Busway - Amtrak Access Road Amtrak Access Rd VON HONE, K. AUDITMYSLIWIEC, A. 3/10/2010
093-0200 NEWINGTON Bridge Rehabilitation Route 175 Bridge No. 04326 CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 9/21/2016
094-0220 NEW LONDON Safety Improvements-Minor Water Street HENDRICKSON, G. CONSTRUCTIONPITEO, M. 10/17/2007
094-0235 NEW LONDON Bridge Rehabilitation I-95NB Bridge # 03819 CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 3/8/2017
094-0239 NEW LONDON ARRA - Resurfacing Montauk Avenue VON HONE, K. AUDITMYSLIWIEC, A. 11/11/2009
094-0245 NEW LONDON Traffic Signalization Bank, Blinman, Howard VON HONE, K. AUDITMYSLIWIEC, A. 7/30/2014
094-0252 NEW LONDON Deck/Steel Repairs I-95 - Various Bridges CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 7/13/2016
094-0255 GROTON Pavement Restoration I-95 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 10/22/2014
095-0212 NEW MILFORD Reconstruction-Major Grove Street CHHABRA, G. CONSTRUCTIONPITEO, M.
095-0234 NEW MILFORD Reconstruction-Major CT 67 CHHABRA, G. CONSTRUCTIONPITEO, M.
095-0235 NEW MILFORD Major Widening Break 95-219,220,226,227 WALLACE, C. DESIGNPITEO, M. 3/8/2017
095-0241 NEW MILFORD Utility Breakout for 95-219,228-230 Route 7 WALLACE, C. CONSTRUCTIONPITEO, M.
095-0246 NEW MILFORD Utility Breakout 95-234 Rte. 67/Grove St. CHHABRA, G. CONSTRUCTIONPITEO, M.
095-0249 NEW MILFORD Resurfacing/Safety Improvements Grove St./Boardman Rd. CHHABRA, G. CONSTRUCTIONPITEO, M. 11/11/2009
096-0185 NEWTOWN Bridge Replacement CT 25 WALLACE, C. CONSTRUCTIONPITEO, M.
096-0192 NEWTOWN Intersection Improvements-Minor Route 6 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 11/8/2017
096-0193 NEWTOWN Bridge Replacement S.R. 816 / Housatonic River CHHABRA, G. CONSTRUCTIONPITEO, M. 5/7/2014
096-0196 NEWTOWN Intersection Improvements-Major Route 25 SMITH, L. / BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 7/5/2017
096-0197 NEWTOWN Bridge Replacement Rte. 302 - Br. #3271 BL COMPANIES CONSTRUCTIONUSHER, JEN 11/2/2016
096-0199 NEWTOWN Resurfacing I-84 WALLACE, C. CONSTRUCTIONPITEO, M. 1/11/2012
096-0200 NEWTOWN Bridge Rehabilitation I-84 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 5/30/2018
096-0201 NEWTOWN Bridge Rehabilitation I-84 EB Bridge No. 01218 CME ASSOCIATES DESIGNNERVAIS, KIMERY 7/10/2019
Monday, June 11, 2018 Page 12 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
096-0202 NEWTOWN Pedestrian Improvements Rte. 25 and Rte. 302 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 6/27/2018
096-0203 NEWTOWN Bridge Rehabilitation Pole Bridge Brook CAI, X. CONSTRUCTIONMYSLIWIEC, A. 10/12/2016
096-0204 NEWTOWN Intersection Improvements-Major Route 34 @ SR 490 CHHABRA, G. DESIGNPITEO, M. 11/6/2019
096-0205 NEWTOWN Bridge Replacement - # 06720 Pole Brook BL COMPANIES DESIGNUSHER, JEN 2/12/2020
097-0095 NORFOLK Bridge Replacement Route 44 WALLACE, C. DESIGNPITEO, M. 8/26/2020
098-0093 NORTH BRANFORD Reconstruction-Major Rte. 80 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 11/9/2011
098-0101 NORTH BRANFORD Bridge Replacement Rte. 80 over Farm River SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 6/21/2017
098-0103 NORTH BRANFORD Realignment-Major Route 139 at School Grnd Rd WALLACE, C. CONSTRUCTIONPITEO, M. 11/7/2012
099-0114 NORTH CANAAN Railroad Grade Crossing US 7 CAI, X. DESIGNMYSLIWIEC, A. 6/13/2018
099-0115 NORTH CANAAN Railroad Grade Crossing US 7 CAI, X. DESIGNMYSLIWIEC, A. 6/13/2018
099-0124 NORTH CANAAN Facility Improvements Union Depot Rail Station HENDRICKSON, G. CONSTRUCTIONPITEO, M. 3/1/2017
100-0174 NORTH HAVEN Reconstruction-Major Valley Service Road Ext WALLACE, C. DESIGNPITEO, M. 6/13/2018
100-0175 NORTH HAVEN Road Reconstruction Sackett Pt. Rd. CHHABRA, G. DESIGNPITEO, M. 10/10/2018
100-0176 NORTH HAVEN Pavement Rehabilitation Universal Dr. VON HONE, K. AUDITMYSLIWIEC, A. 7/28/2010
100-0178 NORTH HAVEN Bridge Replacement Bassett Road Bridge No. 03120 CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 7/13/2016
101-0116 NORTH STONINGTON Bridge Replacement Br. #02968 o/Pendleton Brk. CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 5/9/2018
102-0271 NORWALK RR-Highway Grade Crossing Science Road VON HONE, K. AUDITMYSLIWIEC, A.
102-0272 NORWALK Bridge Superstructure Broad Street BROWN, D. AUDITMYSLIWIEC, A.
102-0278 NORWALK Revise Interchange I-95 WALLACE, C. CONSTRUCTIONPITEO, M. 10/12/2011
102-0285 NORWALK Intersection Improvements-Major Route 1 HENDRICKSON, G. DESIGNPITEO, M. 3/7/2018
102-0295 NORWALK Reconstruction-Major I-95 CAI, X. DESIGNMYSLIWIEC, A. 12/18/2019
102-0296 NORWALK/NEW CAN Safety & Bridge Improvements Route 15 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 9/4/2019
102-0297 NORWALK WALK BRIDGE PROGRAM East Ave. Roadway WALLACE, C. DESIGNPITEO, M. 5/2/2018
102-0303 NORWALK Bridge Replacement Bridge # 1664-Rte. 123 CHHABRA, G. AUDITPITEO, M.
102-0305 NORWALK Reconstruction-Major Route 7 BROWN, D. TBDMYSLIWIEC, A.
102-0306 NORWALK Intersection Improvements-Major U.S. Route 1 WALLACE, C. CONSTRUCTIONPITEO, M. 10/12/2011
102-0307 NORWALK Utility Breakout-102-269 CT 7 & 15 WALLACE, C. CONSTRUCTIONPITEO, M.
102-0324 NORWALK Bridge Rehabilitation Burnell Blvd CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 7/17/2013
102-0325 NORWALK Intersection Improvements-Major Rte. 1 /Rte. 53 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/6/2016
102-0328 NORWALK Bridge Rehabilitation Triangle St over MNRR VON HONE, K. AUDITMYSLIWIEC, A. 7/6/2011
102-0328 NORWALK Bridge Rehabilitation Triangle St over MNRR HENDRICKSON, G. CONSTRUCTIONPITEO, M. 7/6/2011
102-0329 NORWALK Bicycle Facility Strawberry Hill Road HENDRICKSON, G. CONSTRUCTIONPITEO, M. 5/30/2012
102-0333 NORWALK Superstructure Replacement Wall St. - Br. #4048 BL COMPANIES CONSTRUCTIONUSHER, JEN 9/30/2015
102-0334 NORWALK Traffic Signal System Improvements West Avenue Corridor VON HONE, K. AUDITMYSLIWIEC, A. 4/25/2012
102-0335 NORWALK Pavement Rehabilitation Various Roads BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 12/23/2009
102-0340 NORWALK Reconstruction-Major Rowayton Ave CHHABRA, G. CONSTRUCTIONPITEO, M. 6/19/2013
102-0341 NORWALK Pavement Rehabilitation First/Ponus/Seaview VON HONE, K. AUDITMYSLIWIEC, A. 8/30/2010
102-0343 NORWALK Utility Break-out for 102-278 I-95 Interchange 14-15 WALLACE, C. CONSTRUCTIONPITEO, M. 11/11/2011
102-0346 NORWALK Safety Improvements-Major Rte. 1 / Stuart Ave. HENDRICKSON, G. CONSTRUCTIONPITEO, M. 7/6/2016
102-0347 NORWALK Traffic Signalization Various CAI, X. DESIGNMYSLIWIEC, A. 6/6/2018
102-0348 NORWALK Bridge Repairs I-95/Hales Rd./ Rte. 2 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 1/17/2018
102-0350 NORWALK Trail Route 123 CAI, X. DESIGNMYSLIWIEC, A. 6/27/2018
102-0351 NORWALK Pedestrian Improvements West Avenue CAI, X. CONSTRUCTIONMYSLIWIEC, A.
