us 31 corridor study - in.gov meeting_slides_1-24-17.pdfjan 24, 2017  · cha pm cha deputy pm...

17
US 31 Corridor Study CAC Meeting #1 Tuesday, January 24, 2017

Upload: others

Post on 21-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

US 31 Corridor Study

CAC Meeting #1

Tuesday, January 24, 2017

Page 2: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

Agenda Introductions & Welcome Project Team Overview Purpose of Study Project Approach Overview of Intersections Overview of Potential Solutions Group Discussion & Report Out Next Steps

Page 3: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

Contact InfoJay Mitchell, PEINDOT [email protected]

David Henkel, PE, PTOE Rusty Holt, PE, PTOECHA PM CHA Deputy [email protected] [email protected] x227 317-786-0461 x275

Cynthia Bowen, AICPPublic [email protected] x124

Page 4: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

Team Organization

Page 5: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

Purpose of the StudyThe overall purpose of the US31 Corridor study is to investigate various options for the short and long term maintenance and enhancement of US31. The study will address the following:

Stakeholder Input Safety & Mobility Economic Development & Logistics Potential Traffic Carrying Capacity Access Management Short-Term Improvement Plan Long-Term Improvement Plan Environmental Red Flag Survey Utility Identification

Page 6: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

Project Approach1. Develop Corridor Planning Study Work Plan2. Inventory Existing Conditions & Prepare Existing

Conditions Report3. Analyze Present & Future Travel Demand and

System Performance4. Develop Statement of Essential Transportation

Problems; Identify Goals & Objectives5. Identify Improvement Alternatives6. Analysis Alternatives & Identify Feasible

Alternatives7. Prepare Corridor Planning Study Final Report

Page 7: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

Existing Conditions Report Data for Future Analysis

Existing Traffic Volumes / Operations

Crash Locations / Severity Generalized Land Uses / Key

Users Environmentally Sensitive

Areas Major Utility Crossings

Page 8: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

Existing Conditions Report Existing Studies / Plans

County Comprehensive & Thoroughfare Plans

US 31 Economic Impact Study (US 31 Coalition)

Statewide Travel Demand Model (INDOT)

Major Highway Management Plan (INDOT)

Long Range Plan (INDOT) Programmed Roadway

Improvements (INDOT)

Page 9: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

16 Existing Signals / Flashers

Page 10: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia
Page 11: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

KEY ISSUES DISCUSSIONUS 31 Corridor Study

Page 12: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

Discussion Ground Rules

Be Respectful – we are going to hear a lot of differing opinions.

Speak Up – We want to hear what you have to say.

Think Big – this is about the future of the corridor.

Page 13: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

Instructions Break Out into Groups of 10 based on

County If there are more than 10 at your table for

your County, we will split you up into multiple tables

Select a “scribe” and a “reporter” –can’t be the same person

Discuss the questions withyour INDOT/Consultant lead

After discussion, report outto the larger group

Page 14: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

KEY ISSUES REPORT OUTUS 31 Corridor Study

Page 15: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

Next Steps/Tentative Schedule

CAC Meeting 1:Existing Conditions Report:Problem-Analysis Report:CAC Meeting 2:Initial Draft:CAC Meeting 3:Final Report:

January 24, 2017February, 2017July, 2017TBDOctober, 2017TBDJanuary 2018

Page 16: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

THANK YOU!

CONTACT:

Jay Mitchell, PEINDOT [email protected]

David Henkel, PE, PTOE Rusty Holt, PE, PTOECHA PM CHA Deputy [email protected] [email protected] x227 317-786-0461 x275

Cynthia Bowen, AICPPublic [email protected] x124

Questions & Answers??

Page 17: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017  · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia

NOTICEUS 31 Corridor Study

CAC Meeting Scheduled for

January 24, 2017 at 1:30 PM to 3:30 PMAt

Milestone Event Center1458 Liberator Road Peru, Indiana 46970