usf8 report(template)

Upload: muhammad-rizwan-younas

Post on 14-Apr-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/27/2019 USF8 Report(Template)

    1/46

    BCCH

    RSL

    Timing Advanced

    Distance to

    Site (KM)

    Village General View

    Sceco coordinatesPolice Markaz NO

    National Defance NOBSIC

    BCCH Signal Level

    Cell IDNear From Central Point

    Maximum building height

    N E

    ZAINMOBILY

    CoordinatesN

    E

    NO

    STC

    Operation

    BCCH Frequency

    Elevation667M

    Amara Markaz

    Gov't Offices

    Test Points

    No Cordinates

    MOBILY

    N

    E

    N

    E

    West

    Yes No Mosque Yes

    ZAINN

    VILLAGE BORDER

    Direction N E

    North

    Village Name in English

    Elevation 686 M Village Area Number Of HousesPopulation No. of Boys Schools

    N

    CITC VILLAGE SURVEY REPORT

    Site Number

    Hilly

    Contact Name Contact NumberSTC Yes

    District

    Government Offices No. of Girls SchoolsSemi Hilly Facilities InformationSCECO Yes No

    No

    No DSL

    Village Name in Arabic

    South

    Flat Terrain Type

    Coordinates Center of the Village E

    LINE PHONE YesEastYes No

    available spaceDistance (Km)

    N/AN/A

    N/A

    N/A

    available space

    Distance (Km)

    N/A

    N/A

    available space

    Distance (Km)

    No CordinatesNo Cordinates

    Test PointProposed Location

    CoordinatesN

    E

    E

    Towers

    In Village

    YesYes

  • 7/27/2019 USF8 Report(Template)

    2/46

    GPS

    SCECO

  • 7/27/2019 USF8 Report(Template)

    3/46

    Village Photos

  • 7/27/2019 USF8 Report(Template)

    4/46

    Site Name 6737-Mazaree Al-Matiyah

    030 60 9

  • 7/27/2019 USF8 Report(Template)

    5/46

    1. Topography (GF): Normal Hilly Rocky Submerged Sandy

    2. Site Development

    (GF):Normal Needs extra Filling Needs extra Cutting

    3. Access Road (GF): Normal Needs extra Road Length Needs extra Cut & FillExisting road needs

    Grading

    (rehabilitation) (.L.M.)

    Others

    Specify:

    4. Slope Protection (GF): Normal Needs RC Wall Needs Rip RapNeeds Drain Ditch

    (.. L.M.)

    Others

    Specify:

    6. Roof Top: NormalNeeds special Steel

    Fabrication

    Needs External Access

    Ladder

    Needs Extra length of Cable

    Tray (L.M.)

    Others

    Specify:

    7. Distance from Main

    Road to Site location:

    8. Conclusion:

    Civil Ranking for the

    subject nominee A B C D E

    A: Normal Model, B: With Minor Extra CW Cost, C: With Medium Extra CW Cost, D: With High Extra CW Cost, E: Rejected

    CIVIL WORK INITIAL SURVEY REPORT (CWISR)

    OthersSpecify: Long Length Sceco Cable( 281 Mtr) isrequired if site will be developed at Prposed locati

    2.5 KM

    The CW Model shall be NormalThe CW Model requires extra cost - Joint site visit is required to assess the scop

    of the extra CW

  • 7/27/2019 USF8 Report(Template)

    6/46

    Locality Type Administrative District:

    Longitude: Mohafadat Name:

    Locality Coverage Testing

    Entry No.: Locality Name:

    No. Network Information STC Mobily Zain C

    Latitude: Markaz Name:

    Date: Others:

    2 LAC(2G)

    Test

    _1

    1 Operator Name

    3 Cell ID(2G)

    5 NCC(2G)

    7 Throughput(3G) (Kbit/s)

    4 ARFCN(2G)

    6 BCC(2G)

    Approved by (Customer):

    Survey Engineer: DT Engineer:

    DT Report Export: Rizwan Younas Reviewed by:

  • 7/27/2019 USF8 Report(Template)

    7/46

    mments

  • 7/27/2019 USF8 Report(Template)

    8/46

    Locality Coverage Test

    Aerial View

    Village View

  • 7/27/2019 USF8 Report(Template)

    9/46

  • 7/27/2019 USF8 Report(Template)

    10/46

  • 7/27/2019 USF8 Report(Template)

    11/46

  • 7/27/2019 USF8 Report(Template)

    12/46

  • 7/27/2019 USF8 Report(Template)

    13/46

  • 7/27/2019 USF8 Report(Template)

    14/46

    Lo

    6737_C_Rx-Level

    STC

  • 7/27/2019 USF8 Report(Template)

    15/46

    6737_N_Rx-Level

    6737_E_Rx-Level

  • 7/27/2019 USF8 Report(Template)

    16/46

    6737_S_Rx-Level

    6737_W_Rx-Level

  • 7/27/2019 USF8 Report(Template)

    17/46

  • 7/27/2019 USF8 Report(Template)

    18/46

    ality Survey 2G Coverage Test

    Rx Level

    Mobily

  • 7/27/2019 USF8 Report(Template)

    19/46

  • 7/27/2019 USF8 Report(Template)

    20/46

  • 7/27/2019 USF8 Report(Template)

    21/46

  • 7/27/2019 USF8 Report(Template)

    22/46

    Zain

  • 7/27/2019 USF8 Report(Template)

    23/46

    Locality Survey 3G Through

    6737_

    6737_

  • 7/27/2019 USF8 Report(Template)

    24/46

    6737_

  • 7/27/2019 USF8 Report(Template)

    25/46

    6737_

  • 7/27/2019 USF8 Report(Template)

    26/46

    6737_

  • 7/27/2019 USF8 Report(Template)

    27/46

    ut-Downlink Test

  • 7/27/2019 USF8 Report(Template)

    28/46

  • 7/27/2019 USF8 Report(Template)

    29/46

  • 7/27/2019 USF8 Report(Template)

    30/46

  • 7/27/2019 USF8 Report(Template)

    31/46

    Locality Survey 3G Through

    6737_

    6737_

  • 7/27/2019 USF8 Report(Template)

    32/46

    6737_

  • 7/27/2019 USF8 Report(Template)

    33/46

    6737_

  • 7/27/2019 USF8 Report(Template)

    34/46

    6737_

  • 7/27/2019 USF8 Report(Template)

    35/46

    ut-Downlink Test

  • 7/27/2019 USF8 Report(Template)

    36/46

  • 7/27/2019 USF8 Report(Template)

    37/46

  • 7/27/2019 USF8 Report(Template)

    38/46

  • 7/27/2019 USF8 Report(Template)

    39/46

    Locality Survey 3G Through

    6737_

    6737_

  • 7/27/2019 USF8 Report(Template)

    40/46

    6737_

  • 7/27/2019 USF8 Report(Template)

    41/46

    6737_

  • 7/27/2019 USF8 Report(Template)

    42/46

    6737_

  • 7/27/2019 USF8 Report(Template)

    43/46

    ut-Downlink Test

  • 7/27/2019 USF8 Report(Template)

    44/46

  • 7/27/2019 USF8 Report(Template)

    45/46

  • 7/27/2019 USF8 Report(Template)

    46/46