102-0354 NORWALK Intersection Improvements-Major Route 1 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 6/3/2015
Monday, June 11, 2018 Page 13 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
102-0355 NORWALK Pedestrian Safety Improvements Martin Luther King Drive, Bulter & Harb CAI, X. CONSTRUCTIONMYSLIWIEC, A. 4/12/2017
102-0356 NORWALK Bridge Rehabilitation Br # 00722 over Rte. 15 CAI, X. DESIGNMYSLIWIEC, A. 7/19/2017
102-0357 NORWALK Bridge Improvements Br. # 02295 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/12/2017
102-0358 NORWALK Interchange Ramps Rte. 7 and Rte. 15 WALLACE, C. DESIGNPITEO, M. 9/21/2022
102-0359 NORWALK Intersection Improvements Flax Hill Rd. CHHABRA, G. DESIGNPITEO, M. 6/20/2018
102-0362 NORWALK Over-height Vehicle Detection Sys. Various DESIGNMYSLIWIEC, A. 10/9/2019
103-0255 NORWICH Interchange Ramps CT 82 VON HONE, K. AUDITMYSLIWIEC, A.
103-0259 NORWICH Bridge Rehabilitation Sherman St WALLACE, C. DESIGNPITEO, M. 1/15/2020
103-0260 NORWICH Pavement Rehabilitation Canterbury Turnpike VON HONE, K. AUDITMYSLIWIEC, A. 6/15/2011
103-0262 NORWICH Pavement Rehabilitation Wisconsin Avenue VON HONE, K. AUDITMYSLIWIEC, A. 7/1/1013
103-0263 NORWICH Deck Repairs Rte. 2- Br. #00410 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 3/5/2014
103-0265 NORWICH Bridge Replacement Bridge # 02589 CAI, X. DESIGNMYSLIWIEC, A. 3/20/2019
103-0266 NORWICH Bridge Rehabilitation I-395 in Norwich CME ASSOCIATES DESIGNNERVAIS, KIMERY 7/3/2019
103-0272 NORWICH Replace Median Guiderail I-395 CHHABRA, G. DESIGNPITEO, M. 6/19/2019
103-0273 NORWICH Bridge Rehabilitation Br. # 00278 - Scotland Rd. SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 8/26/2020
104-0162 OLD LYME Bridge Replacement U.S. 1 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 4/16/2014
104-0164 OLD LYME E.D. Bridge Repair Whippoorwill Rd over I-95 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A.
104-0167 OLD LYME Superstructure Replacement I-95 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 6/13/2012
104-0172 OLD LYME Intersection Improvements-Minor Hartford Ave/Bocce CAI, X. CONSTRUCTIONMYSLIWIEC, A. 5/25/2016
104-0173 OLD LYME Bridge Replacement Route 156 Bridge No. 01395 CME ASSOCIATES TBDNERVAIS, KIMERY
105-0205 OLD SAYBROOK ARRA-sidewalk reconstrcution Route1 VON HONE, K. AUDITMYSLIWIEC, A. 12/2/2009
105-0206 OLD SAYBROOK Emergency Declaration Route 154 VON HONE, K. AUDITMYSLIWIEC, A. 11/9/2011
105-0209 OLD SAYBROOK Bridge Replacement Rte. 154 over Plum Bank Creek & Back CAI, X. DESIGNMYSLIWIEC, A. 5/8/2019
105-0211 OLD SAYBROOK Bridge Replacement Br # 01890 - Rte. 1 RAIOLA, ROBERT CONSTRUCTIONWURST, DONALD 6/15/2016
106-0109 ORANGE Operational Lane Route 1 VON HONE, K. AUDITMYSLIWIEC, A.
106-0113 ORANGE Intersection Improvements-Minor Rte. 114 @ Rte. 34 WALLACE, C. AUDITPITEO, M.
106-0116 WEST HAVEN Rail Line Facility West Haven Station HENDRICKSON, G. CONSTRUCTIONPITEO, M. 3/24/2010
106-0121 ORANGE Bridge Replacement Rte. 114 - Br. #2637 BL COMPANIES CONSTRUCTIONUSHER, JEN 6/24/2015
106-0122 ORANGE Operational Lanes (106-108) - P.E. Town Line to Rte. 114 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 3/29/2017
106-0126 ORANGE Intersection Improvements-Major Rte. 34 CHHABRA, G. DESIGNPITEO, M. 6/6/2018
106-0127 ORANGE Bridge Rehabilitation Bridge # 00948 CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 8/15/2018
106-0128 ORANGE Interchange 58 Improvements Route 15 HENDRICKSON, G. DESIGNPITEO, M. 5/15/2019
107-0158 OXFORD Realignment-Minor Route 188 CHHABRA, G. AUDITPITEO, M.
107-0166 OXFORD Reconstruction-Minor Christian St. CHHABRA, G. CONSTRUCTIONPITEO, M. 7/17/2013
107-0173 OXFORD Realignment-Major Governors Hill Rd HENDRICKSON, G. CONSTRUCTIONPITEO, M. 11/11/2012
108-0154 PLAINFIELD Reconstruction CT 14A WALLACE, C. CONSTRUCTIONPITEO, M.
108-0174 PLAINFIELD Bridge Rehabilitation CJM CLE Br. #05453 - I-395 CHHABRA, G. CONSTRUCTIONPITEO, M.
108-0177 PLAINFIELD Sidewalk Construction Norwich Rd. CHHABRA, G. CONSTRUCTIONPITEO, M. 12/2/2009
108-0178 PLAINFIELD Bridge Rehabilitation Moosup Pond over I-395 CHHABRA, G. CONSTRUCTIONPITEO, M. 1/11/2013
108-0185 PLAINFIELD Superstructure Replacement Route 12 CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 10/19/2016
108-0186 PLAINFIELD Bridge Rehabilitation I-395 CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 10/23/2019
108-0189 VARIOUS TOWNS Trail State Park SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 7/3/2019
108-0190 PLAINFIELD Bridge Rehabilitation I-395 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 1/9/2019
109-0157 PLAINVILLE Utility Breakout of 109-143 CT 177 HENDRICKSON, G. AUDITPITEO, M.
Monday, June 11, 2018 Page 14 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
109-0172 PLAINVILLE Bridge Rehabilitation I-84 WB CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 7/15/2015
110-0127 PLYMOUTH Bridge Replacement Route 72 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 12/19/2012
110-0129 PLYMOUTH Realignment-Minor South Main VON HONE, K. AUDITMYSLIWIEC, A. 7/14/2010
110-0130 PLYMOUTH Deck Repairs Rte. 114 - Br. # 471 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 9/17/2014
110-0131 PLYMOUTH Pavement Rehabilitation Harwington Ave. CHHABRA, G. CONSTRUCTIONPITEO, M. 12/2/2009
110-0132 PLYMOUTH Reconstruction-Minor Allentown Rd. CAI, X. CONSTRUCTIONMYSLIWIEC, A. 12/14/2016
110-0133 PLYMOUTH Pedestrian Safety Improvements Charles, Maple, Hillside CHHABRA, G. CONSTRUCTIONPITEO, M.
111-0117 POMFRET Bridge Rehabilitation Route 44 - Br 00987 BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
111-0118 POMFRET Bridge Rehabilitation Route 97 - Br 02594 CHHABRA, G. CONSTRUCTIONPITEO, M. 9/30/2009
111-0119 POMFRET Bridge Replacement Route 44 - Br # 990 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 6/24/2015
111-0122 POMFRET Bridge Replacement Route 44 WALLACE, C. DESIGNPITEO, M. 12/6/2017
112-0111 PORTLAND Intersection Improvements-Major Rte. 66/ Middle Haddam VON HONE, K. AUDITMYSLIWIEC, A.
