10/2/2019 https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60… https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60e92c80acc55… 1/9 Section 1 Purple Line Extension Construction Updates Progresses Above and Below While the upcoming relaunch of the tunnel boring machines (TBMs) remains the biggest news for this month, progress on Section 1 of the Purple Line Extension Project continues above and below Wilshire Bl. The design-builder’s excavation of the Wilshire/La Cienega Station has reached the bottom of the station box. The next major step for the western most Section 1 station is pouring the temporary concrete floor. The temporary floor, commonly named the “mud mat,” is required for arrival of the TBMs after their journey from the Wilshire/Fairfax Station. Wilshire/La Cienega Station excavation nearly complete. View this email online

Upload: others

Post on 26-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Updates Section 1 Purple Line Extension Constructionmedia.metro.net/projects_studies/westside/images/... · the Constellation Bl Closure is a little over 75 feet deep. Before tunneling

10/2/2019 https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60…

https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60e92c80acc55… 1/9

Section 1 Purple Line Extension ConstructionUpdates 

Progresses Above and Below 

While the upcoming relaunch of the tunnel boring machines (TBMs) remains thebiggest news for this month, progress on Section 1 of the Purple Line ExtensionProject continues above and below Wilshire Bl.

The design-builder’s excavation of the Wilshire/La Cienega Station has reached thebottom of the station box. The next major step for the western most Section 1station is pouring the temporary concrete floor. The temporary floor, commonlynamed the “mud mat,” is required for arrival of the TBMs after their journey fromthe Wilshire/Fairfax Station.

Wilshire/La Cienega Station excavation nearly complete. 

View this email online

Page 2: Updates Section 1 Purple Line Extension Constructionmedia.metro.net/projects_studies/westside/images/... · the Constellation Bl Closure is a little over 75 feet deep. Before tunneling

10/2/2019 https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60…

https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60e92c80acc55… 2/9

Workers continue to place the high-density polyethylene (HDPE) along theunfinished Fairfax Station walls. Workers wrap each of the Section 1 stations inHDPE to create a barrier between the stations and water and gas in thesurrounding soil.

Reassembly of the twin TBMs, better known as Soyeon and Elsie, is anticipated tobe complete early this month. Pushing off against temporary steel structures—referred to as “thrust frames”—each TBM will begin boring her way west to theWilshire/Fairfax Station. As the TBMs progress by pushing themselves forward—they have no other means of propulsion—workers had to assemble thesestructures. 

Installing HDPE liner inside Wilshire/Fairfax Station.

Their voyage from the Wilshire/La Brea Station to the Wilshire/Fairfax Station willbe much shorter than the tunnels they have already completed. The distancebetween the Wilshire/La Brea and Wilshire/Fairfax stations is less than half thedistance (only .8 miles) they excavated from the Wilshire/La Brea Station to theWilshire/Western TBM Retrieval Shaft.

Above ground, technicians within the K-rail installation east of the McCarthy Vistaand Wilshire Bl intersection continue to sample and eliminate gases from thisunique underground location. This investigation and analysis precede the arrival ofthe TBMs in early 2020.  

Section 2 Purple Line Extension ConstructionUpdates 

Wilshire/Rodeo and Century City/Constellation Update

Page 3: Updates Section 1 Purple Line Extension Constructionmedia.metro.net/projects_studies/westside/images/... · the Constellation Bl Closure is a little over 75 feet deep. Before tunneling

10/2/2019 https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60…

https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60e92c80acc55… 3/9

Starting early October, twenty trees along Wilshire Bl and on adjacent streetswithin the work area will be removed. These trees are expected to be replacedafter the completion of major construction in 2022. Some street lights and trafficsignals will also be temporarily moved or replaced due to location conflicts withpiling operations. This work will take place, Monday through Friday, from 8:15pmto 7am. Lane closures on Wilshire Bl and adjacent streets will be required for thiswork with two lanes maintained eastbound and westbound on Wilshire Bl duringdaytime hours and one lane maintained in both directions during weeknights.

N Cañon Closure in place to support pilng activities and station construction.  

Preparation for piling on the north side of Wilshire Bl is anticipated to continuethis month. Residents and stakeholders can expect to see K-rail barriers onWilshire Bl to reconfigure the street to two lanes in each direction betweenBeverly Dr and Crescent Dr. The K-rail will be in place 24 hours a day, 7 days aweek through the completion of this work.

The City of Beverly Hills Council did not approve Metro’s request to continue pilingduring the holiday moratorium period from Thanksgiving Day through January 2,2020. Thus, any work related to the subway project will only occur within thestaging yards during the holiday period.

Page 4: Updates Section 1 Purple Line Extension Constructionmedia.metro.net/projects_studies/westside/images/... · the Constellation Bl Closure is a little over 75 feet deep. Before tunneling

10/2/2019 https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60…

https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60e92c80acc55… 4/9

Current excavation progress for the Tunnel Boring Machine Launch Box in Century City. 

The relocation of the water line in Century City east of Avenue of the Stars andunderneath Constellation Bl  (to the west edge of the current closure to Solar Way)is expected to begin on October 14 and continue through February 2020. Workhours are Monday through Friday, 8pm to 6am and Saturday, 8pm to 10am. Onelane will be maintained from the Century Park driveway to Avenue of the Stars.Craft valet on Constellation Bl will remain accessible from Avenue of the Stars. 

