u.s. consulate general (erbil) s-094 building renovation … · a1.1erbil, ankawa, s-094 building -...

14
N E W S S-095 U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION Overseas Buildings Operations Washington, DC G1.0 OCT 2018 OCT 2018 ERBIL, ANKAWA, S-094 BUILDING RENOVATION PROJECT G1.0 Scale: NTS Site Plan S-094 Street 1 D a t e: R e v i s i o n: P r o j e c t: S c a l e : D r a w i n g T i t l e: R e v i s i o n n o t e s: Rev: Date: Notes: Approved by: Checked by: U.S. Consulate General Erbil, Iraq Facility Manager: Drawn by: Sheet Number: Ayan Abdoka Arsalan Ali Kevin Lanning Renovation of S-094 building 10/03/2018 NTP Paper Size :11" X 17" Sensitive but Unclassified (SBU) Kevin Lanning

Upload: others

Post on 03-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION … · A1.1ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLAN 6Scale: NTS. KProvide and install Skirting 10cm height

N

EW

S

S-095

U.S. CONSULATE GENERAL

(ERBIL) S-094 BUILDING

RENOVATION

Overseas Buildings Operations

Washington, DC

G1.0

OCT 2018

OCT 2018

ERBIL, ANKAWA, S-094 BUILDING RENOVATION PROJECTG1.0

Scale: NTS

Site Plan

S-094Street

1

D a t e:

R e v i s i o n:

P r o j e c t:

S c a l e :

D r a w i n g T i t l e:

R e v i s i o n n o t e s:

Rev: Date: Notes:

Approved by:

Checked by:

U.S. ConsulateGeneral Erbil,

Iraq

Facility Manager:

Drawn by:

Sheet Number:

Ayan Abdoka

Arsalan Ali

Kevin Lanning Renovation of S-094 building10/03/2018

NTPPaper Size :11" X 17"

Sensitive but Unclassified (SBU)

Kevin Lanning

Page 2: U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION … · A1.1ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLAN 6Scale: NTS. KProvide and install Skirting 10cm height

INDEX OF DRAWING

G1.0 COVER SHEET

1

2

3

4

5

6

7

8

9

10

G1.1

G1.2

A1.0

A1.1

A1.2

A1.3

A1.4

A1.5

A1.6

TABLE OF CONTENT

INDEX OF ROOMS

U.S. CONSULATE GENERAL

(ERBIL) S-094 BUILDING

RENOVATION

Overseas Buildings Operations

Washington, DC

G1.1

OCT 2018

OCT 2018

ERBIL, ANKAWA, TABLE OF CONTENT G1.1

Scale: NTS2

CURRENT BUILDING PLAN

DEMOLISH AND RENOVATION PLAN

PROPOSED LIGHTING DISTRIBUTION PLAN

PROPOSED RECEPTACLES DISTRIBUTION PLAN

PROPOSED SANITARY PLAN

PROPOSED FIRE EXTINGUISHERS PLAN

11

12

A1.7

A1.8

PROPOSED BUILDING LAYOUT

BUILDING FRONT VIEW AND SECTION

PROPOSED AIR-CONDITIONING AND WATER HEATERS PLAN

13

14

G1.3

PROPOSED DOORS AND WINDOWS INDEX

PROPOSED THREE PHASE WIRING INSTALLATION PLAN

A1.9

D a t e:

R e v i s i o n:

P r o j e c t:

S c a l e :

D r a w i n g T i t l e:

R e v i s i o n n o t e s:

Rev: Date: Notes:

Approved by:

Checked by:

U.S. ConsulateGeneral Erbil,

Iraq

Facility Manager:

Drawn by:

Sheet Number:

Ayan Abdoka

Arsalan Ali

Kevin Lanning Renovation of S-094 building10/03/2018

NTPPaper Size :11" X 17"

Sensitive but Unclassified (SBU)

Kevin Lanning

Page 3: U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION … · A1.1ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLAN 6Scale: NTS. KProvide and install Skirting 10cm height