112-0112 PORTLAND Culvert Replacement Route 17A CHHABRA, G. CONSTRUCTIONPITEO, M. 12/2/2009
112-0113 PORTLAND Streetscape Improvements Main Street BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/9/2010
113-0106 MONTVILLE/PRESTON Bridge Replacement RT 2A over Thames River HENDRICKSON, G. TBDPITEO, M.
113-0106 PRESTON Bridge Replacement - TBC RT 2A over Thames River CAI, X. TBDMYSLIWIEC, A.
113-0107 PRESTON Bridge Replacement Route 2A Bridge No. 02931 CME ASSOCIATES DESIGNNERVAIS, KIMERY 7/11/2018
113-0108 PRESTON Bridge Replacement Route 2A Bridge No. 02932 CME ASSOCIATES DESIGNNERVAIS, KIMERY 7/11/2018
113-0109 PRESTON Bridge Replacement (05455) Rte. 2 / Hewitt Brook CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/13/2016
114-0081 PROSPECT Reconstruction-Major Scott Road WALLACE, C. CONSTRUCTIONPITEO, M.
115-0114 PUTNAM Bridge Rehabilitation Route 44 CHHABRA, G. CONSTRUCTIONPITEO, M. 5/14/2014
115-0116 PUTNAM Sidewalk Ramps Various HENDRICKSON, G. CONSTRUCTIONPITEO, M. 5/15/2013
116-0125 REDDING Realignment and Grade Crossing Long Ridge Road CAI, X. DESIGNMYSLIWIEC, A. 5/9/2018
116-0128 REDDING Grade Crossing Topstone Road BROWN, D. AUDITMYSLIWIEC, A.
116-0131 REDDING Streetscape Improvements Georgetown WALLACE, C. CONSTRUCTIONPITEO, M. 4/14/2010
116-0132 REDDING Safety Improvements-Minor Routes 57 and 107 CHHABRA, G. CONSTRUCTIONPITEO, M. 9/1/2010
116-0133 REDDING Bridge Replacement Rte. 53 - Br. # 1018 CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 7/1/2015
116-0134 REDDING Superstructure Replacement Rte. 53 - Br. # 2390 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 9/10/2014
117-0149 RIDGEFIELD Bridge Replacement Rte. 35 - Br. # 2277 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 2/18/2015
117-0157 RIDGEFIELD Bridge Replacement Rte. 7 - Br. # 2029 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 11/5/2014
117-0159 RIDGEFIELD Safety Improvements-Major Route 35 CHHABRA, G. DESIGNPITEO, M. 11/14/2018
118-0166 ROCKY HILL Bridge Replacement Br. #'s 02102, 04179 CHHABRA, G. CONSTRUCTIONPITEO, M. 10/14/2015
118-0170 ROCKY HILL Compterized Traffic Signal System 3, 411 and 99 HENDRICKSON, G. DESIGNPITEO, M. 12/12/2018
120-0086 SALEM Roundabout Route 82 at Route 85 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 9/21/2011
120-0088 SALEM Sidewalkn Improvements Rte. 85 VON HONE, K. AUDITMYSLIWIEC, A. 6/29/2011
120-0090 SALEM Bridge Replacement Rte. 82 - Br.#1140 CME ASSOCIATES DESIGNNERVAIS, KIMERY 6/20/2018
120-0092 SALEM Safety Improvements-Minor Rte. 85 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 11/2/2016
120-0093 SALEM Bridge Replacement Route 85 WALLACE, C. DESIGNPITEO, M. 4/3/2019
121-0130 SALISBURY Safety Improvements-Minor Rte. 41 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 6/15/2016
121-0132 SALISBURY ARRA - Sidewalk Improvements Route 44&41 WALLACE, C. CONSTRUCTIONPITEO, M. 11/18/2009
121-0135 SALISBURY Roadway Enhancement Roadway Enhancement HENDRICKSON, G. CONSTRUCTIONPITEO, M. 5/10/2017
123-0066 SCOTLAND Bridge Rehabilitation Route 14 HENDRICKSON, G. DESIGNPITEO, M. 7/17/2019
124-0162 SEYMOUR Rotary Upgrade Rte. 188 / Rte. 334 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 5/14/2014
124-0169 SEYMOUR Drainage Improvements Rimmon Street CAI, X. CONSTRUCTIONMYSLIWIEC, A. 6/22/2016
Monday, June 11, 2018 Page 15 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
124-0170 SEYMOUR Naugatuck River Greenway Route 67 and 8 SB Ramp HENDRICKSON, G. CONSTRUCTIONPITEO, M. 6/22/2016
126-0158 SHELTON Intersection Improvements-Minor Route 110 CHHABRA, G. CONSTRUCTIONPITEO, M. 11/11/2014
126-0160 SHELTON Reconstruction-Minor East Village Rd. VON HONE, K. AUDITMYSLIWIEC, A. 3/21/2007
126-0166 SHELTON Pavement Rehabilitation (ARRA) Constitution Blvd. CHHABRA, G. CONSTRUCTIONPITEO, M. 10/14/2009
126-0168 SHELTON Pedestrian Safety Improvements Sunnyside Elementary VON HONE, K. AUDITMYSLIWIEC, A. 4/17/2013
126-0170 SHELTON Bridge Rehabilitation Rte. 8 / Housatonic River BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/15/2016
126-0173 SHELTON Intersection Improvement Huntington Street HENDRICKSON, G. DESIGNPITEO, M. 5/2/2018
126-0174 SHELTON Bridge Rehabilitation Bridge # 01659 o/ Housatonic BL COMPANIES DESIGNUSHER, JEN 6/5/2019
128-0143 SIMSBURY Intersection Improvements-Major Routes 10 and 167 VON HONE, K. AUDITMYSLIWIEC, A. 8/13/2008
128-0147 SIMSBURY Bicycle Facility Various VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 8/13/2008
128-0150 SIMSBURY Resurfacing Route 10 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 1/26/2011
128-0153 SIMSBURY Bridge Replacement Br. # 00653 / Hop Brook SMITH, L. / BROWN, D. TBDMYSLIWIEC, A. 11/11/2021
129-0110 SOMERS Realignment-Minor CT 83 HENDRICKSON, G. AUDITPITEO, M.
129-0112 SOMERS Reconstruction-Minor Distric Rd, Sokol Rd, RT190 WALLACE, C. CONSTRUCTIONPITEO, M. 11/11/2014
129-0113 SOMERS Bridge Rehabilitation Maple Street CHHABRA, G. DESIGNPITEO, M. 12/5/2018
130-0173 SOUTHBURY Interchange I-84 Interchange 14 WALLACE, C. DESIGNPITEO, M. 10/7/2020
130-0176 SOUTHBURY ARRA-resurfacing Main Street - south WALLACE, C. CONSTRUCTIONPITEO, M. 11/11/2009
130-0177 SOUTHBURY Pavement Preservation Route 6 VON HONE, K. AUDITMYSLIWIEC, A. 2/2/2011
130-0179 SOUTHBURY Bridge Rehabilitation Br. # 6815 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 10/21/2015
130-0180 SOUTHBURY Bridge Rehabilitation Br. 01155 & 01156 o/Rts 6 & 67 CME ASSOCIATES DESIGNNERVAIS, KIMERY 10/25/2017
130-0182 SOUTHBURY I-84 Improvements Exit 16 WALLACE, C. CONSTRUCTIONPITEO, M. 12/28/2016
131-0190 SOUTHINGTON Intersection Improvements-Major Route 10 over Rte.322 CAI, X. DESIGNMYSLIWIEC, A. 10/6/2021
131-0193 SOUTHINGTON Linear Park Phase II VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 7/1/2013
131-0197 SOUTHINGTON Bridge Rehabilitation I-84 over Pan Am RR WALLACE, C. CONSTRUCTIONPITEO, M. 6/19/2013
131-0197 SOUTHINGTON Bridge Rehabilitation I-84 over Pan Am RR HENDRICKSON, G. CONSTRUCTIONPITEO, M. 6/19/2013
131-0198 SOUTHINGTON Reconstruction-Major Mount Vernon Road WALLACE, C. CONSTRUCTIONPITEO, M. 7/4/2012
131-0200 SOUTHINGTON Full Depth Reclamation (ARRA) So. Ends, Mt. Vernon HENDRICKSON, G. CONSTRUCTIONPITEO, M. 12/29/2009
131-0201 SOUTHINGTON Safe Routes DePaolo Middle School CAI, X. CONSTRUCTIONMYSLIWIEC, A. 3/25/2015
131-0203 SOUTHINGTON Canal Heritage Trail Lazy Lane to Town Line Rd. SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 5/8/2019
132-0127 SOUTH WINDSOR Reconstruction-Minor Kelly Road BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 7/20/2011
132-0128 SOUTH WINDSOR Pavement Reclamation Buckland Road VON HONE, K. AUDITMYSLIWIEC, A. 7/22/2009
132-0129 SOUTH WINDSOR Pedestrian Safety Improvements Podunk River CAI, X. DESIGNMYSLIWIEC, A. 7/11/2018
132-0130 SOUTH WINDSOR Pedestrian Safety Improvements Orchard Hill VON HONE, K. AUDITMYSLIWIEC, A. 6/20/2012
132-0131 SOUTH WINDSOR Reconstruction-Minor Avery Street CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/15/2015
132-0132 SOUTH WINDSOR Intersection Improvements Abbe Rd. CAI, X. CONSTRUCTIONMYSLIWIEC, A. 2/17/2016
133-0094 SPRAGUE Bridge Replacement Rte 207/ Beaver Brook CAI, X. CONSTRUCTIONMYSLIWIEC, A. 11/20/2013
133-0095 SPRAGUE Sidewalks and Guiderail Route 97 WALLACE, C. CONSTRUCTIONPITEO, M. 1/16/2013
133-0097 SPRAGUE Bridge Rehabilitation Bridge # 1291 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 10/11/2017
134-0141 STAFFORD Realignment-Minor CT 319 BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
134-0147 STAFFORD Modern Roundabout Routes 190 & 319 WALLACE, C. DESIGNPITEO, M. 4/10/2019
134-0148 STAFFORD Modern Roundabout Route 190 @ Rte. 32 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 9/25/2019
135-0230 STAMFORD Revise Interchange Ramps CT 15 VON HONE, K. AUDITMYSLIWIEC, A.