The excavation to support the launch of the tunnel boring machines (TBMs) withinthe Constellation Bl Closure is a little over 75 feet deep. Before tunneling canbegin, the launch box must be reach a depth of 100 feet. The first TBM isanticipated to launch by the end of 2019. It will take approximately 3 months forthe TBMs to dig from the launch box to the staging yard on Century Park East.Work hours are Monday through Saturday, 6am to 4:30pm and 7pm to 5am.  

Section 3 Purple Line Extension ConstructionUpdates 

UCLA Westwood Village Block Party On Sunday, September 22, the Community Relations Team for the Purple LineExtension welcomed new students at the UCLA Westwood Block Party. Along withseveral other vendors, Metro sponsored a prize booth to engage students andpromote the future Westwood/UCLA Station. With over 10,000 in attendance, theevent was a high-energy night. Students received Eat Shop Play Metro TAP cards,tote bags and other fun gifts. While many of them hope to graduate before thestation opens in 2027, they were excited to have an easier way to come back andvisit campus. 

Click here to learn about construction activities in Westwood.

Page 5: Updates Section 1 Purple Line Extension Constructionmedia.metro.net/projects_studies/westside/images/... · the Constellation Bl Closure is a little over 75 feet deep. Before tunneling

10/2/2019 https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60…

https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60e92c80acc55… 5/9

Students filling the streets at UCLA Westwood Block Party

Eat Shop Play 3 Things to Do To Kick-Off Fall

Pumpkin spice lattes and cold brews arenow available at The Coffee Bean andTea Leaf. Not feeling basic? Try the newWinter Dream Tea Latte! These seasonalflavors will have you smiling, even ifyou're on your way to work. 

The Coffee Bean and Tea Leaf >

Halloween is just around the corner. Ifyou're undecided on your look this yearor want to spice up your Halloweenoutfit, you can't go wrong with a really

Page 6: Updates Section 1 Purple Line Extension Constructionmedia.metro.net/projects_studies/westside/images/... · the Constellation Bl Closure is a little over 75 feet deep. Before tunneling

10/2/2019 https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60…

https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60e92c80acc55… 6/9

cool wig. The Wig Shop in Miracle Milehas wigs in every color under therainbow! 

The Wig Shop >

Now that the summer peak is over, visitLACMA on October 26 at 1pm for a tourof “The Invisible Man and the Masque ofBlackness” by Zak Ové. The artist is aBritish visual artist of Trinidadiandescent. His sculptural installation, TheInvisible Man and the Masque ofBlackness, encapsulates the complexhistory of racial objectification and theevolution of black subjectivity.

LACMA >

Metro HeadlinesNew Location 64 Maintenanceof Way building is nowcomplete

More from The Source >

Metro releases UnderstandingHow Women Travel report

More from The Source >

Page 7: Updates Section 1 Purple Line Extension Constructionmedia.metro.net/projects_studies/westside/images/... · the Constellation Bl Closure is a little over 75 feet deep. Before tunneling

10/2/2019 https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60…

https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60e92c80acc55… 7/9

Go Metro to Taste of Italy onOctober 12 for discountedtickets

More from The Source >

Last day to use Metro tokens isFriday, Nov. 29!

More from The Source >

Limited edition Purple LineExtension Section 2 TAP cardswill available starting Sept. 25

More from The Source >

Construction is a dynamic process and information is subject to change without notice. Forthe latest construction updates visit our project website.

Page 8: Updates Section 1 Purple Line Extension Constructionmedia.metro.net/projects_studies/westside/images/... · the Constellation Bl Closure is a little over 75 feet deep. Before tunneling

10/2/2019 https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60…

https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60e92c80acc55… 8/9

Contact Us! Question or comments? We are here to help.

24/7 Hotline | 213.922.6934Email | [email protected] | metro.net/purple

Upcoming MeetingsLunch with Us: La Cienega and RodeoStation Update Meeting Wednesday, October 2 | 12pm - 1pm |Link to Webinar

Section 1 & 2: La Cienega and RodeoStation Update Meeting Wednesday, October 2 | 6:30pm - 8pm |Council Chambers, Beverly Hills City Hall

Section 1: Construction CommunityMeeting Thursday, October 17 | 6:30pm - 7:30pm| Cathedral Chapel School

Section 2: Construction CommunityMeeting Tuesday, November 12 | 6:30pm - 8pm |Century Plaza Towers

Section 3: Construction CommunityMeetingThursday, November 14| 6:30pm - 8pm |Belmont Village Senior Living, Westwood

Vist Our Webpage > Eat Shop Play Local > View the Latest ConstructionNotices >

Share Tweet Forward

Page 9: Updates Section 1 Purple Line Extension Constructionmedia.metro.net/projects_studies/westside/images/... · the Constellation Bl Closure is a little over 75 feet deep. Before tunneling

10/2/2019 https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60…

https://view.s10.exacttarget.com/?qs=821d1b22fba12a39df9c25b2f4f4acf5749e93ce99849d4ed5688fbf6f022cc9b4f41320d40f97e58e60e92c80acc55… 9/9

You have subscribed to receive Metro information, edit your preferences, manage subscriptions, or unsubscribe.Your privacy is important to us, please review the Privacy Policy.View this email online.

© 2019 Metro (LACMTA) One Gateway Plaza, Los Angeles, CA 90012-2952

This email was sent to [email protected]

Bus & Rail Transit information323.GO.METRO (323.466.3876)6:30am - 7pm (Monday - Friday)8am - 4:30pm (Saturday/Sunday)