1ST FLOOR, LIVING ROOM

1ST FLOOR, BATHROOM

1ST FLOOR, HALL WAY

1ST FLOOR, GARDEN

1ST FLOOR, MULTI PURPOSE OUTSIDE HALL

2ND FLOOR, MASTER BEDROOM

2ND FLOOR, SETTING AND TV ROOM

2ND FLOOR, HALLWAY

1

2

3

4

5

6

7

8

9

11

12

13

1ST FLOOR, BEDROOM#1

OCT 2018

ERBIL, ANKAWA, S-094 BUILDING - INDEX OF ROOMSG1.2

Scale: NTS

3

14

15

16

17

18

1ST FLOOR, KITCHEN

1ST FLOOR, BEDROOM#2

1ST FLOOR, RESTROOM

2ND FLOOR, BATHROOM

FIRST FLOOR ROOF

2ND FLOOR, OUTDOOR RESTROOM

BALCONY

TOP ROOF19

1ST FLOOR, ENTRANCE

INDEX OF CURRENT ROOMS

1ST FLOOR, LIVING ROOM

1ST FLOOR, BATHROOM

1ST FLOOR, HALL WAY

1ST FLOOR, GARDEN

1ST FLOOR, ALLEY, SIDE YARD

2ND FLOOR, BEDROOM#3

2ND FLOOR, LAUNDRY

2ND FLOOR, HALLWAY

1

2

3

4

5

6

7

8

9

11

12

13

1ST FLOOR, BEDROOM#1

14

15

16

17

18

1ST FLOOR, KITCHEN

1ST FLOOR, BEDROOM#2

1ST FLOOR, UNDER STAIR STORE

2ND FLOOR, BATHROOM

2ND FLOOR, OUTDOOR STORAGE

BALCONY

TOP ROOF19

1ST FLOOR, STORAGE

INDEX OF PROPOSED ROOMS

FIRST FLOOR ROOF

D a t e:

R e v i s i o n:

P r o j e c t:

S c a l e :

D r a w i n g T i t l e:

R e v i s i o n n o t e s:

Rev: Date: Notes:

Approved by:

Checked by:

U.S. ConsulateGeneral Erbil,

Iraq

Facility Manager:

Drawn by:

Sheet Number:

Ayan Abdoka

Arsalan Ali

Kevin Lanning Renovation of S-094 building10/03/2018

NTPPaper Size :11" X 17"

Sensitive but Unclassified (SBU)

Kevin Lanning

AutoCAD SHX Text
A109
AutoCAD SHX Text
A201
AutoCAD SHX Text
A101
AutoCAD SHX Text
A102
AutoCAD SHX Text
A103
AutoCAD SHX Text
A104
AutoCAD SHX Text
A105
AutoCAD SHX Text
A106
AutoCAD SHX Text
A107
AutoCAD SHX Text
A108
AutoCAD SHX Text
A204
AutoCAD SHX Text
A207
AutoCAD SHX Text
A202
AutoCAD SHX Text
A203
AutoCAD SHX Text
A205
AutoCAD SHX Text
A206
AutoCAD SHX Text
A301
AutoCAD SHX Text
A100
AutoCAD SHX Text
A109
AutoCAD SHX Text
A201
AutoCAD SHX Text
A101
AutoCAD SHX Text
A102
AutoCAD SHX Text
A103
AutoCAD SHX Text
A104
AutoCAD SHX Text
A105
AutoCAD SHX Text
A106
AutoCAD SHX Text
A107
AutoCAD SHX Text
A108
AutoCAD SHX Text
A204
AutoCAD SHX Text
A207
AutoCAD SHX Text
A202
AutoCAD SHX Text
A203
AutoCAD SHX Text
A205
AutoCAD SHX Text
A206
AutoCAD SHX Text
A301
AutoCAD SHX Text
A100
Page 4: U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION … · A1.1ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLAN 6Scale: NTS. KProvide and install Skirting 10cm height

DOOR LABEL

DOOR SIZE

WIDTH(MM)HEIGHT(MM)