135-0270 STAMFORD Resurfacing / Bridge Repairs Stamford/ N/ Cannan VON HONE, K. AUDITMYSLIWIEC, A. 1/30/2013
135-0287 STAMFORD Reconstruction-Major Route 106 SMITH, L. / BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 4/26/2017
Monday, June 11, 2018 Page 16 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
135-0295 STAMFORD Reconstruction-Minor Stillwater Rd. CHHABRA, G. CONSTRUCTIONPITEO, M. 7/13/2011
135-0297 STAMFORD Road Widening Hope St. HENDRICKSON, G. CONSTRUCTIONPITEO, M. 7/18/2012
135-0297 STAMFORD Road Widening Hope St. CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/18/2012
135-0298 STAMFORD Safety Improvements-Minor K.T. Murphy School CHHABRA, G. CONSTRUCTIONPITEO, M. 8/25/2010
135-0301 STAMFORD M-N Railroad Bridge Replacement Various BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 9/28/2016
135-0304 STAMFORD Bridge Rehabilitation Guinea Rd. Br. # 700 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 2/20/2012
135-0307 STAMFORD Bridge Replacement Rte. 1 - Br. #315 BL COMPANIES DESIGNUSHER, JEN 1/24/2018
135-0316 STAMFORD Bridge Rehabilitation Riverbank Rd. Br. # 720 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 1/30/2013
135-0317 STAMFORD Reconstruction-Major South End Street WALLACE, C. CONSTRUCTIONPITEO, M.
135-0320 STAMFORD Intersection Improvements-Major Atlantic St. / Henry St. CHHABRA, G. CONSTRUCTIONPITEO, M. 3/15/2017
135-0321 STAMFORD Reconstruction-Minor Oaklawn Ave. CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/13/2016
135-0325 STAMFORD Superstructure Replacement Rte. 1 - Br.# 37 CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 4/19/2017
135-0326 STAMFORD Utiity breakout for 135-0301 Atlantic St. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 5/20/2015
135-0327 STAMFORD Mid-Block Crosswalks Route 137 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 3/25/2015
135-0329 STAMFORD Br # 2600 / Mianus River Route 104 over Mianus River BROWN, D. TBDMYSLIWIEC, A. 11/15/2017
135-0331 STAMFORD Bridge Replacement -Br. 01350 Route 137 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 1/15/2020
135-0334 STAMFORD Bridge Rehabilitation Br. # 00032 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 5/1/2019
135-0335 STAMFORD Bridge Replacement W. Main Street HENDRICKSON, G. DESIGNPITEO, M. 12/11/2019
135-0337 STAMFORD Traffic signal Modification Various SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 10/30/2019
135-0338 STAMFORD Mill River Greenway - Phase 2 Trail SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 4/17/2019
135-0340 STAMFORD Streetscape Improvements Summer St. CHHABRA, G. DESIGNPITEO, M. 10/17/2018
136-0071 STERLING Intersection Improvements-Minor CT 14 & 14A WALLACE, C. CONSTRUCTIONPITEO, M.
136-0072 STERLING Bridge Replacement Br. # 02132 / Cedar Swamp Brook CHHABRA, G. DESIGNPITEO, M. 11/21/2018
136-0073 STERLING Bridge Replacement Route 14 HENDRICKSON, G. DESIGNPITEO, M. 3/20/2019
137-0146 STONINGTON Planting By Contract Pawcatuck Streetscape WALLACE, C. CONSTRUCTIONPITEO, M. 6/4/2008
137-0147 STONINGTON Streetscape Improvements (ARRA) Phase 2 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 12/9/2009
137-0149 STONINGTON Intersection Improvements-Minor Route 1 at Route 2 WALLACE, C. CONSTRUCTIONPITEO, M. 6/4/2008
137-0152 STONINGTON Mystic Streetscape Mystic BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 4/22/2009
137-0153 STONINGTON Bridge #2779 (P.E.) Rte 184 VON HONE, K. AUDITMYSLIWIEC, A. 11/11/2011
137-0156 STONINGTON Resurfacing Taugwonk Rd. VON HONE, K. CONSTRUCTIONMYSLIWIEC, A.
137-0158 STONINGTON Bridge Replacement Rte. 234 - Br.#2934 CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 11/2/2016
138-0182 STRATFORD Intersection Improvements Route 130 @ Honeyspo Rd WALLACE, C. CONSTRUCTIONPITEO, M.
138-0211 STRATFORD Operational Lanes W. Broad and Noble Sts. CAI, X. CONSTRUCTIONMYSLIWIEC, A. 3/8/2017
138-0212 STRATFORD Intersection Improvements-Minor Route 1 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 3/8/2017
138-0215 STRATFORD Reconstruction-Major Huntington Avenue WALLACE, C. CONSTRUCTIONPITEO, M. 6/18/2008
138-0221 STRATFORD Bridge Replacement Bridge # 00135 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 9/1/2010
138-0221 STRATFORD Bridge Replacement Bridge # 00135 WALLACE, C. CONSTRUCTIONPITEO, M. 9/1/2010
138-0226 STRATFORD Parking Expansion Stratford R.R. Station WALLACE, C. CONSTRUCTIONPITEO, M. 9/25/2013
138-0228 STRATFORD Bridge Replacement Rte. 110 - Br.# 2621 CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 7/8/2015
138-0230 STRATFORD Bridge Replacement CJM CLE Route 110 over Freeman Brook HENDRICKSON, G. CONSTRUCTIONPITEO, M. 7/8/2015
138-0233 STRATFORD Bicycle/Pedestrian Trail (ARRA) Housatonic River Gnwy. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 11/18/2009
138-0235 STRATFORD Streetscape Improvements Barnum Ave. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 12/9/2009
138-0241 STRATFORD Reconstruction-Minor West Broad St. SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 2/28/2018
138-0242 STRATFORD Safe Routes Wilcoxson Elementary VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 1/27/2016
Monday, June 11, 2018 Page 17 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
138-0243 STRATFORD Pavement Preservation Route 15 VON HONE, K. AUDITMYSLIWIEC, A. 11/6/2013
138-0245 STRATFORD Bridge Replacement Rte. 1 - Br. #326 CME ASSOCIATES TBDNERVAIS, KIMERY 11/11/2018
138-0248 STRATFORD Interchange Ramps I-95, Interchange 33 CHHABRA, G. DESIGNPITEO, M. 9/12/2018
139-0103 SUFFIELD Grade Crossing Harvey Lane CAI, X. DESIGNMYSLIWIEC, A. 10/13/2018
139-0109 SUFFIELD Bridge Rehabilitation Route 190 CHHABRA, G. CONSTRUCTIONPITEO, M.
