U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+ SLC-off Impact and Solutions/Landsat 5 Tracy Zeiler Landsat Project Chief October 19, 2004

Upload: mabel-alexander

Post on 13-Jan-2016

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Landsat Status Briefing:ETM+ SLC-off Impact and Solutions/Landsat 5

Tracy Zeiler

Landsat Project Chief

October 19, 2004

Page 2: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Landsat 7 ETM+ SLC Failure: Return to Operations Timeline

May 31, 2003 - ETM+ scan line corrector failed July 14, 2003 - ETM+ acquisitions resumed September 3, 2003 – USGS approval for recovery attempt; SLC did not

restart September 16, 2003 – Final reconfiguration of instrument completed September 18, 2003 – Resumed normal LTAP acquisitions, downlinks

to ICs October 22, 2003 – Released standard L1G SLC-off product October 28, 2003 – New product brainstorming workshop May 10, 2004 – Released phase 1 SLC-off to SLC-on gap-filled product November 2004 – Release phase 2 SLC-off to SLC-off gap-filled

product

Page 3: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Initial New Product Development Plan

Requirement for multiple product types to satisfy different user communities

– Result will be suite of products based on ETM+ SLC-off data Use integrated team to provide technical input

– Include USGS, NASA and operational agency scientists and engineers

– Identify all options for ETM+ product improvement

– Identify benefits/risks/complexity/cost-to-benefit for all options

– Prioritize options from those easily achievable in the near-term to those that require research prior to possible future implementation

Implement near-term product options that will satisfy some user requirements

Continue with phased development of new product types

Page 4: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Phase 1 SLC-off Products and Associated Improvements

Enhance existing browse to show impacts to L1G data (i.e. data gaps) Let users choose the number of interpolation pixels used during processing

when ordering products (0-15 pixels) Implement new interpolation method Include gap pixel mask with Level 1 products including interpolated products Implement a Landsat 7 ETM+ SLC-off to SLC-on gap-filled product

Page 5: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Phase 1 SLC-off to SLC-on Product Summary

Level-1G product is radiometrically and geometrically corrected

Requires scene-to-scene registration Localized linear histogram matching implemented

with static window size The linear method chosen used a function of the

standard deviation for gain and a function of the mean for offset in estimating gap-fill pixels

Highly saturated pixels are excluded from histogram calculation

Optimum input is SLC-on image acquired 1-year prior

– Similar phenology improves histogram matching

– Minimum cloud cover is recommended to allow scene registration and reduce artifacts; other transient phenomenon also affect final image quality

Search and order system selects default and prioritizes SLC-on scenes based on above criteria

Cost $275/scene

Page 6: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Phase 2 SLC-off Products and Associated Improvements

Generate enhanced browse data that illustrates the data gaps in each ETM+ SLC-Off image

Implement a Landsat 7 ETM+ SLC-off to SLC-off gap-filled product Provide user an indication of SLC-off to SLC-off scene compatibility Implement modified histogram matching algorithm Include gap pixel mask with Level 1 products that indicates data source

of all fill values

Page 7: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment DPhase 2 SLC-off to SLC-off Product Summary

(slide 1 of 2)

Level-1G product is radiometrically and geometrically corrected

Requires scene-to-scene registration

Localized linear histogram matching implemented with adaptive window

The method was modified to use linear regression in computing pixel transformations

Highly saturated pixels are excluded from histogram calculation

Page 8: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Phase 2 SLC-off to SLC-off Product Summary (slide 2 of 2)

Requires SLC-off image(s) acquired as close as possible to primary SLC-off image– Minimum cloud cover in both primary and secondary image(s) to

reduce image artifacts; other transient phenomenon also affect final image quality

– Minimum cloud cover SLC-on image required to allow scene registration

– Random gap placement increases complexity of scene selection that will ensure complete ground coverage

Metadata called the gap phase statistic calculated during input scene production to provide an indication of SLC-off scene compatibility

Search and order system provides list of available SLC-off scenes for gap filling and default SLC-on image for registration– Provides predicted ground coverage for SLC-off images selected

based on gap phase statistics Cost $300/scene

Page 9: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Composite Gap Area Probability

Page 10: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Landsat Business Model

Landsat operating funds were derived from three sources*

– Appropriated funds 48%

– Data sales income 38%

– International cooperator fees 14% SLC failure has impacted the viability of the previous model

