united states bicycle route system: draft corridor plan
DESCRIPTION
United States Bicycle Route System: Draft Corridor Plan. The Vision. To encourage the development of a coordinated system of US bicycle routes across the country. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/1.jpg)
United States Bicycle Route System: Draft Corridor Plan
![Page 2: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/2.jpg)
The Vision
To encourage the development of a coordinated system of US bicycle routes across the country.
The Task Force was charged with developing a recommended national systems-level or corridor-level plan for use in designating potential future US bicycle routes.
![Page 3: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/3.jpg)
![Page 4: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/4.jpg)
![Page 5: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/5.jpg)
1956-2006 1976-2006
![Page 6: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/6.jpg)
PHASE 1
• Collect, compile and review information on existing and proposed multi-state bicycle routes. In 2005, ACA collected the data and formalized it into a multilayer spreadsheet.
![Page 7: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/7.jpg)
![Page 8: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/8.jpg)
A
ZY
G
S
L
E
• Pennsylvania state designated routes
ArkansasMemphis to Fort Smith cross state route from the Dept. of Parks & Tourism
US-70, 49, 107, 64, AR-147, 50, 70, 1, 284, 306, 38, 31, 319, 60, 236, 89, 10, 176, 9, 154, 7, 155, 22
Per advocacy groups
AR-7 a western-central north-south route
US-71 western side north-south route
AR-1 eastern side north-south route
US-62 northern side east-west route
US-82 southern side east-west route
![Page 9: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/9.jpg)
Inventory of existing and proposed national and state bike routes and trail systems.
![Page 10: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/10.jpg)
PHASE 2
• Develop recommended corridors to comprise a logical national system, called the U.S. Bicycle Corridor Plan. Corridors demonstrate an area (+/- 50 mile radius) where a route should exist.
![Page 11: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/11.jpg)
Corridor Criteria
• Meet the planning, design, and operational criteria in the AASHTO Guide for Development of Bicycle Facilities.
• Access destinations and regions with high tourism potential, including routes that incorporate important scenic, historic, cultural, and recreational values.
• Link major metropolitan areas to connect key attractions and transportation nodes.
• Reasonably direct in connecting cities or attractions.
Primary Considerations - Corridors should meet as many of the following as practicable:
![Page 12: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/12.jpg)
Corridor Criteria Continued
• Make natural connections between adjoining states, Canada, and Mexico when possible.
• Have more or less even distribution, though route density will need to consider both population density and available, suitable roads.
• Include major existing and planned bike routes, including both on-road facilities and off-road shared use paths suitable for road bikes.
Secondary Consideration• Offer services and amenities such as
restaurants, accommodations, camping, bicycle shops, and convenience/grocery stores at appropriate intervals.
![Page 13: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/13.jpg)
Inventory of routes overlaid by the proposed corridor system
![Page 14: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/14.jpg)
Showing all possible Corridors
![Page 15: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/15.jpg)
![Page 16: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/16.jpg)
PHASE 3
• Produce a map of the draft U.S. Bicycle Corridor Plan.
![Page 17: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/17.jpg)
![Page 18: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/18.jpg)
PHASE 4
• Develop a logical system of designations for U.S. bicycle routes and assign appropriate designations to each corridor. Designations will comprise of a number, name, letter or combination system that will accommodate future expansion of the system.
![Page 19: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/19.jpg)
PHASE 5 & 6
• Distribute the draft Corridor Plan for review by the Joint Technical Committee on Non-motorized Transportation, Subcommittee on Design, and Subcommittee on Traffic Engineering.
• Present revised draft Corridor Plan for review by the Standing Committee on Highways for endorsement as an “official corridor plan.”
![Page 20: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/20.jpg)
AASHTO’s On-Going Role
• AASHTO is primarily interested in coordinating routes that cross state lines.
• State DOTs submit applications for each US Bike Route to the Special Committee on Route Numbering for approval and designation.
• Web site, including overview and all pending requests: http://cms.transportation.org/?siteid=68
![Page 21: United States Bicycle Route System: Draft Corridor Plan](https://reader036.vdocuments.site/reader036/viewer/2022062721/5681372c550346895d9eb85f/html5/thumbnails/21.jpg)
For More Information, See Adventure Cycling Website
www.adventurecycling.org/routes/nbrn/usbikewaysystem.cfm