139-0109 SUFFIELD Bridge Rehabilitation Rte. 190 HENDRICKSON, G. CONSTRUCTIONPITEO, M.
139-0113 SUFFIELD Bridge Rehabilitation Route 190 WALLACE, C. DESIGNPITEO, M. 6/19/2019
140-0168 THOMASTON Pavement Rehabilitation (ARRA) Old Northfield/ Hickory BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 12/2/2009
140-0172 THOMASTON Realignment-Major Br. 03350 & 03351 o/Naugatuck CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 10/25/2017
140-0174 THOMASTON Route 8 over Reynolds Bridge Rd Route 8 CHHABRA, G. DESIGNPITEO, M.
141-0154 THOMPSON Bridge Rehabilitation I-395 in Thompson CME ASSOCIATES DESIGNNERVAIS, KIMERY 7/11/2018
142-0146 TOLLAND Widening I-84 WALLACE, C. CONSTRUCTIONPITEO, M. 12/31/2014
142-0148 TOLLAND Bridge Rehabilitation Br # 00840, Rte. 74 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 8/31/2011
142-0149 TOLLAND Intersection Improvements-Minor Route 74 / Route 195 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 1/31/2018
143-0166 TORRINGTON Minor Drainage CT 4 WALLACE, C. CONSTRUCTIONPITEO, M.
143-0177 TORRINGTON Culvert Replacement Pinewoods Road VON HONE, K. AUDITMYSLIWIEC, A. 6/17/2009
143-0184 TORRINGTON Streetscape Improvements Route 800 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/8/2015
143-0189 TORRINGTON Bridge Rail Improvements Br. # 00612 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 3/30/2016
144-0179 TRUMBULL Resurfacing CT 25 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 1/26/2011
144-0181 TRUMBULL Intersection Improvements-Major Route 25 BROWN, D. AUDITMYSLIWIEC, A.
144-0186 TRUMBULL Trail Housatonic Railroad Trail WALLACE, C. CONSTRUCTIONPITEO, M. 9/25/2013
144-0189 TRUMBULL ARRA - Resurfacing Whitney Ave VON HONE, K. AUDITMYSLIWIEC, A. 12/2/2009
144-0191 TRUMBULL Multi-Use Trail Rte. 127 / Quarry Rd. CAI, X. CONSTRUCTIONMYSLIWIEC, A. 6/22/2016
144-0192 TRUMBULL Trail Pequonnock River CAI, X. DESIGNMYSLIWIEC, A. 6/27/2018
144-0196 TRUMBULL Intersection Improvements Route 108 CAI, X. DESIGNMYSLIWIEC, A. 9/18/2019
146-0169 VERNON Intersection Improvements-Major Rte. 83 @ I-84 VON HONE, K. AUDITMYSLIWIEC, A. 8/20/2008
146-0195 VERNON Reconstruction-Minor South Street CHHABRA, G. CONSTRUCTIONPITEO, M. 6/15/2016
146-0196 VERNON Bridge Replacement Rte. 74 - Br.# 5588 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 7/8/2015
147-0058 VOLUNTOWN Intersection Improvements-Minor Route 138 CAI, X. TBDMYSLIWIEC, A.
148-0190 WALLINGFORD Intersection Improvements-Minor US 5 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 6/17/2009
148-0198 WALLINGFORD Trail Quinnipiac River-phase III HENDRICKSON, G. CONSTRUCTIONPITEO, M.
148-0200 WALLINGFORD Interchange Ramps CT Rte. 15 CHHABRA, G. CONSTRUCTIONPITEO, M. 11/11/2015
148-0201 WALLINGFORD Bridge Restoration Rte. 150 / Wharton Brook CAI, X. CONSTRUCTIONMYSLIWIEC, A. 10/7/2015
148-0202 WALLINGFORD Intersection Improvements-Minor Route 68 at Route 150 WALLACE, C. CONSTRUCTIONPITEO, M.
148-0208 WALLINGFORD Pedestrian Improvement Hall Avenue WALLACE, C. DESIGNPITEO, M. 3/28/2018
150-0126 WASHINGTON Retaining Wall Replacement Route 45 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/2/2010
150-0130 WASHINGTON Plaza Rehabilitation Bryan Memorial Plaza CAI, X. CONSTRUCTIONMYSLIWIEC, A. 4/12/2017
150-0131 WASHINGTON Bridge Replacement Rte. 109 - Br. #6786 BL COMPANIES CONSTRUCTIONUSHER, JEN 6/8/2016
151-0273 WATERBURY Upgrade Expressway Rte. 84 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 4/2/2014
151-0274 WATERBURY Reconstruction I-84 BROWN, D. AUDITMYSLIWIEC, A.
151-0279 WATERBURY Intersection Improvements-Major CT 73 BROWN, D. AUDITMYSLIWIEC, A.
151-0285 WATERBURY Breakout For 151-273 Sewer Pump Station BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 3/31/2010
151-0296 WATERBURY Widening Chase Ave. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 7/13/2011
151-0297 WATERBURY Widening Chase Avenue BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 7/10/2013
Monday, June 11, 2018 Page 18 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
151-0307 WATERBURY I .M.S. Breakout 151-273 I-84 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 8/19/2009
151-0312 WATERBURY Bridge Rehabilitation Br. # 03191A - I-84/CT 8 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 9/16/2017
151-0313 WATERBURY Bridge Rehabilitation Br. #03191B - I-84/CT 8 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 9/6/2017
151-0317 WATERBURY Traffic Signalization Washinton St @ Sylvan Ave HENDRICKSON, G. CONSTRUCTIONPITEO, M. 8/15/2012
151-0320 WATERBURY ARRA - Sidewalk Reconstruction Cooke Street WALLACE, C. CONSTRUCTIONPITEO, M. 11/11/2009
151-0321 WATERBURY Naugatuck River Greenway Phase 1 CHHABRA, G. DESIGNPITEO, M. 10/10/2018
151-0322 WATERBURY Safety Improvements-Minor SR 847 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 9/16/2015
151-0324 WATERBURY Safe Routes Gilmartin School WALLACE, C. DESIGNPITEO, M. 1/31/2018
151-0326 WATERBURY Bridge Rehabilitation Br. - 03190 A,B,F, 03191 D,E BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 9/16/2017
151-0329 WATERBURY Replacement of Metal Bin Walls Route 8 SMITH, L. / BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 11/30/2017
151-0332 WATERBURY Bridge Rehabilitation Br. 03191F Ramp 197 BL COMPANIES DESIGNUSHER, JEN 7/10/2019
151-0333 WATERBURY Bridge Rehabilitation Bridge # 03176 / Naugatuck River NERVAIS, KIMERY DESIGNNERVAIS, KIMERY 6/5/2019
151-0334 WATERBURY Bridge Rehabilitation Br. # 03179 - RTE. 8 NERVAIS, KIMERY TBDNERVAIS, KIMERY
152-0149 WATERFORD Bridge Replacement Rte. 1 - Br. #1904 BL COMPANIES CONSTRUCTIONUSHER, JEN 7/8/2015
152-0150 WATERFORD Intersection Improvements-Minor CT Rte. 32/Lathrop Rd BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 12/2/2009
152-0156 WATERFORD Pavement Reclamation Willetts Avenue VON HONE, K. AUDITMYSLIWIEC, A. 7/10/2013
152-0157-A WATERFORD Superstructure Replacement I-95 - Br. # 00352A CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 7/1/2015
152-0157-B WATERFORD Superstructure Replacement I-95 - Br. # 00352B CME ASSOCIATES CONSTRUCTIONNERVAIS, KIMERY 7/1/2015
152-0158 WATERFORD Bridge Replacement Br. 00255 o/Rt 85 (FD) CME ASSOCIATES DESIGNNERVAIS, KIMERY 5/30/2018
153-0111 WATERTOWN Reconstruction-Major Guernseytown Rd. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/25/2008
153-0113 WATERTOWN Realignment-Minor Sunnyside Ave. CHHABRA, G. CONSTRUCTIONPITEO, M. 7/14/2010
153-0118 WATERTOWN Realignment-Minor CT 73 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 2/19/2014
154-0121 MADISON ARRA - Pavement Preservation McVeage Road HENDRICKSON, G. CONSTRUCTIONPITEO, M. 11/11/2009
154-0122 Multi-Town Resurfacing I-95 CHHABRA, G. CONSTRUCTIONPITEO, M. 2/22/2012
154-0123 WESTBROOK Culvert Rehabilitation I-95 / Gatchen Creek VON HONE, K. AUDITMYSLIWIEC, A. 3/14/2012
155-0162 WEST HARTFORD Safety Improvements-Major S.R. 529 & CT 179 CHHABRA, G. CONSTRUCTIONPITEO, M. 8/30/2010
155-0165 WEST HARTFORD Superstructure Replacement Prospect Ave - 84 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 6/12/2013
155-0168 WEST HARTFORD Safety Improvements-Minor Park Rd. / S.R. 501 CHHABRA, G. CONSTRUCTIONPITEO, M. 5/17/2017
155-0169 WEST HARTFORD Superstructure Replacement Mayflower St. - Br.# 1748 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 9/23/2015
155-0171 WEST HARTFORD Auxilary Lanes I-84 CAI, X. DESIGNMYSLIWIEC, A. 10/31/2018
155-0172 WEST HARTFORD Guide Rail I-84 CHHABRA, G. CONSTRUCTIONPITEO, M. 10/19/2016
155-0174 WEST HARTFORD Amtrak Bridge Fascia Painting Bridge No. 00477 HENDRICKSON, G. TBDPITEO, M. 10/25/2017
155-H025 HARTFORD Busway - Hartford South Oakwood Ave to Sigourney St BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 7/1/2010
156-0157 WEST HAVEN Revise Interchange Ramps I-95 HENDRICKSON, G. AUDITPITEO, M.
