    User Manual for Enterprise

    For the Automation of Three Priority Processes Import Permit

    (IP), Export Permit (EP) and Sub-Contracting Permit (SCP) at

    BEPZA

    Supported by:

    IFCBangladesh Investment Climate Fund (IFC-BICF)

    World Bank Group

    Submitted By:

    _____________ ______ _______

    Business Automation Ltd.BDBL Bhaban, 9th Floor

    12 Kawran Bazar, Dhaka-1215Phone: 8144817-20, Fax: 9143656Email- [email protected]

    Corporate website: www.batworld.com

    mailto:[email protected]://www.batworld.com/mailto:[email protected]://www.batworld.com/
  • 8/3/2019 User_Manual for Enterprise

    2/16

    Project Automation of 3 Priority Process of BEPZA System June, 2011Project ID BEPZA/IP-EP-SCP/2009-0244

    Table of ContentsWork Flow of Enterprise Users....................................................................................... 3Log in Form ..................................................................................................................... 4

    Password Changed Form ................................................................................................. 5

    Application Selection Form ............................................................................................. 6

    Application entry Form ....................................................................................................7Attach more supporting document ...................................................................................8

    HS Code ........................................................................................................................... 9Checker Queue ...............................................................................................................10

    Application Queue: ........................................................................................................ 11

    For Checked ...................................................................................................................12

    For Print ........................................................................................................................ 13Application Details ........................................................................................................14

    Application undertaking .................................................................................................15

    Report Generation Form ................................................................................................ 16Summary of Report: ......................................................................................................16

    List of Figures

    Figure 1: Work Flow diagram for Enterprise......................................................................3

    Figure 2: Login Form...........................................................................................................4

    Figure 3: Change Password Form........................................................................................5

    Figure 4: Permit Forms........................................................................................................6Figure 5: Application Form.................................................................................................7

    Figure 6: Upload documents Form......................................................................................8

    Figure 7: HS Code...............................................................................................................9Figure 8: Search Form for HS Code....................................................................................9

    Figure 9: Application Queue..............................................................................................11

    Figure 10: Application for checked...................................................................................12Figure 11: Print Copy.........................................................................................................13

    Figure 12: Application Details...........................................................................................14

    Figure 13: Application Undertaking..................................................................................15

    Business Automation Ltd. www.batworld.c

    All rights reserved Pag

  • 8/3/2019 User_Manual for Enterprise

    3/16

    Project Automation of 3 Priority Process of BEPZA System June, 2011Project ID BEPZA/IP-EP-SCP/2009-0244

    Work Flow of Enterprise Users.

    Figure 1: Work Flow diagram for Enterprise.

    Business Automation Ltd. www.batworld.c

    All rights reserved Pag

  • 8/3/2019 User_Manual for Enterprise

    4/16

    Project Automation of 3 Priority Process of BEPZA System June, 2011Project ID BEPZA/IP-EP-SCP/2009-0244

    Steps for Enterprise User- Operator

    There are two types of user at enterprise end namely

    1. Operator2. Manager

    The Operator will prepare the applications.

    The Manager will authorize the application for submission.

    Log in Form

    For Login as an Operator follow the steps.

    1. Enter User ID in UserID Text box.2. Enter Password in Password Text box.

    3. Click Login button.

    Figure 2: Login Form

    Users have to give valid user id and password for login.

    Business Automation Ltd. www.batworld.c

    All rights reserved Pag

    3

    2

    1

  • 8/3/2019 User_Manual for Enterprise

    5/16

    Project Automation of 3 Priority Process of BEPZA System June, 2011Project ID BEPZA/IP-EP-SCP/2009-0244

    Password Changed Form

    When a user first time login in the system, System will give this form for scanned andpassword changed option.

    Select document type from the list.

    Browse your signature from your system.

    Press Save button to scan signature.

    Enter old, new and confirm password in the text box.

    Press Change Password button.

    Figure 3: Change Password Form.

    Business Automation Ltd. www.batworld.c

    All rights reserved Pag

    Click Save

    button to savesignature.

    Click Changed

    Password button

    for save

    Browse scannedsignature and save

    it.

    Download or

    delete signature

  • 8/3/2019 User_Manual for Enterprise

    6/16

    Project Automation of 3 Priority Process of BEPZA System June, 2011Project ID BEPZA/IP-EP-SCP/2009-0244

    When an Operator will login he/she will get selection form like below:

    There are three types of permit -

    1. Export Permit.

    2. Import Permit.3. Sub - Contract Permit.

    Application Selection Form

    Figure 4: Permit Forms.

    Business Automation Ltd. www.batworld.c

    All rights reserved Pag

    Click to viewcompany profile.

  • 8/3/2019 User_Manual for Enterprise

    7/16

    Project Automation of 3 Priority Process of BEPZA System June, 2011Project ID BEPZA/IP-EP-SCP/2009-0244

    The Permit Forms have several types of Application. When the operator selects a

    permit then he/she gets following form

    Application entry Form

    Figure 5: Application Form.

    Business Automation Ltd. www.batworld.c

    All rights reserved Pag

    Red * marksmeans

    required

    Field.

