upgrade to sap bw 7 - inspiricon ag böblingen - run better....
TRANSCRIPT
© Inspiricon AG
www.inspiricon.de
Upgrade to SAP BW 7.4
Inspiricon Best Practice
Inspiricon AG © All rights reserved. RUN BETTER. RUN DIFFERENT.
An upgrade should be treated as an opportunity to maximize the value from the investments made in SAP, bringing the latest and most optimized business processes in practice.
2
Reduce TCO IT Consolidation Improved Usability
Inspiricon AG © All rights reserved. RUN BETTER. RUN DIFFERENT.
1. Reasons for upgrading
2. Upgrade Process (Test Approach, Upgrade Project Timeline)
3. Upgrade Technical Plan (Preupgrade, Upgrade and Postupgrade Checklist)
4. Upgrade Resources (Project Organigram, Roles and Responsibilities, Communication Matrix)
5. Challenges & Recommendations
6. Workshop timeline
7. Project Approach
Agenda
Inspiricon AG © All rights reserved. RUN BETTER. RUN DIFFERENT. 4
1. Reasons for upgrading to BW 7.4 on HANA
Simple Flexible Performant
Modern Environment Eclipse based modelling
editors Composite Provider New Query Designer
Less Modelling Objects Advanced DSO Composite Provider
BPC Unified (Business Planning Consolidation)
Leverage highly specialized libraries HANA specialized
libraries
SQL to BW HANA artifact via SQL
incorporated into BW
BW to SQL HANA Views
Querying + Loading DSO Activation Loading BW features
executed closed to data
Less Administration Effort Decrease TCO
Big Data HANA extended storage
capability
Inspiricon AG © All rights reserved. 5RUN BETTER. RUN DIFFERENT.
Copy of Production System
Setup critical interfaces
Snapshot of important Applications before
Upgrade preparation and execution
System acceptance test
Snapshot of important Applications after
Business pretests (optional)
Issue solving enhancements
Establish CloneSystem
Test Cycle 1: CloneSystem
Development System
Quality System
Test Cycle 2: Quality
Production System
Implementation freeze
Upgrade preparation and execution
System critical checks/tests
Import of enhancements from clone system
Business/IT tests: Snapshot before
Upgrade preparation and execution
Import of enhancements
IT-System checks (wide scope)
Quality System release to Business
IT tests
Business tests
Issue Solving
Upgrade preparation and execution
Import of enhancements and IT checks
System Release to Business
Hyper-Care phase (e.g. two weeks) for Incident solving
2. Inspiricon Upgrade Process – Best Practices
Inspiricon AG © All rights reserved. RUN BETTER. RUN DIFFERENT. 6
2. Inspiricon Test Approach for SAP BW Upgrade 7.4
Inspiricon AG © All rights reserved. 7
2. Inspiricon Upgrade Project Timeline
RUN BETTER. RUN DIFFERENT.
Inspiricon AG © All rights reserved. 8RUN BETTER. RUN DIFFERENT.
Preupgrade
Upgrade
Postupgrade Checklist
Prepare necessary changes of DDIC elements
Check InfoObject consistency
Check upgrade prerequisites
Check outdated objects for outdated functions
ASU Toolbox BASIS performing the upgrade process
IT Team intervenes in case of errors during the upgrade process
Mass activation of TRFN, transfer rules
Check Customer exit variables
Basic IT testing Check authorizations Check Interface connections
3. Inspiricon Upgrade Technical Plan
Inspiricon AG © All rights reserved.
4. Inspiricon Project Organigram
9
IT Team with Technical LeadClose contact with Project manager, Test Manager, IT (BASIS and Application team)
Working side-by-side with BI-IT team
Business TeamUpgrade prerequisite checks, preparations and performing upgrade from application side / ABAP fixes needed for 7.4 DDIC
element changes
SAP Basis Team
RUN BETTER. RUN DIFFERENT.
Inspiricon AG © All rights reserved.
Weekly meetings Test Cases Coverage and
Execution Progress
10RUN BETTER. RUN DIFFERENT.
Communicate status and project timeline
Additional meetingsare set-up in case it is necessary
Test Progress (Test Phase)
Steering Committee:
Meeting for taking decision to Go-Live
Status Meeting –Business Team
4. Communication Matrix
Inspiricon AG © All rights reserved.
5. Challenges & Recommendations
11
Challenges
– Clone system could be difficult to establish (infrastructure and all connections to other systems)
– Prepare test cases (definition phase, before/after tests)
– Prepare data for test cases – clear communication with business, what data is available as test basis for which system (clone system and quality system)
– Project schedule – consider business resources for pre-testing
Recommendations
– Create an overview over the applications that were impacted by the upgrade and related actions (e.g. hardware move).
– Create an overview for system landscape to identify all affected interfaces and connected systems.
– Dedicate resources for testing – test manager.
– Overview of parallel projects – additional focus on multi-project management.
RUN BETTER. RUN DIFFERENT.
Inspiricon AG © All rights reserved. 12RUN BETTER. RUN DIFFERENT.
Inspiricon sends questionnaire to customer
Customer sends existing documents/answers about the system/project to Inspiricon
Inspiricon processes the received information and finalizes the workshop agenda
Introduction to the customer landscape and structure
Customer presents the project charter and expectations (resources, test procedure, deadline, external factors, etc.)
Q&A: Customer / Inspiricon
Inspiricon prepares the next day based on the input
PreparationDay 1
Onsite with customer
Day 2Onsite with customer
Finalization
Inspiricon presents its understanding of customer project needs on the high-level
Discussion about open points/issues
Inspiricon and customer align the project plan
Summary project plan discussion plus definition of next steps
Execution of defined steps
Inspiricon makes a customized offer based on the workshop output
6. Workshop timeline
Inspiricon AG © All rights reserved.
7. Project Approach
13RUN BETTER. RUN DIFFERENT.
Inspiricon presents understanding of customer project needs on the high-level
Discussion about open points/issues, where there is a need for more detail
Inspiricon and customer align the project plan (resources, schedule, etc.)
Summary project plan discussion plus definition of next steps and Q&A
Closing
Inspiricon AG © All rights reserved.
Inspiricon AG | Otto-Lilienthal-Str. 36 | D – 71034 Böblingen | www.inspiricon.de
Michael SchmerSales Director | [email protected] | +49 151 61129640