uri hydel power project

28
URI HYDEL POWER PROJECT Concern teacher : Ms. Anshu Gupta Presented by : Junaid ul Islam

Upload: lonez

Post on 15-Apr-2017

489 views

Category:

Environment


1 download

TRANSCRIPT

Page 1: Uri hydel power project

URI HYDEL POWER PROJECT

Concern teacher : Ms. Anshu GuptaPresented by : Junaid ul Islam

Page 2: Uri hydel power project

Hydroelectricity

Hydroelectricity is the term referring to electricity generated by hydropower; the production of electrical power through the use of the gravitational force of falling or flowing water. It is the most widely used form of renewable energy, accounting for 16 percent of global electricity generation.

Page 3: Uri hydel power project

URI DAM• Uri Dam is a 480 MW hydroelectric power station

on the Jhelum River near Uri in Baramulla district of Jammu and Kashmir, India. It is located very near to the Line of Control, the de facto border between India and Pakistan . The station is largely built under a hill with a 10 km tunnel. It is of the run-of-the-river type without a large dam, since the Indus Waters Treaty gives Pakistan the exclusive right to regulate the Jhelum River.

Page 4: Uri hydel power project

CONSTRUCTION• The project was awarded by the National Hydroelectric

Power Corporation in October 1989 to a European consortium called Uri Civil led by Swedish Skanska and including Swedish NCC and ABB and British Kvaerner Boving .It was partially funded by the Swedish and British governments.

• The project cost about Rs. 3,300 crore (about 450 million EUR or 660 million USD) and was completed in 1997.

Page 5: Uri hydel power project

• The workforce included about 200 foreigners and 4,000 Indians, many from the local area. On March 31, 1991, the two Swedish engineers Jan Ole Loman and Johan Jansson were kidnapped by members of the Muslim Janbaaz Force, but managed to escape 97 days later. This together with shelling across the border and unrest related to the burning of Charari Sharief and the siege of Hazratbal Shrine led to an 18 month delay.

Page 6: Uri hydel power project

SAILENT FEATURES OF THE URI PROJECT

• Workforce.• Most Modern and Impenetrable.• NHPC envisages a Power share (tariff) of Rs.

2.58 per unit.• Annual generation of power is 2663 million units • Project cost --- Rs. 33000 million.• Beneficiary states ------- Jammu and Kashmir,

Punjab, Haryana, Delhi, Himachal Pradesh, Rajasthan and Chandigarh.

Page 7: Uri hydel power project

TECHNICAL FEATURES

• 93.5 m long barrage.• 10.64 km long head race tunnel.• 2 km long tail race tunnel.• Under ground power hose containing 4 units of

120 MW each.• Constructed in record time of 7 years(1989- 1997)• Height of water head at maximum is 25 m.• Water flow rate through turbines is 240 cum/ sec.

Page 8: Uri hydel power project
Page 9: Uri hydel power project

OPERATION

• The station is operated by the NHPC. Plans to expand it with a 250 MW Uri-II plant were announced in 1998. The government of Pakistan has objected to this, saying it violates the Indus Waters Treaty.

Page 10: Uri hydel power project

INDUS WATER TREATY

• The Indus Waters Treaty is a water-sharing treaty between the Republic of India and Islamic Republic of Pakistan brokered by the World Bank. The treaty was signed in Karachi on September 19, 1960 by Indian Prime Minister Jawaharlal Nehru and President of Pakistan Mohammad Ayub Khan.

Page 11: Uri hydel power project
Page 12: Uri hydel power project

• Both the mainstream political parties viz., National Conference (NC) and Peoples Democratic Party (PDP) have many times demanded repeal of the treaty as it is anti – state policy and was not signed taking the state government into confidence .

• In 1985 NHPC obtained IWT clearance for the project.

Page 13: Uri hydel power project

Main Objectives of Uri Project

• To supply electricity to Northern Grid of India.• To improve electricity supply in the Kashmir

region .• To obtain environmental benefits from

displacement of alternative thermal power generation.

• To assist with capacity building in the electricity sector in India.

• To develop a sustainable hydroelectric resource.

Page 14: Uri hydel power project

Outside Comments

• The project was awarded with “Indo – German GREENTECH Environment Excellence Award” in year 2001 by GREENTECH Foundations , New Delhi.

