2016. UK Power Networks. All rights reserved 1
Unlocking Capacity in the South East of
England
Regional Development Programme
2016. UK Power Networks. All rights reserved
Connecting You to the South East Network
Regional
Development
Programme
Power
Potential
Flexible
Connections
Kent Active
System
Management
2016. UK Power Networks. All rights reserved
A New Approach, with benefits to customers
3
Our new approach provide tools that remove constraints to DER connections on the South East Coast in the short- to medium-term
Continued access to network capacity in the South East at lowest overall cost
Single stage connections process – no undue delays in application or connection
Investable proposition – no current financial exposure to transmission constraints.
Opportunity for additional revenues – participation in new markets
3
2016. UK Power Networks. All rights reserved4
Bolney GSP
Ninfield GSP
Sellindge GSP
Canterbury GSP
South East Coast Network
4
2016. UK Power Networks. All rights reserved 5
• The South East Coast system is one of the most complex areas of
network in Europe, with several interconnections to continental
Europe, a nuclear power station and a significant volume of
renewable energy resources.
CANTERBURY NORTH
SELLINDGE
RICHBOROUGH
CLEVE HILL
DUNGENESSNINFIELDBOLNEY
KEMSLEY
TO LOVEDEAN
TO ROWDOWN
TO GRAIN
1.1GW
IFA (existing)2GW
NEW ELECLINK1GW
NEMO (new)1GW
INTERCONNECTOR
GENERATOR
NEW GSP AND INTERCONNECTOR
London Array0.63GW
0
400
800
1200
1600
1992 1997 1999 2002 2005 2007 2009 2011 2013 2015
MW
Distributed Generation South East
CumulativeMW
Background
2016. UK Power Networks. All rights reserved
BETTESHANGER
CANTERBURY SOUTH
HERNE BAY
RICHBOROUGHTHANET
FOLKESTONE
SELLINDGE
CANTERBURY NORTH
NATIONAL GRID GSP
NATIONAL GRID GSP
RUCKINGE
ASHFORD
HASTINGS
RYE
TO NINFIELD & BOLNEY
LITTLE CHEYNE
THANET OFFSHORE WINDFARM
6
• 132kV constraints in East Kent
network
• Constraints on existing DG during
outage season
• Circa 1.5GW DERs across 4x GSPs
• Summer minimum demand 1.1GW
• Localised network constraints
• Mix of new applications (storage,
CHP, etc.)
Distribution Challenge
2016. UK Power Networks. All rights reserved
Overload Voltage Collapse
Secured event e.g.
Fault on overhead line
• Restrictions
• Thermal
• Voltage Stability
• Asset based solution circa £1bn
10yrs lead time
EleclinkNEMO
Rampion
London Array
Shoreham
Dungeness Thanet
Transmission challenge
77
2016. UK Power Networks. All rights reserved
Developing a whole-system framework
8
A collaborative effort
Improve Customer
Experience
Accelerate DER
connections
Deliver at lowest
system cost
Technical Development
A regional active network
management capability
Managing loss of mains potential
issues
Data exchange and modelling
Market Development
Application of deep connect
and manage
DER curtailment services for
transmission constraints
Conflicts of service
framework
Whole System
Planning
Storage Integration
Industry Engagement
(ENA TSO – DSO project)
Regional Planning
Innovation
New Cross industry
processes
8
Phase 2, July 2017 – Dec 2018
Phase 1,
Aug’16 – Jun’17
2016. UK Power Networks. All rights reserved
Data exchange and modelling
Week 24 Data
GSP Demand Data (MW and MVAr) for:· GB max· GB min· GSP peak (BSP & GSP)
· Access Period peak
Small Embedded Power Station data > 1MW per GSP:· Registered capacity· Type of generation· Control mode· Loss of mains
protection
Statement of Works Data
BSP Net Demand Data (MW and MVAr) for:· GSP min
Small Embedded Power Station data >1Mw per BSP:· Registered capacity· Voltage· Type of generation· Control mode· Fault Infeed
IN DNO
Data for Medium Power Stations and 132kV generation connections
Small capacity allocation based on most onerous network condition
Enhanced Data
BSP Gross Demand* Data (MW and MVAr):· Using GSP mins
across 4x timestampsSeparated by:· Directly connected at
33kV· Aggregated at 11kV
and below
Small Embedded Power Station data per BSP:· Aggregated by
technology type· Inc. loss of mains infoSeparated by:· Directly connected at
33kV· Aggregated at 11kV
and below
Additional capacity release across a number of scenarios. More certainty in evaluating operational solutions
+
Network Models as per Week 24 submission
*All generation down to LV
separated from demand using
derived profiles
Improved DNO model and dynamic models for transmission system
NGET Network Model
NGET Network Model
OUTNGET
Old World
New World
9
2016. UK Power Networks. All rights reserved 10
Old World
New World
Revised connections process
Acceptance & Payment (inc. Statement of Works fee)
Connection Offer – subject to Statement of Works
Connection Application
Statement of Works Process
Progress to Delivery
Can
t ak e
upt o
12m
ont h
s
Decision Making Process
Withdraw Acceptance
Offer Includes:· DN costs· DN site specific reqs
Connection Offer
Connection Application
Progress to Delivery
Decision Making Process
Offer Includes:· DN costs· Securities· DN site specific reqs· TN site specific reqs
3m
ont h
s
Acceptance & Payment (inc. securities)
2016. UK Power Networks. All rights reserved 11
• Scope of the distribution works
• Cost breakdown (Contestable/Non-contestable)
• Project milestones
• Special Conditions
• Control & Visibility
• Loss of Mains Protection
• Abnormal Network Conditions (N-3, etc.)
