update on ace
DESCRIPTION
Update on ACE. Wojciech Lapka LCG MB, 7 th June 2011. May availability reports. ACE (“official” only for OPS): ORing of CE flavours + LHC experiments: http://gridview015.cern.ch/GRIDVIEW/downloads/Reports/201105-ace/ GridView (official for LHC experiments ): - PowerPoint PPT PresentationTRANSCRIPT
Grid Technology
CERN IT Department
CH-1211 Geneva 23
Switzerlandwww.cern.ch/
it
DBCFCFGT
Update on ACE
Wojciech Lapka
LCG MB, 7th June 2011
Grid Technology May availability reports
• ACE (“official” only for OPS):– ORing of CE flavours + LHC experiments:
• http://gridview015.cern.ch/GRIDVIEW/downloads/Reports/201105-ace/
• GridView (official for LHC experiments):– http://gridview015.cern.ch
/GRIDVIEW/downloads/Reports/201105/wlcg/
Update on ACE - 2
Grid Technology ACE/GridView comparison
• ACE numbers correct since 1st of May– Minor differences
• Services not declared in GOCDB• Automatic status re-computations when data received with a
delay• Downtime declared for several sites• Few sites with availabilities higher in ACE for standard algorithm
(to be checked)
• WLCG and EGI reports fixed– Tier-2 reports (country name & description missing)
Update on ACE - 3
Grid Technology ORing of CEs & standard GV algorithm
• T1 sites– Average (the same as with the old algorithm)
• Availability & Reliability: 92%– FZK-LCG2: 3% higher in ACE
• CE was failing while CREAM was OK– TW-LCG: 5% lower in ACE
• Different SRMv2 services
• General for T1s & T2s:– Lower availability for 59 sites– Higher availability for 16 sites
Update on ACE - 4
Grid Technology GridView portal based on ACE
• https://gvdev.cern.ch/ACEVAL/ace_index.php– Till the time this functionality integrated in MyWLCG– Data transfers, FTS and old GridView availabilities: http
://gridview.cern.ch/GRIDVIEW/
• Excel Report Generation Form– http://gvdev.cern.ch/GVPC/Excel/ACE/
Update on ACE - 5
Grid Technology ACE - next steps
• ACE still using Integration Database– Migration to Production Database
• Availabilities for LHC experiments– VO feeds need improvement in ATP– Validation by the experiments
Update on ACE - 6
Grid Technology Conclusion
ACE ready for OPS based on any CE flavour
Update on ACE - 7
Grid Technology Miscellaneous
• Delayed metric results– We would like to set ‘max delay’. – If yes, how many days?
• Replacement of CA probe– 'org.sam.WN-CAver' by new probe 'hr.srce.CADist-Check’– Tentative date: 01st August
Update on ACE - 8
Grid Technology
Questions?
Update on ACE - 9
Grid Technology Acknowledgments
• GridView Team from BARC:– Rajesh Kalmady– Phool Chand– Vaibhav Kumar– Digamber Sonvane– Pradyumna Joshi– Vibhuti Duggal– Kislay Bhatt
Update on ACE - 10