• Study conducted in association with the Institute of Freshwater Research (FWRI), Sweden and Department of Zoology, University of Kashmir to design fish ladder.

Page 15: Uri hydel power project
Page 16: Uri hydel power project

Beneficial Environmental Impacts Of Hydroelectric Projects

Catchment benefits:• Treatment of the catchment area resulting in the

regeneration of natural forests and other ecosystems in the catchment area.

Impacts of the reservoir:  The creation of a reservoir provides :

• Habitat for wetland species, especially water birds. • Source of water to animals and plants in the adjoining area.• Significant environmental benefit for unnaturally dry areas.

Page 17: Uri hydel power project

Negative Impacts of Hydroelectric Projects

Submergence of land and properties : 471 families belonging to 19 villages were affected.Out of which

121 families became homeless or landless and needed resettlement. Diversion of 54.6 hectares of forest land . Felling of 4000 trees. Impact on aquatic ecosystems Impact on terrestrial fauna and flora Wildlife losses Impact on cultivated biodiversity Impacts of reservoir-induced seismicity (RIS) Impacts on biodiversity downstream Impacts of power lines Impacts of water flow variation downstream

Page 18: Uri hydel power project

Mitigation Measures NHPC established an environmental team and contracted

various agencies, including the principal contractor Uri Civil, to implement mitigation measures:

SOCIAL MEASURES ;• Resettlement and construction of primary schools.• Reconstruction and safeguard of religious places.• Training and self employment.• Commission of drinking water supply scheme.• Communication facility and maintenance of roads.• Pasture development of the area.

Page 19: Uri hydel power project

ENVIRONMENTAL MEASURES ; A comprehensive “Catchment Area Treatment”

(CAT) plan was prepared . The objective of CAT was achieved at an estimated cost of Rs. 38.205 million. The plan envisaged:

Massive Afforestation programme: • More than 7 lac plants were planted.• Afforestation of an area of 62.7 hectares of

degraded forest land .• Besides the CAT scheme, voluntary afforestation

of 50,000 shade providing and fruit bearing species were planted.

Page 20: Uri hydel power project

Soil and Water Conservation Works :

• Contour bounding• Gully control• Landslide control• Vegetation spur • Pasture development • Construction of fish ladder in barrage in which

schizothorax species were tagged and dropped in 1997,1998,1999.

Page 21: Uri hydel power project

The environmental clearance (1980)

Environmental clearance was granted by World Bank subject to safeguards :

• Avoid indiscriminate felling of trees.• Restoration of land damaged during

construction.• Implementation of soil conservation during

construction of roads.

Page 22: Uri hydel power project
Page 23: Uri hydel power project

URI- II PROJECT

• 240 MW project.• Estimated cost 1800 crore.• First 60 MW unit of project

commissioned in January, 2013, while remaining 3 units of equal capacity will be commissioned at monthly intervals thereafter.

Page 24: Uri hydel power project

Dispute Between NHPC and State of Jammu and Kashmir

• NHPC shares only 12% of the total power generated from the roar of J&Ks rivers.

• Cabinet decision 537 taken on 15 December 1980 :- 50% share of power generation and half of the profit to state.

• NHPC is like East India Company --- Taj Mohi-u-din.

• Land Titles and misplacement of records.

Page 25: Uri hydel power project

NHPC & URI PROJECT

• Royalty of 984 crore from NHPC for usage resources as stated by appointed committee.

• Present value of project has been estimated 2100 crore.

• Taking back of Uri-I Project will generate annual revenue of 1000-1500 crore .

Page 26: Uri hydel power project

Economic Edifice of State

• Total annual income --- Rs.6500 crore.i. Rs. 13500 crore salary to employees annually.ii. Rs. 1500 crore pension to pensioners annually.• Debit of Rs. 8500 crore.• So to stand on its own economic edifice, State

has to harness rich hydroelectric potential.

Page 27: Uri hydel power project

BIBLIOGRAPHY

• Uri Booklet by NHPC ltd.• Detailed Project Report – Uri hydroelectric

project.• Uri hydro electric project India : Evaluation of

the Swedish report – Sida evaluation 2008.• Annex VIII Case Study Uri India.• wikipedia

Page 28: Uri hydel power project