TYPEFINISH

10002100

WOOD WOODEN FRAME WITH SOLID HARDWARE

WOOD

WINDOW LABEL

ROUGH PENNING

WIDTH(MM)HEIGHT(MM)

VIEW

2000 1500

50

1500

15001000

650 1500

2400 1500

2000 1500

500 1400

W001

W002

W003

W004

W005

W006

W007

W009

W010

D001

D002

D003

D004

D006

D007

D008

D009

D010

D011

WOOD

D005

WOODEN FRAME WITH SOLID HARDWARE

WOODEN FRAME WITH SOLID HARDWARE

OCT 2018

ERBIL, ANKAWA, S-094 BUILDING - PROPOSED DOORS AND WINDOWS INDEXG1.3

Scale: NTS

4

WINDOW SPECIFICATION

Aluminum window with 6 mm double

tinted float colored glazing, screen,

handle and all other accessories.

Install window with emergency

escape egress. and install steel grille

with max. space between bars not

exceed 10cm.

Aluminum window with 6 mm

double tinted float colored

glazing, screen, handle and all

other accessories.

WOOD

1000

1000

1000

2100

2100

2100

WOODEN FRAME WITH SOLID HARDWARE

1000

1000

2100

2100

WOOD

WOOD

STEEL DOOR OIL BASE PAINTED STEEL2100

2100

2100

2100

1000

1000

1000

1000

WOODEN FRAME WITH SOLID HARDWARE

WOODEN FRAME WITH SOLID HARDWARE

STEEL DOOR OIL BASE PAINTED

STEEL DOOR OIL BASE PAINTED

STEEL DOOR OIL BASE PAINTED

D012

STEEL

STEEL

STEEL

ALUMINUM

ALUMINUM

ALUMINUM FRAME AND DOOR

ALUMINUM FRAME AND DOOR

2100

2100

900

900

Aluminum window with 6 mm

double tinted float colored

glazing, screen, handle and all

other accessories.

Aluminum window with 6 mm

double tinted float colored

glazing, screen, handle and all

other accessories.

Aluminum window with 6 mm double

tinted float colored glazing, screen,

handle and all other accessories.

Install window with emergency

escape egress. and install steel grille

with max. space between bars not

exceed 10cm.

Aluminum window with 6 mm double

tinted float colored glazing, screen,

handle and all other accessories.

Install window with emergency

escape egress. and install steel grille

with max. space between bars not

exceed 10cm.

Aluminum window with 6 mm

double tinted float colored

glazing, screen, handle and all

other accessories.

W008

2400

1500

500

1200

Aluminum window with 6 mm

double tinted float colored

glazing, screen, handle and all

other accessories.

Aluminum window with 6 mm

double tinted float colored

glazing, screen, handle and all

other accessories.

Note\ Two windows with same

size to be installed.

1400

1800

Aluminum window with 6 mm

double tinted float colored

glazing, screen, handle and all

other accessories.

W011

14001200

Aluminum window with 6 mm

double tinted float colored

glazing, screen, handle and all

other accessories.

W012

500

1200

Aluminum window with 6 mm

double tinted float colored

glazing, screen, handle and all

other accessories.

W013

14001800

Aluminum window with 6 mm double

tinted float colored glazing, screen,

handle and all other accessories.

Install window with emergency

escape egress. and install steel grille

with max. space between bars not

exceed 10cm.

D a t e:

R e v i s i o n:

P r o j e c t:

S c a l e :

D r a w i n g T i t l e:

R e v i s i o n n o t e s:

Rev: Date: Notes:

Approved by:

Checked by:

U.S. ConsulateGeneral Erbil,

Iraq

Facility Manager:

Drawn by:

Sheet Number:

Ayan Abdoka

Arsalan Ali

Kevin Lanning Renovation of S-094 building10/03/2018

NTPPaper Size :11" X 17"

Sensitive but Unclassified (SBU)

Kevin Lanning

Page 5: U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION … · A1.1ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLAN 6Scale: NTS. KProvide and install Skirting 10cm height