• Commitment to deliver commercial framework
for transmission curtailment
• Securities & Liabilities (NGET works)
• Distribution curtailment assessment (where
applicable)
What to expect in the connection offer
2016. UK Power Networks. All rights reserved
Technical Development
12
Active Network Management
• Developing a regional capability to provide control and visibility at EHV / HV
• Customers will be responsible for sole use assets (substation controller and
telecommunications) as per existing standard arrangements
• UK Power Networks is assessing the option of developing and funding centrally ANM
software development & enabling infrastructure as a low cost alternative to creating
capacity.
Loss of mains protection
• UK Power Networks is putting a moratorium to further use of vector shift in the South
East Coast region pending national resolution of this issue to mitigate risks
around the secure operation of the system.
12
2016. UK Power Networks. All rights reserved
Alignment with Wider Industry Initiatives
13
• ENA’s Open Networks Project:
• Improved data exchange and T-D Capacity management is being
incorporated in the revised Statement of Works process
• ANM development is using the processes defined by the ENA Project’s work
to co-ordinate T and D constraints
• National Grid’s FRSO Programme:
• Market development is feeding into National Grids ancillary service
simplification work; itself feeding ‘DER Commercial Principles’ work into the
ENA’s Open Networks Project
• Loss of mains approach is consistent with approach adopted by WPD, as well
as wider Grid Code/Distribution Code work
13
2016. UK Power Networks. All rights reserved
14
Programme kick-
off meeting
Begin scoping
initiatives
Scope and
plan agreed
Models and
data
exchanged
Stakeholder
engagement
event
External engagement – UK Power Networks DER customer workshops,
Power Responsive and Power Potential stakeholder fora, ENA Open
Networks project
Aug’16 Dec’16 June’17 Phase 2 - > July’17 - July’18 Q3’18 – Q1’19
ENGAGEMENT
Phase 1
completed
Customer Event
Capacity Release
Go Live (26/06)
Work plan
developed
Programme timeline
Develop
operational /
market
framework for
DER services for
transmission
constraints
Power
Potential
market
framework
& technical
solution
RDP other
initiatives
Phase 2
Go Live
Weekly teleconferences / monthly workshops / technical & commercial
Monthly Executive steering groupGOVERNANCE
14
2016. UK Power Networks. All rights reserved 15
• Go Live – Monday 26th June 2017
• Applications for the South Eastern zone are open
• DER factsheet issued via the mailing list and the website
• Q&A available via DG-Q&[email protected]
• Ongoing engagement to inform commercial and operational framework
Next Steps
2016. UK Power Networks. All rights reserved 16
Summary
• Significant progress in delivering a T-D framework through collaborative
structured working to:
• Improve the customer experience
• Release DER connection capacity in the SE Coast
• Deliver outcomes at lower overall system cost
• Further work on operational and market models to be carried out in conjunction
with the wider industry
2016. UK Power Networks. All rights reserved
Acronyms
18
ANM Active Network Management
BSP Bulk Supply Point
CHP Combined Heat & Power
DER Distributed Energy Resources
DG Distributed Generation
DN Distribution Network
DSO Distribution System Operator
EHV Extra High Voltage
ENA Energy Networks Association
EPN Eastern Power Networks
GSP Grid Supply Point
GW Giga Watt
HV High Voltage
kV Kilo Volt
LPN London Power Networks
MVar Mega Var
MW Mega Watt
NGET National Grid Electricity Transmission
RDP Regional Development Programme
SPN South Eastern Networks
T-D Transmission - Distribution
TN Transmission Network
TSO Transmission System Operator
WPD Western Power Distribution
18