us 31 corridor study - in.gov meeting_slides_1-24-17.pdfjan 24, 2017 · cha pm cha deputy pm...
TRANSCRIPT
![Page 1: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/1.jpg)
US 31 Corridor Study
CAC Meeting #1
Tuesday, January 24, 2017
![Page 2: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/2.jpg)
Agenda Introductions & Welcome Project Team Overview Purpose of Study Project Approach Overview of Intersections Overview of Potential Solutions Group Discussion & Report Out Next Steps
![Page 3: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/3.jpg)
Contact InfoJay Mitchell, PEINDOT [email protected]
David Henkel, PE, PTOE Rusty Holt, PE, PTOECHA PM CHA Deputy [email protected] [email protected] x227 317-786-0461 x275
Cynthia Bowen, AICPPublic [email protected] x124
![Page 4: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/4.jpg)
Team Organization
![Page 5: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/5.jpg)
Purpose of the StudyThe overall purpose of the US31 Corridor study is to investigate various options for the short and long term maintenance and enhancement of US31. The study will address the following:
Stakeholder Input Safety & Mobility Economic Development & Logistics Potential Traffic Carrying Capacity Access Management Short-Term Improvement Plan Long-Term Improvement Plan Environmental Red Flag Survey Utility Identification
![Page 6: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/6.jpg)
Project Approach1. Develop Corridor Planning Study Work Plan2. Inventory Existing Conditions & Prepare Existing
Conditions Report3. Analyze Present & Future Travel Demand and
System Performance4. Develop Statement of Essential Transportation
Problems; Identify Goals & Objectives5. Identify Improvement Alternatives6. Analysis Alternatives & Identify Feasible
Alternatives7. Prepare Corridor Planning Study Final Report
![Page 7: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/7.jpg)
Existing Conditions Report Data for Future Analysis
Existing Traffic Volumes / Operations
Crash Locations / Severity Generalized Land Uses / Key
Users Environmentally Sensitive
Areas Major Utility Crossings
![Page 8: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/8.jpg)
Existing Conditions Report Existing Studies / Plans
County Comprehensive & Thoroughfare Plans
US 31 Economic Impact Study (US 31 Coalition)
Statewide Travel Demand Model (INDOT)
Major Highway Management Plan (INDOT)
Long Range Plan (INDOT) Programmed Roadway
Improvements (INDOT)
![Page 9: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/9.jpg)
16 Existing Signals / Flashers
![Page 10: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/10.jpg)
![Page 11: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/11.jpg)
KEY ISSUES DISCUSSIONUS 31 Corridor Study
![Page 12: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/12.jpg)
Discussion Ground Rules
Be Respectful – we are going to hear a lot of differing opinions.
Speak Up – We want to hear what you have to say.
Think Big – this is about the future of the corridor.
![Page 13: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/13.jpg)
Instructions Break Out into Groups of 10 based on
County If there are more than 10 at your table for
your County, we will split you up into multiple tables
Select a “scribe” and a “reporter” –can’t be the same person
Discuss the questions withyour INDOT/Consultant lead
After discussion, report outto the larger group
![Page 14: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/14.jpg)
KEY ISSUES REPORT OUTUS 31 Corridor Study
![Page 15: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/15.jpg)
Next Steps/Tentative Schedule
CAC Meeting 1:Existing Conditions Report:Problem-Analysis Report:CAC Meeting 2:Initial Draft:CAC Meeting 3:Final Report:
January 24, 2017February, 2017July, 2017TBDOctober, 2017TBDJanuary 2018
![Page 16: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/16.jpg)
THANK YOU!
CONTACT:
Jay Mitchell, PEINDOT [email protected]
David Henkel, PE, PTOE Rusty Holt, PE, PTOECHA PM CHA Deputy [email protected] [email protected] x227 317-786-0461 x275
Cynthia Bowen, AICPPublic [email protected] x124
Questions & Answers??
![Page 17: US 31 Corridor Study - IN.gov Meeting_Slides_1-24-17.pdfJan 24, 2017 · CHA PM CHA Deputy PM dhenkel@chacompanies.com rholt@chacompanies.com 317-786-0461 x227 317-786-0461 x275 Cynthia](https://reader033.vdocuments.site/reader033/viewer/2022060310/5f0a8a6b7e708231d42c238a/html5/thumbnails/17.jpg)
NOTICEUS 31 Corridor Study
CAC Meeting Scheduled for
January 24, 2017 at 1:30 PM to 3:30 PMAt
Milestone Event Center1458 Liberator Road Peru, Indiana 46970