156-0170 WEST HAVEN Intersection Improvements-Major Route 1 and 22 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/2/2014
156-0174 WEST HAVEN Safety Improvements-Major Route 1 @ Farewell St. BROWN, D. AUDITMYSLIWIEC, A.
156-0175 WEST HAVEN Resurfacing Campell Ave. HENDRICKSON, G. CONSTRUCTIONPITEO, M. 7/18/2012
156-0177 WEST HAVEN Bridge Repairs Br. #05751 / Oyster Riv. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 11/11/2013
157-0082 WESTON Pavement Improvements (ARRA) Old Hyde Road CHHABRA, G. CONSTRUCTIONPITEO, M. 12/16/2009
157-0083 WESTON Bridge Replacement Rte. 57 - Br.# 1023 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 7/16/2014
157-0084 WESTON Retaining Wall Improvements Route 53 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A.
158-0193 WESTPORT Operational Lanes U.S. 1, Grand Union Dr., Turkey Hill CAI, X. TBDMYSLIWIEC, A.
158-0203 WESTPORT Pavement Improvements (ARRA) Various Roads CHHABRA, G. CONSTRUCTIONPITEO, M. 10/21/2009
158-0205 WESTPORT ARRA - Pavement Preservation Various HENDRICKSON, G. CONSTRUCTIONPITEO, M. 7/14/2010
Monday, June 11, 2018 Page 19 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
158-0206 WESTPORT Bridge Rehabilitation Beachside Ave. / I-95 CAI, X. DESIGNMYSLIWIEC, A. 5/29/2019
158-0208 WESTPORT Superstucture Replace & Repair North Ave. - Br.# 732 CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 10/29/2014
158-0211 WESTPORT Safety Improvements-Major CT 33 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/6/2016
159-0141 WETHERSFIELD Various Traffic Operations CT 99 BROWN, D. AUDITMYSLIWIEC, A.
159-0187 WETHERSFIELD Pavement Preservation Route 5 / 15 VON HONE, K. AUDITMYSLIWIEC, A. 1/19/2011
159-0189 WETHERSFIELD Superstructure Repair Ridge Rd. - Br.# 807 CLOSE, JENSEN & MILLER DESIGNMANGAN, THOMAS 6/14/2017
159-0191 WETHERSFIELD Safety Improvements-Major I-91 CHHABRA, G. DESIGNPITEO, M. 6/6/2018
159-0192 WETHERSFIELD Pavement Preservation Route 3 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 12/9/2015
160-0139 WILLINGTON Bridge Replacement Route 74 - Br 00982 WALLACE, C. CONSTRUCTIONPITEO, M. 9/30/2015
160-0147 WILLINGTON Bridge Replacement Br. 02259 o/S. Branch Roaring Brk CAI, X. DESIGNMYSLIWIEC, A. 10/31/2018
160-0150 WILLINGTON Bridge Replacement - # 02169 Lower Ruby Brook BL COMPANIES DESIGNUSHER, JEN 3/4/2020
161-0118 WILTON Major Widening U.S. 7 HENDRICKSON, G. CONSTRUCTIONPITEO, M.
161-0118 WILTON Major Widening US 7 VON HONE, K. AUDITMYSLIWIEC, A.
161-0120 WILTON Railroad Parking Parking Lot PITEO, M. CONSTRUCTIONPITEO, M.
161-0124 WILTON Major Widening U.S. 7 HENDRICKSON, G. CONSTRUCTIONPITEO, M.
161-0124 WILTON Major Widening US 7 VON HONE, K. AUDITMYSLIWIEC, A.
161-0137 WILTON Utility Breakout-161-118,161-124 US 7 VON HONE, K. AUDITMYSLIWIEC, A.
161-0141 WILTON Safety & Operational Improvements Route 7 @Grumman Hill WALLACE, C. DESIGNPITEO, M. 10/2/2019
162-0145 WINSTED Reconstruction-Minor Holabird Ave. CAI, X. CONSTRUCTIONMYSLIWIEC, A. 2/24/2016
162-0148 WINCHESTER Streetscape Improvements Main Street HENDRICKSON, G. CONSTRUCTIONPITEO, M. 9/12/2012
162-0151 WINCHESTER Pavement Rehabilitation (ARRA) Wetmore Avenue CHHABRA, G. CONSTRUCTIONPITEO, M. 12/16/2009
163-0194 WINDHAM Bicycle Facility Hop River VON HONE, K. CONSTRUCTIONMYSLIWIEC, A.
163-0194 WINDHAM Bicycle Facility Hop River HENDRICKSON, G. CONSTRUCTIONPITEO, M.
163-0196 WINDHAM Bridge Replacement Rte. 66 - Br.# 488 BL COMPANIES DESIGNUSHER, JEN 6/12/2019
163-0197 WINDHAM Pavement Rehabilitation (ARRA) High/Valley/Jackson Sts. BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 12/9/2009
163-0198 WINDHAM Intermodal Transportation Center Walnut / Meadow Sts. WALLACE, C. AUDITPITEO, M.
163-0203 WINDHAM Bridge Replacement Rte. 66 - Br. #490 BL COMPANIES CONSTRUCTIONUSHER, JEN 11/16/2016
164-0229 WINDSOR Reconstruction-Minor Day Hill Road WALLACE, C. CONSTRUCTIONPITEO, M. 3/26/2008
164-0232 WINDSOR Reconstruction-Minor Day Hill Road, Phase 2 WALLACE, C. CONSTRUCTIONPITEO, M. 7/1/2009
164-0233 WINDSOR Reconstruction-Major Prospect Hill Road CHHABRA, G. CONSTRUCTIONPITEO, M. 7/10/2013
164-0234 WINDSOR Pavement Preservation I-91 VON HONE, K. AUDITMYSLIWIEC, A. 1/5/2011
164-0238 WINDSOR Pavement Rehabilitation Day Hill Rd. WALLACE, C. CONSTRUCTIONPITEO, M. 5/29/2013
165-0303 WINDSOR LOCKS Reconstruction Old County Rd. BROWN, D. AUDITMYSLIWIEC, A.
166-0099 WOLCOTT Traffic Signalization CT 69 WALLACE, C. CONSTRUCTIONPITEO, M. 10/27/2010
166-0101 WOLCOTT Reconstruction-Minor Long Swamp Rd. CHHABRA, G. CONSTRUCTIONPITEO, M. 12/23/2009
166-0102 WOLCOTT Pavement Rehabilitation Spindle Hill Road HENDRICKSON, G. CONSTRUCTIONPITEO, M.
