Page 1: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic

Update on the Escambia/Santa Rosa Regional Advanced Traffic Management

System (ATMS) Feasibility andImplementation Plan

Ben Faust, P.E.

Advanced Traffic Management System

Page 2: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic

Advanced Traffic Management System

Todays Presentation Agenda• Update on Traffic Signal System Operations

& Engineering Support Contract• Update on ATMS Phase I• Overview of ATMS Feasibility Study

• Project Schedule & Progress• ATMS Phase II – Future Funding

Page 3: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic

Update on Traffic Signal System Operations & Engineering Support Contract

DRMP - to work on Best Practices for Regional Traffic Operations Optimization:

– Regional Traffic Engineering Champion– Optimize Regional Signal Operations– Continue the Signal Retiming efforts– Manage and operate ATMS projects

Advanced Traffic Management System

Page 4: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic

FDOT Financial Project ID 428058-52-01Design-Build project 18 Intersections, fiber optic connection to signal controller and CCTV cameras

• Brent Lane & Bayou Boulevard from Highway 29 to 12th Avenue

• SR95 (N Palafox Street) from Brent Lane to Fairfield Drive

• Fairfield Drive from Texar Drive to North 9th Avenue

Staff training completed • in final test phase

The ATMS Phase 1 Project

Page 5: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic

• Monitors system-wide traffic conditions and devices

• Enables proactive management• Empowers users with data,

accessible via web enabled devices• Ensures system integrity through

data validation• Centralizes documentation and

inventory control

The ATMS Phase 1 Project

Page 6: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic

Escambia/Santa Rosa Regional Advanced Traffic Management System Feasibility

Study and Implementation Plan

ATMS Study

Page 7: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic

• City of Pensacola contracted with Atkins

• The results of this study will be used to develop a project or series of projects that will evolve the existing signal systems into a regional ATMS, and will identify immediate, intermediate, and future needs.

ATMS Study

Page 8: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic

• Notice to Proceed to Atkins: May 13, 2015• 3 Stakeholder meetings in June & July

• Develop ATMS Phase II RFP by December• Final Masterplan and Implementation Plan

completed by June 2016

ATMS Study Schedule

Page 9: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic

Existing Conditions

ATMS Framework

ATMS Study Schedule

Page 10: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic

ATMS Implementation Plan

Technology Review

Develop ATMS Requirements

TMC - Operations

Implementation Plan &RFP Development

Page 11: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic

• Meeting with FDOT October 22nd

– Provide Details on Masterplan to date– Discuss viable funding alternatives

• Develop Request for Proposal– Design Build for ATMS Phase II– Other deployment options

ATMS Study

Page 12: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic

DRAFT

ATMS Study

DRAFT

Page 13: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic

Questions?

Ben Faust, P.E.

Advanced Traffic Management System