using suds to redefine public spaces in enfield winning ... · using suds to redefine public spaces...

13
Susdrain – SuDS and placemaking 01/10/2015 Ian Russell and Graham Campbell – London Borough of Enfield 1 Using SuDS to redefine public spaces in Enfield Winning hearts and minds Thursday 1 st October 2015 [email protected] [email protected] London Borough of Enfield Themes - Our aims in Enfield - Normalising SuDS - Designing for public safety - Allowing for maintenance - SuDS perception - Project case studies ~ technicalities and public engagement

Upload: others

Post on 04-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Using SuDS to redefine public spaces in Enfield Winning ... · Using SuDS to redefine public spaces in Enfield Winning hearts and minds Thursday 1 st October 2015 ian.russell@enfield.gov.uk

Susdrain – SuDS and placemaking 01/10/2015

Ian Russell and Graham Campbell –

London Borough of Enfield 1

Using SuDS to redefine public spaces in

Enfield

Winning hearts and minds

Thursday 1st October 2015

[email protected]

[email protected]

London Borough of Enfield

Themes

- Our aims in Enfield

- Normalising SuDS

- Designing for public safety

- Allowing for maintenance

- SuDS perception

- Project case studies ~ technicalities and public engagement

Page 2: Using SuDS to redefine public spaces in Enfield Winning ... · Using SuDS to redefine public spaces in Enfield Winning hearts and minds Thursday 1 st October 2015 ian.russell@enfield.gov.uk

Susdrain – SuDS and placemaking 01/10/2015

Ian Russell and Graham Campbell –

London Borough of Enfield 2

Our SuDS Aim

- Local Flood Risk Management Strategy

- Objective 4 Reduce Runoff Rates – retrofit sustainable drainage to existing developments where opportunities exist, store flood waters in parks and other open

spaces during extreme flood events and apply natural flood management techniques

- We aim to achieve this through Normalising SuDS

Moore Brook catchment

•Area ~ 350 hectares

•8,000 residential properties

•300 misconnected properties

rectified since 2012

Page 3: Using SuDS to redefine public spaces in Enfield Winning ... · Using SuDS to redefine public spaces in Enfield Winning hearts and minds Thursday 1 st October 2015 ian.russell@enfield.gov.uk

Susdrain – SuDS and placemaking 01/10/2015

Ian Russell and Graham Campbell –

London Borough of Enfield 3

Moore Brook Flood Risk Map

Page 4: Using SuDS to redefine public spaces in Enfield Winning ... · Using SuDS to redefine public spaces in Enfield Winning hearts and minds Thursday 1 st October 2015 ian.russell@enfield.gov.uk

Susdrain – SuDS and placemaking 01/10/2015

Ian Russell and Graham Campbell –

London Borough of Enfield 4

Pymmes Park Wetlands

•Total area ~ 5,000m2

•Wetland area ~ 2,000m2

•Volunteer planting in May 2015 organised by

Thames21

•600m2 of pre-planted coir mats installed in 2

days

•Trees and shrubs to be planted in Autumn 2015

May 2015

August 2015

Page 5: Using SuDS to redefine public spaces in Enfield Winning ... · Using SuDS to redefine public spaces in Enfield Winning hearts and minds Thursday 1 st October 2015 ian.russell@enfield.gov.uk

Susdrain – SuDS and placemaking 01/10/2015

Ian Russell and Graham Campbell –

London Borough of Enfield 5

Pymmes Park Wetlands

•Spoil used to create one new 11-aside football pitch and significantly improve a second existing pitch

•Area of 10,0000m2 raised by 0.7m

Pre-scheme During works

Moore Brook Flood Risk Map

Page 6: Using SuDS to redefine public spaces in Enfield Winning ... · Using SuDS to redefine public spaces in Enfield Winning hearts and minds Thursday 1 st October 2015 ian.russell@enfield.gov.uk

Susdrain – SuDS and placemaking 01/10/2015

Ian Russell and Graham Campbell –

London Borough of Enfield 6

Firs Farm Playing Fields 21 hectares, 12 football pitches and 1 rugby pitch

Firs Farm Wetlands 30,000m3 flood storage, 2.4ha habitat enhancements including 4,000m2 wetlands, 600m long cycleway