Sandwich panel room

Kitchen

Living Room

Bathroom

BedroomBedroom

A105

A101

A103

A104

A102

A100

A106

A107

A201

A202

A203

A205

A204

A206

A207

Bare slab Roof

Top Roof

Remove the existing

sandwich panel and

roof

A301

OCT, 2018

First Floor

ERBIL, ANKAWA, S-094 BUILDING - CURRENT BUILDING PLANA1.0

Scale: NTS

5

Second Floor Top Roof

A108

A109

Bedroom

Setting room

Bathroom

Balcony

First Floor Roof

D a t e:

R e v i s i o n:

P r o j e c t:

S c a l e :

D r a w i n g T i t l e:

R e v i s i o n n o t e s:

Rev: Date: Notes:

Approved by:

Checked by:

U.S. ConsulateGeneral Erbil,

Iraq

Facility Manager:

Drawn by:

Sheet Number:

Ayan Abdoka

Arsalan Ali

Kevin Lanning Renovation of S-094 building10/03/2018

NTPPaper Size :11" X 17"

Sensitive but Unclassified (SBU)

Kevin Lanning

Page 6: U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION … · A1.1ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLAN 6Scale: NTS. KProvide and install Skirting 10cm height

Kitchen

BedroomBedroom

Bedroom

Living Room

Laundry Room

3.54

1.59

1.65

2.88

0.75

1.65 2.88

1.65

A

A

A

A

A

A

A

A

A

G

G

A

B

B

B

B

F

B

B

B

B

B

C

C

A

D

D

D

D

D

D

D

D

E

F

F

F

B

F

G

E

H

H

H

H

I I

I I

II

J

J

F

Demolish existing wall/under the existing Lintel

for new doorway. Provide and install new steel

access door.

Re-build interior partition wall by using

hollow concrete block and cement and

stand mortar .

A

Demolish existing floor tiles, provide and install

new anti-slip ceramic floor tiles.

B

Remove the existing plastering , re-plastering by

proper ,materials and paintings .

C

Remove the existing wall and floor tiles,

provide and install new tiles .

D

Remove existing windows, provide and install

new aluminum windows .

E

F

G

Provide and install waterproofing

material, install new tiles.

I

Remove existing Interior doors, correct the door

dimensions to meet the IBC standers, provide

and install new wooden doors .

J Remove existing bathroom doors, correct the door

dimensions to meet the IBC standers, provide and

install new aluminum doors .

First Floor

Second Floor Top Roof

G

H

Remove existing exterior doors, correct the door

dimensions to meet the IBC standers, provide

and install new steel doors .

OCT, 2018

ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLANA1.1

Scale: NTS6

K

Provide and install Skirting 10cm height to the

interior and exterior walls.

L

L

L

Remove the existing oil painting of the steel

columns, re-paint it with three layer oil paint.

G

G

G

M

Remove the existing balcony Railing and install

new steel railing according to IBC standers, paint it

with three layer oil paint.

N

Remove the existing Stair Railing and install new

steel railing according to IBC standers, paint it with

three layer oil paint.

13.22

7.27

D a t e:

R e v i s i o n:

P r o j e c t:

S c a l e :

D r a w i n g T i t l e:

R e v i s i o n n o t e s:

Rev: Date: Notes:

Approved by:

Checked by:

U.S. ConsulateGeneral Erbil,

Iraq

Facility Manager:

Drawn by:

Sheet Number:

Ayan Abdoka

Arsalan Ali

Kevin Lanning Renovation of S-094 building10/03/2018

NTPPaper Size :11" X 17"

Sensitive but Unclassified (SBU)

Kevin Lanning

Page 7: U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION … · A1.1ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLAN 6Scale: NTS. KProvide and install Skirting 10cm height

