Page 1: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

Presented by Steven De Proost, CEO

June 15, 2021

VIRTUAL PRESENTATION

Update Q1’21 & Capacity Target

Page 2: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

DISCLAIMER

This presentation is for information purposes only and does not constitute an invitation to purchase any securities of 7C SOLARPARKEN AG. All

information contained herein has been carefully prepared. Nevertheless, we do not guarantee its accuracy or completeness. Certain statements

contained in this presentation may be statements of future expectations that are based on the company's current views and assumptions and

involve known and unknown risks. Investments in capital markets are fundamentally associated with risks and a complete loss of the invested

capital cannot be ruled out. Copies of the content of this presentation will only be authorized by written consent from 7C SOLARPARKEN AG.

2DISCLAIMER

Page 3: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

NEW CAPACITYQ1 2021 EBITDA

3AGENDA

AGENDA

OUTLOOK 2021

Page 4: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

OPERATIONAL PERFORMANCE Adverse Weather in Germany, also in Q2

4Q1 2021 EBITDA

0

50

100

150

200

250

Jan. Febr. März April Mai Juni Juli Aug. Sept. Okt. Nov. Dez.

2021 2020 2019

-10

10

30

50

70

90

110

130

150

Jan. Febr. März April Mai Juni Juli Aug. Sept. Okt. Nov. Dez.

2021 2020 2019

WIND REFERENCE GERMANY: -40% Q1 2021 SOLAR PV REFERENCE GERMANY: -10% Q1 2021

Source: BDB-index Source: kWh/kWp www.pv-ertraege.de

Q2’21

Page 5: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

190 201

225

256

275

8

11

OPERATIONAL PERFORMANCE Capacity grew by 19 MWp in Q1

5Q1 2021 EBITDA

QUARTERLY CAPACITY GROWTH MWP SINCE 2020

Page 6: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

OPERATIONAL PERFORMANCE Specific Yield down by 19%, Volumes still up by 14%

6Q1 2021 EBITDA

KPI Q1 2021 AVERAGE FEED-IN TARIFF EUR/MWH

Q1 21 Q1 20 %

Weighted capacity MWp 268 191 41%

Production GWh 40 35 14%

Yield kWh/kWp 148 182 -19%

_ solar PV 137 154 -11%

_ wind 592 1,072 -45%

Avg. Tariff EUR/MWh 201 222 -10%

289

256

222201

Q1 2018 Q1 2019 Q1 2020 Q1 2021

Page 7: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

EBITDA Stable versus last year at EUR 6.9 Mio.

7Q1 2021 EBITDA

FROM REVENUES TO EBITDA

EUR Mio. Q1 21 Q1 20 Dec-20 % Comment

Power sales 8.1 7.5 7% ~ GWh x Tariff

Other revenues 0.3 0.9 -71% EUR 0.7 Mio. one-time sale of panels to fund business in Q1'20

Total sales 8.3 8.4 -1%

EBITDA 6.9 6.9 -1%

Margin 83% 82% 0%

Net debt 182.7 171.3 174.6 5% Increase in capacity versus year-end 2020

Page 8: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

NEW CAPACITYQ1 2021 EBITDA

8AGENDA

AGENDA

OUTLOOK 2021

Page 9: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

IPP PORTFOLIO Raised to 301 MWp

9NEW CAPACITY

275

301 2.5

5.3

6.2 0.1 0.1 1.3 0.4 0.1 0.2 0.6

9.2

Page 10: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

NEW ASSETS BELGIUM Unfinanced Projects with Certificates of EUR 24-44/MWh

10NEW CAPACITY

RIEME 6.2 MWp

EUR 24/MWh + Spot Price

850 kWh/kWp

KRUIBEKE 0.4 MWp

EUR 44/MWh + client PPA

850 kWh/kWp

GENT 0.6 MWp

EUR 24/MWh + client PPA

850 kWh/kWp

LOKEREN 1.2 MWp

EUR 24/MWh + client PPA

850 kWh/kWp

KORTRIJK 0.1 MWp

EUR 44/MWh + client PPA

950 kWh/kWp

ROESELARE 0.1 MWp

EUR 44/MWh + client PPA

950 kWh/kWp

BELSELE 0.2 MWp

EUR 44/MWh + client PPA

850 kWh/kWp

ZOTTEGEM 0.1 MWp

EUR 330/MWh + client PPA

850 kWh/kWp

Page 11: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

NEW ASSETS GERMANY Two Acquisitions of Operating Parks

11NEW CAPACITY

HEILGERSDORF 5.3 MWP DESSAU 2.5 MWP

YEAR 2020

TARIFF EUR 52/MWh

YIELD 1 050 kWh/kWp

EBITDA 210 T EUR

DEBT -

YEAR 2015

TARIFF EUR 90/MWh

YIELD 800 kWh/kWp

EBITDA 135 T EUR

DEBT EUR 1.1 MIO

Rooftop project design on land due to specific construction permitSouth-oriented freefield, new-build acquisition from IBC Solar

Page 12: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

NEW CAPACITYQ1 2021 EBITDA

12AGENDA

AGENDA

OUTLOOK 2021

Page 13: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

GUIDANCE UNCHANGED Although Production in April and May > 10% too low

13OUTLOOK 2021

FOUR EFFECTS ON GUIDANCE

1. Underperformance Q1’21 versus Q1’20 was fully accounted already in the full-

year guidance

2. Additional investments beyond 275 MWp were not included in guidance.

Subsequently, 26 MWp will contribute to EBITDA for the second-half of the year

to an extent of approx. EUR 0.3 – 0.4 Mio.

3. Production during April-May 2021 came in significantly lower than the

comparable period in 2020, and 10-15% below the normal / long-term values

due to low sunshine levels. The negative impact can be quantified around EUR

1.2 Mio.

4. Uncertainty (standard deviation) of forecast is progressively reducing

throughout the year. As the annual standard deviation (Slide 14) has been

exceeded already within the first five months, we anticipate a slight recovery for

the next 7 months.

Guidance

In Mio EUR 2020 2021

EBITDA 42.9 42.5

Lease paid -0.9 -1.1

Cash interest paid -5.5 -5.3

Cash taxes paid -1.2 -1.4

Net Cash Flow 35.3 34.7

Number of shares, weighted Mio 62.3 69.4

CFPS 0.57 0.50

Page 14: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

ANNUAL IRRADIATION DEVIATIONS

14OUTLOOK 2021

-10%

-5%

0%

5%

10%

15%

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

ST

AN

DA

RD

DE

VIA

TIO

N

2021

Page 15: Update Q1’21 & Capacity Target Update Q1 + Growth.pdf · 2021. 6. 11. · ROESELARE 0.1 MWp EUR 44/MWh + client PPA 950 kWh/kWp BELSELE 0.2 MWp EUR 44/MWh + client PPA kWp ZOTTEGEM

CONTACT

15CONTACT

CONTACT

7C SOLARPARKEN AG

An der Feuerwache 15

95445 Bayreuth / Germany

+49 (0) 921 23 05 57 77

www.solarparken.com

[email protected]