United States Department of the Interior BUREAU OF LAND MANAGEMENT Springfield Interagency Office, Northwest Oregon District 3106 Pierce Parkway Suite E, Springfield, Oregon 97477 http://www.blm.gov To: Northwest Oregon District, Springfield Interagency Office Attn: Cynthia L. Phillips, Siuslaw Field Office (541) 683-6776 Terry Ray, Upper Willamette Field Office (541) 683-6417 Debra Wilson, Northwest Oregon District (541) 683-6798 PROSPECTUS REQUEST Please send the following information for the timber sales to be sold on March 16, 2017. (Check appropriate boxes) Parcel No. Sale Name Prospectus EXHIBITS AND APPRAISALS Road Slash Disposal Other (indicate) Construction Maintenance Decom- missioning 1 Perry Road 2 High Pass Salvage 3 What’s Bruin 4 Lucky Meyer Mail to: Requested by:

Upload: others

Post on 08-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

  • United States Department of the Interior BUREAU OF LAND MANAGEMENT

    Springfield Interagency Office, Northwest Oregon District 3106 Pierce Parkway Suite E, Springfield, Oregon 97477

    http://www.blm.gov

    To: Northwest Oregon District, Springfield Interagency Office

    Attn: Cynthia L. Phillips, Siuslaw Field Office (541) 683-6776 Terry Ray, Upper Willamette Field Office (541) 683-6417 Debra Wilson, Northwest Oregon District (541) 683-6798

    PROSPECTUS REQUEST

    Please send the following information for the timber sales to be sold on March 16, 2017. (Check appropriate boxes)

    Parcel No. Sale Name Prospectus

    EXHIBITS AND APPRAISALS Road

    Slash Disposal

    Other (indicate)Construction Maintenance

    Decommissioning

    1 Perry Road

    2 High Pass Salvage

    3 What’s Bruin

    4 Lucky Meyer

    Mail to:

    Requested by:

    http:http://www.blm.gov

  • United States Department of the Interior BUREAU OF LAND MANAGEMENT

    Springfield Interagency Office, Northwest Oregon District 3106 Pierce Parkway Suite E, Springfield, Oregon 97477

    http://www.blm.gov

    February 15, 2017 This advertisement includes:

    Parcel No. 1 – Perry Road Parcel No. 2 – High Pass Salvage Parcel No. 3 – What’s Bruin Parcel No. 4 – Lucky Meyer

    TIMBER SALE NOTICE

    NOTICE IS HEREBY GIVEN that the Bureau of Land Management will offer for sale timber as described herein for oral auction, pursuant to Instructions to Bidders, as stated on Form No. 5440-9, attached. Written and oral bids will be received by the District Manager, or her representative, at the NORTHWEST OREGON DISTRICT, SPRINGFIELD INTERAGENCY OFFICE, 3106 PIERCE PARKWAY, SPRINGFIELD, OREGON. The timber sale will commence at 10:00 a.m. on Thursday, March 16, 2017.

    This Timber Sale Notice does not constitute the decision document for purposes of protest and appeal of a forest management decision. Consistent with 43 CFR Subpart 5003 - Administrative Remedies, the notice of a timber sale, when published as a legal ad in a newspaper of general circulation shall constitute the decision document for purposes of protest and appeal. Protests may be filed with the Contracting Officer within 15 days of the publication of the aforementioned decision document in the newspaper. It is anticipated that the decision document will be published in The Register-Guard newspaper on or about February 15, 2017. BLM does not warrant publication on this exact date. All parties considering protest of the timber sale decision document are encouraged to review the aforementioned newspaper to ensure accurate knowledge of the exact publication date.

    A WRITTEN BID on Form 5440-9 at not less than the appraised price on a unit basis per species and the required minimum bid deposit shall be required to participate in oral bidding for each tract.

    THE SUCCESSFUL BIDDER, as a condition of award, will be required to complete and/or sign the following forms:

    1. Form 5430-11, a certification that the bid was arrived at by the bidder or offerer independently, and was tendered without collusion with any other bidder or offerer.

    2. Form 5450-17, Export Determination.

    PRE-AWARD QUALIFICATIONS. The high bidder may be required to furnish information to determine the ability to perform the obligations of the contract. If the high bidder is determined not qualified, not responsible or refuses to respond within 15 days of a request for information pertaining to qualifications, the contract may be offered and awarded for the amount of the high bid to the highest of the bidders who is qualified, responsible, and willing to accept the contract.

    A PERFORMANCE BOND in an amount not less than 20 percent of the total purchase price will be required for all contracts of $2,500 or more, but the amount of the bond shall not be in excess of $500,000, except when the Purchaser opts to increase the minimum bond as provided in 43 CFR 5451.2. A minimum performance bond of not less than $500 will be required for all installment contracts less than $2,500.

    http:http://www.blm.gov

  • INSTALLMENT PAYMENTS may be authorized for sales of $500 or more. Required installments will be determined by BLM. For sales under $500,000, installments will not be less than 10% of the total purchase price. For sales of $500,000 or more, installment payments shall be $50,000.

    LOG EXPORT AND SUBSTITUTION. All timber sales, including timber from Federal rights-of-ways, shall be subject to the restrictions relating to the export and substitution of unprocessed timber from the United States in accordance with P.L. 94-165 and 43 CFR 5400 and 5424, as amended.

    LOG EXPORT AND SUBSTITUTION RESTRICTIONS. Excepting Port-Orford-cedar, all timber offered for sale hereunder is restricted from export from the United States in the form of unprocessed timber and is prohibited from being used as a substitute for exported private timber.

    The BLM has revised the log export restrictions special provision to reduce the log branding and painting requirements. The new requirements include branding of one end of all logs with a scaling diameter of over 10 inches. All loads of 11 logs or more, regardless of the diameter of the logs, will have a minimum of 10 logs branded on one end. All logs will be branded on loads of 10 logs or less. One end of all branded logs will be marked with yellow paint. At the discretion of the Contracting Officer, the Purchaser may be required to brand and paint all logs. The Purchaser shall bear any increased costs for log branding and painting.

    ADDITIONAL INFORMATION concerning each timber sale tract described herein is available at the above District Office. A copy of the timber sale contract is also available for inspection at the District Office. This prospectus includes maps and tables that cannot be made Section 508 compliant. For help with its data or information, please contact the Northwest Oregon District, Springfield Interagency Office at (541) 683-6798.

    THE VOLUMES LISTED herein are estimates only, based on 16-foot taper breaks, which must be taken into consideration if comparisons are made with volume predictions based on other standards. The volumes based on 32-foot taper breaks are shown for comparison purposes. No sale shall be made for less than the total purchase price, without regard to the amount bid per unit, even though quantity of timber actually cut or removed or designated for taking is more or less than the estimated volume or quantity so listed.

    ENVIRONMENTAL ASSESSMENTS were prepared for the What’s Bruin and Lucky Meyer timber sales, and Findings of No Significant Impact have been documented. These documents are available for inspection as background for these sales at the Northwest Oregon District, Springfield Interagency Office.

    A CATEGORICAL EXCLUSION was prepared for High Pass Salvage Timber Sale, and conforms to the applicable Land Use Plan as documented in the 2016 Northwestern & Coastal Oregon Record of Decision and Resource Management Plan. In review, this Categorical Exclusion did not identify any extraordinary circumstances affecting this sale. The documents are available for inspection as background for this sale at the Northwest Oregon District, Springfield Interagency Office.

    AN ENVIRONMENTAL ANALYSIS (EA) was prepared for the Long Tom Landscape Level Plan Project, which includes the Perry Road sale area. A Finding of No Significant Impact and Decision Record for the EA have been documented. A Determination of NEPA Adequacy (DNA) has been documented for this sale. These documents are available for inspection as background for this sale at the Northwest Oregon District, Springfield Interagency Office.

    ACCESS to a sale may be through a locked gate (see individual sale information). Prospective bidders may obtain a key from the Northwest Oregon District, Springfield Interagency Office. Any other persons interested in visiting the timber sale site should first contact the District Office at (541) 683-6600.

    Attachments: Form 5440-9 Form 5430-11 Form 5450-17 Form 5450-22

    -2

  • NORTHWEST OREGON DISTRICT TIMBER SALE NOTICE PARCEL NO.: 1 SIUSLAW FIELD OFFICE LUMP SUM SALE DATE: March 16, 2017

    EUGENE MASTER UNIT

    Contract No.: ORN03-TS17-302, Perry Road Lane County, Oregon: O&C: Oral Auction Bid Deposit Required: $34,600.00

    All timber designated for cutting on N1/2NW1/4, NE1/4SW1/4, S1/2SW1/4, SW1/4SE1/4, Section 9, T. 19 S., R. 4 W.; NE1/4NE1/4, Section 17, T. 19 S., R. 4 W.; Will. Mer.

    Estimated Volume Estimated Volume Appraised Price Estimated Volume

    32' Log (MBF) Species 16’ Log (MBF) Per MBF Times Approx. Price

    1,279 Douglas-fir 1,506 $ 219.30 $ 330,265.80 133 Grand-fir 162 $ 85.20 13,802.40 10 Incense cedar 13 $ 79.80 1,037.40

    3 Red alder 4 $ 63.70 254.80 1,425 TOTALS 1,685 $ 345,360.40

    APPRAISED PRICES are calculated by determining market value through the analytical appraisal method. The minimum bid increment will be $0.10 per MBF or multiples thereof.

    LOG EXPORT RESTRICTIONS: All timber offered for sale hereunder is restricted from export from the United States in the form of unprocessed timber and is prohibited from being used as a substitute for exported private timber.

    NOTE: The volume for this timber sale has been calculated using 16 foot eastside Scribner rules, and the 32 foot log volumes are estimates derived from the 16 foot volumes.

    CRUISE INFORMATION: Volume for all Douglas-fir, grand fir and incense cedar in the Partial Harvest Areas was variable plot cruised. Plot data is then used to calculate v-bar and basal area per acre using the National Cruise Processing Program. The basal area was determined with a Relaskop using a 20 BAF. This sale contains a total of 217 plots. 108 sample trees were randomly selected on these plots to determine v-bar. A map showing the location of the sample trees is available at the Springfield Interagency Office.

    All Douglas-fir in the right-of-ways have been cruised using the 3P system to select sample trees. The sample trees have been cruised and the volume computed using the National Cruise Processing Program for estimating volume in 16 foot lengths and the volume expanded to a total right-of-way volume. A map showing the location and description of these sample trees is available at the Springfield Interagency Office. The timber volumes for grand fir and red alder in the rightof-ways were based on a 100% cruise using the National Cruise Processing Program for estimating board foot volume of trees in 16 foot logs.

    With respect to merchantable Douglas-fir (sample) trees: The average tree is 11.9” DBHOB; the average log contains 37 bd. ft.; the total gross merchantable volume is approximately 1,566 MBF; and 96% recovery is expected.

    CUTTING AREA: Two areas totaling approximately 102 acres must be partial harvested and 6 acres of right-of-way must be clear cut.

    ACCESS: Access to the sale is provided by: 1. A public road; 2. BLM existing roads; 3. BLM roads to be constructed;

    ROAD MAINTENANCE: The Purchaser shall pay the BLM a rockwear fee of $1,794.05. See Exhibit D map for specification of road maintenance responsibility.

    In addition to the quantities shown below, 300 cubic yards (truck measure) of maintenance rock is required. Additional road reinforcement (rocking) may be required for wet weather haul and will be at the Purchaser’s expense. Load tickets are required for maintenance rock accounting.

    Only the map page of Exhibit D is included in the Prospectus. Refer to the contract file for the full Exhibit D.

    http:1,794.05http:345,360.40http:1,037.40http:13,802.40http:330,265.80http:34,600.00

  • Contract No. ORN03-TS17-302, Perry Road Parcel No. 1

    ROAD CONSTRUCTION: Road No. 19-4-9.3 Length: 8.00 Stations Class: SN-14 Special Requirements in Road Construction: Operations limited to periods of dry weather.

    ROAD RENOVATION: Road Nos. 19-4-4, 19-4-9, 19-4-9.1, 19-4-9.2, 19-4-9.4 and 19-4-17 Length: 187.96 Stations Class: SN-14 Special Requirements in Road Renovation: Operations may be limited to periods of dry weather. In stream work shall be completed between July 1 and October 15, both days inclusive.

    ROAD IMPROVEMENT: Road No. 19-4-9.1 Length: 6.86 Stations Class: SN-14 Special Requirements in Road Improvement: Operations limited to periods of dry weather.

    Suggested Rock Source: Commercial, Lorane Vicinity

    Estimated Quantities (truck measure)

    3/4” minus 270

    3” minus 3,193

    6” minus 1,065

    Culverts Diameter: 18”

    Length: 270’

    Number: 9

    Total Estimated Exhibit C Road Costs (construction, renovation, and improvement): $128,499.22

    DURATION OF CONTRACT: Duration of the contract will be 36 months for cutting and removal of timber.

    SPECIAL PROVISIONS: The contract will contain special provisions regarding road construction, road renovation, road improvement, road maintenance, road decommissioning, logging methods, prevention of erosion, falling of snags, falling of all trees designated for cutting, logging residue reduction, and submission of a written logging plan specifying landing locations, spur road location, logging methods and logging schedule.

    Under Sec. 26 of the timber sale contract, ground based logging will be prohibited during periods of excessive soil moisture. This will normally limit ground based logging to July, August, and September.

    It is estimated that 216 MBF of additional timber, such as corridor and guyline trees may be removed under the contract, but it is not included in the advertised sale volume, nor is it included in the timber sale appraisal.

    A Special Provision has been added that expands on safety and temporary traffic control measures required under the contract.

    A revised Special Provision has been added to the contract which enables the Contracting Officer to suspend the contract to facilitate protection of certain plant or animal species, and/or to modify or terminate the contract when necessary to: (1) Comply with the Endangered Species Act or to prevent incidental take of northern spotted owls in accordance with management direction in the Record of Decision (ROD) and Resource Management Plan (RMP), or; (2) Comply with a court order, or; (3) Protect species which were identified for protection through survey and manage and/or protection buffer standards and guidelines or management direction established in the ROD and RMP.

    http:128,499.22

  • Contract No. ORN03-TS17-302, Perry Road Parcel No. 1

    OTHER SPECIAL REQUIREMENTS:

    • Yarding shall be done with a carriage equipped skyline capable of yarding 1,200 feet slope distance in the Partial Harvest Areas on slopes greater than 35%.

    • Approximately 5 trees marked with yellow paint above and below breast height in the Approximate Location of Special Habitat Tree shown on Exhibit A shall not be felled or damaged during logging operations.

    • The Purchaser shall directionally fall timber away from oak trees and layout yarding corridors and skid trails to avoid oak trees where feasible.

    • With the exception of hauling, daily operations within Special Operating Areas shown on Exhibit A shall not be permitted from April 1 through August 5 of each year, both days inclusive. This restriction shall not be waived.

    • With the exception of hauling, daily operations within the Special Operating Areas shown on Exhibit A shall not begin until at least 2 hours after sunrise and shall cease at least 2 hours prior to sunset from August 6 through September 15 of each year, both days inclusive. This restriction shall not be waived.

    • In the Special Tailhold Area, approval from the Authorized Officer shall be obtained prior to attaching logging equipment to any tree.

    • In stream work shall be completed between July 1- October 15, both days inclusive. • The Purchaser shall rock Road Nos. 19-4-4 Seg. A-B, 19-4-9, 19-4-9.1 por. 1, 19-4-9.2, 19-4-9.3, and 19-4-9.4 for wet

    weather haul.

    • The Purchaser shall have the option to rock Road Nos. 19-4-4 Seg. C, 19-4-9.1 por. 2, and 19-4-17 for wet weather haul, at the Purchaser’s expense. Additional conditions for wet weather haul include the addition of cross drains, stream culverts, and rocking.

    • Upon completion of hauling, all decommissioning shall be completed during the dry season and as directed by the Authorized Officer. Decommissioning measures may include: o Decompact skid trails and natural surfaced roads with decompaction equipment, such as a track mounted

    excavator. o Construct drainage dips, waterbars, and/or lead-off ditches. o Remove stream crossings. o Place waterbars within 25 feet upslope of all remaining cross drains on all blocked roads. Key waterbars into

    existing ditches and construct ditch dams. o Place logging slash greater than 6 inches in diameter, where available, on surfaces in a discontinuous pattern. o Install earthen barricades or block entry points using root wads, logs, and/or slash.

    • The Exhibit F contains explicit instruction on requirements for equipment and personnel involved in pile burning.

    Optional Contributions: The Purchaser will have the option of performing pile burning or contributing $3,304.04 in lieu thereof. The option must be declared prior to contract execution. Piling and covering are not included in the Optional Contribution and will remain the responsibility of the Purchaser.

    NARRATIVE DESCRIPTION OF HOW TO GET TO THE TIMBER SALE AREA:

    Access to the sale is through a locked gate. Prospective bidders may obtain a key at the Northwest Oregon District’s, Springfield Interagency Office and proceed to the sale area. Any other persons interested in visiting the timber sale site should first contact Christopher Finn at ( 541) 683-6421.

    To Partial Harvest Area: From the Intersection of West 11th (Hwy 126) and Bailey Hill Road in Eugene, proceed south o n Bailey Hill Road for approximately 4.6 miles to the junction of Lorane Hwy and Bailey Hill Road. Continue on Lorane Hwy for approximately 4.6 miles to the junction of Fox Hollow Road and Lorane Hwy. Turn east ont o Fox Hollow Road for approximately 1.4 miles to the junction of Road No. 19-4-4 (Perry Road) and Fox Hollow Road and t urn south ont o Road No. 19-4-4 and follow the Timber Sale Area signs to the sale area.

    http:3,304.04

  • 2

    PH 1

    21 22

    23 2430 28 27C44 DC45 25

    2

    3

    6

    N! !

    N! !

    N! !

    PH 1

    PH 2

    y wHenraoL

    wHFox ollo Rd

    y wHen ra oL

    d Ryrr eP 4- 4- 91

    Territorial Hwy

    31

    01 04

    0907

    06 05

    36 32 33

    08

    17 16

    20

    12

    18

    19

    34

    03

    10

    15

    29

    30 25 29 28

    02

    11

    14 13

    24

    DC43

    27

    DC51

    DC41

    DC49

    DC50

    DC42

    DC40

    DC39

    DC39

    R.4 W.R.5 W.

    .8 S.1T

    .8 S.1T. 9 S.1T

    . 9 S.1T

    9.5 MilesTo Eugene

    6

    5

    D

    LaneCounty

    Timber Sale Location Map Perry RoadT. 19 S., R. 4 W., Sec. 9 & 17 £

    Gate Rocked Road Paved Road Native Road Stream

    Miles Partial Harvest Area 0 1 2 BLM Ownership

    P:\nwo\Siuslaw\Projects\TimberSale\2016\PerryRoad\Location_PerryRoad.mxd -- 2/2/2017 5:30:46 PM

  • Contract No.: ORN03-TS17-302

    Seasonal Restriction Matrix Perry Road

    Restricted Periods are Shaded and X’d; 2-hour daily timing restrictions are X’d only. Jan Feb Mar Apr May June July

    1 15 1 15 1 15 1 15 1 15 1 15 1 15

    All operations except hauling Special Operating Area

    April 1 – August 5, both days inclusive: Operations are prohibited.

    August 6-September 15, both days inclusive: Operations shall not begin until 2 hours after sunrise

    and shall cease 2 hours prior to sunset. Felling, yarding or loading

    Partial Harvest Areas April 15 – June 15, both days inclusive. Sap flow seasonal restriction may be conditionally waived.

    Ground-based yarding Partial Harvest Areas

    Typically October 1 – June 30; may vary due to weather conditions.

    Right-of-way logging and clearing Right-of-Way Areas

    Typically October 1 – May 31; may vary due to weather conditions.

    In stream restrictions

    October 16 – June 30 both days inclusive: Stream crossing culvert replacement site work shall be

    completed within the stream channel below the normal high water line prior to timber haul.

    Hauling on natural-surfaced roads Partial Harvest Areas

    Typically October 15 – May 31; may vary due to weather conditions.

    Aug Sept Oct Nov Dec 1 15 1 15 1 15 1 15 1 15

    NOTE: This chart is for informational purposes only. Refer to Section 42 Special Provisions of the timber sale contract for exact date restrictions and stipulations.

  • Ë Ë Ë Ë Ë

    Ë Ë Ë Ë Ë

    Y

    UNITED STATES Exhibit ADEPARTMENT OF THE INTERIOR Sheet 1 of 1Bureau of Land ManagementPerry Road Timber Sale Contract No.: ORN03-TS17-302T. 19 S., R. 4 W., Secs. 9 and 17, Will. Mer., Northwest Oregon District

    Perry RdFox Hol low Rd

    19-4-4

    19-4-4

    -9.2

    -9.3

    -9

    Perry Rd

    19-44

    TRANS

    ITION IN

    C

    GLTBLM

    9

    1300

    1200 110

    0

    1000

    GLT 1100 1000-9.1

    -17

    1000 110

    0

    900

    GLT

    Private

    BLM

    Private Private

    Private

    Private

    GLT GIUSTINA LAND & TIMBER (GLT)

    Private Private

    17

    11001100

    1100

    900

    Private

    -9.4

    19-4-4 9212

    1000

    900

    9190

    £ 0 500 1,000 1,500 Feet

    Contract Area Reserve Area Partial Harvest Area Clearcut (R/W) Area Special Tailhold Area

    ! ! !

    ! ! ! ! !

    ! ! ! ! ! ! !

    Special Operating Area Ë Ë Ë Ë Ë Ë Ë Ë Ë ËSpecial Skidding / Yarding Area

    Y

    Approximate Location ofSpecial Habitat Tree

    9101 0 Partial Harvest Area (Top)/Partial Harvest Area Acres (Bottom)

    !!! ! !!! ! ! ! ! ! Stream Paved Road Rocked Road Renovate Road

    ` ` ` ` ` Improve RoadConstruct Road

    D D D Not Authorized To Use Ç Ç¯ Gate !> Approximate Location of Oak Release

    Total Partial Harvest AreaTotal Clearcut (R/W) AreaTotal Reserve AreaTotal Contract Area

    1026172280 A.

    P:\nwo\Siuslaw\Projects\TimberSale\2016\PerryRoad\XA_PerryRoad_Sec_09_17_bythebook.mxd -- 2/9/2017 4:21:29 PM

  • NORTHWEST OREGON DISTRICT TIMBER SALE NOTICE PARCEL NO.: 2 SIUSLAW FIELD OFFICE LUMP SUM SALE DATE: March 16, 2017

    EUGENE MASTER UNIT

    Contract No.: ORN03-TS17-304, High Pass Salvage Lane County, Oregon: O&C: Oral Auction Bid Deposit Required: $13,800.00

    All timber designated for cutting on N1/2NW1/4, SW1/4NW1/4, NW1/4SW1/4, Section 33, T. 15 S., R. 6 W., Will. Mer.

    Estimated Volume Estimated Volume Appraised Price Estimated Volume 32' Log (MBF) Species 16’ Log (MBF) Per MBF Times Approx. Price

    612 Douglas-fir 757 $ 181.50 $ 137,395.50

    APPRAISED PRICES are calculated by determining market value through the analytical appraisal method. The minimum bid increment will be $0.10 per MBF or multiples thereof.

    LOG EXPORT RESTRICTIONS: All timber offered for sale hereunder is restricted from export from the United States in the form of unprocessed timber and is prohibited from being used as a substitute for exported private timber.

    NOTE: The volume for this timber sale has been calculated using 16 foot eastside Scribner rules, and the 32 foot log volumes are estimates derived from the 16 foot volumes.

    CRUISE INFORMATION: Volume for all species has been cruised using the 3P system to select sample trees. A portion of the sample trees have been cruised and the volume computed using the National Cruise Processing Program for estimating volume in 16-foot lengths and the volume expanded to a total sale volume. A map showing the location and description of these sample trees is available at the Northwest Oregon District’s Springfield Interagency Office.

    With respect to merchantable Douglas-fir (sample) trees: The average tree is 18.4" DBHOB; the average log contains 100 bd. ft.; the total gross merchantable volume is approximately 849 MBF; and 86% recovery is expected; and 100% was determined to be salvage volume.

    CUTTING AREA: One area totaling approximately 34 acres must be salvage harvested.

    ACCESS: Access to the sale is provided by:

    1. A public road; 2. BLM existing roads;

    ROAD MAINTENANCE: The Purchaser shall pay the BLM a rockwear fee estimated at $180.74. See Exhibit D map for specification of road maintenance responsibility.

    In addition to the quantities shown below, 200 cubic yards (truck measure) of maintenance rock is required. Additional road reinforcement (rocking) may be required for wet weather haul and will be at the Purchaser’s expense. Load tickets are required for maintenance rock accounting.

    Only the map page of Exhibit D is included in the Prospectus. Refer to the contract file for the full Exhibit D.

    ROAD RENOVATION: County Road No. 3455 (High Pass Road) and Road Nos.: 15-6-33.1, 15-6-33.7, 15-6-33.8, 15-6-33.11 Length: 69.75 Stations Class: SN-14 / SN16 Special Requirements in Road Renovation: Lane County Facility Permit required.

    Culverts Diameter: Length: Number:

    18” 30’ 1

    Suggested Rock Source: Commercial, Junction City Vicinity

    Surfacing Estimated Quantities (truck measure)

    3/4” minus 1-1/2” minus 3” minus 6” minus 30 10 125 162

    Total Estimated Exhibit C Road Costs (renovation): $13,061.46

    http:13,061.46http:15-6-33.11http:137,395.50http:13,800.00

  • ORN03-TS17-304 High Pass Salvage Parcel No. 2

    DURATION OF CONTRACT: Duration of the contract will be 12 months for cutting and removal of timber.

    SPECIAL PROVISIONS: The contract will contain special provisions regarding road renovation, road maintenance, logging methods, prevention of erosion, falling of snags, falling of all trees designated for cutting, logging residue reduction, and submission of a written logging plan specifying spur road locations, landing locations, logging methods, and logging schedule.

    Under Sec. 26 of the timber sale contract, ground based logging will be prohibited during periods of excessive soil moisture. This will normally limit tractor logging to July, August and September.

    It is estimated that approximately 20 MBF of additional timber, such as corridor and guyline trees, may be removed under the contract, but it is not included in the advertised sale volume, nor is it included in the timber sale appraisal.

    A Special Provision has been added that expands on safety and temporary traffic control measures required under the contract.

    A revised Special Provision has been added to the contract which enables the Contracting Officer to suspend the contract to facilitate protection of certain plant or animal species, and/or to modify or terminate the contract when necessary to: (1) comply with the Endangered Species Act or to prevent incidental take of northern spotted owls in accordance with management direction in the Record of Decision (ROD) and Resource Management Plan (RMP), or; (2) comply with a court order, or; (3) protect species which were identified for protection through survey and manage and/or protection buffer standards and guidelines or management direction established in the ROD and RMP.

    OTHER SPECIAL REQUIREMENTS:

    • All coniferous standing, down, dead or live trees greater than 40” DBH shall be reserved where operationally possible. If felled for operational purposes, these trees shall be retained on site and shall not be bucked.

    • No yarding or hauling shall be conducted on natural surfaced roads, unless rocked for wet weather haul, during periods of wet weather as determined by the Authorized Officer.

    • During the use of County Road No. 3455 (High Pass Road) and Road No. 15-6-33.1, the roads shall not be blocked for more than 20 minutes at a time during operations. At the close of business each day these roads shall be cleared.

    • Warning signs and flaggers are required when operating within two tree lengths of County Road No. 3455 (High Pass Road) and Road No. 15-6-33.1.

    • Yarding shall be done with a carriage equipped skyline capable of yarding 1,000 feet slope distance in the Salvage Harvest Area on slopes greater than 35%.

    • Within 25 feet of High Pass Road and Road No. 15-6-33.1, the Purchaser shall scatter excess logging slash back into the unit as directed by the Authorized Officer. Scattered slash shall be arranged in a discontinuous pattern, not to exceed 12 inches.

    • The Purchaser shall comply with the terms and conditions of a Facility Permit from Lane County Department of Public Works.

    • 17 trees marked with yellow paint above and below breast height shall not be felled or damaged during logging operations.

    • Upon completion of hauling, all decommissioning shall be completed during the dry season and as directed by the Authorized Officer. Decommissioning measures may include:

    o Decompact skid trails and natural surfaced roads with decompaction equipment, such as a track mounted

    excavator.

    o Construct drainage dips, waterbars, and/or lead-off ditches. o Place logging slash greater than 6 inches in diameter, where available, on surfaces in a discontinuous pattern. o Block entry points using root wads, logs, and/or slash.

    • The Exhibit F contains explicit instruction on requirements for equipment and personnel involved in pile burning.

    OPTIONAL CONTRIBUTION: The Purchaser will have the option of performing pile burning or contributing $694.13 in lieu thereof. The option must be declared prior to contract execution. Piling and covering are not included in the Optional Contribution and will remain the responsibility of the Purchaser.

  • ORN03-TS17-304 High Pass Salvage Parcel No. 2

    NARRATIVE DESCRIPTION OF HOW TO GET TO THE TIMBER SALE AREA: From Junction City, travel west on High Pass Road (County Road 3455) for approximately 12 miles to enter the sale area. For further information contact Christopher Finn at (541) 683-6421.

  • Timber Sale Location Map High Pass Salvage

    T. 15 S., R. 6 W., Sec. 33

    High Pass Rd

    Salvage Harvest Area

    Turnbo

    w Rd

    Lavell Rd

    Templeto

    n Rd

    Ferguson Road

    Junction City

    02

    11

    03

    27

    01 04

    36 35

    26 25

    10 09

    28

    34 33

    12

    21 24 22 23

    07

    06

    30

    19

    16 15 14 13

    20

    18 17

    T15S R06W

    T16S R06W

    LegendSalvage Harvest Area Road BLM Ownership gate

    0.65 0.325 0 0.65 Miles OREGON

    WASHINGTON

    No warranty is made by the Bureau of Land Management as to the accuracy, reliability or completeness of this data forindividual or aggregate use with other data.

  • ORN03-TS17-304 High Pass Salvage

    Seasonal Restriction Matrix Restricted Periods are Shaded and X’d; 2-hour daily timing restrictions are X’d only.

    Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

    1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 Felling, yarding or loading

    Salvage Harvest Area

    April 15 – June 15, both days inclusive. Sap flow seasonal restriction may be conditionally waived.

    Ground-based yarding

    Salvage Harvest Area Typically October 15 – June 30; may vary due to weather

    conditions. Right-of-way logging and clearing

    Right-of-Way Areas

    Typically October 1 – May 31; may vary due to weather conditions.

    Hauling on natural-surfaced roads

    Salvage Harvest Area Typically October 15 – May 31; may vary due to weather

    conditions.

    NOTE: This chart is for informational purposes only. Refer to Section 42 Special Provisions of the timber sale contract for exact date restrictions and stipulations.

  • Weyer

    haeuse

    r Comp

    anyGiu

    stina L

    and& T

    imber C

    o.

    BLMBLM

    BLM

    Franklin-Clarkson Timber Co. GiustinaLand & Timber Co.

    BLM

    1500

    1400 1500

    1600 1500

    1400

    -33.7

    -33.11

    33

    Cnty Rd No. 3455 (High Pass Rd)

    15-6-3

    3.1

    -33.4

    -33.8

    Salvage Harvest Area Reserve Area Contract Area Approximate Location of Special Habitat Tree Gate Existing Rock RoadRoad Renovation Native Surface Stream

    UNITED STATES Exhibit ADEPARTMENT OF THE INTERIORBureau of Land ManagementHigh Pass Salvage Timber Sale ContractT. 15 S., R. 6 W., Sec. 33, NorthwesNo. ORN03-TS17-304t Oregon District

    Salvage Harvest Area 34.00Reserve Area 126.00Contract Area 160.00 Ac.

    Feet 0 500 1,000 1,500

    P:\nwo\Siuslaw\Projects\TimberSale\2017\HighPassSalvage\XA_HighPass.mxd -- 1/25/2017 10:49:19 AM

    http:Area126.00

  • TIMBER SALE NOTICE LUMP SUM

    EUGENE MASTER UNIT

    NORTHWEST OREGON DISTRICT PARCEL NO.: 3 UPPER WILLAMETTE FIELD OFFICE SALE DATE: March 16, 2017

    What’s Bruin Contract Number: ORN05-TS17-501 Lane County, Oregon: O&C: Oral Auction Bid Deposit Required: $ 76,000.00

    All timber designated for cutting on SE1/4NE1/4, NE1/4SE1/4 Section 31; E1/2NE1/4, NE1/4SE1/4, S1/2SE1/4 Section 33, T. 19 S., R. 2 W., Lots 3, 4, 5, SW1/4NE1/4, SE1/4NW1/4, E1/2SW1/4, SE1/4 Section 3, T. 20 S., R. 2 W., Will. Mer.

    Estimated Volume Estimated Volume Appraised Price Estimated Volume 32' Log (MBF) Species 16’ Log (MBF) Per MBF Times Approx. Price

    1,932 Douglas-fir 2,227 $ 246.10 $ 548,064.70 1,395 Western hemlock 1,589 $ 115.00 $ 182,735.00

    64 Grand fir 73 $ 111.50 $ 8,139.50 15 Incense cedar 18 $ 120.30 $ 2,165.40 31 Western redcedar 34 $ 533.00 $ 18,122.00

    3,437 TOTALS 3,941 $ 759,226.60

    APPRAISED PRICES are calculated by determining market value through the analytical appraisal method. The minimum bid increment will be $0.10 per MBF or multiples thereof.

    LOG EXPORT RESTRICTIONS: All timber offered for sale hereunder is restricted from export from the United States in the form of unprocessed timber and is prohibited from being used as a substitute for exported private timber.

    NOTE: The volume for this timber sale has been calculated using 16 foot eastside Scribner rules, and the 32 foot log volumes are estimates derived from the 16 foot volumes.

    CRUISE INFORMATION: Volume for all Douglas-fir, western hemlock, grand fir, incense cedar and western redcedar in the Partial Harvest Areas was variable plot cruised. Plot data is then used to calculate v-bar and basal area per acre using the National Cruise Processing Program. The basal area was determined with a Relaskop using a 20 BAF. This sale contains a total of 227 plots. 236 sample trees were randomly selected on these plots to determine v-bar. A map showing the location of the sample trees is available at the Springfield Interagency Office.

    Volume for Douglas-fir and western hemlock in the right-of-ways has been cruised using the 3P system to select sample trees. The sample trees have been cruised and the volume computed using the National Cruise Processing Program for estimating volume in 16 foot lengths and the volume expanded to a total right-of-way volume. A map showing the location and description of these sample trees is available at the Springfield Interagency Office. The timber volumes for all other species in the right-of-ways were based on a 100% cruise using the National Cruise Processing Program for estimating board foot volume of trees in 16 foot logs.

    With respect to merchantable Douglas-fir (sample) trees: The average tree is 13.5” DBHOB; the average log contains 49 bd. ft.; the total gross merchantable volume is approximately 2,349 MBF; and 95% recovery is expected.

    CUTTING AREA: Approximately 255 acres must be partial harvested and approximately 4 acres of right-of-way must be clear cut.

    ACCESS: Access to the sale is provided by: 1. A public road; 2. BLM existing roads; 3. BLM roads to be constructed; 4. Roads covered by a Right-of-Way and Road Use Agreement E-662E between Giustina Resources Limited

    Partnership and the United States, Right-of-Way and Road Use Agreement E-662 between Weyerhaeuser Company and the United States, or Right-of-Way and Road Use Agreement E-364C between Mount Scott Holding Company and the United States. In the renovation, maintenance, and use of private roads, in the use of tailholds and guybacks, and in the use of a yarding wedge the Purchaser shall enter into license agreements with Giustina Resources Limited

    http:759,226.60http:18,122.00http:2,165.40http:8,139.50http:182,735.00http:548,064.70http:76,000.00

  • What’s Bruin Parcel No. 3

    Partnership, Weyerhaeuser Company, and Mount Scott Holding Company. The license agreements shall be delivered to Giustina Resources Limited Partnership, Weyerhaeuser Company, and Mount Scott Holding Company for execution at least 15 days prior to any use of company roads, tailholds, guylines, or yarding wedge. See the Prospectus for full terms and conditions of use.

    ROAD MAINTENANCE: The Purchaser shall pay road use fees of $429.00 and rockwear fees of $45.47 to Weyerhaeuser Company. The Purchaser shall pay road use fees of $3,896.00 and rockwear fees of $409.08 to Mount Scott Holding Company. The Purchaser shall pay the BLM a road maintenance fee of $9,709.66 and a rockwear fee of $8,915.15. See the Exhibit D map for specifications of road maintenance responsibility. Only the map page of the Exhibit D is included in the Prospectus. Refer to the contract file for the full Exhibit D.

    In addition to the quantities shown below, 500 cubic yards (truck measure) of maintenance rock is required. Additional road reinforcement (rocking) may be required for wet weather haul and will be at the Purchaser’s expense.

    ROAD CONSTRUCTION: Spurs 3C, 3D, 3E, 31A (por.), 33A, and 33B (por.); Road No. 20-2-3.8 (por.) Length: 31.75 Stations Class: SN-14

    Special Requirements: Operations limited to periods of dry weather. Culvert replacement/installation on streams shall be

    done between June 1 and October 31 (both days inclusive).

    ROAD RENOVATION: Spurs 31A (por.) and 31B; Road Nos. 19-2-20.1, -29, -33, -33.1, -33.4, -34, 20-2-2, -3.2, -3.4, and -3.8 (por.) Length: 457.71 Stations Class: SN-14 / SN-16 Special Requirements: Culvert replacement/installation on streams shall be done between June 1 and October 31 (both

    days inclusive).

    ROAD IMPROVEMENT Spur 33B (por.) Length: 11.08 Stations Class: SN-14 Special Requirements: Operations limited to periods of dry weather. Culvert replacement/installation on streams shall be

    done between June 1 and October 31 (both days inclusive).

    Rock Source: Commercial - Creswell Vicinity Estimated Quantities (CY truck measure)

    3/4” Minus 1-1/2” Minus 3” Minus 6” Minus 480 660 4,396 2,055

    CULVERTS: Diameter: Length: Number:

    18” 610’ 17 24” 150’ 4 30” 80’ 2 36” 40’ 1

    Total Estimated Exhibit C (construction, renovation, and improvement) Road Costs: $274,691.08

    ROAD DECOMMISSIONING: Spur 31A and 20-2-3.8 Barriers: 2 Estimated Cost of Decommissioning: $515.60 Special Requirements in Road Decommissioning: Operations limited to periods of dry weather

    DURATION OF CONTRACT: Duration of the contract will be 36 months for cutting and removal of timber.

    http:274,691.08http:8,915.15http:9,709.66http:3,896.00

  • What’s Bruin Parcel No. 3

    SPECIAL PROVISIONS: The contract will contain special provisions regarding road construction, road renovation, road improvement, road maintenance, road decommissioning, logging methods, prevention of erosion, logging residue reduction, and submission of a written logging plan specifying landing locations and logging schedule.

    Under Sec. 26 of the timber sale contract, ground based logging will be prohibited during periods of excessive soil moisture. This will normally limit ground based logging to July, August, and September.

    It is estimated that 473 MBF of additional timber, such as corridor and guyline trees may be removed under the contract, but it is not included in the advertised sale volume, nor is it included in the timber sale appraisal.

    A Special Provision has been added that expands on safety and temporary traffic control measures required under the contract.

    A revised Special Provision has been added to the contract which enables the Contracting Officer to suspend the contract to facilitate protection of certain plant or animal species, and/or to modify or terminate the contract when necessary to: (1) Comply with the Endangered Species Act or to prevent incidental take of northern spotted owls in accordance with management direction in the Record of Decision (ROD) and Resource Management Plan (RMP), or; (2) Comply with a court order, or; (3) Protect species which were identified for protection through survey and manage and/or protection buffer standards and guidelines or management direction established in the ROD and RMP.

    OTHER SPECIAL REQUIREMENTS: 1. No felling, yarding, or loading is permitted in or through the Reserve Areas shown on Exhibit A. 2. Adjacent to Partial Harvest Area No. 1, an approximately 1-acre yarding wedge is necessary across Weyerhaeuser

    Company property to accommodate logging systems. 3. No harvest activities shall be conducted in the Partial Harvest Areas during sap flow from April 1 to June 15 of each

    year, unless otherwise approved by the Authorized Officer. 4. The Purchaser shall be required to clean logging, road, decommissioning, and slash piling equipment prior to entry on

    BLM lands. 5. Approximately 26 trees marked with an orange “W” in the Partial Harvest Areas as shown on Exhibit A are reserved

    from cutting. All Wildlife Trees felled for safety and operational reasons shall remain on site. 6. Use of native surface roads shall be restricted to dry periods (typically July 1 to September 30). 7. The Purchaser shall have the option to rock Spurs 31A and 31B for wet weather haul. Costs for rocking and

    installation of additional drainage features will be at Purchaser’s expense. 8. The Purchaser shall determine the location of Spur 3E. The final spur road location, landings, and clearing limits shall

    be identified with flagging and shall be approved by the Authorized Officer in writing before construction begins. The Purchaser agrees to accept a modification to the contract for the additional timber within the right-of-way.

    9. The Purchaser shall provide a map of requested skyline and skid trail locations a minimum of seven (7) working days in advance of cutting to obtain approval of the locations from the Authorized Officer.

    10. The Purchaser shall pile logging slash at all landings and within 25 feet of Spurs 3C, 3D, 3E, 33A, 33B, and Road Nos. 19-2-33.1, -33.4, -34, 20-2-3.2, and -3.4.

    11. Feller Buncher operations may be permitted in ground based areas with a written waiver request by Purchaser and approval by Authorized Officer. If approved, whole tree yarding will be authorized.

    12. The Purchaser shall be required to spread BLM-provided seed and mulch at culverts and designated areas. 13. The Purchaser will be required to file a Notification of Operations with the Oregon Department of Forestry office for all

    harvest operations and road construction/renovation on BLM and private lands.

    OPTIONAL CONTRIBUTION: The Purchaser will have the option of performing pile burning or contributing $4,979.19 in lieu thereof. The option must be declared prior to contract execution. Piling and covering are not included in the Optional Contribution and will remain the responsibility of the Purchaser.

    NARRATIVE DESCRIPTION OF HOW TO GET TO SALE AREA: Portions of this sale are accessed through locked gates over private land. Prospective bidders may obtain a key from the Springfield Interagency Office and proceed to the sale area. Any other persons interested in visiting the timber sale should first contact Brian Bickford at 541-683-6164.

    To Partial Harvest Areas: From I-5 Exit 182 in Creswell, proceed east on Cloverdale Road for approximately 1.8 miles to Bear Creek Road. Proceed southeast on Bear Creek Road for approximately 1.7 miles to Road No. 19-2-20.1 (Bear Mountain Road.) Proceed south on Road No. 19-2-20.1 (Bear Mountain Road) for approximately 0.7 miles to the junction of Road No. 19-2-29.

    To Partial Harvest Area No. 2: Proceed west on Road No. 19-2-29 for approximately 1.7 miles to the junction of Road No. 19-2-32. Proceed south on Road No. 19-2-32 for approximately 0.5 miles. Proceed west on foot for approximately 0.1 miles to the sale area.

    http:4,979.19

  • What’s Bruin Parcel No. 3

    To Partial Harvest Area No. 1: Return to the junction of Road Nos. 19-2-20.1 and 19-2-29 and proceed south on Road No. 19-2-20.1 for approximately 1.6 miles to the junction of Road No. 19-2-33. Proceed south on Road No. 19-2-33 for approximately 0.5 miles to the junction of Road No. 19-2-33.1. Proceed south on Road No. 19-2-33.1 for approximately 0.7 miles to the sale area.

    To Partial Harvest Area No. 3: Continue southeast on Road No. 19-2-33.1 for approximately 0.4 miles to the sale area.

  • Bear Creek Road

    19-2-29

    19-2-20.1

    19-2-33.1

    19-2-32 19-2-33

    Bear Mtn Rd

    Timber Sale Location MapSale Name: What's Bruin

    T. 19 S., R. 2 W., SECs. 31, 33 T. 20 S., R. 2 W., SEC. 3, WILL. MER., NORTHWEST OREGON DISTRICT, SPRINGFIELD INTERAGENCY OFFICE 12 10 1110 11 09

    171415

    13Creswell Cloverdale Road 16 15 14222 18

    22 23

    21 222099 24 19

    29 28 27 2625 30

    5

    31 323635 34

    T19S R03W T19S R02W T20S R03W T20S R02W

    02 01

    Partial Harvest 33Area No. 2 Partial HarvestArea No. 1

    06 05 04 03 02

    03

    10

    Partial HarvestArea No. 3

    11 12 07 08 09 10

    Harvest Unit Travel Route Gate NARRATIVE DESCRIPTION OF HOW TO GET TO SALE AREA: Portions of this sale are accessed through locked gates over private land. Prospective bidders may obtain a key from the Springfield InteragencyOffice and proceed to the sale area. Any other persons interested in visiting the timber sale should first contact Brian Bickford at 541-683-6164. 0 0.5 1 MilesTo Partial Harvest Areas:From I-5 Exit 182 in Creswell, proceed east on Cloverdale Road for approximately 1.8 miles to Bear Creek Road. Proceed southeast on BearCreek Road for approximately 1.7 miles to Road No. 19-2-20.1 (Bear Mountain Road.) Proceed south on Road No. 19-2-20.1 (Bear MountainRoad) for approximately 0.7 miles to the junction of Road No. 19-2-29.To Partial Harvest Area No. 2:Proceed west on Road No. 19-2-29 for approximately 1.7 miles to the junction of Road No.19-2-32. Proceed south on 19-2-32 for approximately0.5 miles. Proceed west on foot for approximately 0.1 miles to the sale area.To Partial Harvest Area No. 1:Return to the junction of Road Nos. 19-2-20.1 and 19-2-29 and proceed south on Road No. 19-2-20.1 for approximately 1.6 miles to the junction ofRoad No. 19-2-33. Proceed south on Road No. 19-2-33 for approximately 0.5 miles to the junction of Road No. 19-2-33.1. Proceed south on RoadNo. 19-2-33.1 for approximately 0.7 miles to the sale area.To Partial Harvest Area No. 3:Continue southeast on Road No. 19-2-33.1 for approximately 0.4 miles to the sale area.

    United States Department of the InteriorBureau of Land ManagementOregon State OffiP.O. Box 2965 ce Portland, Oregon 97208-2965No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these datafor individual or aggregate use with other data. Original data were compiled from various sources. This information maynot meet National Map Accuracy Standards. This product was developed through digital means and may be updated without notification.P:\eug\UW\TimberSales\FY2017\CoastDorenaEA\Exhibits\GISMaps\WhatsBruin\WhatsBruin_Location.mxd 1/30/2017

    35

    23

    11

  • What’s Bruin

    Seasonal Restriction Matrix

    Restricted Times

    Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Restricted Activity:

    1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 Road Construction, Improvement,

    Decommissioning, Use of native-surface roads,

    and Ground based yarding October 1 – June 30

    May vary due to weather conditions; soil moisture still overrides weather conditions

    Partial Harvest Area Activities (Sap flow)

    April 1 – June 15 Sap flow restrictions may be conditionally

    waived at the discretion of BLM

    Stream Culvert Installation and Removal

    November 1 – May 31, both days inclusive

    NOTE: This chart is for informational purposes only. Refer to Section 42 Special Provisions of the timber sale contract for exact date restrictions and specifications. Subject to transient winter snow, elevation ranges from 1200 - 2700 feet.

  • ####

    !!

    !

    !!

    !

    !!!

    !!

    !

    ########

    1900

    1800

    2000

    1900

    ####################################################

    UNITED STATES EXHIBIT ADEPARTMENT OF THE INTERIOR Sheet 1 of 3BUREAU OF LAND MANAGEMENTWHAT'S BRUIN TIMBER SALE CONTRACT NO. ORN05-TS17-501T. 19 S., R. 2 W., SEC. 33, WILL. MER., NORTHWEST OREGON DISTRICT

    1400 1300

    1600

    1700

    1500

    !

    ! !

    ! ! !

    !!

    !

    !

    ! !

    ! ! !

    ! ! !

    ! ! !

    !!

    ! ! !

    ! ! !

    !!

    !

    ! !

    !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    !!

    !

    !!

    !

    !!

    !

    !!

    !

    !!

    !

    !!

    ! ! !

    ! ! !

    ! ! !

    !!

    9

    ooo

    o o

    o

    19-2-33.8

    Spur 33

    A

    19-2-33.1 19-2-33.4

    19-2-3

    3.1

    Spur

    33B

    1 9 -2-34

    GIUSTINA RESOURCES

    GIUSTINA RESOURCES

    WEYERHAEUSER COMPANY

    BLM

    BLM

    186

    27

    5

    33

    29

    3

    34 32

    28

    4

    Partial Harvest Area - Cable Rocked Road 500 1,000 1,500 Feet± 0 ######## Yard######################## ing Wedge Construction - Rock################ Boundary of Cutting Area Renovation/ImprovementPosted, Painted

    ! ! ! ! ! StreamReserve Area 1010 Unit Number (Top)/Contract Area 9 Unit Acres (Bottom)

    Total Partial Harvest AreaTotal Right-of-Way (Clearcut)Total Reserve Area 435.70Total Contract Area

    2554 694.70 A.

    Right-of-Way (Clear Cut) Wildlife Trees

    Partial Harvest AreaRight-of-Way (Clearcut)Reserve Area 112Contract Area 862

    200 A. Approximate Area of oUnited States Department of the InteriorBureau of Land ManagementOregon State OffiP.O. Box 2965 ce Portland, Oregon 97208-2965

    Document Path: P:\eug\UW\TimberSales\FY2017\CoastDorenaEA\Exhibits\GISMaps\WhatsBruin\WhatsBruinExA_sec33.mxd 2/7/2017

  • !!

    !

    !!

    !

    !!

    !

    !

    V V V VV V V VV V V V VV V V V V

    V V V V V VV V V V V V VV V V V

    0

    2100

    UNITED STATES EXHIBIT ADEPARTMENT OF THE INTERIOR Sheet 2 of 3BUREAU OF LAND MANAGEMENTWHAT'S BRUIN TIMBER SALE CONTRACT NO. ORN05-TS17-501T. 19 S., R. 2 W., SEC. 31, WILL. MER., NORTHWEST OREGON DISTRICT

    V V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V V V V V VV V V V V V V V V V V V VV V V V V V V V V V V V VV V V V V V V V V V V VV V V V V V V V V V V VV V V V V V V V V V VV V V V V V V V V VV V V V V V V V V V V V V

    220

    ¯

    !

    !!

    !!

    !

    !

    ! !

    !

    ! !

    9 o o o

    o

    o

    oo

    o

    o

    o o

    ÇÇ

    Spur 31A

    Spur 31

    A

    Spur 31B 19-2-31.0

    19-2-32

    2000

    2

    BLM

    MOUNT SCOTTHOLDING COMPANY

    PRIVA

    TE

    MOUNT SCOTTHOLDING COMPANY

    PRIVA

    TE 55

    30

    1 5

    36

    29

    32

    6

    25

    31

    Partial Harvest Area - Cable Rocked Road V V V V V VV V V V V VV V V V V VV V V V V V Partial Harvest Area - Ground-based Construction - Optional Rock

    Boundary of Cutting Area RenovationPosted, Painted ± Reserve Area Approximate Area ofWildlife Treeo 0 500 1,000 1,500 Feet Contract Area Found Corner! Right-of-Way (Clearcut) ¯ Gate Partial Harvest AreaÇ Ç Right-of-Way (Clearcut) 55 241 ! ! ! ! ! ! Stream Reserve AreaContract Area 80A.

    9Unit Number (Top)/ United States Department of the Interior1010 Unit Acres (Bottom) Bureau of Land ManagementOregon State OffiP.O. Box 2965 ce Portland, Oregon 97208-2965 Document Path: P:\eug\UW\TimberSales\FY2017\CoastDorenaEA\Exhibits\GISMaps\WhatsBruin\WhatsBruinExA_sec31.mxd 2/7/2017

  • V V V

    !!

    !!

    !!

    !!

    !

    !

    !

    !!!

    !!

    !

    !!

    !

    ! ! !

    !

    !!

    !

    !!

    !

    !!

    !!

    !

    !

    !

    !

    !!!

    !

    !

    !

    !

    !!

    !

    !

    1900

    0

    2000

    V

    UNITED STATES EXHIBIT ADEPARTMENT OF THE INTERIOR Sheet 3 of 3BUREAU OF LAND MANAGEMENTWHAT'S BRUIN TIMBER SALE CONTRACT NO. ORN05-TS17-501T. 20 S., R. 2 W., SEC. 3, WILL. MER., NORTHWEST OREGON DISTRICT

    2400 2300

    2600

    240

    2300

    2200

    2600

    2400

    2700

    2500

    2100

    V V V V V V VV V V V V V VV V V V V V VV V V V V V VV V V V V V VV V V V V V VV V V V V V VV V V V V V VV V V V V V VV V V V V V VV V V V V V VV V V V V V V

    !! !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    !

    ! !

    !

    ! !!

    ! ! !

    ! ! !

    ! !!

    !!

    !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    !

    ! ! !

    ! ! !

    !! ! !

    ! ! !

    ! ! !

    !!

    !

    ! ! !

    ! ! !

    !! !

    ! ! !

    !!

    !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    ! !

    !!!!

    !! !

    !

    ! !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    !! !

    !! !

    !!

    !

    ! ! !

    ! ! !

    ! ! !

    !

    ! !

    ! ! !

    !

    !

    !

    ! ! !

    !!

    !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    !! !

    ! ! !

    !! !

    !

    ! ! !

    ! ! !

    ! !

    !

    ! ! !

    !

    ! !

    ! ! !

    ! ! !

    ! !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    ! !

    !

    !!

    !

    ! ! !

    ! !!

    ! !

    !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    ! !

    !

    ! ! !

    ! ! !

    ! ! !

    ! ! !

    !!

    !

    !!

    !

    ! ! !

    ! ! !

    ! ! !

    !

    ! ! !

    ! ! !

    !

    ! !

    ! ! !

    !

    ! ! !

    !!

    !

    !

    !

    !

    ! !

    !

    !

    ! !!

    ! !

    !

    !! !

    !!

    ! ! !

    9

    !!

    19-2-34

    Spur 3C

    Spur 3DSpur 3E

    20-2-3.8

    20-23.

    4

    20-2-2 20-2-3

    .2

    19-2-33.1 1 9-2

    -34Lot 426.43

    Lot 335.72Lot 532.55

    3

    WEYE

    RHAEU

    SER C

    OMPAN

    Y

    WEYE

    RHAEU

    SER

    COMP

    ANY

    WEYERHAEUSER COMPANY

    GIUSTINA RESOURCESGIUSTINA RESOURCES

    BLM

    BLM

    114

    35

    2

    33

    109

    3

    34

    11

    4

    V V V V

    ParV V V V V VV V V V V VV V V V V VV V V V V V Par

    tial Harvest Area - Cable Rocked Road tial Harvest Area - Ground-based Construction - Rock

    Boundary oPosted, Paif Cutting Area Renovationnted ± Reserve Area Optional Locate 0 500 1,000 1,500 Feet

    ! ! ! ! ! ! StreamContract Area Unit Number (Top)/ Partial Harvest AreaRight-of-Way (Clearcut) 1010 Unit Acres (Bottom) Right-of-Way (Clearcut)9 Reserve Area 299.70 1141 Contract Area 414.70A.

    ! Found Corner United States Department of the InteriorBureau of Land ManagementOregon State OffiP.O. Box 2965 ce Portland, Oregon 97208-2965

    Document Path: P:\eug\UW\TimberSales\FY2017\CoastDorenaEA\Exhibits\GISMaps\WhatsBruin\WhatsBruinExA_sec3.mxd 2/7/2017

    VVV

    !

    http:Area299.70

  • TIMBER SALE NOTICE LUMP SUM

    EUGENE MASTER UNIT

    NORTHWEST OREGON DISTRICT PARCEL NO.: 4 UPPER WILLAMETTE FIELD OFFICE SALE DATE: March 16, 2017

    Lucky Meyer Contract Number: ORN05-TS17-502 Lane County, Oregon: O&C: Oral Auction Bid Deposit Required: $ 91,400.00

    All timber designated for cutting on SW1/4NW1/4, W1/2SW1/4, SE1/4SW1/4 Section 13; Lots 1-3, SE1/4NE1/4, E1/2SW1/4, N1/2SE1/4, SW1/4SE1/4, Section 19; Lots 1,2,3,7,8, SE1/4NE1/4, Section 23, T. 20 S., R. 2 W., Will. Mer.

    Estimated Volume Estimated Volume Appraised Price Estimated Volume 32' Log (MBF) Species 16’ Log (MBF) Per MBF Times Approx. Price

    3,048 Douglas-fir 3,539 $ 224.70 $ 795,213.30 670 Western hemlock 781 $ 93.70 $ 73,179.70 97 Grand fir 121 $ 71.20 $ 8,615.20 16 Incense cedar 19 $ 108.80 $ 2,067.20 67 Western redcedar 84 $ 406.50 $ 34,146.00

    3,898 TOTALS 4,544 $ 913,221.40

    APPRAISED PRICES are calculated by determining market value through the analytical appraisal method. The minimum bid increment will be $0.10 per MBF or multiples thereof.

    LOG EXPORT RESTRICTIONS: All timber offered for sale hereunder is restricted from export from the United States in the form of unprocessed timber and is prohibited from being used as a substitute for exported private timber.

    NOTE: The volume for this timber sale has been calculated using 16 foot eastside Scribner rules, and the 32 foot log volumes are estimates derived from the 16 foot volumes.

    CRUISE INFORMATION: Volume for all Douglas-fir, grand fir, western hemlock, incense cedar and western redcedar in the Partial Harvest Areas was variable plot cruised. Plot data is then used to calculate v-bar and basal area per acre using the National Cruise Processing Program. The basal area was determined with a Relaskop using a 20 BAF. This sale contains a total of 240 plots. 189 sample trees were randomly selected on these plots to determine v-bar. A map showing the location of the sample trees is available at the Springfield Interagency Office.

    Volume for Douglas-fir in the right-of-ways has been cruised using the 3P system to select sample trees. The sample trees have been cruised and the volume computed using the National Cruise Processing Program for estimating volume in 16 foot lengths and the volume expanded to a total right-of-way volume. A map showing the location and description of these sample trees is available at the Springfield Interagency Office. The timber volumes for all other grand fir, western hemlock, incense cedar and western redcedar in the right-of-ways were based on a 100% cruise using the National Cruise Processing Program for estimating board foot volume of trees in 16 foot logs.

    With respect to merchantable Douglas-fir (sample) trees: The average tree is 14.2” DBHOB; the average log contains 52 bd. ft.; the total gross merchantable volume is approximately 3,730 MBF; and 95% recovery is expected.

    CUTTING AREA: Approximately 216 acres must be partial harvested and approximately 6 acres of right-of-way must be clear cut.

    ACCESS: Access to the sale is provided by: 1. A public road; 2. BLM existing roads; 3. BLM roads to be constructed; 4. Roads covered by Right-of-Way and Road Use Agreement E-387 between Weyerhaeuser Company and the United

    States. In the construction, renovation, use, and maintenance of private roads, in the construction of yarding wedges, and the use of tailholds and guybacks, the Purchaser shall enter into a license agreement with Weyerhaeuser Company. The license agreement shall be delivered to Weyerhaeuser Company for execution at least 15 days prior to any use of company roads or lands. See the Prospectus for full terms and conditions of use.

    http:913,221.40http:34,146.00http:2,067.20http:8,615.20http:73,179.70http:795,213.30

  • Lucky Meyer Parcel No. 4

    ROAD MAINTENANCE: The Purchaser shall pay road use fees of $3,061.00 and rockwear fees estimated at $2,111.37 to Weyerhaeuser Company. The Purchaser shall pay to the BLM a road maintenance fee of $4,130.78 and a rockwear fee of $4,539.22 See the Exhibit D map for specifications of road maintenance responsibility. Only the map page of the Exhibit D is included in the Prospectus. Refer to the contract file for the full Exhibit D.

    In addition to the quantities shown below, 300 cubic yards (truck measure) of maintenance rock (gradation to be determined by AO) is required. Additional road reinforcement (rocking) may be required for wet weather haul and will be at the Purchaser’s expense.

    ROAD CONSTRUCTION: Spur 19A; Road Nos. 20-2-13.4, -14.2, -14.3, -20.2, -23.6 Seg. B, and -23.14 Length: 74.53 Stations Class: SN-14 Special Requirements: Operations limited to periods of dry weather. Culvert replacement/installation on streams shall be done between May 15 and November 30 (both days inclusive).

    ROAD RENOVATION: Road Nos. 20-2-14.2, -14.3, -18, -19, -20, -23, -23.2, -23.6 Seg. A, -23.10, -23.13, -27, and -27.1 Length: 466.01 Stations Class: SN-14 / SN-16 Special Requirements: Culvert replacement/installation on streams on Road Nos. 20-2-18 and -19 shall be done between June 1 and October 31 (both days inclusive). Culvert replacement/installation on streams on Road Nos. 20-2-23, -23.13, -27, and -27.1 shall be done between May 15 and November 30 (both days inclusive).

    ROAD IMPROVEMENT: Spur 19B Length: 11.60 Stations Class: SN-14 Special Requirements: Operations limited to periods of dry weather. Culvert replacement/installation on streams shall be done between June 1 and October 31 (both days inclusive).

    Rock Source: Commercial – Creswell Vicinity Estimated Quantities (CY truck measure)

    3/4” Minus 1-1/2” Minus 3” Minus 6” Minus 6” Open 590 2,238 3,516 3,486 115

    CULVERTS: Diameter: Length: Number:

    18” 692’ 22 24” 220’ 7 30” 135’ 3

    Total Estimated Exhibit C (construction, improvement, and renovation) Road Costs: $296,107.97

    ROAD DECOMMISSIONING: Road Nos. 20-2-23.6 Seg. B, -23.13, and -23.14 Barriers: 3 Estimated Cost of Decommissioning: $2,062.40 Special Requirements in Road Decommissioning: Operations limited to periods of dry weather

    DURATION OF CONTRACT: Duration of the contract will be 36 months for cutting and removal of timber.

    SPECIAL PROVISIONS: The contract will contain special provisions regarding road construction, road renovation, road improvement, road maintenance, road decommissioning, logging methods, prevention of erosion, logging residue reduction, and submission of a written logging plan specifying landing locations and logging schedule.

    Under Sec. 26 of the timber sale contract, ground based logging will be prohibited during periods of excessive soil moisture. This will normally limit ground based logging to July, August, and September.

    It is estimated that 545 MBF of additional timber, such as corridor and guyline trees may be removed under the contract, but it is not included in the advertised sale volume, nor is it included in the timber sale appraisal.

    http:2,062.40http:296,107.97http:4,539.22http:4,130.78http:2,111.37http:3,061.00

  • Lucky Meyer Parcel No. 4

    A Special Provision has been added that expands on safety and temporary traffic control measures required under the contract.

    A revised Special Provision has been added to the contract which enables the Contracting Officer to suspend the contract to facilitate protection of certain plant or animal species, and/or to modify or terminate the contract when necessary to: (1) Comply with the Endangered Species Act or to prevent incidental take of northern spotted owls in accordance with management direction in the Record of Decision (ROD) and Resource Management Plan (RMP), or; (2) Comply with a court order, or; (3) Protect species which were identified for protection through survey and manage and/or protection buffer standards and guidelines or management direction established in the ROD and RMP.

    OTHER SPECIAL REQUIREMENTS: 1. Monument corner and bearing tree protection is required in Partial Harvest Area 1 when yarding from Road No.

    20-2-14.3 and in Partial Harvest Area 2 from Road No. 20-2-20 where yarding corridors/guybacks have the potential of damaging these features, and re-monumentation of features will be required if damaged.

    2. Notification and coordination with Lane Electric Cooperative shall be required prior to renovation on Road Nos. 20-223 and 20-2-27 (Rat Creek Road).

    3. No felling, yarding, or loading is permitted in or through the Reserve Area shown on Exhibit A, except for the Special Operating Area in Partial Harvest Area 3. Full suspension of logs over stream shall be required, and all trees felled for corridors within the Reserve Area shall remain on site, unless otherwise approved by the Authorized Officer.

    4. No harvest activities shall be conducted in the Partial Harvest Areas during sap flow from April 1 to June 15 of each year, unless otherwise approved by the Authorized Officer.

    5. The Purchaser shall be required to clean logging, road, decommissioning, and slash piling equipment prior to entry on BLM lands.

    6. Prior to entering T. 20 S., R. 2 W., Section 13, the Purchaser shall wash and/or rewash all logging, road, decommissioning, and slash piling equipment arriving from other projects, including other Partial Harvest Areas within this sale.

    7. Approximately 58 trees marked with an orange “W” in the Partial Harvest Areas shown on Exhibit A are reserved from cutting. All Wildlife Trees felled for safety and operational reasons shall remain on site.

    8. Use of native surface roads shall be restricted to dry periods (typically July 1 to September 30). 9. Operations (tailholds) may coincide with operations in an adjacent BLM sale in the south half of T. 20S., R. 2W.,

    Section 13. 10. The Purchaser shall provide a map of requested skyline and skid trail locations a minimum of seven (7) working days

    in advance of cutting to obtain approval of the locations from the Authorized Officer. 11. Purchaser shall pile logging slash at all landings and within 25 feet of Spur 19B and Road Nos. 20-2-18, -19, -23

    and -23.2. 12. Feller Buncher operations may be permitted in ground based areas with a written waiver request by Purchaser and

    approval by Authorized Officer. If approved, whole tree yarding, or yarding with tops attached will be authorized. 13. The Purchaser shall be required to spread BLM-provided seed and mulch at culverts and designated areas in

    accordance with the plans and specifications shown in Exhibit C of this contract. 14. The Purchaser will be required to file a Notification of Operations with the Oregon Department of Forestry office for all

    harvest operations and road construction, renovation, and improvement on BLM and private.

    OPTIONAL CONTRIBUTION: The Purchaser will have the option of performing pile burning or contributing $4,118.48 in lieu thereof. The option must be declared prior to contract execution. Piling and covering are not included in the Optional Contribution and will remain the responsibility of the Purchaser.

    NARRATIVE DESCRIPTION OF HOW TO GET TO SALE AREA: Portions of this sale are accessed through locked gates over private land. Prospective bidders may obtain a key from the

    Springfield Interagency Office and proceed to the sale area. Any other persons interested in visiting the timber sale

    should first contact Brian Bickford at 541-683-6164.

    To Partial Harvest Area No. 2 (west portion): From Creswell, proceed south on Interstate 5 for approximately 6.0 miles to Exit 176 (Saginaw Exit). Take Exit 176 and proceed east to Sears Rd. Proceed north on Sears Rd for approximately 0.7 miles to the junction of Meyer Rd. Proceed on Meyer Rd for approximately 2.2 miles to the sale area.

    To Partial Harvest Area No.2 (east portion): Return to Meyer Rd. and proceed north for approximately 1 mile to the junction of Castle Rock Rd. Proceed east on Castle Rock Rd for approximately 1.7 miles to the junction of WY 1000 Rd. Proceed east on WY 1000 approximately 0.6 miles to the jct with WY 1200 Rd. Proceed south on WY 1200 Rd for approximately 1 mile and follow timber sale location signs to the sale area.

    http:4,118.48

  • Lucky Meyer Parcel No. 4

    To Partial Harvest Area No. 3: From Cottage Grove, proceed east onto Row River Road (County Road No. 2400) for approximately 1.5 miles to Road No. 20-2-27 (Rat Creek Road). Proceed northeast onto Rat Creek Road for approximately 2 miles to the junction of Road No. 20-2-27.1. Proceed east for approximately 1 mile to the main portion of the sale area. To other portions of the sale area: Return to Road No. 20-2-27 (Rat Creek Road) and proceed north for approximately 0.6 miles and follow timber sale location signs to the sale area.

    To Partial Harvest Area No. 1: Return to Road No. 20-2-27 (Rat Creek Road) and proceed north for approximately 1.4 miles to the junction of Road No. 20-2-23. Proceed east on Road No. 20-2-23 for approximately 0.5 miles and follow timber sale location signs to the sale area.

  • Meyers Rd

    Row River Road

    Rat Cre

    ek Road

    Rat

    Creek

    ML

    20-2-27.1

    20-2-2

    3.2

    Rock ML WY 1000 WY 120020-2-17

    20-2-18.1 20-2-

    23

    Spur 23

    A

    12

    Timber Sale Location MapSale Name: Lucky Meyer

    T. 20 S., R. 2 W., SEC. 13, 19, 23, WILL. MER., NORTHWEST OREGON DISTRICT, SPRINGFIELD INTERAGENCY OFFICE 0201 06 05 04 03 01

    T20S R

    03W

    T20S R02W

    07 08 09 10 11 12

    Castle I-5 Approximately 2 Miles Partial HarvestArea No. 1

    13

    18 17 16 15 14 13

    24 19 20 21

    Partial Harvest25 Area No. 2

    28

    22 20-2-23.6

    23 24

    Partial Harvest 2530 27 26 Area No. 329

    I-5 Approximately 3 Miles

    32 34 35 36 31 33

    T20S R02W Dorena Lake 02 01

    01 T21S R02W 05 04 03 Harvest Unit Travel Route Gate

    NARRATIVE DESCRIPTION OF HOW TO GET TO SALE AREA: Portions of this sale are accessed through locked gates over private land. Prospective bidders may obtain a key from the Springfield InteragencyOffice and proceed to the sale area. Any other persons interested in visiting the timber sale should first contact Brian Bickford at 541-683-6164. 0 0.5 1 Miles To Partial Harvest Area No. 2 (west portion):From Creswell, proceed south on Interstate 5 for approximately 6.0 miles to Exit 176 (Saginaw Exit). Take Exit 176 and proceed East to Sears Rd.Proceed North on Sears Rd for approximatelty 0.7 miles to the junction of Meyer Rd. Proceed on Meyer Rd for approximately 2.2 miles to the sale area.To Partial Harvest Area No. 2 (east portion):Return to Meyers Rd. and proceed north for approximately 1 mile to the junction of Castle Rock Rd. Proceed east on Castle Rock Rd for approximately 1.7 miles to the junction of WY 1000 Rd. Proceed east on WY 1000 approximately 0.6 miles to the jct with WY 1200 Rd. Proceed south on WY 1200 Rd for approximately 1 mile and follow timber sale location signs to the sale area.To PartiaFrom Co l Harvest Area No. 3:ttage Grove, proceed east onto Row River Road (County Road No. 2400) for approximately 1.5 miles to Road No. 20-2-27 (Rat CreekRoad). Proceed northeast onto Rat Creek Road for approximately 2 miles to the junction of Road No. 20-2-27.1. Proceed east for approximately 1 mile to the main portion of Partial Harvest Area No. 3. To other portions of PH No. 3: Return to Road No. 20-2-27 (Rat Creek Road) and proceed north for approximately 0.6 miles and follow timber sale location signs to the sale area.To Partial Harvest Area No. 1: United States Department of the InteriorReturn to Road No. 20-2-27 (Rat Creek Road) and proceed north for approximately 1.4 miles to the junction of Road No. 20-2-23.0. Proceed east Bureau of Land Managementon Road No. 20-2-23 for approximately 0.5 miles and follow timber sale location signs to the sale area. Oregon State OffiP.O. Box 2965 ce No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data Portland, Oregon 97208-2965for individual or aggregate use with other data. Original data were compiled from various sources. This information maynot meet National Map Accuracy Standards. This product was developed through digital means and may be updated without notification.

    P:\eug\UW\TimberSales\FY2017\CoastDorenaEA\Exhibits\GISMaps\LuckyMeyer\LuckyMeyer_Location.mxd 11/2/2016

  • Seasonal Restriction Matrix Lucky Meyer

    Restricted Times

    Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Restricted Activity:

    1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 1 15 Road Construction, Improvement,

    Decommissioning, Use of native-surface roads,

    and Ground based yarding October 1 – June 30

    May vary due to weather conditions; soil moisture still overrides weather conditions

    Partial Harvest Area Activities (Sap flow)

    April 1 – June 15 Sap flow restrictions may be conditionally

    waived at the discretion of BLM Stream Culvert Installation and Removal-

    Section 19

    November 1 – April 30, both days inclusive

    Stream Culvert Installation and Removal-

    Sections 13, 23

    December 1 – May 14, both days inclusive

    NOTE: This chart is for informational purposes only. Refer to Section 42 Special Provisions of the timber sale contract for exact date restrictions and specifications. Subject to transient winter snow, elevation ranges from 1600-3000 feet.

  • UNITED STATES EXHIBIT ADEPARTMENT OF THE INTERIOR Sheet 1 of 3BUREAU OF LAND MANAGEMENTLUCKY MEYER TIMBER SALE CONTRACT NO. ORN05-TS17-502T. 20 S., R. 2 W., SEC. 13, WILL. MER., NORTHWEST OREGON DISTRICT

    20-2-14.2

    20-2-23

    -14.3

    20-2-23

    20-2-23.14 -13.4

    20-1-18

    -23.10

    2700

    2900

    2700

    2600

    2500

    2400

    2300

    2800

    BLM

    BLM BLM

    WEYERHAEUSER COMPANY

    WEYE

    RHAEU

    SER

    COMP

    ANY

    158

    23

    18

    13

    12

    19

    07

    14

    11

    24 Partial Harvest Area - Cable Construction-Rock Contract Area Rocked RoadBoundary of Cutting Area- 0 500 1,000 1,500 2,000Renovation/Improvement FeetPosted, Painted StreamReserve Area

    GateRight-of-Way (Clearcut) Found CornerUnit/Acres Approximate Location of Wildlife Trees Impassible

    Partial Harvest AreaRight-of-Way (Clearcut)Reserve AreaContract Area

    582100160 A.

    Total Partial Harvest Area 216.00Total Total Right-of-Way (Clearcut) 6.00Total Reserve Area 535.38Total Contract Area 757.38 A.

    United States Department of the InteriorBureau of Land ManagementNo warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these data Oregon State Offifor individual or aggregate use with other data. Original data were compiled from various sources. This information may P.O. Box 2965 ce not meet National Map Accuracy Standards. This product was developed through digital means and may be updated Portland, Oregon 97208-2965 without notification. 1/5/2017Document Path: P:\eug\UW\TimberSales\FY2017\CoastDorenaEA\Exhibits\GISMaps\LuckyMeyer\LuckyMeyer_ExA_sec13.mxd

  • !!

    !

    !!

    !!

    !!

    !!

    !

    !!

    !

    !!

    !

    !!

    !

    UNITED STATES EXHIBIT ADEPARTMENT OF THE INTERIOR Sheet 2 of 3BUREAU OF LAND MANAGEMENTLUCKY MEYER TIMBER SALE CONTRACT NO. ORN05-TS17-502T. 20 S., R. 2 W., SEC. 19, WILL. MER., NORTHWEST OREGON DISTRICT

    ! !

    !

    !

    !

    !

    ! !

    !

    ! ! !

    ! ! !

    ! ! !

    ! !

    !

    ! !

    !

    !

    !

    !

    ! !

    !

    !

    !

    !

    ! !

    !

    ! !

    !

    !

    !

    !

    !

    !

    !

    ! ! !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    ! !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    ! !

    !

    !

    !

    !

    !

    !

    !

    ! !

    !

    !

    !

    ! !

    !

    ! ! ! !

    ! ! !

    ! !

    !

    ! ! !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    ! !

    ! !

    ! !

    !

    !

    !

    !

    ! ! !

    ! ! !

    ! ! !

    !

    !

    ! !

    !

    !

    20-2-18 20-2-19

    20-2-18

    Spur 19

    B

    20-2-19.6

    20-2-19.2

    Spur 19A

    20-2-19.4

    20-2-19.1

    20-2-20

    20-2-20.2

    !

    1300

    1800

    1500

    1800

    1700

    1700

    1400

    o

    o

    oo

    o

    o

    o92104 Lot 241.92

    Lot 141.97

    Lot 341.87

    Çǯ

    BLM

    BLM

    BLM

    BLM BLM

    BLMBLM

    WEYERHAEUSERCOMPANY

    WEYERHAEUSER COMPANY WEYERHAEUSER

    COMPANY

    WEYERHAEUSER COMPANY

    LONE R

    OCK T

    IMBER

    PRIVA

    TE

    24 ³ ³³

    29

    17

    30

    19

    25

    18

    20

    13

    YardingWedge

    YardingWedge

    ParV V V V V VV V V V V VV V V V V VV V V V V V

    tial Harvest Area - Cable Construction-Rock

    ###################################################################################################

    Partial Harvest Area - Ground Based Rocked Road Yarding Wedge Renovation/Improvement

    ! ! ! ! ! !Contract Area Stream Reserve Area Ç Ç¯ GaBoundary of Cutting Area - ! Found CornerPosted, Painted Approximate Location ofRight-of-Way (Clearcut) o Wildlife Trees

    ±te 0 500 1,000 1,500 2,000Feet 1010 Unit/Acres Contract Area

    Partial Harvest Area 104.00Right f-Way (Clearcu 3.00Reserve Area-o t) 258.76365.76 A.

    No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these daf idua or aggregat ith other data. Ori inal dat iled from various sources. ThiMap Accuracy Swithout noDocument not meeor indiv t tNatifiPa

    ionalie use w t

    tcath:on.P:\

    g a were compandards. This product was developed through digital s information maymeans and may be updated Portlta

    United States Department of the InteriorBureau of Land ManagementOregon State OffiP.O. Box 2965 ce and, Oregon 97208-2965 2/7/2017eug\UW\TimberSales\FY2017\CoastDorenaEA\Exhibits\GISMaps\LuckyMeyer\LuckyMeyer_ExA_sec19.mxd

    l

    9

    http:Clearcu3.00

  • -13

    20-2-23

    20-2-23.

    2

    20-2-23.8

    20-2-23.14 4

    -2Se3g.6B

    20-2-26.2

    20-2-23.12

    20-2-23.13

    20-2-23.6

    20-2-27.1

    20-2-2

    7

    -23.10

    20-2-27.1

    20-2-23

    20-2-2

    7 20-2-27

    22

    27

    13 15

    UNITED STATES EXHIBIT A DEPARTMENT OF THE INTERIOR Sheet 3 of 3BUREAU OF LAND MANAGEMENTLUCKY MEYER TIMBER SALE CONTRACT NO. ORN05-TS17-502 T. 20 S., R. 2 W., SEC. 23, WILL. MER., NORTHWEST OREGON DISTRICT

    14

    BLM

    WEYERHAEUSERCOMPANY 23 BLM

    BLM 24

    Lot Lot38.683 38.362

    BLM

    Lot38.131

    LotBLM 38.347

    BLM

    WEYERHAEUSER

    COMPANY

    Lot38.118

    WEYERHAEUSER26 COMPANY

    Partial Harvest Area - Cable Construction-Optional Rock Special Operating Area Construction-Rock Contract Area Rocked Road Boundary of Cutting Area Renovation/ImprovementPosted, Painted Stream Reserve Area GateRight-of-Way (Clearcut) Approximate Location of

    Unit/Acres Wildlife Trees

    No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or completeness of these datafor individual or aggregate use with other data. Original data were compiled from various sources. This information may not meet National Map Accuracy Standards. This product was developed through digital means and may be updated without notification. Document Path: P:\eug\UW\TimberSales\FY2017\CoastDorenaEA\Exhibits\GISMaps\LuckyMeyer\LuckyMeyer_ExA_sec23.mxd

    25

    0 500 1,000 1,500 2,000Feet Partial Harvest Area 54.00Right-of-Way (Clearcut) 1.00Reserve Area 176.62Contract Area 231.62 A.

    United States Department of the Interior Bureau of Land ManagementOregon State OffiP.O. Box 2965 ce Portland, Oregon 97208-2965 1/5/2017

    .

    http:Area176.62

    Prospectus Request-Mar 17CvrSht-Mar 17TSN Perry_RoadLocation_Map-Perry_RoadSRMatrix-Perry_RoadXA-PerryRoad_Sec_09_17TSN-High Pass SalvageLocation_Highpass_SalvageSRMatrix-High Pass SalvageXA_High Pass SalvageTSN-Whats BruinLocationMap-WhatsBruinSRMatrix-Whats BruinXAS1-sec 33-WhatsBruinXAS2- sec31-WhatsBruinXAS3- sec3-WhatsBruinTSN-LuckyMeyerLocation-LuckyMeyerSRMatrix_LuckyMeyerXAS1-LuckyMeyer-sec13XAS2-LuckyMeyer_sec19XAS3-LuckyMeyer-sec23