166-TBD WOLCOTT Bridge Rehabilitation Bridge # 03240 / Mad River RAIOLA, ROBERT TBDNERVAIS, KIMERY
167-0100 WOODBRIDGE Intersection Improvements-Minor Rtes. 63 and 67 WALLACE, C. CONSTRUCTIONPITEO, M. 6/26/2013
167-0104 WOODBRIDGE Reconstruction-Minor Christmas Tree Rd. CHHABRA, G. CONSTRUCTIONPITEO, M. 7/13/2011
167-0107 WOODBRIDGE Culvert Repair/Extension Rte. 15 - Br. #2151 BL COMPANIES DESIGNUSHER, JEN 10/24/2018
167-0108 WOODBRIDGE Tunnel Improvements Route 15 CAI, X. DESIGNMYSLIWIEC, A. 9/15/2021
169-0128 WOODSTOCK Bridge Replacement - Br. # 02738 Rte. 169 / Gravelly Brook WALLACE, C. CONSTRUCTIONPITEO, M. 4/20/2016
170-2296 NHHS Double Tracking of Rail Line Springfield Line SMITH, L. / BROWN, D. TBDMYSLIWIEC, A.
170-2296 NHHS Double tracking of Rail Line Springfiel Line HENDRICKSON, G. TBDPITEO, M. 12/31/2016
Monday, June 11, 2018 Page 20 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
170-2313 ESSEX Commuter Parking Lot Rte. 9/Interchange 4 CHHABRA, G. CONSTRUCTIONPITEO, M.
170-2537 VARIOUS DOCKET 272 NU VON HONE, K. AUDITMYSLIWIEC, A. 5/1/2006
170-2876 WESTON, SOUTHBUR Culvert Rehabilitations Various BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 11/5/2014
170-3017 STONINGTON Bridge #2779 (Costr.) Rte 216 CHHABRA, G. CONSTRUCTIONPITEO, M. 3/16/2012
170-3046 DISTRICT Fastener Replacement Statewide Various locations BROWN, D. AUDITMYSLIWIEC, A. 4/12/2012
170-3134 BRISTOL Reconstruction-Major Rte. 72 CAI, X. CONSTRUCTIONMYSLIWIEC, A.
170-3154 NHHS Double Tracking of Rail Line Phase 1 BROWN, D. TBDMYSLIWIEC, A.
170-3154 NHHS Double Tracking of Rail Line Phase 1 HENDRICKSON, G. DESIGNPITEO, M. 12/31/2016
170-3155 NHHS Double Tracking of Rail Line Phase 2 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 2/19/2014
170-3155 NHHS Double Tracking of Rail Line Phase 2 HENDRICKSON, G. DESIGNPITEO, M. 12/31/2016
170-3156 NHHS Double Tracking of Rail Line Phase 3a BROWN, D. TBDMYSLIWIEC, A.
170-3156 NHHS Double Tracking of Rail Line Phase 3a HENDRICKSON, G. DESIGNPITEO, M. 12/31/2016
170-3250 WATERFORD Route 85 Bridge No. 00255 CME ASSOCIATES TBDNERVAIS, KIMERY
170-3250 HARTFORD I-84 TR 824 Bridge No. 03399C,03400C CME ASSOCIATES TBDNERVAIS, KIMERY
170-3250 FRANKLIN Route 207 Bridge No. 06787 & 06788 CME ASSOCIATES TBDNERVAIS, KIMERY
170-3250 THOMPSON I-395 Bridge No. 06793 & 06794 CME ASSOCIATES TBDNERVAIS, KIMERY
170-3250 BROOKFIELD Route 133 Bridge No. 01343 CME ASSOCIATES TBDNERVAIS, KIMERY
170-3250 SOUTHBURY I-84 EB Bridge No. 01155 & 01156 CME ASSOCIATES TBDNERVAIS, KIMERY
170-3250 OLD SAYBROOK Route 154 Bridge No. 01386 CME ASSOCIATES TBDNERVAIS, KIMERY
170-3250 NEW HAVEN I-91 Bridge 03094 CME ASSOCIATES TBDNERVAIS, KIMERY
170-3346 Various Roadway Weather Information Systems Various BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 12/14/2016
171-0280 DISTRICT 1 Bridge Replacement Rtes. 69, 140, 160 BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 5/23/2007
171-0295 VARIOUS Guide Rail Routes 94 and 17 BROWN, D. AUDITMYSLIWIEC, A.
171-0305 NEW BRITAIN Busway Stations Various CHHABRA, G. CONSTRUCTIONPITEO, M. 11/11/2012
171-0310 DISTRICT 2 Guide Rail Various VON HONE, K. AUDITMYSLIWIEC, A. 6/5/2013
171-0316 DISTRICT 1 Traffic Signalization Various WALLACE, C. CONSTRUCTIONPITEO, M. 2/28/2007
171-0339 NEW BRITAIN Bridge Repair Bridge No. 03313, 03320 WALLACE, C. CONSTRUCTIONPITEO, M. 2/24/2010
171-0346 MIDDLETOWN Culvert Rehabilitations Route 410 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 8/20/2014
171-0359 VARIOUS Bridge Beam End repairs Various HENDRICKSON, G. CONSTRUCTIONPITEO, M. 11/28/2012
171-0359 VARIOUS Bridge Beam End Repairs Various CHHABRA, G. CONSTRUCTIONPITEO, M. 11/28/2012
171-0360 DISTRICT 1 Bridge Preservation - Deck Joints Various Bridges BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
171-0373 DISTRICT 1 Bridge Painting Bradley Gateway Br. VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 10/14/2015
171-0375 HARTFORD IMS Upgrade Various HENDRICKSON, G. CONSTRUCTIONPITEO, M. 3/9/2016
171-0406 DISTRICT 1 Bridge Joint Replacements Br.# 03031, 03047, 04287 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 5/25/2016
171-0414 SOUTHINGTON/MERI I.M.S I-691 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 6/27/2018
171-0432 DISTRICT 1 Replacement of Illumination Various HENDRICKSON, G. DESIGNPITEO, M. 5/16/2018
172-0377 VARIOUS Bridge Bearing Replacement Various CHHABRA, G. CONSTRUCTIONPITEO, M. 6/22/2016
172-0380 NEW LONDON Bridge Painting Various CHHABRA, G. CONSTRUCTIONPITEO, M. 10/28/2009
172-0383 VARIOUS Guiderail Rtes. 97, 169, 207 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 6/6/2012
172-0392 DISTRICT 2 Culvert Replacement Route 2 VON HONE, K. AUDITMYSLIWIEC, A. 7/17/2013
172-0393 KILLINGWORTH Culvert Replacement (3 sites) Route 148 & Route 82 CHHABRA, G. CONSTRUCTIONPITEO, M. 10/15/2014
172-0394 MANSFIELD Culvert Rehabilitation Eagleville / Beaver CHHABRA, G. CONSTRUCTIONPITEO, M. 1/14/2015
172-0399 DISTRICT 2 Bridge Beam End & Bearing Repair Various Bridges CHHABRA, G. CONSTRUCTIONPITEO, M. 12/16/2011
172-0405 VARIOUS Bridge Beam End Repairs Various WALLACE, C. CONSTRUCTIONPITEO, M. 10/3/2013
Monday, June 11, 2018 Page 21 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
172-0411 LISBON Bridge Joint Replacement District 2 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A.
172-0417 DISTRICT Superstructure Repair Various CLOSE, JENSEN & MILLER CONSTRUCTIONMANGAN, THOMAS 11/27/2013
172-0446 STONINGTON Beam End Repairs Various CHHABRA, G. CONSTRUCTIONPITEO, M. 8/3/2016
172-0447 DISTRICT 2 Bearing Replacement & Repair Various BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 7/20/2016
173-0226 Dist. #2-P.E. Greenwich, Stamford-173-290 Minor Intersection Improvement WALLACE, C. CONSTRUCTIONPITEO, M.
173-0288 DISTRICT 3 Operational Lanes N. England, Noble, Concord Aves. WALLACE, C. AUDITPITEO, M.
173-0289 DISTRICT 3 Operational Lanes Route 1 WALLACE, C. AUDITPITEO, M.
173-0291 BRIDGEPORT Operational Lanes Route 1 WALLACE, C. CONSTRUCTIONPITEO, M. 3/2/2011
173-0364 VARIOUS DOCKET 292 NU MYSLIWIEC, A. AUDITMYSLIWIEC, A.