– FY04 operating funds required 73% appropriated funding

Additional appropriated funds are required to continue mission – Permanent appropriations not yet identified

– Data sales still falling

– IC income dropping

*based on 2003 pre-anomaly budget

Page 11: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Trends in Landsat ETM+ Data Sales(FY 2000 – 2004)

$0

$2,000,000

$4,000,000

$6,000,000

$8,000,000

$10,000,000

$12,000,000

1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52

FY-00 FY-01 FY-02 FY-03 FY-04

Reference: Dollar Trending Stats - FY04 V5_final.xls

Page 12: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Landsat 7 ETM+ SLC-on versus SLC-off FY04 Product Sales

Scenes Shipped by Percent

0%10%20%30%40%50%60%70%80%90%

100%

09

/19

/03

10

/17

/03

11/1

4/0

3

12

/12

/03

01

/09

/04

02

/06

/04

03

/05

/04

04

/02

/04

04

/30

/04

05

/28

/04

06

/25

/04

07

/23

/04

08

/20

/04

09

/24

/04

SLC OFF SLC OFF to ON Gapfill SLC ONReference: Dollar Trending Stat - FY04 V5_final.xls

• Demonstrates the normal sales growth for new products

Page 13: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Landsat ETM+ SLC-on versus SLC-off Product Demand

FY2004 Product Sales Breakout 19 Mar 2004 - 30 Sep 2004

77%

23%

SLC-on

SLC-off

Reference: Dollar Trending Stat - FY04 V5_final.xls

FY2004 Product Sales Breakout (24 Oct 2003 - 30 Sep 2004)

85%

15%

Reference: Dollar Trending Stat - FY04 V5_final.xls

• Demonstrates the increase in SLC-off sales with new product releases

Page 14: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Other Landsat 7 Status Information

Long term acquisition plan has been modified to aid in the collection of potential SLC-off to SLC-off image pairs; nominal rate increased from 250 to 300 scenes per day

Number of participating International Cooperators is down due to SLC failure; current participating ICs include:

Gyroscope 3 was exhibiting anomalous behavior and was turned off (May 5, 2004); mission continues with no loss of function; accuracy and precision of imagery unaffected

End-of-life based on fuel estimated to be Spring, 2011

Australia, Argentina, Canada, Indonesia, Japan

Page 15: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Landsat 5 Status

Number of ICs downlinking Landsat 5 has increased.– Australia, Argentina, Brazil, Canada, China, ESA, South Africa,

Thailand Investigation of amplifier behavior resulted in standby operations mode

that does not preclude additional IC downlinks Battery 3 behavior required that it be turned off (May 21, 2004); nominal

operations continues with 2 batteries Addition of telemetry (S-band) downlinks to ASA New sensor alignment parameters and addition of definitive ephemeris

will make geometric accuracy more consistent; data will be available from 1993 forward

Improved radiometric calibration through inclusion of general detector change and changes due to ice buildup in lookup table; up to 20% improvement

End-of-life based on fuel is estimated to be Spring, 2009

Page 16: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

U.S. Landsat Archive(Marketable Scenes through September 29, 2004)

ETM+: Landsat 7– 446,774 scenes– 323TB data in archive (RCC and L0Ra)– Archive grows by 300GB Daily

TM: Landsat 4 & Landsat 5– 550,626 scenes– Approximately 135TB of Data in Archive– Archive Grows by 30GB Daily

MSS: Landsat 1 through 5– 641,555 scenes– Approximately 20TB of Data in Archive

Page 17: U.S. Geological Survey EROS Data Center Landsat Program Archive Advisory Committee Meeting 19-20 October 2004 Attachment D Landsat Status Briefing: ETM+

U.S. Geological SurveyEROS Data CenterLandsat Program

Archive Advisory Committee Meeting19-20 October 2004

Attachment D

Summary

Landsat Project reacted quickly to SLC failure by quick return to acquisitions, recovery attempt, move to SLC-off operations and new product development.

Three SLC-off product types are available for current and future acquisitions:– Level-1G SLC-off

– Level-1G Interpolated SLC-off

– Level-1G SLC-off to SLC-on Gap-filled

Users are ordering SLC-off and new products Landsat 7 and Landsat 5 are expected to continue operations

until 2011 and 2009 respectively