Bedroom

BedroomLiving Room

Laundry Room

1.86

3.25

1.863.25

1.86

First Floor

Second Floor Top Roof

Bedroom

4.20

4.85

0.70

4.57

5.05

2.60

3.00

0.71

4.35

1.70

2.40

4.20

9.65

4.00

3.00

0.90

8.53

1.53

1.80

1.86

0.71

0.90

2.26

9.95

7.96

3.766.89

3.60

AAA

A

AA

OCT, 2018

ERBIL, ANKAWA, S-094 BUILDING - PROPOSED BUILDING LAYOUT A1.2

Scale: NTS7

Alley

Alley

A100

A101

A102

Kitchen

STORAGE

1.40

1.80

A103A104

A106

A105

A108

A201

4.00

A202

A205

A207

Bare slab Roof

Top Roof

A301

First Floor Roof

4.48

Balcony

D001D002

D004D003

D006

D005

D012

D011

D010

D009D008

5.05

D007

W001

W002

W003

W00

6

W0

04

W0

05

W00

7W

00

8

4.00

1.86

4.00

W0

10

W0

11

W0

13

W0

12

W0

09

B

New Perimeter wall

hollow concrete

1.65m high X 0.2m thickness

provide and install support

columns every 2.5m, cement

plastering and painting

B

D a t e:

R e v i s i o n:

P r o j e c t:

S c a l e :

D r a w i n g T i t l e:

R e v i s i o n n o t e s:

Rev: Date: Notes:

Approved by:

Checked by:

U.S. ConsulateGeneral Erbil,

Iraq

Facility Manager:

Drawn by:

Sheet Number:

Ayan Abdoka

Arsalan Ali

Kevin Lanning Renovation of S-094 building10/03/2018

NTPPaper Size :11" X 17"

Sensitive but Unclassified (SBU)

Kevin Lanning

Page 8: U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION … · A1.1ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLAN 6Scale: NTS. KProvide and install Skirting 10cm height

+0.20 m

+3.30 m

+6.10 m

+7.50 m

+0.00 m

Front View

+3.30 m

+0.00 m

+6.40 m

+7.50 m

Section A-A

OCT, 2018

ERBIL, ANKAWA, S-094 BUILDING - BUILDING VIEW AND SECTIONA1.3

Scale: NTS8

1.50

G

1.40

K

A

A

DD

D

D

I

I

N

B

B

B

B

B

H

HJ

J

C

C

C

C

B

B

L

A

1.10

1.10

1.10

Waterproofing materials/three layers of Epoxy

2mm thick polyethylene barrier

5cm thick lean concrete layer

Anti-slip ceramic tiles dimension 30cm X 30 cm

Joints fill by grouting

Details 1 of Roof Waterproofing

UP

0.50m

0.95m

0.60m

7 cm x 5cm semi-curved

top hollow section

1.10m1.10m

7cm x 5cm semi-curved

top hollow section

4cm x 4cm square

hollow section

Rounded corner

Rounded corner

4cm x 4cm rectangular

hollow section every 10

cm c/c

7cm x 5cm semi-curved

top hollow section

4cm x 4cm square

hollow section

Rounded corner

7cm x 5cm semi-curved

top hollow section

SECTION B-B

M

B

Demolish existing wall/under the existing Lintel

for new doorway. Provide and install new steel

access door.

Re-build interior partition wall by using

hollow concrete block and cement and

stand mortar .

A

Demolish existing floor tiles, provide and install

new anti-slip ceramic floor tiles.

B

Remove the existing plastering , re-plastering by

proper ,materials and paintings .

C

Remove the existing wall and floor tiles,

provide and install new tiles .

D

Remove existing windows, provide and install

new aluminum windows .

E

F

G

Provide and install waterproofing

material, install new tiles.

I

Remove existing Interior doors, correct the door

dimensions to meet the IBC standers, provide

and install new wooden doors .

J Remove existing bathroom doors, correct the door

dimensions to meet the IBC standers, provide and

install new aluminum doors .

H

Remove existing exterior doors, correct the door

dimensions to meet the IBC standers, provide

and install new steel doors .

K

Provide and install Skirting 10cm height to the

interior and exterior walls.

L

Remove the existing oil painting of the steel

columns, re-paint it with three layer oil paint.

M

Remove the existing balcony Railing and install

new steel railing according to IBC standers, paint it

with three layer oil paint.

