UNIFI INSTALLATION GUIDE OUTSIDE PREMISE Beyond TM Scope Standard Provided by TM Provided by TM Customer to bear the cost Standard SCENARIO CATEGORY RESPONSIBILITY If cable is blocked outside customer’s compound If cable is blocked within customer’s compound If customer requires installation via surface cabling If customer requires installation via underground cabling 2.1 2.2 Standard Optional Provided by TM Customer to bear the cost SCENARIO CATEGORY RESPONSIBILITY From pole straight to Entry Wall From pole to Entry Wall via underground and surface cabling Note: Materials : GI Pipe, Jubilee Clip, Microduct and Cement. 1. Installation for Scenario 1 is considered as TM standard installation subject to customer private housing policy. 2. Installation for Scenario 2.2 requires customer to appoint own contractor to resolve the blockage. Note: Materials : GI Pipe, Jubilee Clip, Microduct, Cement. TM Installation work scope for scenario 4 comprise of underground cabling for outside customer compound and surface cabling inside customer compound. 4.1 First 10 meter RM 200 RM 10 4.2 Each additional 1 meter PRICE CABLING LENGTH Charges For Scenario 4 FWS DP 1 2 FWS DP 4 3 Where Distribution Point (DP) On-ground Where Distribution Point (DP) On Pole Underground Cabling Surface Cabling 1 2 3 4

Upload: others

Post on 30-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

UNIFI INSTALLATION GUIDE

OUTSIDE PREMISE

Beyond TM Scope

Standard Provided by TM

Provided by TM

Customer to bear the cost

Standard

SCENARIO CATEGORY RESPONSIBILITY

If cable is blocked outside customer’s compound

If cable is blocked within customer’s compound

If customer requires installation via surface cabling

If customer requires installation via underground cabling

2.1

2.2

Standard

Optional

Provided by TM

Customer to bear the cost

SCENARIO CATEGORY RESPONSIBILITY

From pole straight to Entry Wall

From pole to Entry Wall via underground and surface cabling

Note:

Materials : GI Pipe, Jubilee Clip, Microduct and Cement.

1. Installation for Scenario 1 is considered as TM standard installation subject to customer private housing policy. 2. Installation for Scenario 2.2 requires customer to appoint own contractor to resolve the blockage.

Note:

Materials : GI Pipe, Jubilee Clip, Microduct, Cement.

TM Installation work scope for scenario 4 comprise of underground cabling for outside customer compound and surface cabling inside customer compound.

4.1 First 10 meter RM 200

RM 104.2 Each additional 1 meter

PRICECABLING LENGTH

Charges For Scenario 4

FWS

DP

12

FWS

DP

4

3

Where Distribution Point (DP) On-ground

Where Distribution Point (DP) On Pole

UndergroundCabling

SurfaceCabling

1

2

3

4

5

6

UNIFI INSTALLATIONGUIDE

Standard

Optional

Provided by TM

Customer to bear the cost

SCENARIO CATEGORY RESPONSIBILITY

Internal cabling first 50 meter

Internal cabling more than 50 meter

Note:

Materials : RJ45 and RJ11.

Cable length calculation starts from Entry Wall until the furthest Unifi equipment.

Raceway (casing) is also provided to protect your cabling up to 30 meter (additional RM5/m)

1.

2.

Note:

Materials : Cement and Microduct.

5.1 First 50 meter FREE

RM 55.2 Each additional 1 meter

PRICECABLING LENGTH

6.1 First 10 meter RM60

RM 106.2 Each additional 1 meter

PRICECABLING LENGTH

Charges For Scenario 6

Charges For Scenario 5

Optional Customer to bear the cost

SCENARIO CATEGORY RESPONSIBILITY

Cabling inside the ceiling with micro duct protection

ENTRYWALL

FWS

First 50m cablingprovided

INSIDE PREMISEInternal Cabling

Inside The Ceiling

FWS = Fibre Wall Socket