Feedback from Last Meeting - I Mapping Should be field checked. Example widths should be widened. Buffer Information Examples of other programs. Data on stream buffer implementation (before and after).TRANSCRIPT
![Page 1: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/1.jpg)
Update: Where We Are and Feedback
Lake George Stream Corridor Management Stake Holder Meeting
June 25, 2008
![Page 2: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/2.jpg)
Process for Stream Corridor Management Regulations First Stakeholder Meeting May 28, 2008
Second Stakeholder Meeting June 25, 2008 Draft GEIS for Public Comment November 15,
2008
Public Hearing December 1-5
Final GEIS February 9, 2009
Final Regulations Promulgated After March, 2009
![Page 3: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/3.jpg)
Feedback from Last Meeting - I
Mapping Should be field checked. Example widths should be widened.
Buffer Information Examples of other programs. Data on stream buffer implementation (before
and after).
![Page 4: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/4.jpg)
Feedback from Last Meeting - II
Regulation Program needs to be simple. Process needs to be transparent. Measures of success? Need incentives/education for compliance. Should address property rights. How do we treat streams that originate in the
Lake George Park, but flow to other waters?
![Page 5: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/5.jpg)
Feedback from Last Meeting - III
Regulation (continued) Difference between redevelopment and
redevelopment? How do we “retrofit” during redevelopment?
Other Broader Concerns Need to include state agencies, towns and
counties who cause most of the problem. Need to address septic systems.
![Page 6: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/6.jpg)
Important Note:
“Starting Point” proposal is a technically justifiable option, but is not at this point the recommended criteria for Lake George.
Feedback, along with further analysis, will help to determine if these criteria are feasible.
![Page 7: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/7.jpg)
Topics for Discussion Buffer Width Buffer Expansion Vegetation Within the Buffer Stream Crossings Use of Stream Mapping in the Regulation Property Rights Issues, Exceptions Regulations for Redevelopment Versus New
Subdivisions Other Concerns?
![Page 8: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/8.jpg)
Any Major Topics We Aren’t Covering?
![Page 9: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/9.jpg)
Buffer Width
Starting Point: 100’ Buffer from High WaterReasons:
Typical of Many Communities (range between 50’-200’)
Provides pollutant removal and temperature benefits
Same as DEC Wetland Buffer
![Page 10: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/10.jpg)
“Bankfull Flow” or “Mean High Water”
(Source: Ontario Ministry of Natural Resourceshttp://www.mnr.gov.on.ca/en/Business/Water/2ColumnSubPage/STEL02_163598.html)
![Page 11: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/11.jpg)
Impacts to Property*
Lot Size
1.3-acre 3.2-acre 8.5-acre 100-acre
Buffer Area(acres)
0.55(42% of lot)
0.86(27% of lot)
1.40(16% of lot)
4.80(5% of lot)
RemainingLot Area(acres)
0.75 2.34 7.10 95.20
*Assumption: Square Lot with stream along 1 edge of the property
![Page 12: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/12.jpg)
Modified from: Emmons & Olivier Resources, 2001
Critical Buffer Widths
![Page 13: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/13.jpg)
Concerns/ Comments
100’ Too Narrow? Too Wide? Just Right?
![Page 14: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/14.jpg)
Buffer Expansion
Typical Buffer Expansion for: Steep Slopes Wetlands Floodplain
Starting Point: Steep slopes, wetlands do not count for buffer. Expand to include floodplain.
![Page 15: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/15.jpg)
Starting Point Expand for:
All Slopes>15% Wetlands
![Page 16: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/16.jpg)
Buffer Management - I
Potential Prohibited Uses Tree Clearing Construction of Structures Mowing Fertilizing Storage of Hazardous Materials
![Page 17: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/17.jpg)
Any others that should be restricted?
![Page 18: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/18.jpg)
Should any of these uses be allowed?
![Page 19: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/19.jpg)
Buffer Management - II
Potential Allowable uses Utility rights of way Footpaths Road crossings, where permitted Docks, where permitted Stormwater management practices (50’
setback)
![Page 20: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/20.jpg)
Should any of these uses be prohibited?
![Page 21: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/21.jpg)
Any Other Uses That Should Be Allowed? Uses Where they should be allowed
![Page 22: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/22.jpg)
Stream Crossings
![Page 23: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/23.jpg)
Stream Crossing Starting Point Cross perpendicular to the buffer.
Minimize width.
Limit to one crossing per 1000 feet.
Design to convey the 100-year storm.
Design to allow fish passage.
![Page 24: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/24.jpg)
Additional criteria or recommendations?
Any concerns?
![Page 25: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/25.jpg)
Use of Mapping
Accuracy of the Data Streams Mapped (1st order?) What is a stream? When should site mapping be required What should we do with non-mapped,
intermittent conveyances
![Page 26: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/26.jpg)
Mapping: Any Known Missing or Inaccurate Streams?
Review existing maps at:
www.lgpc.state.ny.us
![Page 27: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/27.jpg)
Is this a Stream?
Some Indicators Defined Channel USGS “Dashed Line”
Hydric Soils Flows “30%-90% of the
year” Flows with baseflow. Identified as a wetland.
![Page 28: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/28.jpg)
How should we treat unmapped, intermittent streams? Starting Point: No clearing of banks.
Provide buffer as much of a buffer as possible to prevent sedimentation.
Definition: Wetlands attached to the stream network?
![Page 29: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/29.jpg)
Property Rights 1: Who Owns the Buffer? Can be
Held in an Easement Have a Deed Restriction Purchased
![Page 30: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/30.jpg)
Potential Guidelines for Waivers
For new single lot development: Buffer makes construction of a single home
impossible? Retain a 25’ buffer for mapped streams?
For expansions on existing lots Automatic waiver if less than 250 sf of
impervious cover constructed within the buffer?
Retain a 25’ buffer for mapped streams?
![Page 31: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/31.jpg)
Other Guidance for Waivers?
![Page 32: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/32.jpg)
“Grandfathering”: Which Sites Should This Apply To? Considerations:
Sites where Subdivision Approval Has Been Granted. What should we do here?
Sites Under Construction
Existing Impervious Cover
![Page 33: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/33.jpg)
Subdivisions Versus Single Lot Development Starting Point: No Waivers for Subdivisions
because: Site Design Allows for more flexibility The buffer will affect less of these large
parcels (i.e., before subdivision)
![Page 34: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/34.jpg)
http://swim.wellsreserve.org/ktmlpro10/images/uploads/ConSubCompVert.png
![Page 35: Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008](https://reader036.vdocuments.site/reader036/viewer/2022081605/5a4d1ad57f8b9ab0599729d4/html5/thumbnails/35.jpg)
Redevelopment
Starting point Waivers available (See above) No reforestation typically required, but