N

Remove the existing Stair Railing and install new

steel railing according to IBC standers, paint it with

three layer oil paint.

Cement& sand mortar 1:3

plastering+ 3 coats of approved

outdoor paintings.

10 cm thick compacted crushed

stone.

2mm thick nylon

barrier.

P.C, 1:2:4, using Sulfate Resisting

Cement, 40cm thick.

1.6m high wall, 20 cm thick

building by hollow concrete block

20X20X40 cm and cement and

sand mortar 1:3.

compacted sub-grade

Cement& sand mortar 1:3

plastering+ 3 coats of approved

outdoor paintings.

STAIRCASE AND RAILING PLAN

D a t e:

R e v i s i o n:

P r o j e c t:

S c a l e :

D r a w i n g T i t l e:

R e v i s i o n n o t e s:

Rev: Date: Notes:

Approved by:

Checked by:

U.S. ConsulateGeneral Erbil,

Iraq

Facility Manager:

Drawn by:

Sheet Number:

Ayan Abdoka

Arsalan Ali

Kevin Lanning Renovation of S-094 building10/03/2018

NTPPaper Size :11" X 17"

Sensitive but Unclassified (SBU)

Kevin Lanning

Page 9: U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION … · A1.1ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLAN 6Scale: NTS. KProvide and install Skirting 10cm height

LED LIGHTING

Single Pole One Way Switch

Circut Breaker

Exhaust Fan

Electrical Board

LED Panel Light 24-Watt

Two Way Switch

Cable 3X2.5 mm

Cable 3X2.5 mm

Cable 3X2.5 mm

Cable 3X2.5 mm

Cable 3X2.5 mm

Cable 3X2.5 mm

Cable 3X2.5 mm

Cable 3X2.5 mm

Cable 3X2.5 mm

Cable 3X2.5 mm

Cable 3X2.5 mm

Cable 3X2.5 mm

Cable 3X2.5 mm

First Floor

Second Floor

Top Roof

OCT, 2018

ERBIL, ANKAWA, S-094 BUILDING - PROPOSED LIGHTING DISTRIBUTION PLAN A1.4

Scale: NTS9

Exterior LED lights shall be

waterproof type

D a t e:

R e v i s i o n:

P r o j e c t:

S c a l e :

D r a w i n g T i t l e:

R e v i s i o n n o t e s:

Rev: Date: Notes:

Approved by:

Checked by:

U.S. ConsulateGeneral Erbil,

Iraq

Facility Manager:

Drawn by:

Sheet Number:

Ayan Abdoka

Arsalan Ali

Kevin Lanning Renovation of S-094 building10/03/2018

NTPPaper Size :11" X 17"

Sensitive but Unclassified (SBU)

Kevin Lanning

Page 10: U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION … · A1.1ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLAN 6Scale: NTS. KProvide and install Skirting 10cm height

Circuit Breaker

Outlet 13 &15 A

GFCI Outlet 15 A

Electrical Boarder

Cable 3X4 mm

Cable 3X4 mm

Cable 3X4 mm

Cable 3X4 mm

Cable 3X4 mm

Cable 3X4 mm

Cable 3X4 mm

Cable 3X4 mm

Cable 3X4 mm

Cable 3X4 mm

Cable 3X4 mm

Cable 3X4 mm

Cable 3X4 mm

First Floor

Second Floor

Top Roof

OCT, 2018

ERBIL, ANKAWA, S-094 BUILDING - PROPOSED RECEPTACLES DISTRIBUTION PLANA1.5

Scale: NTS

10

Exterior Outlets shall

be connected to GFCI

breakers and have

protection cover.