    Calendar

    date sele

    By clicking you

    add moreinformation.

    2. HS CodeSearch Option

    by clicking

    After fill up all fields you will click submit

    button.

    Attach supporting

    document which i

    essential.

  • 8/3/2019 User_Manual for Enterprise

    8/16

    Project Automation of 3 Priority Process of BEPZA System June, 2011Project ID BEPZA/IP-EP-SCP/2009-0244

    Attach more supporting document

    Figure 6: Upload documents Form.

    Business Automation Ltd. www.batworld.c

    All rights reserved Pag

    You can

    upload

    anotherdocument

  • 8/3/2019 User_Manual for Enterprise

    9/16

    Project Automation of 3 Priority Process of BEPZA System June, 2011Project ID BEPZA/IP-EP-SCP/2009-0244

    HS Code

    To fill HS Code textbox you have to click on HS Code.

    Figure 7: HS Code

    After clicking on HS Code you will get this window for search. You have to give a

    keyword in the textbox and click submit button then you will get HS Code. Copy thecode and put it in HS Code textbox in entry form.

    Figure 8: Search Form for HS Code.

    Business Automation Ltd. www.batworld.c

    All rights reserved Pag

    Click on

    HS Code

    Enter a

    keyword

    and PressSubmit

    button.

  • 8/3/2019 User_Manual for Enterprise

    10/16

    Project Automation of 3 Priority Process of BEPZA System June, 2011Project ID BEPZA/IP-EP-SCP/2009-0244

    Steps for Enterprise User- Manager

    Checker Queue

    After making the application checker will get this application with checking

    option.

    At first checker will get application list. He/she will check one more at a time byselecting check box. All of applications will show in the form by a token number

    which is auto created.

    New Application: All new submit application and others application will beavailable in new Application menu

    New Application main menu contains some sub menu. Which are

    Export Permit ( New Application)

    Import Permit (New Application)

    Sub - Contract Permit (New Application)

    Export Extension/Cancel ( The export applications which are

    Extended or Canceled)

    Import Extension/Cancel ( The export applications which are

    Extended or Canceled)

    Export: Contain all applications which are new application, extension

    applications and Canceled application of Export Permit.

    Import: Contain all applications which are new application, extension

    applications and Canceled application of Import Permit.

    Sub-Contract: Contain all applications which are new application, extension

    applications and Canceled application of Sub-Contract Permit.

    Report: Report Generation Form contains report form for generate Report.

    Business Automation Ltd. www.batworld.c

    All rights reserved Page

  • 8/3/2019 User_Manual for Enterprise

    11/16

    Project Automation of 3 Priority Process of BEPZA System June, 2011Project ID BEPZA/IP-EP-SCP/2009-0244

    Application Queue:

    Figure 9: Application Queue.

    He/she will also get edit, print, application details and undertaking application options.

    Business Automation Ltd. www.batworld.c

    All rights reserved Page

    Checker will get allnew submit

    application.

    Export will show Export form, Import willshow Import form and Sub-Contract will showSub-Contract form.

    Click on these icon for Update,

    Check in, Print and Undertakin

    You can

    select onemore file

    and can

    checked at

    a time

  • 8/3/2019 User_Manual for Enterprise

    12/16

    Project Automation of 3 Priority Process of BEPZA System June, 2011Project ID BEPZA/IP-EP-SCP/2009-0244

    For Checked

    Click Application Edit / Checked icon for checked from application queue.

    The form will be appeared as bellow:

    Figure 10: Application for checked.

    Business Automation Ltd. www.batworld.c

    All rights reserved Page

    Add mo

    informa

    Add more supporti

    documents.

    Click for save

    application.

    Clickfor

    Delete

    View and Delete

    supporting docum

    Click for submit

    application.

  • 8/3/2019 User_Manual for Enterprise

    13/16

  • 8/3/2019 User_Manual for Enterprise

    14/16

    Project Automation of 3 Priority Process of BEPZA System June, 2011Project ID BEPZA/IP-EP-SCP/2009-0244

    Application Details

    Click Application Details icon to view all information from application queue.

    Figure 12: Application Details.

    Business Automation Ltd. www.batworld.c

    All rights reserved Page

  • 8/3/2019 User_Manual for Enterprise

    15/16

    Project Automation of 3 Priority Process of BEPZA System June, 2011Project ID BEPZA/IP-EP-SCP/2009-0244

    Application undertaking

    Click Application Undertaking icon to see Undertaking from application queue

    Figure 13: Application Undertaking.

    Business Automation Ltd. www.batworld.c

    All rights reserved Page

  • 8/3/2019 User_Manual for Enterprise

    16/16

    Project Automation of 3 Priority Process of BEPZA System June, 2011Project ID BEPZA/IP-EP-SCP/2009-0244

    Report Generation Form

    Enterprise can see reports for status of all applications by date, permit type, and permit

    status and Enterprise wise.

    1. Press Generate Report button to view report.

    Figure 14: Report Form

    Summary of Report:

    Figure 15: Summary of Report.