Page 1: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 1

United Nations Economic Commission for Europe

TRANS-EUROPEAN RAILWAY (TER) PROJECT

2nd Expert Group Meeting (Budapest, 23 September 2004)

By Mr. Michalis P. Adamantiadis, Regional Adviser

Page 2: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 2

United Nations Economic Commission for Europe

Content

• Background (TOR-Tasks-Participation)

• Elaboration

• Objectives of the Meeting

• Review of the work

• Problems encountered

• Next steps

Page 3: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 3

United Nations Economic Commission for Europe

Terms of ReferenceObjectives

Consistent and realistic investment strategy for the development of the rail and combined transport infrastructures in the wider TER Region, supporting:

• Promotion of TER Project goals

• Extension of TEN-T

• Development of Pan-European Transport Corridors

• Promotion of intermodality

• European transport integration

Page 4: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 4

United Nations Economic Commission for Europe

Tasks• Review of related TER work and European

initiatives, policies and studies (WP.1, 2)• Socioeconomic framework of concerned countries

and alternative scenarios of growth (WP.3)• Methodology and main assumptions (WP.4)• Inventory of needs (WP.5)• Elaboration of Master Plan (WP.6)• Funding questions/financing arrangements

(WP.7)• Border crossing questions (WP.8)• Conclusions/recommendations/

dissemination(WP.9)

Page 5: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 5

United Nations Economic Commission for Europe

Country LegendCountry LegendTER MemberTER MemberTER ObserverTER ObserverOtherOther

Participation

Page 6: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 6

United Nations Economic Commission for Europe

Page 7: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 7

United Nations Economic Commission for Europe

ElaborationOrganisation and management (WP 0)

• PCO Main responsible

• National Experts Consolidate national information

• Invited organizations Thematic support/guidance

• External consultants Technical/ scientific assistance

TER Master Plan Expert Group

PCO, National Experts, Organizations, Consultants, UNECE

TEM and TER Master Plan Coordination Group

PCOs, External Consultants, UNECE

Page 8: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 8

United Nations Economic Commission for Europe

CompletedReview of TER development (WP 1)

Description of work / tasks

1.1: Introduction of the TER Project objectives and degree of their attainment

1.2: Introduction of the TER technical standards

1.3: Introduction of TER network and plans

1.4: Introduction of the TER GIS mapping and database

1.5: Introduction of the TER Master Plan decisions

Outputs – deliverables

TER Project’s background, objectives and plans

Time October 2003

Page 9: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 9

United Nations Economic Commission for Europe

Completed (2)TER environment in Europe (WP 2) Description of work / tasks

2.1: Collection and review of relevant studies and works

2.2: Pan-European Transport Corridors (PETCs) and TER

2.3: Transport Infrastructure Needs Assessment (TINA) and TER

2.4: Trans European Transport Networks (TEN-T) and the TER

2.5: EU railway infrastructure package and its impact in TER region

2.6: TER role and perspectives in the Pan-European context

Outputs – deliverables

TER environment in Europe

Time November 2003

Page 10: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 10

United Nations Economic Commission for Europe

Completed (3)

Socio-economic framework of the concerned countries (WP 3) Description of work / tasks

31: Economic and social characteristics of concerned countries

3.2: Alternative scenarios of growth

Outputs – deliverables

Socio-economic status and scenarios of growth in the countries of the TER wider region

Time January 2004

Page 11: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 11

United Nations Economic Commission for Europe

Completed (4)Methodology (WP 4) Description of work / tasks

4.1: Definition of bottlenecks, missing links and other priority transport infrastructure needs

4.2: Identification of parameters and assumptions

4.3: Criteria of priority infrastructure needs

4.4: Identifications of data requirements

Outputs – deliverables

Methodology and main assumptions for the work

Time January 2004

Page 12: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 12

United Nations Economic Commission for Europe

To be done (1)Priority infrastructure needs in concerned countries (WP 5)

Description of work / tasks

5.1: Collection of necessary information

5.2: Analysis and control of information obtained

5.3: Review and update the TER Region traffic forecasts

5.4: Establish alternative scenarios for the TER Master Plan

5.5: Review and prioritize proposed projects

5.6 Identify interconnections between TER other network components (Ports-IWW-SSS-CT)

5.7: Identify possible connections and extensions of the TER Network with neighboring regions