D a t e:

R e v i s i o n:

P r o j e c t:

S c a l e :

D r a w i n g T i t l e:

R e v i s i o n n o t e s:

Rev: Date: Notes:

Approved by:

Checked by:

U.S. ConsulateGeneral Erbil,

Iraq

Facility Manager:

Drawn by:

Sheet Number:

Ayan Abdoka

Arsalan Ali

Kevin Lanning Renovation of S-094 building10/03/2018

NTPPaper Size :11" X 17"

Sensitive but Unclassified (SBU)

Kevin Lanning

Page 11: U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION … · A1.1ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLAN 6Scale: NTS. KProvide and install Skirting 10cm height

OCT, 2018

ERBIL, ANKAWA, S-094 BUILDING - PROPOSED THREE PHASE WIRING INSTALLATION PLAN

Scale: NTS

A1.6

11

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

31

30

29

28

27

26

25

24

23

22

32

33

34

35

36

37

38

39

40

41

42

R

Y

B

N

Main

Circuit

Breaker

63 A,

Molded

Case

Circuit

Breaker

(MCCB)

R

Y

B

N

R

Y

B

21

20

19

18

17

16

15

14

12

11

10

9

8

7

6

5

13

4

3

2

1

21

20

19

18

17

16

15

14

12

11

10

9

8

7

6

5

13

4

3

2

1

22

23

24

25

26

27

28

29

31

32

33

34

35

36

37

38

30

39

40

41

42

22

23

24

25

26

27

28

29

31

32

33

34

35

36

37

38

30

39

40

41

42

Grounding

Electrode

Neutral C

onductors

Grounding C

onductors

Neutral C

onductors

Grounding C

onductors

Circuit Breaker

63 A

III-Phase,

4

Wire

System

Compound

Grid

Copper

Busbar

Strip

Circuit Breaker vs Wire Size Schedule

BreakerNo. Description/Room Floor Fixture Breaker

Type

BreakerSize

(Amperes)

Wire Size(mm2)

1 Bedroom 1 First floor Lights MCB 10 1.52 Bedroom 2 First floor Lights MCB 10 1.53 Hallway First floor Lights MCB 10 1.54 Kitchen First floor Lights & Exhaust fan MCB 10 1.55 Formal living room First floor Lights MCB 10 1.56 Bathroom First floor Lights & Exhaust fan MCB 10 1.57 Outdoor 1 First floor Lights MCB 10 1.58 Outdoor 2 First floor Lights MCB 10 1.59 Master Bedroom Second floor Lights MCB 10 1.5

10 Bathroom Second floor Lights & Exhaust fan MCB 10 1.511 Laundry Second floor Lights MCB 10 1.512 Hallway Second floor Lights MCB 10 1.513 Outdoor - Front Side Second floor Lights MCB 10 1.514 Outdoor - Back Side Second floor Lights MCB 10 1.515 Bedroom 1 First floor Outlets MCB 25 4

16 Bedroom 2 First floor Outlets MCB 25 417 Hallway First floor Outlets MCB 25 418 Formal living room First floor Outlets MCB 25 419 Kitchen First floor Outlets GFCI 25 420 Outdoors First floor Outlets GFCI 25 421 Bathroom First floor Outlets GFCI 25 422 Water pump First floor Outlet GFCI 16 2.523 Water Heater First floor Switch GFCI 25 424 Master Bedroom Second floor Outlet MCB 25 425 Laundry Second floor Outlet GFCI 25 426 Hallway Second floor Outlets MCB 16 2.527 Bathroom Second floor Outlets GFCI 25 428 Outdoor - Front Side Second floor Outlets GFCI 25 429 Outdoor - Back Side Second floor Outlets GFCI 25 430 Top Roof Pump Second floor Outlet GFCI 10 2.531 Bedroom 1 First floor AC Unit MCB 25 432 Bedroom 2 First floor AC Unit MCB 25 433 Formal living room First floor AC Unit MCB 25 434 Kitchen First floor AC Unit MCB 25 435 Master Bedroom Second floor AC Unit MCB 25 436 Laundry

Second floor

AC unit

MCB 16 2.537 Spare MCB 1638 Spare MCB 1639 Spare MCB 2540 Spare MCB 2541 Spare GFCI 2542 Spare GFCI 25

43 Main Breaker (III-Phase) First floor MCB 63 16

44 Circuit Breaker (III-Phase) First floor MCCB 63 16

D a t e:

R e v i s i o n:

P r o j e c t:

S c a l e :

D r a w i n g T i t l e:

R e v i s i o n n o t e s:

Rev: Date: Notes:

Approved by:

Checked by:

U.S. ConsulateGeneral Erbil,

Iraq

Facility Manager:

Drawn by:

Sheet Number:

Ayan Abdoka

Arsalan Ali

Kevin Lanning Renovation of S-094 building10/03/2018

NTPPaper Size :11" X 17"

Sensitive but Unclassified (SBU)

Kevin Lanning

Page 12: U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION … · A1.1ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLAN 6Scale: NTS. KProvide and install Skirting 10cm height

Power Point 45 Amp.

Condenser - AC Outdoor unit

AC indoor unit

Electrical Water Heater

First Floor

Second Floor Top Roof

OCT, 2018

ERBIL, ANKAWA, S-094 BUILDING - PROPOSED AIR-CONDITIONING AND WATER HEATERS PLANA1.7

Scale: NTS12

D a t e:

R e v i s i o n:

P r o j e c t:

S c a l e :

D r a w i n g T i t l e:

R e v i s i o n n o t e s:

Rev: Date: Notes:

Approved by:

Checked by:

U.S. ConsulateGeneral Erbil,

Iraq

Facility Manager:

Drawn by:

Sheet Number:

Ayan Abdoka

Arsalan Ali

Kevin Lanning Renovation of S-094 building10/03/2018

NTPPaper Size :11" X 17"

Sensitive but Unclassified (SBU)

Kevin Lanning

Page 13: U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION … · A1.1ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLAN 6Scale: NTS. KProvide and install Skirting 10cm height

Existing Cesspool

Ex

is

tin

g G

ra

y W

ate

r (M

un

ic

ip

ality

) S

ew

er

W D

Sewage Manhole 40x40 cm

Collection Manhole 15x15 cm

UPVC Floor Drain PIPE 4"

GRAY Water - light Sewer UPVC line 4"

BLACK Water - Heavy Sewer PVC line 4"

First Floor

Second Floor

Top Roof

OCT, 2018

ERBIL, ANKAWA, S-094 BUILDING - PROPOSED SANITARY PLANA1.8

Scale: NTS13

GRAY Water - light Sewer UPVC line 6"

BLACK Water - Heavy Sewer PVC line 6"

PLASTIC Water TANK

D a t e:

R e v i s i o n:

P r o j e c t:

S c a l e :

D r a w i n g T i t l e:

R e v i s i o n n o t e s:

Rev: Date: Notes:

Approved by:

Checked by:

U.S. ConsulateGeneral Erbil,

Iraq

Facility Manager:

Drawn by:

Sheet Number:

Ayan Abdoka

Arsalan Ali

Kevin Lanning Renovation of S-094 building10/03/2018

NTPPaper Size :11" X 17"

Sensitive but Unclassified (SBU)

Kevin Lanning

Page 14: U.S. CONSULATE GENERAL (ERBIL) S-094 BUILDING RENOVATION … · A1.1ERBIL, ANKAWA, S-094 BUILDING - DEMOLISH AND RENOVATION PLAN 6Scale: NTS. KProvide and install Skirting 10cm height

FIRE EXTINGUISHER

SMOKE DETECTOR

First Floor

Second Floor

Top Roof

OCT, 2018

ERBIL, ANKAWA, S-094 BUILDING - PROPOSED FIRE EXTINGUISHERS PLANA1.9

Scale: NTS

14

D a t e:

R e v i s i o n:

P r o j e c t:

S c a l e :

D r a w i n g T i t l e:

R e v i s i o n n o t e s:

Rev: Date: Notes:

Approved by:

Checked by:

U.S. ConsulateGeneral Erbil,

Iraq

Facility Manager:

Drawn by:

Sheet Number:

Ayan Abdoka

Arsalan Ali

Kevin Lanning Renovation of S-094 building10/03/2018

NTPPaper Size :11" X 17"

Sensitive but Unclassified (SBU)

Kevin Lanning