unit_4 balance civil works 08.008.14
TRANSCRIPT
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
1/20
sr.
noDescription Constraints
TRANSFORMER YARD AREA
1 Drain along Road beyond Transformer yard
2 AWU towards U#3, founds not completed
3Cable trench near GT
4Balance precast cover in RAT
5
Balance paving near GT
6Pending works of drain along A row
7 Painting of fencing gates to be done.
8
Precast fixing in fire fighting pipe line
9 Cable trench and Drain cleaning and dewatering
10 Gcb Balance cladding
11
Providing rain water down comers and connecting
with floor bends (As per dwg)
POWER HOUSE BUILDING
12 Sheeting for Elevator within PHB
13 C-Row & A-Row Cladding sheet
u ect to proper
alignment as per
drawing
14 Gable End Cladding Sheet
15 Windows on A-Row,B Row,C- Row & Gable End
0.0M Floor
16 Toilets
17 Wall along C-Row
18 C-Row Column Encasing
19 Balance ironite flooring
20
Toilet: Balance work wc wash washing basin, doors
fixing, fixtures and fittings, painting etc
21 cladding C - row and Gable end
22 Fixing of Chequered plate
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
2/20
23
Balance brickwork & plaster along C row and Gable
end.
24 General painting of walls and structural steel.
25 Balance Window and cladding Fixing
26 Final Painting work internal and External PHB
6.9 M Floor
27 Ironite Flooring
28 Kerb wall around openings
29 Toilets
30 Plastering near Staircase
8.5 M
31 ,
32 Turbine MCC room: Painting work balance
10 m floor
33 Final painting to be done.
34Door fixing C-Row
35 Window and cladding
13.6 Floor
36 Ironite Flooring
37 Kerb wall around openings
38 Toilets
39 Granite Flooring40 S.S handrailing.
41 Construction of parapet wall
42
CER Room---Pop,paiting,Seepage repair,fall ceiling
repair ,outer face plaster work
damage done by Ril IT
and C & I
Swas Room Block:
43
False ceiling workWater flooding from
top to be arrested by
RIL
44 Acid resistant paint & OBD Not in scope
45 Drains to be cleaned and connected to main drain
46Final painting
47 Outer face plaster and painting
48 Windows to be fixed.
LT SWGR room:
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
3/20
49 Window repair
50 Final painting
H T Switch Gear Room
51Opning hole packed
52 AWU ducting opining pending
53 Final painting
19.0m Floor
54Ironite flooring to be completed.
55 Balance brickwork around openings in AHU room
56 Windows to be fixed in AHU room.
57 Balance 1no door to be provided.
58 Civil scrap dump in cable room
59Window fixing and cladding & gable end
60 Final painting to be done.
22.0m floor
61 Final painting to be done.
62Window fixing and cladding & gable end
63 Fixing of window glass incomplete.
26.0 m floor
64 Hardener flooring to start
65 Hand railing.
66 Roof water treatment.
67 Kerb wall and parapet wall to complete.
68 Windows along B row to complete.
69 AWU towards U#3 not completed
70 Over head tank of 5000 lit for toilets & pipeing main.
37.6m floor
71 Roof water treatment.
72 Parpet wall to complete.
73 Closing of openings around Roof extractors
CD BAY,BOILER & ESP AREA UPTO CHIMNEY
74 Drain along C-RowWater left from boiler to
be removed
75 Drain parallel to Bunker 4A
76 Pavement in Bunker 4A Area
77 Mill Reject Silo Foundation
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
4/20
78 TP 12 Roof Sheeting
79 Bunker 4A Cladding sheet
80 Bunker 4B Cladding sheet81 BAT Culvert between U#4 to U#5 behind ESP Front not available
82 BAT Culvert from PA&FD Area to ESP of U#4 Front not available
83 Pavement between Road & ESP along East West Front not available
84 BAT top slab on the south side of ESP
85 Precast cover for BAT & S Row Drain
86 Boiler Elevator Cladding Sheet
87 Pavement between PHB & Service Bldg.
itd scope only from 37
grid
88Finishing works of CPU Regeneration Area liketiling,screed concrete,kerb wall,etc
89 Air Receiver Foundation
90 Sewer line pavement ACW pipe not installed
91 CPU Waste water pit in CD bay Front not available
92 BAT Pedestal in ESP Area completed
93 Drain between ESP & BAT towards U#3 alongE-W dirn.
ASH SLURRY SUMP AREA
94 Column Encasing
95 Pavement between Ash Slurry sump & Electrical Room96 Handrail & Chequered plate in Ash slurry sump Chequered plate not av
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
5/20
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
6/20
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
7/20
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
8/20
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
9/20
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
10/20
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
11/20
STATUS AS ON 08-08-14 Completion Date
Completed Completed
Completed Completed
Completed Completed
COMPLETED 30-6-14
COMPLETED Available scope completed
COMPLETED Available scope completed
12/8/2014 15/6/2014
NOT IN SCOPEFire fighting works area not in
scope
Completed Completed
Completed Completed
20-6-14
NO ELEVATOR No elevator
A-row completed & C row 20-
8-14
A-row completed & C row 10-6-
14
Completed 10/6/2014
NCL issue NCL issue
COMPLETED 15-6-14
COMPLETED 10/6/2014
COMPLETED completed
COMPLETED completed
30-08-14 15-6-14
PT. NO 14 & 13 15-6-14
COMPLETED completed
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
12/20
COMPLETED completed
after mansoon after mansoon
NCL issue 20-6-14
after mansoon 20-6-14
COMPLETED 20-6-14
COMPLETED 5/6/2014
COMPLETED 15-6-14
COMPLETED 15-6-14
COMPLETED 20-6-14
COMPLETED 15-6-14
COMPLETED 20-6-14
COMPLETED completed
COMPLETED completed
20-6-14
COMPLETED 14-6-14
COMPLETED 15-6-14
Reliance trailer damaged the
granite around 400 m2 -20-08-
14
20-6-14
Completed 10/6/2014
Completed
17-08-14 10/6/2014
Not in scope
Completed Already cleaned
After arresting of water leakage
from Ril - 5 days required
After arresting of water leakage
from Ril
COMPLETED 20-6-14
COMPLETED Completed
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
13/20
COMPLETED completed
COMPLETED completed
COMPLETED completed
COMPLETED completed
26-6-14
COMPLETED completed
COMPLETED completed
COMPLETED completed
COMPLETED completed
COMPLETED completed
COMPLETED completed
COMPLETED 20-6-14
completed 20-6-14
completed completed
completed completed
not in scope not in scope
completed 15-6-14
completed NCL issue
completed completed
not in scope not in scope
not in scope not in scope
completed 15-6-14
not in scope not in scope
Completed
Completed
Completed completed
Completed Front not available
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
14/20
Completed completed
completed but the entire sheets
were removed by other agency
Twice
15-6-14
completed but the entire sheets
were removed by other agencyTwice
15-6-14
Design issues 15 days
completed 16 days
completed 19 days
completed 10/6/2014
completed 15-6-14
PowerMech work at top not
completed safety issues to
work at bottom
20-6-14
not in scope not in scope
completed
completed available front completed
10/8/2014
boiler water to be removed by
Reliance15-6-14
completed
Completed Completed
Not in scope 10/6/2014
ailable in RIL Store
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
15/20
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
16/20
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
17/20
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
18/20
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
19/20
-
8/11/2019 Unit_4 Balance Civil Works 08.008.14
20/20