Page 7: Using SuDS to redefine public spaces in Enfield Winning ... · Using SuDS to redefine public spaces in Enfield Winning hearts and minds Thursday 1 st October 2015 ian.russell@enfield.gov.uk

Susdrain – SuDS and placemaking 01/10/2015

Ian Russell and Graham Campbell –

London Borough of Enfield 7

Firs Farm Wetlands – Community Engagement

- A culverted watercourse running through the site

- Development prevented due to flood risk

- An area which required rejuvenation

- A friends group in its infancy

- Since the development of the scheme ~

- A friends group which has become engaged and receptive to ideas

- Financial streams from Enfield, Thames Water, Environment Agency

and the GLA

- Thames 21 assisting in community engagement and water quality

testing

- Series of volunteer planting days

Page 8: Using SuDS to redefine public spaces in Enfield Winning ... · Using SuDS to redefine public spaces in Enfield Winning hearts and minds Thursday 1 st October 2015 ian.russell@enfield.gov.uk

Susdrain – SuDS and placemaking 01/10/2015

Ian Russell and Graham Campbell –

London Borough of Enfield 8

Page 9: Using SuDS to redefine public spaces in Enfield Winning ... · Using SuDS to redefine public spaces in Enfield Winning hearts and minds Thursday 1 st October 2015 ian.russell@enfield.gov.uk

Susdrain – SuDS and placemaking 01/10/2015

Ian Russell and Graham Campbell –

London Borough of Enfield 9

Page 10: Using SuDS to redefine public spaces in Enfield Winning ... · Using SuDS to redefine public spaces in Enfield Winning hearts and minds Thursday 1 st October 2015 ian.russell@enfield.gov.uk

Susdrain – SuDS and placemaking 01/10/2015

Ian Russell and Graham Campbell –

London Borough of Enfield 10

Page 11: Using SuDS to redefine public spaces in Enfield Winning ... · Using SuDS to redefine public spaces in Enfield Winning hearts and minds Thursday 1 st October 2015 ian.russell@enfield.gov.uk

Susdrain – SuDS and placemaking 01/10/2015

Ian Russell and Graham Campbell –

London Borough of Enfield 11

0

10

20

30

40

50

60

70

80

90

100

Perception of SuDS Schemes

"What we have

does the job"

"We don't really

understand why

we need this...."

WTF !!!

Mildly dis-

satisfied

"OK....this

looks alright"

"Ahhh....I see

how this works

now"

"This is fantastic - how

can we get involved? Can

we repeat it somewhere

else?"

TIME �

PERCEPTION�

Page 12: Using SuDS to redefine public spaces in Enfield Winning ... · Using SuDS to redefine public spaces in Enfield Winning hearts and minds Thursday 1 st October 2015 ian.russell@enfield.gov.uk

Susdrain – SuDS and placemaking 01/10/2015

Ian Russell and Graham Campbell –

London Borough of Enfield 12

0

10

20

30

40

50

60

70

80

90

100

Perception of SuDS Schemes

"What we have

does the job"

"We don't really

understand why

we need this...."

WTF !!!

Mildly dis-

satisfied

"OK....this

looks alright"

"Ahhh....I see

how this works

now"

"This is fantastic - how

can we get involved? Can

we repeat it somewhere

else?"

TIME �

PERCEPTION�

Firs Farm Wetlands

Pymmes

Park

Bury Lodge

Wetlands

The next scheme

Page 13: Using SuDS to redefine public spaces in Enfield Winning ... · Using SuDS to redefine public spaces in Enfield Winning hearts and minds Thursday 1 st October 2015 ian.russell@enfield.gov.uk

Susdrain – SuDS and placemaking 01/10/2015

Ian Russell and Graham Campbell –

London Borough of Enfield 13

Using SuDS to redefine public spaces in

Enfield

Winning hearts and minds

Thursday 1st October 2015

[email protected]

[email protected]

London Borough of Enfield