Using Energy Savings Performance Contracts
Ohio WEA Conference
June 23, 2011
David Wrightsman, P.E.Energy Systems Group
Municipal Utility Sales [email protected]
![Page 2: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/2.jpg)
Agenda
• What is Performance Contracting?
• Ohio Legislation
• Pro’s and Con’s
• Examples
• Questions
![Page 3: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/3.jpg)
Procurement Options
• Design/Bid/Build = Hard BidoStandard approach
• Design/BuildoVaries by state
• Performance Contractingo (design/build/finance)
![Page 4: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/4.jpg)
What is Performance Contracting?
• One party providing all engineering and construction including financing
• Intent is to improve infrastructure to improve energy efficiency while reducing operating costs
• Guaranteedo Savings, Performance, Price.
• Savings offset costso Energy & Operational
• Qualification Based Selection
![Page 5: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/5.jpg)
What you do now.
Construction Start Up
Design30->60->90->100%RFP
Contract Engineer
Prelim Engineering
Report
ContractEngineer
Price Bid
Contracts– Multiple Trades Contracts– Engineer(Final Project Price)
Design-Bid-Build
![Page 6: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/6.jpg)
What you could do.
Construction Start Up
Design60% –> 90%
RFP
Contract - ESCO(Project Development)
Project Scope Development
(30% Design)
Contract - ESCO(Energy Performance Contract)
Final Price
Design-Build
![Page 7: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/7.jpg)
Construction Start Up
Design60% –> 90%
RFP
Contract - ESCO(Project Development)
Project Scope Development
(30% Design)
Contract - ESCO(Energy Performance Contract)
Final Price
Construction Start Up
Design30->60->90->100%RFP
Contract Engineer
Prelim Engineering
Report
ContractEngineer
Price Bid
Contracts– Multiple Trades Contracts– Engineer(Final Project Price)
Comparison
Saved
![Page 8: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/8.jpg)
National Perspective
• 2010 - $6 Billion dollar business among 53 companies
• 75% in institutional - (K-12 schools, universities, hospitals,
and state, local, and federal governments)
• 14% on site power generation
• Increasing Municipal Utility market
Source: Market Trends in the U.S. ESCO Industry: Results from the NAESCO Database Project - Lawrence Berkeley National Laboratory, NAESCO 2010
![Page 9: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/9.jpg)
States with Enabling Municipal Legislation
![Page 10: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/10.jpg)
Ohio LegislationGuaranteed Energy Savings Contracts
•
• Ohio Revised Code– 3313.372 - School Corporations (passed 10-1-1985)
– 717.02 – Municipal Corporations
– 505.26.4 - Townships
• Installment Payment Contracts for energy conservation measures
• Savings are Defined– Energy = Any Resource
– Water, Electricity, Natural Gas, Steam, Air, Chilled Water
– O&M Cost Reductions = Labor or Materials
![Page 11: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/11.jpg)
Why do it?
• Single point of contact
• Accelerate a project
• Control over contractors/technology
• Best value vs. lowest price
• Alternative financing
• Cash flow management
![Page 12: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/12.jpg)
Why Not?
• Very small projects (<$100K)
• No needs
• Comfortable w/DBB
• Project already designed
![Page 13: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/13.jpg)
Project Development Process
![Page 14: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/14.jpg)
Savings
Where does the money come from?
Labor
Maint
Energy
Other
DebtService
Labor
Maint
Energy
Other
DebtService
SAVINGS
Labor
Maint
Energy
Other
Debt Service
SAVINGS
Savings applied to debt service to fund project
Performancecontract creates savings
RAT
ES
DebtService
![Page 15: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/15.jpg)
Project Financing
Cash – Capital Funds
Tax Exempt Municipal Lease
Utility Incentives
State Incentives
Revolving Loan Funds
Federal Incentives
Renewable Energy Credits
Tax Incentives
Total Project Capitalization
![Page 16: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/16.jpg)
The Guarantee
• Energy service company guarantees annual energy savings– Annual Reconciliation
– Calculated from agreed upon factors:• Utility rates
• Operational conditions (hours, flows, etc.)
• System or equipment efficiency
– Method of measurement determined before construction
• The guarantee changes the behavior of the project team from short-term to long-term focus.
![Page 17: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/17.jpg)
Examples
• Equipment replacement – (motors, pumps, electrical)
• Plant rehabilitation (windows, roof, lights, etc.)
• SCADA
• Biosolids
• Underground Pipe
• Lift Stations
• Biogas
![Page 18: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/18.jpg)
City of Winchester, IN
• Fine bubble diffusers
• Variable Speed PD Blowers
• DO Control
• $0.9M project
$520,000
$540,000
$560,000
$580,000
$600,000
$620,000
$640,000
After 6 Years
GuaranteeActual
2 MGD Wastewater Plant
![Page 19: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/19.jpg)
City of Wapakoneta, OH
• SCADA Upgrade
• DO Control
• VFD’s on pumps
• $0.7M Project
$0
$20,000
$40,000
$60,000
$80,000
$100,000
After 2 Years
GuaranteeActual
4 MGD Wastewater Plant
![Page 20: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/20.jpg)
Washington Suburban Sanitary DistrictPotomoc, MD
• Raw water pump rebuild
• $6.8M Project
175 MGD Wastewater Plant
![Page 21: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/21.jpg)
Final Thoughts
• Performance contracting is alternative procurement that offers– Financing
– Long term approach
– Collaborative development
– Guarantee
![Page 22: Using Energy Savings Performance Contracts](https://reader036.vdocuments.site/reader036/viewer/2022081622/613d32a9736caf36b75a7a00/html5/thumbnails/22.jpg)
Questions?
David Wrightsman, P.E.Energy Systems Group
Municipal Utility Sales [email protected]
317-849-2015