173-0368 DISTRICT 3 Guide Rail CT 110 & CT 113 WALLACE, C. CONSTRUCTIONPITEO, M. 10/7/2009
173-0401 DISTRICT 3 Bridge Bearimg Replacement Br. 03019 - Willow St. CHHABRA, G. CONSTRUCTIONPITEO, M. 2/7/2018
173-0401 DISTRICT 3 Bridge Bearimg Replacement Bridge 03563 - Over MNRR BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 2/7/2018
173-0415 TRUMBULL Culvert Rehab Br Nos 06778, 06750, 06768 WALLACE, C. DESIGNPITEO, M. 3/20/2019
173-0421 DISTRICT 3 Beam End Painting and Steel Repair Various Towns VON HONE, K. AUDITMYSLIWIEC, A. 7/25/2012
173-0430 DISTRICT 3 Substructure Concrete Repairs 7 Bridges HENDRICKSON, G. CONSTRUCTIONPITEO, M. 10/16/2013
173-0430 DISTRICT 3 Substructure Concrete Repairs 7 Bridges WALLACE, C. CONSTRUCTIONPITEO, M. 10/16/2013
173-0434 VARIOUS TOWNS Bearing Replacement & Repair Bridges over Amtrak R.R. HENDRICKSON, G. DESIGNPITEO, M. 10/11/2017
173-0442 DISTRICT 3 Guide Rail Various SMITH, L. / BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 9/6/2017
173-0463 DISTRICT 3 Bearing Replacement & Repair Various SMITH, L. / BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 5/24/2017
173-0464 DISTRICT 3 Bearing Replacement & Repair Various SMITH, L. / BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/21/2017
173-0466 DISTRICT 3 Bridge Joint Replacement Various BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 11/2/2016
173-0484 Superelevation Improvements 15 DESIGNMYSLIWIEC, A. 1/17/2018
174-0317 DISTRICT 4 Guide Rail Grant St./ Rte. 6 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 7/6/2011
174-0345 DISTRICT 4 Expansion Bearing Replacement 6 Bridges BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 3/10/2010
174-0351 BURLINGTON Culvert Replacement Route 69 HENDRICKSON, G. CONSTRUCTIONPITEO, M. 8/30/2017
174-0356 MIDDLEBURY Bridge Steel Repairs Site #10 WALLACE, C. CONSTRUCTIONPITEO, M.
174-0363-A MIDDLEBURY Bridge Preservation Improvements I-84 VON HONE, K. CONSTRUCTIONMYSLIWIEC, A. 10/16/2013
174-0363-B DERBY Bridge Preservation Improvements Route 8 / Housatonic R.R. CAI, X. CONSTRUCTIONMYSLIWIEC, A. 10/16/2013
174-0363-C THOMASTON Bridge Preservation Improvements Route 8 CAI, X. CONSTRUCTIONMYSLIWIEC, A. 10/16/2013
174-0370 DISTRICT 4 Substructure Concrete Repairs 10 Bridges WALLACE, C. CONSTRUCTIONPITEO, M. 10/23/2013
174-0370 DISTRICT 4 Substructure Concrete Repairs 10 Bridges HENDRICKSON, G. CONSTRUCTIONPITEO, M. 10/23/2013
174-0402 DISTRICT 4 Bearing Replacement & Repair Various SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 7/19/2017
174-0403 DISTRICT 4 Bearing Replacement & Repair Various SMITH, L. / BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 6/14/2017
200-0005 DERBY Emergency Declaration Rte. 115 - Derby Avenue. CAI, X. CONSTRUCTIONMYSLIWIEC, A. 3/23/2016
300-0098 NORWALK Bridge Rehabilitation Bridge No. 04132R VON HONE, K. AUDITMYSLIWIEC, A.
300-0099 DARIEN Bridge Rehabilitation Bridge No. 00316R VON HONE, K. AUDITMYSLIWIEC, A.
301-0039 NEW HAVEN Railroad Yard New Haven BROWN, D. AUDITMYSLIWIEC, A.
301-0049 NEW HAVEN Rail Line Facility Union Station Park Garage WALLACE, C. AUDITPITEO, M.
301-0056 NORWALK Widening (301-0033) Monroe St. VON HONE, K. AUDITMYSLIWIEC, A.
301-0059 MILFORD Railroad Bridge Replacement Old Gate Lane VON HONE, K. AUDITMYSLIWIEC, A.
301-0088 NEW HAVEN Rail Yard Facility Union Station - New Haven HENDRICKSON, G. CONSTRUCTIONPITEO, M. 2/25/2009
301-0106 NEW HAVEN Facility Improvements Component Shop HENDRICKSON, G. CONSTRUCTIONPITEO, M. 3/18/2009
301-0114 DISTRICT 3 Parking Garage Union Station SMITH, L. / BROWN, D. TBDMYSLIWIEC, A.
301-0144 NEW HAVEN Power Upgrade Rail Yard HENDRICKSON, G. CONSTRUCTIONPITEO, M. 11/26/2014
Monday, June 11, 2018 Page 22 of 23UPDATED:
PROJECT # TOWN PROJECT TYPE ROUTE / STREET ASSIGNED TO STATUSSUPERVISING ENG.FINAL DESIGN AND
PLANS
301-0149 STAMFORD Pedestrian Bridge Stamford Transportation Center HENDRICKSON, G. CONSTRUCTIONPITEO, M. 11/14/2012
301-0167 BRIDGEPORT Roadway Enhancement East Bridgeport Rail Yard BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 10/26/2016
301-0168 MILFORD Bridge Replacement Devon Bridge CHHABRA, G. DESIGNPITEO, M. 10/2/2019
301-0176 NORWALK Bridge Replacement - Railroad Walk Bridge WALLACE, C. DESIGNPITEO, M. 12/18/2018
301-0180 NORWALK WALK BRIDGE PROGRAM Dockyard Proj.- Danbury WALLACE, C. CONSTRUCTIONPITEO, M.
301-0181 NORWALK WALK BRIDGE PROGRAM CP-243 Project WALLACE, C. CONSTRUCTIONPITEO, M.
301-0187 NORWALK WALK BRIDGE PROGRAM East Ave. Bridge WALLACE, C. DESIGNPITEO, M. 12/18/2018
301-0188 NORWALK WALK BRIDGE PROGRAM Osborne Ave. Bridge WALLACE, C. DESIGNPITEO, M. 12/18/2018
301-0189 NORWALK WALK BRIDGE PROGRAM Fort Point St. Bridge WALLACE, C. DESIGNPITEO, M. 12/18/2018
302-0014 DISTRICT 3 Station Improvements Merritt 7 SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 1/31/2018
302-0015 BETHEL Station Parking Enhancements M-N Station BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 7/16/2016
302-0015 BETHEL R.R. Station Parking Lot Expansion Durant Avenue BROWN, D. CONSTRUCTIONMYSLIWIEC, A. 7/16/2016
302-0022 WILTON Railroad Station Water Line CAI, X. DESIGNMYSLIWIEC, A. 2/1/2017
303-0004 STAMFORD Railroad Bridge Replacement Viaduct Rd. BROWN, D. AUDITMYSLIWIEC, A.
310- 0022 WESTBROOK Railroad Station Westbrook Shoreline East CAI, X. CONSTRUCTIONMYSLIWIEC, A. 2/16/2011
310-0056 BRANFORD Railroad Station Shore Line East CHHABRA, G. CONSTRUCTIONPITEO, M. 4/11/2012
310-0057 GUILFORD Railroad Station Shoreline East CAI, X. CONSTRUCTIONMYSLIWIEC, A. 4/18/2012
310-0059 CLINTON Railroad Station Shoreline East CHHABRA, G. TBDPITEO, M. 11/18/2017
320-0005 HARTFORD Hartford Line - 6 Stations Various HENDRICKSON, G. DESIGNPITEO, M. 9/26/2018
320-0005 HARTFORD Hartford Line - 6 Stations Various SMITH, L. / BROWN, D. DESIGNMYSLIWIEC, A. 9/26/2018
320-0008 WINDSOR NHHS-Phase 3 B Various BROWN, D. DESIGNMYSLIWIEC, A. 10/27/2019
320-0008 WINDSOR NHHS- Phase 3 B Various HENDRICKSON, G. DESIGNPITEO, M. 10/27/2019
402-0002 NEW HAVEN Bus Maintenance Facility State Street BROWN, D. CONSTRUCTIONMYSLIWIEC, A.
431-0006 WATERBURY Utility Infrastructure Bus Facility HENDRICKSON, G. DESIGNPITEO, M. 4/25/2018
472-0048 TORRINGTON Facility Improvements Various WALLACE, C. TBDPITEO, M. 11/11/2018
Monday, June 11, 2018 Page 23 of 23UPDATED: