Tutorial: Use of CMMI in Acquisition Environments - Page 1
Sponsored by the U.S. Department of Defense 2005 by Carnegie Mellon UniversityThis material is approved for public release.
Use of CMMI in Acquisition
Environments
Brian Gallagher
Lorraine Adams
SEPG
March 6, 2006
SM CMM Integration, IDEAL, and SCAMPI are service marks of Carnegie Mellon University. Capability Maturity Model, Capability Maturity Modeling, CMM, and CMMI are registered in the U.S. Patent and Trademark Office
by Carnegie Mellon University.
-
7/30/2019 Use of Cmmi in Acquisition Environments
2/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 2
Tutorial AgendaIntroduction
Part 1: Using CMMI to Encourage Good Contractor
Practices
Part 2: Using CMMI-AM to Improve AcquisitionPractices
-
7/30/2019 Use of Cmmi in Acquisition Environments
3/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 3
IntroductionLack of acquisition guidance is a major concern for projects involved in theacquisition and sustainmentof systems, including software-intensive systems.Over the past decade, much of the headquarters and field-level acquisition
guidance for systems and software acquisition and sustainmenthas beenrescinded, simplified, or reduced in scope such that only minimal acquisition-related guidance remains in many acquisition areas.
This reduction of guidance has occurred as system complexity and the
software contribution to overall system functionality rises to unprecedentedlevels.
Congressional- and DOD-level guidance continues to emphasize softwareacquisition process improvement, including the measurement of process
performance by acquisition organizations
The goal of this tutorial is to define effective and efficient acquisition practices,both directed internally toward the acquisition project and directed externallytoward the monitoring and control of the selected supplier(s). These practices
are intended to provide a basis for acquisition process discipline whilebalancing the need for agility.
-
7/30/2019 Use of Cmmi in Acquisition Environments
4/204 2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 4
Tutorial AgendaIntroduction
Part 1: Using CMMI to Encourage Good Contractor
Practices
Part 2: Using CMMI-AM to Improve AcquisitionPractices
-
7/30/2019 Use of Cmmi in Acquisition Environments
5/204 2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 5
Problem StatementMany DoD contractors claim high Maturity Levels (3 andabove) as measured by the Capability Maturity ModelIntegration, yet from the perspective of acquisition programmanagers on some high visibility individual programs, forvarious reasons, individual teams are not executing to the
level claimed in proposals.
-
7/30/2019 Use of Cmmi in Acquisition Environments
6/204 2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 6
Example Program
BackgroundLarge DoD program with multiple, geographically dispersedengineering locations.
Multi-contractor teams (10+) using different processes.
Several million lines of code.
Systems engineering challenges.Combination of legacy, re-use, COTS integration and newdevelopment.
All contractor sites are Maturity Level 3 or higher.18 months after contract award, the program office conducted aCMMI Class Bappraisal on the team.
-
7/30/2019 Use of Cmmi in Acquisition Environments
7/204 2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 7
Example Program
Appraisal Output
0
5
10
15
20
25
30
Project Mgmt Engineering
Processes
Process
Mgmt
Support
Processes
Number of Strengths Number of Weaknesses
Project Mgmt Processes
- Project Planning
- Project Monitoring & Control
- Integrated Project Mgmt
- Risk Management
Engineering Processes
- Requirements Mgmt
- Requirements Definition
- Technical Solution
- Product Integration
- Verification (Peer Reviews)
Support Processes- Measurement & Analysis
- Product and Process Quality
Assurance
- Configuration Mgmt
- Decision Analysis
Process Mgmt
- Organizational Process Focus
- Organizational Process Definition
-
7/30/2019 Use of Cmmi in Acquisition Environments
8/204 2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 8
Example Program
Issues Identified 1PROJECT MANAGEMENT
Lack of project plans or having onlyincomplete, conflicting or out of dateproject plans
Ineffective use of Integrated MasterSchedule as basis forplanning/tracking status acrossprogram
Undefined engineering andmanagement processes on program
Inability to track and manage actionsto closure
Inadequate cost estimation processes,
methods, data and tools Inadequate staffing and trainingproject personnel
Tracking dependencies between oracross teams not defined
Managing project data ad hoc Inability to proactively identify andmanage risks
ENGINEERING
Lack of understanding of theprograms requirements
Inability to trace requirements toarchitecture/design or to testplans/procedures
Poor linkage of functional andperformance requirements
Inconsistent requirementsmanagement at different levels
No criteria for makingarchitectural/design decisions amongalternatives
Not capturing entire technical datapackage (requirements, design anddesign rationale, test results, etc)
Efficiency of design process/methodsin question
Late definition of integration and testprocedures
-
7/30/2019 Use of Cmmi in Acquisition Environments
9/204 2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 9
Example Program
Issues Identified 2SUPPORT
Difficult to identify items in configuration management baselines
Lack of ability to manage individual versionsin incremental development
Inability to effectively managing changes to work products throughout lifecycle
Not conducting audits to establish/ensure integrity of baselines throughout
incremental engineering and developmentInefficient change management process (cycle time, volume of changes)
Roles/responsibilities of change control boards not defined
Quality Assurance audits of products and processes not consistent
QA involvement in system and software engineering processes not consistent
No metrics to manage engineering activities (outside of cost/schedule data)
-
7/30/2019 Use of Cmmi in Acquisition Environments
10/204 2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 10
Example Program
ResultsEarly and periodic Class B appraisals using CMMI identified risksto program success
Identified risks were assigned to contractor, to acquirer, or bothbased upon who was best able to mitigate them.
Many risks were managed jointly and cooperatively between the
contractor and the acquirer
Identification of and attention to risks early in the program lifecycle led to the ultimate success of the program.
-
7/30/2019 Use of Cmmi in Acquisition Environments
11/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 11
High Maturity High MaturityOrganizations Projects
WHY?
Maturity Levels are goodindicators of organizationalpotential performance.
They describe how the nextproject will most likely performbased on a sampling ofexisting projects.
Maturity Levels reside at theorganizational level and arenotan indication of how an
individual project is performing.
XYZ Corp.
Division
A
Project1
Project2
Project3
Division
B
Division
N
?
Project5
Project6
Project7
Projectx
Projecty
Projectz
Project4
MLs usuallyapply HEREbased upon
appraisals ofTHESE
but yourproject isHERE or HERE
-
7/30/2019 Use of Cmmi in Acquisition Environments
12/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 12
The Acquirers ConcernMY PROGRAM
ML = ???
Contractor AML = 5 Contractor BML = 3
Contractor CML = 4
PMOML = 2
During
source
selection:
How capable is acontractor team to
deliver anoperationalcapability?
Ongoing: How well is myprogram
performing?
Maturity Levels at the organizational level arenecessary but not sufficient to provide answers to
these questions at the program level.
-
7/30/2019 Use of Cmmi in Acquisition Environments
13/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 13
Key QuestionsIs the appraisal of the contractors organizational
maturity relevant to my project?
Did the part of the organization executing my projectparticipate in the appraisal?
Did projects similar to mine participate in the appraisal?
Are the appraised processes routinely used by the partof the organization executing my project?
Are the appraised processes an integral part of the
project execution, or are they an overlay on the the realway the work gets done?
The BIG question: What processes will really
be used on MY project
-
7/30/2019 Use of Cmmi in Acquisition Environments
14/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 14
Excerpt from Defense AcquisitionGuidebook Source Selection
4.2.5.2 Capability Reviews
Capability reviews are a useful tool
available during source selections to assessthe offerors' capability in selected criticalprocess areas. Capability reviews may be the
appropriate means for evaluating program-specific critical processes such as systemsengineering, software development,
configuration management, etc.
-
7/30/2019 Use of Cmmi in Acquisition Environments
15/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 15
Getting the processes that you need1. Identify the characteristics of the processes that you need on
your project.
2. Include process evaluation as one of the source selectioncriteria.
3. Require the bidders to define in the proposal, the processes
and the process outputs that they intend to use on the project.4. During source selection, evaluate the bidders processes w.r.t.
the projects process needs using the SCAMPI method.
5. For the winning bidder, reference the proposed processes inthe contract.
6. During contract execution, evaluate the contractorcompliance with the proposed processes.
-
7/30/2019 Use of Cmmi in Acquisition Environments
16/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 16
Step 1: Identify Process Needs 1
Self-assessment of project needs by the PMO
Based upon Guidelines for using CMMI in AcquisitionPrograms(draft)
CMMI Risk Worksheet Results
NotImportant Important Essential
1 2 3 4 5 6 7 8 9 10
Project Planning
1.Establish Estimates o o o o o o o o o
2.Develop a Project Plan o o o o o o o o o3.Obtain Commitment to the
Plan
o o o o o o o o o
Project Monitoring and Control
4.Monitor Project AgainstPlan o o o o
-
7/30/2019 Use of Cmmi in Acquisition Environments
17/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 17
Step 1: Identify Process Needs 2
Example
Program is looking to select a Lead System Integrator for acomplex, multi-year, development effort
Program is concerned with the potential LSIs ability to:
- manage risk
- manage suppliers- plan and track the program
- build an integrated team
- develop an architecture
- integrate the various components
The program might want to explore the bidders proposedprocesses in these CMMI process areas: PP, PMC, IPM (with
IPPD), ISM, RD, IT, RSKM, PI
-
7/30/2019 Use of Cmmi in Acquisition Environments
18/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 18
Step 2: Source Selection CriteriaDont just require organizational Maturity Levels
Include an evaluation of contractor-proposedprocesses as one of the factors for source selection.
-
7/30/2019 Use of Cmmi in Acquisition Environments
19/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 19
Step 3: Require process proposals 1
RFP requires all bidders to propose the processes thatthey wil l use on this project.
Process proposals include
a description of the process
a list of the outputs / artifacts produced by the process.
-
7/30/2019 Use of Cmmi in Acquisition Environments
20/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 20
Step 3: Require process proposals 2
RFP Language
L.X.X.X Product Development Capabilities
In support of the Management Factor evaluation, the Governmentintends to conduct an evaluation of the product development andmanagement capabilities of the offeror teamproposed for application on
this project. The evaluation will involve methods and procedures tailoredfrom the Software Engineering Institute (SEI) Standard CMMISM
Appraisal Method for Process Improvement (SCAMPISM) Class X*
Version 1.1 using Capability Maturity Model Integration (CMMISM) forSystems Engineering, Software Engineering, and Integrated Product and
Process Development (CMMI-SE/SW/IPPD), Version 1.1. The offerorshall provide the SCAMPI documentation described in Attachment A ofthis RFP to support this evaluation. This documentation shall be providedin the proposal and will not be included in the page count limitations forthe proposal.
*B or C depending on program needs
-
7/30/2019 Use of Cmmi in Acquisition Environments
21/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 21
Step 4: Evaluate process proposals 1
Appraise the proposed processes using a SCAMPI-Cmethod.
SCAMPI-C is suitable for process appraisal based ondocument review.
Use an authorized Lead Appraiser with acquisitionexperience
Ensure the appraisal team is trained and experienced
Perform a gap analysis against the self-assessment ofproject needs established in Step 1.
Gaps represent process-related risks to the project.
-
7/30/2019 Use of Cmmi in Acquisition Environments
22/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 22
Step 4: Evaluate process proposals 2
If the program is of sufficient size, duration, or
complexity, consider performing SCAMPI-Bs on thebidding teams .
Use the continuous representation, select 3 to 7
process areas based on program risk.Use an authorized Lead Appraiser with acquisitionexperience.
Ensure the team is trained and experienced.
-
7/30/2019 Use of Cmmi in Acquisition Environments
23/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 23
Step 5: Contract proposed processesReference the proposed processes in the awarded
contract.
Dont tell the contractor what processes to use.
- That could shift performance liability to the PMO if theprocesses are found to be unsuitable for the project.
J ust tell the contractor to perform as proposed.
-
7/30/2019 Use of Cmmi in Acquisition Environments
24/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 24
Step 6: Evaluate process compliance 1Excerpt from Defense Acquisition
Guidebook Contract Monitoring
4.2.5.3 Capability Appraisals
the program manager retains theright to independently evaluate theprocess capabil ities of the selected
team prior to or immediately aftercontract award. Periodicappraisals are encouraged as part of
contract process monitoring
activities. assessments are mostvaluable when they apply across thefull program team, and not just one
segment of the
organization
Monitor the production ofprocess-related artifacts
Perform one or moreSCAMPI-B appraisals onkey process areas toassess compliance to
proposed processes
Appraisal focus is oncontract monitoring, not
process improvement
-
7/30/2019 Use of Cmmi in Acquisition Environments
25/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 25
Step 6: Evaluate process compliance 2
Contract Monitoring Guidelines
Dont appraise Maturity Levels
Use the SCAMPI-B method
Include the entire program team (prime, subs, and theacquisition program office)
Use the continuous representation, select process areasbased on program risk (selection may evolve during programlife).
Use an authorized Lead Appraiser
Ensure the team is trained and experienced
Include contractor members on the appraisal team
Use the results as the basis for collaborative risk mitigation
and process improvement across program team
-
7/30/2019 Use of Cmmi in Acquisition Environments
26/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 26
Benefits of Using the SCAMPI Familyof Appraisal MethodsSCAMPI Class B and Class C appraisals are consistent with the
SCAMPI Class A Method (same steps, use of PIIs, etc.) and: are led by an authorized team lead require team training focus on areas of risk to the program without an artificial focus
on achieving Levels are repeatable follow a publicly vetted, documented, and easily accessible
method
In the absence of a repeatable method with clear expectations onthe part of the acquirer and contractor communities, homegrownmethods will emerge.
-
7/30/2019 Use of Cmmi in Acquisition Environments
27/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 27
SummaryMaturity Levels alone do not provide the information anacquirer needs to determine:
How capable is a contractor team to deliver anoperational capability?
How well is my program performing?
Acquirers need a simple, actionable set of guidelines onhow to use the CMMI framework (models and appraisalmethods) to help reduce program risk.
-
7/30/2019 Use of Cmmi in Acquisition Environments
28/204
Pittsburgh, PA 15213-3890
Tutorial: Use of CMMI in Acquisition Environments - Page 1
Sponsored by the U.S. Department of Defense
2005 by Carnegie Mellon UniversityThis material is approved for public release.
Use of CMMI in Acquisition Environments
Part 2: Using CMMI-AM to Improve
Acquisition Practices
Brian Gallagher
Lorraine Adams
SEPG
March 6, 2006
SM CMM Integration, IDEAL, and SCAMPI are service marks of Carnegie Mellon University. Capability Maturity Model, Capability Maturity Modeling, CMM, and CMMI are registered in the U.S. Patent and Trademark Office
by Carnegie Mellon University.
-
7/30/2019 Use of Cmmi in Acquisition Environments
29/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 2
Using CMMI-AM to Improve Acquisition
Practices- Contents
Module 1 Background
Tutorial information and background
Module 2 CMMI-AM and Project ManagementProject Management process areas, goals, andpractices
Module 3 CMMI-AM and EngineeringEngineering process areas, goals, and practices
Module 4 CMMI-AM and Support and Generic Practices
Support process areas, goals, and practices; andGeneric Practices
Module 5 Using CMMI-AM
Module 6 Summary and Conclusion
-
7/30/2019 Use of Cmmi in Acquisition Environments
30/204
Pittsburgh, PA 15213-3890
Tutorial: Use of CMMI in Acquisition Environments - Page 3
Sponsored by the U.S. Department of Defense
2005 by Carnegie Mellon UniversityThis material is approved for public release.
Using CMMI-AM to ImproveAcquisition Practices
Module 1:Background
SM CMM Integration, IDEAL, and SCAMPI are service marks of Carnegie Mellon University. Capability Maturity Model, Capability Maturity Modeling, CMM, and CMMI are registered in the U.S. Patent and Trademark Office
by Carnegie Mellon University.
-
7/30/2019 Use of Cmmi in Acquisition Environments
31/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 4
Module 1 AgendaThe State of Acquisition Practices
Capability Maturity Model Integration
-
7/30/2019 Use of Cmmi in Acquisition Environments
32/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 5
What is Acquisition
Question: What are the key
activit ies that youperform when youacquire systems?
Operational
Need
-
7/30/2019 Use of Cmmi in Acquisition Environments
33/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 6
The State of Acquisition Practice 1The agencies assume the partnership arrangementabsolves them of all acquisition management
responsibilities
Virtually all (Air Force) software-intensive systems sufferfrom difficulties achieving cost, schedule, and
performance objectives.
I'd rather have it wrong than have it late. A senior manager (industry)
The bottom line is schedule. My promotions and raisesare based on meeting schedule first and foremost. A programmanager (government)
Lack of robust systems engineering practices identified
as crit ical factor in SBIRS-High problems. Lt. Gen. Brian A. Arnold,USAF, CDR, USAF/SMC
-
7/30/2019 Use of Cmmi in Acquisition Environments
34/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 7
The State of Acquisition Practice 2Is There an Acquisition Crisis?
Investigation of one acquisit ion program showed:
System complexity and the programs lack of experience inprocuring major systems caused serious cost growth.
Program lacks systems engineering and program
management expertise. Absence of requirements stabilization process.
Program management does not enforce timely milestones,timelines, and deliverables.
Programs lack of process control made assessment oftechnical risk impossible.
Programs lack of short- and long-term budget tracking makescost assessment nearly impossible.
Program does not manage risk.
-
7/30/2019 Use of Cmmi in Acquisition Environments
35/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 8
The State of Acquisition Practice 3Whats the Problem?
There are many. Among them,Evidence shows that an acquirers management
processes and practices and resultant decisions canhave a negative impact on the development processes
of the supplier
A mismatch in Acquirer/Supplier in terms of associatedprocess capability and maturity can have unpredictable
and even disastrous results.
And the challenges are increasing
-
7/30/2019 Use of Cmmi in Acquisition Environments
36/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 9
Acquirer/Supplier Mismatch
Acqu
irer
Supplier
Mismatch
Mismatch
mature acquirer mentorslow maturity supplier
outcome not predictable
Immature | mature
acquirer | supplier
Customer encouragesshort cuts.
Matched
acquirer and supplierare both high maturity
highest probability ofsuccess
Disaster
no discipline
no processno product
Technical &Mgt Skill Low
Low
High
High
-
7/30/2019 Use of Cmmi in Acquisition Environments
37/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 10
Complexity in Modern SystemsMany commercial products are the result of a complex mix ofsubcomponents engineered into a system
Most DoD weapon and information systems are at least thiscomplex
-
7/30/2019 Use of Cmmi in Acquisition Environments
38/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 11
Weapon System Complexity
FCS Manned Ground Vehicle concept
-
7/30/2019 Use of Cmmi in Acquisition Environments
39/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 12
System of Systems Complexity
DCGS - Worldwide
DCGS - Regional
Sun
Sun
Sun
DCGS - Forward
MIST/SATCOM GCS
NationalNationalMissionMissionPartnersPartners
ETPETPLOSLOS
KU SATCOMKU SATCOM
BLOSBLOS
PredatorPredator
AWACSAWACS
RJRJ
CommercialCommercialImageryImagery
JSTARSJSTARS
SIBRSIBR
NationalNational
INTINT
IBSIBS
Collection
TaskReceive
Process
Task
ReceiveProcess
Exploit
Disseminate
Execute
MCE
ISRM
AOCM3 IWPCM3 IWPC
ARGUSARGUS
-
7/30/2019 Use of Cmmi in Acquisition Environments
40/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 13
KSLO
C
F/A-18C/D SMUG/RUG 14268K
F/A-18E/F17101K
F/A-18C/D XN-86629K
F/A-18 Night Attack3054k
F/A-18C/D 2130K F-14D416K F-14B 2866K
A-7E16K
F-14 80K
A-4 (ARBS) 16K
A-6E 64K
F/A-18A/B 943K
F-14B 364K
AV-8B NightAt tack 1780K
AV-8B Radar 3748K
AH-1 NTS 1000KAH-1 764KA-E SWIP 364KAV-8B 764K0
3000
6000
9000
12000
15000
18000
66 70 74 78 82 86 90 94 98 02
Aircraf t IOC, Year
EA-6B ICAP2BLK 89 2203K
E-A6B ICAP148K
EA-6B ICAP2BLK 82 395K
EA-6B ICAP2BLK 86 779K
06 10
JSFUAVsNCWInter-System
Operability
Increasing System Complexity
-
7/30/2019 Use of Cmmi in Acquisition Environments
41/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 14
Module 1 AgendaThe State of Acquisition Practices
Capability Maturity Model Integration
-
7/30/2019 Use of Cmmi in Acquisition Environments
42/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 15
What Can Be Done?
Based on the premise that
The quality of the product is governed largely
by the process used to create the product
We could improve the Suppliers process and practices
But the developers have a head start (CMMI-based improvement
programs are widespread)
We could improve the Acquirers processes and
practices by: increasing the visibility of the acquirers contribution to program
success
defining, implementing, measuring and evolving effective
acquisition processes and practices
-
7/30/2019 Use of Cmmi in Acquisition Environments
43/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 16
How Do You Want to Work?
Random motion lots ofenergy, not much progress
No teamwork - each persongoes his own way
Frequent conflict
You never know where youllend up
Directed motion every stepbrings you closer to the goal
Coordinated efforts
Cooperation
Predictable results
Process can make the difference
-
7/30/2019 Use of Cmmi in Acquisition Environments
44/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 17
S u n
S un
S un
Focus of CMMI
CMMI is applied here
SW-CMM is applied here
-
7/30/2019 Use of Cmmi in Acquisition Environments
45/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 18
CMMI - Continuous SE/SW/IPPD/SS
Organizational ProcessFocus
Organizational ProcessDefinition
Organizational TrainingOrganizational Process
PerformanceOrganizational
Innovation andDeployment
Project PlanningProject Monitoring and
ControlSupplier Agreement Mgmt.Integrated Project Mgmt.Risk ManagementIntegrated TeamingIntegrated Supplier Mgmt
Quantitative Project Mgmt.
RequirementsManagement
RequirementsDevelopment
Technical SolutionProduct IntegrationVerificationValidation
ConfigurationMgmt.
Process andProduct QualityAssurance
Measurement &Analysis
Decision Analysis
and ResolutionOrganizational
Environment for
Integration
Causal Analysis
and Resolution
CMMI
Engineering SupportProcess
Management
Project
Management
-
7/30/2019 Use of Cmmi in Acquisition Environments
46/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 19
Structure of CMMI1
For CMMI-SW/SE
22 ProcessAreas
157 Goals
539 Practices
PROCESS
AREA 1
PROCESS
AREA n
PROCESS
AREA 2
SpecificPractices
CapabilityLevels
GenericPractices
Specific
Goals
Generic
Goals
-
7/30/2019 Use of Cmmi in Acquisition Environments
47/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 20
Perspectives on Maturity
ML 1
ML2
ML3
ML4
ML5
Staged
Organization-Focused. . . for an established set of process
areas across an organization
Process-Focused. . . for a single process area
or a set of process areas
PA PACL
0
CL1
CL2
CL3
CL
4
CL
5
PA
Continuous
ProcessA
reaCapab
ility
CONTRACTOR AND PROCESS
-
7/30/2019 Use of Cmmi in Acquisition Environments
48/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 21
What Levels Tell Us
CONTRACTOR AND PROCESS
Levels are good indicators ofpotentialorganizational performance
They describe how the next project could performbased on a sampling of existing projects
Capability Levels and Maturity Levels reside at theorganizational level (corporation, major division)and are not an indication of how any individualproject is performing
Note: Sometimes a project is large enough to be considered an organizational uni t (e.g. JSF, C-17)
-
7/30/2019 Use of Cmmi in Acquisition Environments
49/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 22
SummaryAcquisition is a challenging multi-disciplinary effortoccurring in a difficult environment, and demands for
greater capabilities and increasing complexity are adding tothis challenge.
Capable performance by BOTH the acquirer and the
supplier are essential to program success
A focus on PROCESS at the acquirer and at the suppliercan help.
CMMI is a proven and widely accepted processimprovement model
U i CMMI AM t I A i iti
-
7/30/2019 Use of Cmmi in Acquisition Environments
50/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 1
Using CMMI-AM to Improve Acquisition
Practices- Contents
Module 1 BackgroundTutorial information and background
Module 2 CMMI-AM and Project ManagementProject Management process areas, goals, andpractices
Module 3 CMMI-AM and EngineeringEngineering process areas, goals, and practices
Module 4 CMMI-AM and Support and Generic Practices
Support process areas, goals, and practices; andGeneric Practices
Module 5 Using CMMI-AM
Module 6 Summary and Conclusion
Pittsburgh PA 15213 3890
-
7/30/2019 Use of Cmmi in Acquisition Environments
51/204
Pittsburgh, PA 15213-3890
Tutorial: Use of CMMI in Acquisition Environments - Page 2
Sponsored by the U.S. Department of Defense
2005 by Carnegie Mellon UniversityThis material is approved for public release.
Introduction to the CMMIAcquisition Module
(CMMI-AM)
SM CMM Integration, IDEAL, and SCAMPI are service marks of Carnegie Mellon University. Capability Maturity Model, Capability Maturity Modeling, CMM, and CMMI are registered in the U.S. Patent and Trademark Office
by Carnegie Mellon University.
Module 2:CMMI-AM and
Project Management
-
7/30/2019 Use of Cmmi in Acquisition Environments
52/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 3
Module 2 AgendaIntroduction to the CMMI Acquisition Module
Project Management Process Areas
Project Planning
Project Monitoring and Control
Solicitation and Contract Monitoring
Integrated Project Management
Risk Management
Summary
-
7/30/2019 Use of Cmmi in Acquisition Environments
53/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 4
Where Does Process Fit inAcquisition?
at the Project Management Office (PMO)
Management of internal PMO activitiesManagement of processes applied to projectOversight of contractors processesIntegration of contractors and PMO processes
at the ContractorManagement of internal contractor activitiesOversight of subcontractor processes
for integration of PMO, contractor, and
subcontractor processes
PMO AND PROCESS
-
7/30/2019 Use of Cmmi in Acquisition Environments
54/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 5
Process and the Roles of the PMManage process within the PMO
Manage process applied to the project
Exercise oversight of the contractorsprocess management
Ensure integrationof contractor and
PMO processes
PM
ContractorPMO
Suppliers
PMO AND PROCESS
-
7/30/2019 Use of Cmmi in Acquisition Environments
55/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 6
The PMO Management RoleThe PM is responsible for managing internal PMO
processes. The PM must take a hands-on approach to
Identify, define, and document process needs
Communicate and train the PMO staff
Support, track, measure,and review the PMOprocesses
PMO
PM
Direct
Responsi
bility
PMO AND PROCESS
-
7/30/2019 Use of Cmmi in Acquisition Environments
56/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 7
Program Management RoleDefine the interface between the PMO and the
contractor using the RFP and negotiations
Project process requirementsProject metricsProject communication needsProject risk management needs
Manage the interface during
contract executionReal-time monitoring of
deliverablesKeep communication
channels clear & openDevelop trust with contractor
PM
ContractorPMO
Contract
CommunicationProgram Risk
PMO AND PROCESS
-
7/30/2019 Use of Cmmi in Acquisition Environments
57/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 8
Contractor Oversight Role1
Process maturity of the contractor should be a
consideration in source selection
Obtain process definitions and commitments- J ust requiring a CMMI Maturity Level is NOT enough.
- You need to ensure that high-maturity processes are appliedto YOUR project
- Require your bidders to define the processes they will use intheir proposals
- Evaluate the proposedprocesses as a part of
source selection
- Reference the processesin the contract
Plan process integrationPM
ContractorPMO
Oversight
C t t O i ht R lPMO AND PROCESS
-
7/30/2019 Use of Cmmi in Acquisition Environments
58/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 9
Contractor Oversight Role 2
After contract award, ensure that contracted process
commitments are kept
Committed processes are used by the project teamProcess artifacts are evidentProcess integration is effective and monitoredConsider periodic independent appraisals of key process areas
PM
ContractorPMO
Oversight
S b t t O i ht R lPMO AND PROCESS
-
7/30/2019 Use of Cmmi in Acquisition Environments
59/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 10
Subcontractor Oversight Role
For many systems, the bulk of the work is done bysubcontractors
Primary responsibility for oversight of subcontractors lieswith the prime contractor
PMO role is to ensure that prime isproviding adequate oversight tosubcontractors
Ensure flowdown of projectprocess requirements
Ensure integration ofprime and subcontractorprocesses
PM
ContractorPMO
SuppliersIndirectO
versight
P I t ti R lPMO AND PROCESS
-
7/30/2019 Use of Cmmi in Acquisition Environments
60/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 11
Process Integration Role
It is the PMOs responsibility to ensure PMO and
Contractor processes are compatible
Include any process must havesin the RFP- Consider specific compatibility with tools for risk,
requirements, schedule, etc. Ensure good communications with contractor(s) regarding
process incompatibilities Integration focus
needed throughoutproject
PM
ContractorPMO
ProcessIntegration
CMMI Acquisition Module (CMMI AM)
-
7/30/2019 Use of Cmmi in Acquisition Environments
61/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 12
CMMI Acquisition Module (CMMI-AM)
Focuses on effective acquisition activities and practices thatare implemented by first-level acquisition projects (e.g.,
System Project Office/Program Manager)Acquisition practices drawn and summarized from existingsources of best practices:
- Software Acquisition Capability Maturity Model (SA-CMM)
- Capability Maturity Model Integration (CMMI)- FAA Integrated Capability Maturity Model (iCMM)- Section 804
Intended to be used in conjunction with the CMMI as anacquisition lensfor interpreting the CMMI in acquisitionenvironments
CMMI-AM a tool for the acquirer
CMMI AM Structure
-
7/30/2019 Use of Cmmi in Acquisition Environments
62/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 13
CMMI-AM Structure
CMMI Acquisition ModuleV 1.1
Engineering SupportProject
Management
Project PlanningProject Monitor and
ControlIntegrated Project
Management
Risk ManagementSolicitation and
Contract Monitoring
Requirements ManagementRequirements DevelopmentVerificationValidation
Measurement andAnalysis
Decision Analysis andResolution
Transit ion to Operations
and Support
Key
New for CMMI-AM
Structure of CMMI AM
-
7/30/2019 Use of Cmmi in Acquisition Environments
63/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 14
Structure of CMMI-AM 1
For CMMI-SW/SE
12 Process
Areas
28 Goals
246 Practices
PROCESS
AREA 1
PROCESS
AREA n
SpecificPractices
GenericPractices
SpecificGoals
PROCESS
AREA 2
plus 47 self-assessment questions
Module 2 Agenda
-
7/30/2019 Use of Cmmi in Acquisition Environments
64/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 15
Module 2 Agenda
Introduction to the CMMI Acquisition Module
Project Management Process Areas
Project Planning
Project Monitoring and Control
Solicitation and Contract Monitoring
Integrated Project Management
Risk Management
Summary
-
7/30/2019 Use of Cmmi in Acquisition Environments
65/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 16
Project Management PAs
Project management process areas cover the projectmanagement activities related to planning, monitoring, andcontrolling the project.
Project Planning PPProject Monitoring and Control PMC
Solicitation and Contract Monitoring SCM
Integrated Project Management IPMRisk Management RSKM
-
7/30/2019 Use of Cmmi in Acquisition Environments
66/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 17
Project PlanningThe purpose of project planning is to establish andmaintain plans that define project activit ies. Foracquisition:
Project planning starts by setting the acquisition strategy andis followed by planning the acquisition process in ever
increasing levels of detailAs the acquisition proceeds toward selection of a supplier,the suppliers planning process should be reviewed forsufficiency
The resulting plans should also be reviewed for consistencywith the system acquisition plans
The acquirers and developers project planning processesare continuous and the plans evolve to meet the projects
needs.
Purpose of Acquisition Planning
-
7/30/2019 Use of Cmmi in Acquisition Environments
67/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 18
Purpose of Acquisition Planning
Guide program execution
From initiation through re-procurement and during post-
production supportSystems, subsystems, components, spares, and services
Minimize the time and cost of satisfying identified, validated
needs in a manner consistent with common sense andsound business practices
Planning evolves through an iterative process and becomes
increasingly more definitive in describing the relationship ofthe essential elements of a program
Paraphrased from DoD 5000 Interim Guidebook
Poor Project Planning
-
7/30/2019 Use of Cmmi in Acquisition Environments
68/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 19
Poor Project Planning
Symptoms
Poor estimates lead to cost and schedule overruns.
An inability to discover deviations from undocumented plans. Resources are not available/applied when needed.
An inability to meet commitments.
Project failure.
Why should we care?
Customers dont trust acquirers or suppliers who waste theirresources (i.e., loss of future business).
No lessons learned for future projects means making the samemistakes on multiple projects.
Unhappy customers, employees, and stakeholders means ashort life for the business.
If you fail to plan, then you plan to fail.
Acquisition Strategy vs. Acquisition Plan
-
7/30/2019 Use of Cmmi in Acquisition Environments
69/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 20
Acquisition Strategy vs. Acquisition Plan
Acquisition Strategy is high-level Top-level road map for program execution from program
initiation through post-production support.
ITERATIVE should be updatedLevel of detail changes as you go through the phasesAs per DoDI 5000.2 required for ALL programs at:
- Program Initiation for Ships
- Milestone B- Milestone C- Full-Rate Production Deployment Review
Acquisition Plan is typically for one phaseRequired by the Federal Acquisition Regulation (FAR)Focuses on specifics of the acquisitionConcerned with contract type, incentives, etc.
Acquisition Planning Cycle
-
7/30/2019 Use of Cmmi in Acquisition Environments
70/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 21
Acquisition Planning Cycle
StakeholdersStakeholders
EvaluateIncremental
Progress
StakeholdersStakeholdersStakeholdersStakeholders
MS B
ExecuteAcquisition
Strategy
EvaluateIncremental
Progress
Execute
RefinedAcquisit ion
Strategy
ImproveProcess
ImproveProcess
RefineAcquisition Strategy
RefineAcquisit ion StrategyDevelop
Acquisit ion Strategy
Acq.Strategyv1.0
Acq.Strategyv2.0
TechDevelStrat
AoAPlan
Acquisition Planning Objectives
-
7/30/2019 Use of Cmmi in Acquisition Environments
71/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 22
Acquisition Planning Objectives
Communicate!
Identify risks- Strategies for risk mitigation- Balance risks with cost, schedule and performance
Define expectations for all stakeholders- Role and responsibilities of all parties
Determine how to make your program executable withinbudget and schedule constraints- Expected program changes throughout lifecycle
Acquisition Strategy Elements
-
7/30/2019 Use of Cmmi in Acquisition Environments
72/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 23
Acquisition Strategy Elements
Acquisition Approach
RequirementsRisk Management
Design ConsiderationsBusiness Strategy
Program ManagementSupport Strategy
From Interim Defense Acquisition Guidebook, 30 Oct 2002
Single-Step and Evolutionary Acquisition
-
7/30/2019 Use of Cmmi in Acquisition Environments
73/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 24
g p y q
100%
Based on AF Program Manager Workshop presented by Mr Little
Single-Step
Time
Known increment
Deliverable Capability
100% of requirementsknown at start
100% of requirementsknown at start
Known increment
Partially
known
increment Unknown
increment
Only first incrementrequirements known at start
Incremental
Spiral
Known increment Known increment
User, developer, tester,
sustainer use and learn
Unknown
increment
Evolutionary Approach
-
7/30/2019 Use of Cmmi in Acquisition Environments
74/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 25
Evolutionary Approach
CR TD SDD PD OS
B
Increment 2
Increment 3
A C
B C
B C
Increment 1
Adapted from dod5000.dau.mil
= Contractor Spiral
Development
= Contractor Incremental
Development
Acquisition & Development Methods
-
7/30/2019 Use of Cmmi in Acquisition Environments
75/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 26
q p
= fielded system
Acquisition of a New Utility truck
Single Step Acquisit ion, Contractor Incremental Development
Increment 1 Hard to produce brakesIncrement 2 Easier to produce brakes
Inc 3 Develop new interfaces
Spiral 1 Prototype 1
Spiral 2 Prototype 2
Spiral 3 Prototype 3
Inc 2SW radios for existing interfaces
Increment 1- Interface 1
Increment 2- Interface 2
Inc 1 HW Upgrades
Single Step Development
Evolutionary Acquisit ion (Spiral), Contractor Mixed Development
Comms System
Program Drivers
-
7/30/2019 Use of Cmmi in Acquisition Environments
76/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 27
g
What software and system issues might DRIVE
your acquisit ion strategy due to the risk they pose
to successful execution?Schedule Staffing
Funding Test Requirements
Requirements Stability User Support
External Interfaces Policy Mandates
Deployment Security
Interoperability (Programmaticand Developmental)
System ComplexityPrecedented / Unprecedented
Technology Maturity
Dealing with Drivers
-
7/30/2019 Use of Cmmi in Acquisition Environments
77/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 28
g
Determine which present the highest risk exposure to yourprogram
Determine how the drivers will influence your acquisitionstrategy elements
Formulate strategies that you believe will deal with the
risks posed by the top drivers
Analyze the strategies to determine gaps and remaining
high risk areas
Acquisition Plan Contents
-
7/30/2019 Use of Cmmi in Acquisition Environments
78/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 29
qAcquisition background and objectives
Statement of need Applicable conditions
Cost Capability or performance
Risks Trade-offsDelivery or performance-periodrequirements
Plan of action (sample)
Sources Competition
Source-selection procedures Acquisition considerations
Budgeting and funding Government-furnished property
Make or buy Inherently governmental functionsTest and evaluation Logistics considerations
Security considerations Contractor versus Governmentperformance
Project Planning
-
7/30/2019 Use of Cmmi in Acquisition Environments
79/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 30
CMMI-AM Goals and Practices 1Specific Goal Specific Practice
EstablishEstimates
Estimate the Scope of the Project Establish Estimates of Work Product and Task
Attributes Define Project Life Cycle Determine Estimates of Effort and Cost
Develop a
Project Plan
Establish the Budget and Schedule
Identify Project Risks Plan for Data Management Plan for Project Resources Plan for Needed Knowledge and Skills Plan Stakeholder Involvement
Establish the Project PlanObtainCommitmentto the Plan
Review Plans that Affect the Project Reconcile Work and Resource Levels Obtain Plan Commitment
Project Planning
-
7/30/2019 Use of Cmmi in Acquisition Environments
80/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 31
Goal 1: Establish Estimates 1Estimates of project planning parameters are
established and maintained
Establish a top-level WBS1 to estimate the scope of theproject
Defines tasks for the ENTIRE project, including efforts of:- The supplier - The acquirer- Other stakeholders (e.g., test community, users)
Based upon product architecture
Establish estimates of work product and task attributes
Provides a basis for cost and effort estimation
Software examples KSLOC, function points, # of objects, # ofinterfaces, data volume, etc.
1 See MIL-HDBK-881A ( http://dcarc.pae.osd.mil/881handbook/881A.pdf)
Project Planning
-
7/30/2019 Use of Cmmi in Acquisition Environments
81/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 32
Goal 1: Establish Estimates 2Define the project life-cycle phases upon which to scope theplanning effort
Acquisition method- Single-Step - Evolutionary-incremental Evolutionary-spiral
Life Cycle phases- Development - Manufacturing - Verification - Training- Deployment - Operation - Support - Disposal
Estimate the project effort and cost for the work productsand tasks based on estimation rationale
Define estimation rationale
Estimate cost and effort for each work product and task
Consider independent review of estimates
Project Planning
-
7/30/2019 Use of Cmmi in Acquisition Environments
82/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 33
Goal 2: Develop a Project Plan 1A project plan is established and maintained as thebasis for managing the project
Establish and maintain the projects budget and schedule Identify assumptions, constraints, major milestones
Identify task dependencies
Identify and analyze project risks
Involve stakeholders in identification of risk
Analyze impact, timeframe, and probability of occurrence
Plan for the management of project data
Create master list of data to be managed (formal and informal)- Identify needs for version control and configuration mgt
Define data content and formats
Establish requirements for security and information assurance
Project Planning
-
7/30/2019 Use of Cmmi in Acquisition Environments
83/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 34
Goal 2: Develop a Project Plan 2Plan for necessary resources to perform the project Identify and plan for process requirements
Identify and plan for staffing requirements
Identify and plan for facilities and equipment requirements
Plan for knowledge and skills needed to perform theproject
Identify skills needed Assess available skills
Develop a plan to fill the gaps
Project Planning
-
7/30/2019 Use of Cmmi in Acquisition Environments
84/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 35
Goal 2: Develop a Project Plan 3Plan the involvement of identified stakeholders Identify relevant stakeholders
Plan their involvement
Obtain commitments for involvement
Establish and maintain the overall project plan content
Captures all relevant planning items to enable communication
among the project team and stakeholders
May be comprised of multiple plans such as- Integrated Master Plan- Integrate Master Schedule
- Systems Engineering Management Plan- Software Development Plan
Must be maintained throughout the acquisition
Module 2 Agenda
-
7/30/2019 Use of Cmmi in Acquisition Environments
85/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 36
Introduction to the CMMI Acquisition Module
Project Management Process AreasProject Planning
Project Monitoring and Control
Solicitation and Contract Monitoring
Integrated Project Management
Risk Management
Summary
-
7/30/2019 Use of Cmmi in Acquisition Environments
86/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 37
Project Monitoring and Control1The purpose of project monitoring and control is to provideunderstanding into the projects progress so that appropriate
corrective actions can be taken when the projectsperformance deviates significantly from the plan.
Project Monitoring and Control2
-
7/30/2019 Use of Cmmi in Acquisition Environments
87/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 38
For Acquisition, monitoring and control functions aredirected within the acquisition project early in the processas the acquisition planning is performed and the strategy isdefined. As the acquisition process enfolds, monitoring andcontrol are essential to ensuring that appropriate resourcesare being applied and that the internal acquisition activitiesare progressing according to plan.
Once a supplier is selected and an award is made, the roleof monitoring and control becomes two fold, concerned withboth continuing to monitor and control internally while alsomonitoring and controlling the progress of the suppliersexecution under the suppliers project plan.
Poor Project Monitoring and Control
-
7/30/2019 Use of Cmmi in Acquisition Environments
88/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 39
Symptoms
Lots of time is spent in meetings trying to discover projectstatus rather than reporting on it.
Data needed for management decisions is unavailable whenneeded.
Actions that should have been taken early arent identified untilits too late
Why should we care?
If you dont know whats going on, corrective action cant betaken early when its least expensive.
Lack of management insight/oversight makes project resultshighly unpredictable, even later in the project.
If your confidence in the status you give to your customer islow, they probably perceive it.
Project Monitoring and Control
CMMI AM G l d P ti
-
7/30/2019 Use of Cmmi in Acquisition Environments
89/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 40
CMMI-AM Goals and Practices
Specific Goal Specific Practice
Monitor ProjectAgainst Plan Monitor Project Planning Parameters Monitor Commitments Monitor Project Risks Monitor Data Management Monitor Stakeholder Involvement Conduct Progress Reviews Conduct Milestone Reviews
Manage CorrectiveAction to Closure
Analyze Issues Take Corrective Action Manage Corrective Action
Module 2 Agenda
-
7/30/2019 Use of Cmmi in Acquisition Environments
90/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 41
Introduction to the CMMI Acquisition Module
Project Management Process AreasProject Planning
Project Monitoring and Control
Solicitation and Contract Monitoring
Integrated Project Management
Risk Management
Summary
Solicitation and Contract Monitoring
-
7/30/2019 Use of Cmmi in Acquisition Environments
91/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 42
The purpose of Solicitation and Contract Monitoring is to preparea solicitation package that identifies the needs of a particularacquisition, to select a supplier who is best capable of satisfying
those needs, and to establish the process for monitoring thesupplier for the duration of the contract.
For Acquisition, the solicitation must comply with the applicable
federal, departmental, and service acquisition regulations andpolicies. The solicitation should address issues appropriate to theproduct domain or acquisition environment (e.g., supplier processevaluations, operational safety suitability and effectiveness,certifications, architecture evaluations, and interoperability). The
representatives responsible for these activities within the projector stakeholder organizations should be consulted for properinclusion of those activities into the solicitation and contractmonitoring process.
Poor Solicitation and Contract Monitoring
-
7/30/2019 Use of Cmmi in Acquisition Environments
92/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 43
Symptoms
The solicitation package does not include theagreement/contractual requirements and proposal evaluation
criteria. The technical and management elements of proposals are not
properly evaluated to ensure that the requirements of theagreement/contract will be satisfied.
The selection official will not select suppliers who are qualified tosatisfy the agreement/contracts requirements for the projectsproducts..
Why Do We Care?
The project team will have insufficient insight into the suppliersactivities to ensure the effort is managed, controlled and complieswith contract requirements.
The project team and supplier team will be unable to maintain
ongoing communication and commitments.
Solicitation and Contract Monitoring
CMMI AM Goals and Practices
-
7/30/2019 Use of Cmmi in Acquisition Environments
93/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 44
CMMI-AM Goals and PracticesSpecific Goal Specific Practice
Prepare for theSolicitation
Designate a Selection Official Establish a Solicitation Package and Evaluation
Criteria Establish Cost and Schedule Estimates Validate the Solicitation Package
Select Suppliers Evaluate Proposals
Use Evaluation Results to Select SuppliersAward Contracts Establish an Understanding of the Contract and
Proposed Approach Establish Communications Processes and
Procedures
Coordinate Workwith Suppliers
Monitor Selected Supplier Processes Evaluate Selected Supplier Work Products Revise the Supplier Agreement or Relationship
Solicitation and Contract Monitoring
Goal 1: Prepare for the Solicitation 1
-
7/30/2019 Use of Cmmi in Acquisition Environments
94/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 45
Goal 1: Prepare for the Solicitation 1The project is prepared to conduct the solicitation
Designate a selection official responsible for making the
selection decisionEstablish and maintain a solicitation package that includesthe needs of the acquisit ion and corresponding proposalevaluation criteria
Define the required proposal content- Process descriptions and commitments
- Proposed development approach (e.g., processes, tasks,activities)
- Metrics to be provided to the PMO (including processmetrics)
- Appropriate plans (e.g., Integrated Mgt plan, SoftwareDevelopment Plan, risk Management Plan)
Solicitation and Contract Monitoring
Goal 1: Prepare for the Solicitation 2
-
7/30/2019 Use of Cmmi in Acquisition Environments
95/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 46
Goal 1: Prepare for the Solicitation 2Establish and maintain independently reviewed cost andschedule estimates for the products to be acquired
Reviewers should not be connected with the acquisition team
or the supplier
Validate the solicitation package with end users andpotential offerors to ensure the approach and cost andschedule estimates are realistic and can reasonably lead to a
usable product. In a competitive environment, ensure equal access to all
potential offerors. Provide a means for reviewers to offerclarifications of ambiguous capabilities.
In a sole source or change order environment, ensure thatrelevant stakeholders recognize the consequences ofproposed changes
Solicitation and Contract Monitoring
Goal 2: Select Supplier
-
7/30/2019 Use of Cmmi in Acquisition Environments
96/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 47
Goal 2: Select SupplierSuppliers are selected based on the solicitationpackage
Evaluate proposals according to the documented evaluationcriteria
In addition to evaluating the technical approach, evaluate- Management practices - Sufficiency of plans- Process capabilities - Domain experience- Cost - Schedule- Past Performance
Use proposal evaluation results as a basis to support
selection decisions
Solicitation and Contract Monitoring
Goal 3: Award Contracts 1
-
7/30/2019 Use of Cmmi in Acquisition Environments
97/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 48
Goal 3: Award Contracts 1Contracts are issued based on the needs of theacquisition and the suppliers proposed approaches
Establish and maintain a mutual understanding of thecontract with selected suppliers and end users based on theacquisition needs and the suppliers proposed approaches
Ensure that contractual commitments are made for factorscritical to project success (e.g., process execution, metricscollection and reporting)
Maintain mutual understanding for the duration of the contract
Solicitation and Contract Monitoring
Goal 3: Award Contracts 2
-
7/30/2019 Use of Cmmi in Acquisition Environments
98/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 49
Goal 3: Award ContractsEstablish and maintain communication processes andprocedures with suppliers that emphasize the needs,expectations, and measures of effectiveness to be used
throughout the acquisition Define ground rules for
- communication (e.g., data reported, frequency of reporting)
- key decision-making (e.g., rationale, documentation,acquirer involvement)
- conflict resolution
Monitor process deployment and effectiveness
Maintain open lines of communication
Solicitation and Contract Monitoring
Goal 4: Coordinate Work 1
-
7/30/2019 Use of Cmmi in Acquisition Environments
99/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 50
Goal 4: Coordinate WorkWork is coordinated with suppliers to ensure thecontract is executed properly
Monitor and evaluate selected processes used by thesupplier based on the suppliers documented processes
Adherence to plan
Timeliness of deployment
Effectiveness of processEvaluate selected supplier work products based ondocumented evaluation criteria
Define work products to be evaluated (may include interime
products) and evaluation criteria Ensure capacity and capability for timely and accurate
evaluation
Solicitation and Contract Monitoring
Goal 4: Coordinate Work 2
-
7/30/2019 Use of Cmmi in Acquisition Environments
100/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 51
Goal 4: Coordinate WorkRevise the supplier agreement or relationship, asappropriate, to reflect changes in conditions
Address shortfalls in both products and processes
Offer relief when needs evolve to invalidate processrequirements, documentation requirements, reportingrequirements, etc.
Module 2 Agenda
-
7/30/2019 Use of Cmmi in Acquisition Environments
101/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 52
Introduction to the CMMI Acquisition Module
Project Management Process Areas
Project Planning
Project Monitoring and Control
Solicitation and Contract Monitoring
Integrated Project Management
Risk Management
Summary
Integrated Project Management
-
7/30/2019 Use of Cmmi in Acquisition Environments
102/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 53
For Acquisition, integrated project management involvesestablishing project management processes consistent withand tailored from the organizations standard processes. This
includes higher level acquisition guidance, regulations,instructions, as well as local practices established to be usedacross various projects in the local organization. Establishingan integrated project management process incorporating andinvolving all stakeholders (executive level acquisition offices,
users, test organizations, developers, and associatedgovernment support organizations) is critical to thesuccessful development of the project.
Formal interfaces among project stakeholders take the form
of memorandums of understanding (MOUs), memorandumsof agreements (MOAs), contractual commitments, associatecontractor agreements and similar documents depending onthe nature of the interfaces and involved stakeholders.
Poor Integrated Project Mgt
S t
-
7/30/2019 Use of Cmmi in Acquisition Environments
103/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 54
Symptoms
No defined processes for the project
Project estimates make no reference to prior projects
Plans do not reflect the way the project is executed
Project staff does not know what is in the project plans
Stakeholders are not identified and involved
Why do we care?
Without processes, performance is ad hoc
Without the history of prior projects, we may make the same
mistakes If execution doesnt follow the plans, what does it follow?
Uninvolved stakeholders can provide last-minute surprises
Lessons learned are not captured
Integrated Project Management
CMMI-AM Goals and Practices
-
7/30/2019 Use of Cmmi in Acquisition Environments
104/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 55
CMMI AM Goals and PracticesSpecific Goal Specific Practice
Use the ProjectsDefined Process
Establish the Projects Defined Process Use Organizational Process Assets for Planning
Project Activities Integrate Plans
Manage the Project Using the Integrated Plans
Contribute to the Organizational
Process AssetsCoordinate andCollaborate withRelevant
Stakeholders
Manage Stakeholder Involvement Manage Dependencies Resolve Coordination Issues
Module 2 Agenda
I t d ti t th CMMI A i iti M d l
-
7/30/2019 Use of Cmmi in Acquisition Environments
105/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 56
Introduction to the CMMI Acquisition Module
Project Management Process Areas
Project Planning
Project Monitoring and Control
Solicitation and Contract Monitoring
Integrated Project Management
Risk ManagementSummary
Risk Management
Th f i k t i t id tif t ti l bl
-
7/30/2019 Use of Cmmi in Acquisition Environments
106/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 57
The purpose of risk management is to identify potential problemsbefore they occur, so that risk-handling activities may be plannedand invoked as needed across the life of the product or project to
mitigate adverse impacts on achieving objectives.
For Acquisition, risk identification and estimation of probability ofoccurrence and impact, particularly for those risks involved inmeeting performance requirements, schedules, and cost targets,largely determines the acquisition strategy. The acquirer has a dualrole, first in assessing and managing overall project risks for theduration of the project, and second, in assessing and managing risksassociated with the performance of the supplier. As the acquisition
progresses to the selection of a supplier, the risk specific to thesuppliers technical and management approach becomes importantto the success of the acquisition.
Poor Risk Management
S t
-
7/30/2019 Use of Cmmi in Acquisition Environments
107/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 58
Symptoms
Risks are being ignored.
Known risks to project staff are a surprise to management. Every time a new problem manifests, a new management
technique is tried.
Why should we care? The project may escape some of the bullets,but not all of
them.
No lessons learned for future projects means making the same
mistakes on multiple projects. Repeated project failures due to unforeseen (but predictable)
risks costs you and your organization.
Risk Management
CMMI-AM Goals and PracticesSpecific Goal Specific Practice
-
7/30/2019 Use of Cmmi in Acquisition Environments
108/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 59
Specific Goal Specific Practice
Prepare for RiskManagement
Determine Risk Sources and Categories
Define Risk Parameters
Establish a Risk Management Strategy
Identify andAnalyze Risks
Identify Risks Evaluate, Categorize, and Prioritize Risks
Mitigate Risks Develop Risk Mitigation Plans Implement Risk Mitigation Plans
Acquisition Risk Management 1
What Can Acquisit ion Program Offices Do? A Few Ideas
-
7/30/2019 Use of Cmmi in Acquisition Environments
109/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 60
What Can Acquisit ion Program Offices Do? A Few Ideas
Start a risk management program on Day 1 of the program
Ensure that PMO staff have appropriate risk managementtraining
Use mult iple methods to identify risk sources:- periodic risk reporting - brainstorming- voluntary risk reporting - risk report forms- taxonomy-based questionnaire (TBQ) - TBQ interviews
Acquisition Risk Management 2
What Can Acquisit ion Program Offices Do? A Few Ideas
-
7/30/2019 Use of Cmmi in Acquisition Environments
110/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 61
What Can Acquisit ion Program Offices Do? A Few Ideas
Add language to RFPs and contracts that specify how risks are
to be reported to the PMOEncourage decentralization of risk identification and analysis
following an organizationally defined process
Establish and maintain a schedule of joint risk reviews with allcontractors throughout the program, including joint prioritizationof the most important risks to the program
Find ways to reward contractors for early identification of
issues and risksDefine a process and criteria for escalating risks to the next
higher level
Module 2 Agenda
Introduction to the CMMI Acquisition Module
-
7/30/2019 Use of Cmmi in Acquisition Environments
111/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 62
Introduction to the CMMI Acquisition Module
Project Management Process Areas
Project Planning
Project Monitoring and Control
Solicitation and Contract Monitoring
Integrated Project Management
Risk ManagementSummary
Summary 1
PM roles include PMO management, project management,
-
7/30/2019 Use of Cmmi in Acquisition Environments
112/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 63
PM roles include PMO management, project management,supplier oversight, indirect subcontractor oversight, and processintegration
CMMI-AM is a tool intended to help the acquirerachieve success
Development of a suitable acquisit ion strategy is a keycomponent of project planning
Principal goals ofProject Planning Establish estimates Develop a project plan Obtain commitment to the plan
Principal goals ofProject Monitoring and Control Monitor Project Against Plan Manage Corrective Action to Closure
Summary 2
Principal goals of Solicitation and Contract Monitoring
-
7/30/2019 Use of Cmmi in Acquisition Environments
113/204
2005 by Carnegie Mellon University Tutorial: Use of CMMI in Acquisition Environments - Page 64
Principal goals ofSolicitation and Contract Monitoring Prepare for the Solicitation Select Suppliers
Award Contracts Coordinate Work with Suppliers
Principal goals ofIntegrated Project Management Use the Projects Defined Process
Coordinate and Collaborate with Relevant Stakeholders
Principal goals ofRisk Management Prepare for Risk Management Identify and Analyze Risks Mitigate Risks
CMMI
Using CMMI-AM to Improve Acquisition
Practices- Contents
-
7/30/2019 Use of Cmmi in Acquisition Environments
114/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-1CMMI-AM and Engineering v0.1
Module 1 BackgroundTutorial information and background
Module 2 CMMI-AM and Project ManagementProject Management process areas, goals, andpractices
Module 3 CMMI-AM and EngineeringEngineering process areas, goals, and practices
Module 4 CMMI-AM and Support and Generic PracticesSupport process areas, goals, and practices; and
Generic Practices
Module 5 Using CMMI-AM
Module 6 Summary and Conclusion
Pittsburgh, PA 15213-3890
CMMI
Using CMMI-AM to Improve
-
7/30/2019 Use of Cmmi in Acquisition Environments
115/204
CMMI Acquisit ion Module - Page M3-2
Sponsored by the U.S. Department of Defense
2005 by Carnegie Mellon UniversityThis material is approved for public release. Distribution is limited by the Software Engineering Institute toattendees.
g pAcquisition Practices
Module 3:
CMMI-AM andEngineering
SM CMM Integration, IDEAL, and SCAMPI are service marks of Carnegie Mellon University. Capability Maturity Model, Capability Maturity Modeling, CMM, and CMMI are registered in the U.S. Patent and Trademark Office
by Carnegie Mellon University.
CMMI
Module 3 Agenda
Engineering Process Areas
-
7/30/2019 Use of Cmmi in Acquisition Environments
116/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-3CMMI-AM and Engineering v0.1
g g
Requirements Development
Requirements Management
Verification
ValidationSummary
CMMI
PMO Role in Systems Engineering 1
Inherent PMO Responsibility:
-
7/30/2019 Use of Cmmi in Acquisition Environments
117/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-4CMMI-AM and Engineering v0.1
Ensure technology readiness level is appropriate for programphase
Develop initial system requirements in conjunction withstakeholders and ensure continued involvement
Develop technical evaluation criteria and evaluate proposals
during source selection
Develop independent cost and schedule estimates for thetechnical effort
Ensure external interfaces are properly identified andmonitored
Ensure PMO has adequate systems engineering staff
CMMI
PMO Role in Systems Engineering 2
PMO responsibility in conjunction with your contractor:
-
7/30/2019 Use of Cmmi in Acquisition Environments
118/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-5CMMI-AM and Engineering v0.1
p y j y
Ensure contractor development method is appropriate
Ensure contractors systems engineering processes areacceptable and being followed
Ensure compatible processes between prime and subcontractors and between the contractor team and the PMO
Review and approve systems engineering documentationEnsure systems engineering function is adequately integrated
with other areas such as logistics and test
Manage the top-level change control process
Perform technical evaluationsSystems Integration (if applicable)
Ensure end system meets requirements
CMMI
Module 3 Agenda
Engineering Process Areas
-
7/30/2019 Use of Cmmi in Acquisition Environments
119/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-6CMMI-AM and Engineering v0.1
g g
Requirements Development
Requirements Management
Verification
ValidationSummary
CMMI
Requirements Development 1
The purpose of requirements development is to produce
-
7/30/2019 Use of Cmmi in Acquisition Environments
120/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-7CMMI-AM and Engineering v0.1
p p q p pand analyze customer, product, and product-componentrequirements.
CMMI
Requirements Development 2
The purpose of requirements development is to produce
-
7/30/2019 Use of Cmmi in Acquisition Environments
121/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-8CMMI-AM and Engineering v0.1
and analyze customer, product, and product-componentrequirements.
For Acquisition, requirements development has twocontexts;
The amalgamation and coordination of the operationalrequirements (customer requirements) into a requirementsset that will define the scope and direction of the acquisition;
The allocation and extension of the customer requirements
and additional acquirer requirements (e.g., architecture,formal and informal reviews, reporting or data requirements)that become the basis of the processes utilized by thesuppliers organization.
CMMI
Requirements Development 3
There is a continuous iteration of requirements down through
-
7/30/2019 Use of Cmmi in Acquisition Environments
122/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-9CMMI-AM and Engineering v0.1
the multiple tiers of requirements documents associated with the
components of the system. For example, requirements flow from the stakeholders to the
system level to multiple subsystem levels and eventually to
either hardware or software component levels.The responsibility for developing requirements across the levels
is generally split between the acquirer and the supplier.
The acquirer is generally responsible for the higher level,starting with operational requirements and the supplier is
responsible for successive levels below that.
CMMI
Poor Requirements Development
Symptoms
-
7/30/2019 Use of Cmmi in Acquisition Environments
123/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-10CMMI-AM and Engineering v0.1
Unstated requirements or poorly stated requirements lead toconfusion among staff and customers.
Design, implementation, and test work products inconsistentlyinterpret the requirements.
It takes a long time to get agreement on product design.
Why should we care?
Unusable products and unhappy customers
Wasted time and resources building the wrongproduct
Staff members get tired of rework because requirements havebeen re-interpreted yet again.
Excessive spending to satisfy customer expectations
CMMI
Requirements: Input or Output?
-
7/30/2019 Use of Cmmi in Acquisition Environments
124/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-11CMMI-AM and Engineering v0.1
You RECEIVE requirements from your customerOperational needs
You DELIVER requirements to your supplierThrough the solicitation, SOW, SOO, and/or contract
Your job isTo ensure the quality of the inputsTo convert the inputs to the high-quality outputs
CMMI
Requirements Must be Balanced
Stakeholder Needs /
-
7/30/2019 Use of Cmmi in Acquisition Environments
125/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-12CMMI-AM and Engineering v0.1
Adapted from COTS-Based Systems forProgram Managers
Marketplace
Stakeholder Needs /
Business Processes
Programmatics/
Risks
Architecture /
Design
Simultaneous
Defini tion &Tradeoffs
CMMI
Requirements Must Evolve
Accumulating knowledge
D
-
7/30/2019 Use of Cmmi in Acquisition Environments
126/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-13CMMI-AM and Engineering v0.1
[EPIC 2002]
g g
Increasing stakeholder buy-in
Iteratively converging
decisions
Definition
& Trade
Offs
TIME
Stakeholders
Program
Market Design
Definition
& TradeOffs
CMMI
Requirements Development
CMMI-AM Goals and Practices
Specific Goal Specific Practice
D l Eli it N d
-
7/30/2019 Use of Cmmi in Acquisition Environments
127/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-14CMMI-AM and Engineering v0.1
DevelopCustomer
Requirements
Elicit Needs
Develop the Customer Requirements
DevelopProductRequirements
Establish Product and Product- ComponentRequirements
Allocate Product-Component Requirements
Identify Interface RequirementsAnalyze andValidateRequirements
Establish Operational Concepts and Scenarios
Establish a Definition of Required Functionality
Analyze Requirements
Analyze Requirements to Achieve Balance Validate Requirements with Comprehensive
Methods
CMMI
Module 3 Agenda
Engineering Process Areas
-
7/30/2019 Use of Cmmi in Acquisition Environments
128/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-15CMMI-AM and Engineering v0.1
Requirements Development
Requirements Management
Verification
ValidationSummary
CMMI
Requirements Management 1
The purpose of requirements management is tomanage the requirements of the projects products and
-
7/30/2019 Use of Cmmi in Acquisition Environments
129/204
2005 by Carnegie Mellon University CMMI Acquisition Module - Page M3-16CMMI-AM and Engineering v0.1
manage the requirements of the project s products andproduct components and to identify inconsistencies
between those requirements and the projects plans andwork products.
For Acquisition, requirements management is applied to
the requirements that are received from therequirements development process.
CMMI
Requirements Management 2
During acquisition, requirements management includes
the direct manag