uptown tech - apps.pittsburghpa.gov€¦ · uptown partners, letter of support: february 25th, 2020...

25
Uptown Tech 304 Jumonville Street, Pittsburgh PA 15219

Upload: others

Post on 24-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Uptown Tech304 Jumonville Street, Pittsburgh PA 15219

Page 2: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Project ScopeProposed Use:

Adaptive reuse of former commercial laundry facility into a proposed Tech-Flex space.

Work to Be Completed:

• Cleaning of Existing Brick

• New Windows and Doors

• New ADA Front Entry with Curtainwall Facing Jumonville for more natural light.

• Improvements to Existing Parking Areas

• New Landscaping and Exterior Lighting

• Interior Bicycle and Car Parking

• Restoring Existing Loading Docks

• Interior Fit-Out for New Spec Tenant

Page 3: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Site Location

Site

Site Facts:

• UPR-B Zoning District;Project is going to Planning Commission as a PDP in the Uptown Public Realm (UPR-B).

• Parcel Nos.11-K-276 and 11-J-236

• Bluff Neighborhood

• 1st Ward

Page 4: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Site Location

Site

Site Facts:

• Located near UPMC Mercy

• Located at the Corner of Jumonville Street and Tustin Street

• Residential Properties on the opposite side of Jumonville.

Building Facts:

• Approx. 62,940 SF +/-Total Gross Floor Area

Page 5: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Existing Context

View of Surroundings from Blvd. of the Allies View of Surroundings from Jumonville Street

Page 6: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Existing Context

View of Surroundings from Tustin (From Jumonville) View of Surroundings from Tustin (Towards Jumonville)

Page 7: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Existing Photos

Existing Loading Dock off of Jumonville Street to remain with a face lift

Front Façade Looking from BLVD Side to be reworked for a New

ADA Ramp Entry

Existing Front Entry off of Jumonville Street to be reworked

for a New ADA Ramp Entry

Page 8: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Existing Photos

Side Façade on Tustin to be cleaned and freshened up with

new openings

Side Façade Looking from Corner of Jumonville Street and Tustin

Street to be cleaned up

Rear Facade and Side Parking Lot to be Improved

Page 9: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Existing Photos

BLVD Façade to be completely cleaned of Graffiti

BLVD Façade Looking toward Jumonville Street

BLVD Façade to get new windows and Landscaping

Page 10: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Proposed Site/Landscape Plan

Pervious Bituminous Paving

Tustin Street

Jum

onvi

lleSt

reet

Flexi-Pave Tree Surround Paving (Typ)

Bench – Multiplicity by Landscape Forms

Decorative Metal Screen

Trash Receptacle – Multiplicity by Landscape Forms

Existing Curb Cut

Proposed Curb Cut

Existing Planter Wall to Remain

Concrete Paving

1

2

3

4

5

6

7

8

9

10

11

12

Ornamental Grasses

Shrubs

Street Trees

13

1

4

4

3

16

8

8

10

7

12

11

6

8

11

9

304 Jumonville Street

13

14

Existing Loading Dock

N.I.C.

14

15

Multiplicity Path Light by Landscape Forms

9

*Products are subject to change upon availability, cost, and lead time

Property Line

Landscape Requirements:Linear Feet of Frontage: 331Street Trees Required: 17 Provided: 17Parking Lot Trees: 10 Spaces=2 Trees or 6 InchesTrees Provided: 2 Trees or 6 InchesRequired Landscape (25SF/Space): 250SFProvided Landscape: 280SF

155

Slope Light by Landscape Forms

515

16

17

Crushed Stone

Boulders

917

15

1 1 2

13

Page 11: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Proposed Parking Plan

(21) Spaces(10) Standard(9) Compact(1) ADA(1) Van

(18) Spaces(9) Standard(9) Compact

(10) Standard Spaces

Tustin Street

Jum

onvi

lleSt

reet

(12) Interior Bicycle Spaces

Bike Entrance Route

Page 12: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Accessibility & Universal DesignTustin Street

Jum

onvi

lleSt

reet

Accessible Route to Elevator

Accessible Route to Front of Building

• Full accessibility to the main building entrance and surrounding sidewalks

• New ADA Entry which will include a ramp from the street level up to the first floor.

• New elevator to bring people up from the first floor to second floor.

• New ADA Restrooms on each floor for tenant fit out(s).