Outputs – deliverables

Inventory of priority infrastructure needs and assessment of their costs

Time May 2004

Page 13: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 13

United Nations Economic Commission for Europe

To be done (2)Elaboration of Master Plans (WP 6) Description of work / tasks

6.1: Identification of the wider TER Region Backbone Network

6.2: Elaboration of the wider TER Region Master Plan and its alternative implementation scenarios

6.3: GIS presentation of the wider TER Region Master Plan

Outputs – deliverables

TER Master Plan and GIS maps

Time June 2004

Page 14: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 14

United Nations Economic Commission for Europe

To be done (3)Addressing funding questions (WP 7)

Description of work / tasks

7.1: Inventory of specific projects for implementation

7.2: Estimate of budget for the implementation

7.3: Possibilities of stage construction

7.4: Technical and institutional actions for implementation

7.5: Estimate of financial resources available

7.6: Perspectives to construct the wider TER Region Backbone Network

Outputs – deliverables

1. Inventory of specific priority projects and costs

2. Definition of technical and institutional actions required

Time July 2004

Page 15: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 15

United Nations Economic Commission for Europe

Addressing border crossing questions (WP 8)

Description of work / tasks

8.1: Inventory of border crossing problems on the wider TER Region Backbone Network and improvement recommendations

Outputs – deliverables

1.    Inventory of border crossing problems

2. Recommendations for improvement

Time July 2004

To be done (4)

Page 16: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 16

United Nations Economic Commission for Europe

To be done (5)Conclusions/Recommendations (WP 9) Description of work / tasks

9.1: Conclusions and recommendations

9.2: Results on the WEB pages

9.3: Publication of newsletter, brochures and summary report

9.4: Organization of workshops to present the the results

Outputs – deliverables

1. Final Report

2. Dissemination and Public awareness

3. Follow-up preparation

Time September 2004

Page 17: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 17

United Nations Economic Commission for Europe

Reviewed Work Time Plan

YEAR 2003 YEAR 2004

MONTHS

WP

1

SEPT

2

OCT

3

NOV

4

DEC

5

JAN

6

FEB

7

MARCH

8

APR

9

MAY

10

JUNE

11

JUL

12

AUG

SEP

WP0

WP1

WP2

WP3

WP4

WP5

WP6

WP7

WP8

WP9

Master Plan Coordination

Group Meetings

Master Plan TEM and TER

Expert Group Meetings

Elaboration-Time table

Page 18: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 18

United Nations Economic Commission for Europe

Objectives of the Meeting

• Review of the work

• Economic and social characteristics-WP 3.1

• Alternatives scenarios of growth-WP 3.2

• Analysis and evaluation of projects – WP.5

• Additional data needs

• Follow-up actions

Page 19: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 19

United Nations Economic Commission for Europe

Review of the work done

• 1st Coordination meeting, Budapest 16/9/03 • 2nd Coordination meeting, Warsaw 15/12/03• 3rd Coordination meeting, Geneva 9/6/04• 1st EGM Budapest, 10-11 February 2004• 2nd EGM Budapest, 23 September 2004• Completed: WP 1, WP 2, WP 3, WP 4, WP 5

(part)• TEM and TER Master Plans Website opened

and updated

Page 20: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 20

United Nations Economic Commission for Europe

Review of work to be done

• Inventory of needs (WP.5)• Elaboration of Master Plan (WP.6)• Funding questions/financing

arrangements (WP.7)• Border crossing questions (WP.8)• Conclusions/recommendations/

dissemination(WP.9)

Page 21: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 21

United Nations Economic Commission for Europe

Problems encountered• Late submission of country inputs

• Not all countries provided inputs

• Missing data

• Delay in the elaboration

• Short time left for completion

Page 22: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 22

United Nations Economic Commission for Europe

Next steps

•Cover missing data

•Complete the rest of the work, by October 2004

• Convene the 4th TEM and TER Master Plans Coordination Meeting, Budapest, 25 October 2004

• Present the result to the next Steering Committee

• Decide upon the appropriate follow-up actions

• Implement the follow-up actions (starting in 2005)

Page 23: United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September

UNECE Transport Division 23

United Nations Economic Commission for Europe

FOR INTEGRATION AND DEVELOPMENT