• New Interior parking at first floor level, for better accessibility into tenant spaces.

• Removal of second curb cut on Jumonville for reduced traffic impact at intersection.

Page 13: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Site Materials

Multiplicity Bench by Landscape Forms

Multiplicity Trash Receptacle by Landscape Forms

Decorative Metal Screen

Pervious BituminousFlexi-Pave Tree Surround

Decorative Metal Screen

Slope Lighting by Landscape Forms

Flexi-Pave Tree Surround Flexi-Pave Tree Surround Color Options

Multiplicity Path Light by Landscape Forms *Products are subject to change upon availability,

cost, and lead time

Page 14: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Planting

Quercus x warei ‘Regal Prince’

Regal Prince Oak

Cephalotaxus harringtonia ‘Duke Gardens’

Duke Gardens Japanese Plum Yew

Panicum virgatum ‘Heavy Metal’

Heavy Metal Switchgrass

Magnolia x ‘Betty’

Betty Magnolia

Page 15: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Sustainability & Stormwater ManagementPervious Bituminous Section

4” Pervious Bituminous Paving

24” Min. AASHTO #3 (Cleaned and Washed)

Compacted Subgrade

Filter Fabric (Wrap All Sides)

Overflow Pipe

• Exterior Light Fixtures are LED

• Eliminated estimated 6,200sf of existing impervious surface

• Proposed estimated 3,720cf (accounts for 40% void) of stormwater storage via Dry Well Storage BMP

Choker Course

Page 16: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Building Materials

Existing Brick to be Cleaned

New Curtainwall and Storefront Color –

Kawneer Champagne

New D Stone Dutch Quality Limestone

Tuscany Veneer – Ivory

H: 11⅝" x W: 23⅝"

Metl-Span Panels CF-Vertical Color:

Weathered Copper

Page 17: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Building Elevations

Front (Jumonville Street) Elevation

Rear Parking (Gist Street) Elevation

Existing Brick

Existing BrickNew Metal Panel

New LimestoneNew Glazing

New Glazing

New Glazing

Page 18: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Building Elevations

Side (Tustin Street) Elevation

Side (Blvd. of the Allies) Elevation

Existing Brick New Metal Panel

Existing Brick

Existing Brick New Metal PanelNew Limestone

Existing Brick

New Glass Block Infill New LightingNew Doors

New Glazing in Existing Openings

Page 19: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Community ProcessDAM Meeting: July 16th, 2020

Uptown Partners, Letter of Support: February 25th, 2020

#ArtsInHD:

We have been in active discussions with Samantha Black at the ArtsInHD group to help us in the design process of a few aspects of this project.

Areas we are looking for artist engagement:

• Metal screening around property

• Industrial sculpture in front lobby entrance

• Plus any additional spaces that the local artist(s) think would add benefit to this building.

Who we are working with for MBE, WBE, and VOSB Engagement:

• Reed Building Supply

• Klavon Design Associates, Inc.

• A-1 Hauling (now known as Junk Joeys LLC)

• We will also continue to engage and/or hire such businesses moving forward during construction

Page 20: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Construction Management PlanManagement and Quality Control Overview

• Project collaboration and coordination through Buildertrend Project Management Software.• A full-time Superintendent, with full knowledge of the construction documents, will be stationed on site to

inspect all work and assure compliance to the documents and schedule, among other responsibilities.• The Project Manager will be in close contact with the Superintendent to review progress, address any

concerns, and communicate with the project team, community, and others. • Safety and compliance staff will visit the site to inspect and report/correct any issues that may arise,

including compliance with CDC and Commonwealth of PA COVID-19 regulations. • Coordinate testing as required by code and the specifications to ensure materials and workmanship meet

the design standards of the project.

• Obtain Substantial Completion and a final Certificate of Occupancy from the City of Pittsburgh

• Other Construction Management and Safety best practices consistent within the industry

Page 21: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Front Façade Render

Page 22: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Front Loading Dock Render

Page 23: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

BLVD. Side Façade Render

Page 24: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Tustin Street and Parking Lot Render

Page 25: Uptown Tech - apps.pittsburghpa.gov€¦ · Uptown Partners, Letter of Support: February 25th, 2020 #ArtsInHD: We have been in active discussions with Samantha Black at the ArtsInHD

Thank you for your time! Questions?