Page 1: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

UNCLASSIFIED

Industry Communications Event(ICE)

28 October 2015

UNCLASSIFIED

Page 2: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

AGENDA

• Welcoming Comments• Ground Rules• Brief Update• Q & A• Closing Comments

UNCLASSIFIED 2

Page 3: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

Ground Rules

• Submit questions on provided note cards.

• The panel of the informal forum will field and attempt to answer submitted questions.

• Area of focus is services contracting requirements in Enterprise Service Solutions Directorate.

• This is not designed to provide formal briefings on any acquisition.

• The Government will not prepare for distribution to attendees any notes or minutes of the event or any lists of attendees/registrants.

• The event will end at 15:00 or when questions end, whichever comes first.

UNCLASSIFIED 3

Page 4: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

Enterprise Service Solutions DirectorateDirector, Debra Scruggs

Division CIT Division

Tammi CochranDivision Chief

Program Strategies Division

Vacant - TBD Division Chief

Division A (AMRDEC – All Domains)Shirley MartinDivision Chief

Division B(Non-AMRDEC – All Domains)Pamela MiltonDivision Chief

Page 5: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

EXPRESS Domain Protest Status

• Programmatic

CoFC protest filed on 25 March 2015• All newly issued BPAs were cancelled.

Protest was dismissed on 18 August 2015 Corrective Action will be taken within 3 months A new RFQ will not be issued The current RFQ is not expected to be amended Only offerors who proposed previously will be considered

UNCLASSIFIED 5

Page 6: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

PROGRAMMATIC DOMAIN SBSA SUSPENSION• A letter was issued October 27, 2015 informing the

Programmatic BPA Holders that small business set-asides are being temporarily suspended in the Programmatic Domain.

• The rationale for this suspension is that since the protest resulted in the termination of the new BPAs, only two small businesses were left in the eligible pool of contractors. While it is true that the “rule of two” applies for making a set-aside determination, FAR 8.4 requires that the ordering activity provide the RFQ to at least three schedule contractors. Therefore, until new small businesses BPAs are added to the Programmatic Domain small business set-asides are suspended.

UNCLASSIFIED 6

Page 7: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

What’s Going On?

• EXPRESS FOLLOW-ON/NEXT GENERATION – In acquisition planning phase.

• IPTs in process for program improvement in the areas of TORFQ process, Evaluation Criteria, and EXPRESS Handbook

• Realignment Pilot Process Suspended

• Subcontractors We discontinued tracking subcontractors at the BPA level Allowing flexibility to add/change subcontractors at the TO

level

UNCLASSIFIED 7

Page 8: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

EXPRESSNET REPLACEMENT - EXPRESS Systems Model

UNCLASSIFIED

8

Customer Requirements Submission

Requirements Review

Workload Assignment

Solicitation

Q&A Responses / Quote Submission

Evaluations

Award

VCE AM – Milestone Tracking

VCE PCF – Official Record

ESSAP NTOR App Manual PADDSGSA eBuy

Overall New Task Order Acquisition Process

Systems

Capability Available in November

Contractors will have access to GSA eBuy

Contractors will not interact with ESSAP

Page 9: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

Recap

UNCLASSIFIED

9

• Contractor’s don’t interface or access ESSAP

• TORFQ packages will be emailed until GSA eBuy is activated TORFQ questions submitted via email Quotes will be submitted through either email or hand delivered

• Administration documentation will be emailed to KO, CS, and/or COR for appropriate filing

• After TO Award, historical data will be posted to the EXPRESS Public Site • Sanitized ESSAP data will be posted on the EXPRESS Public Site for industry

awareness on a quarterly basis

• Beginning late November, GSA eBuy will be used to issue RFI’s and RFQ’s to EXPRESS BPA holders and to receive quotes from prospective vendors

Short-Term• Email• Hand delivery

Long-Term• GSA eBuy

Page 10: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

Professional Services Schedule (PSS) Migration• For the most part, GSA has completed the

migration of schedules • There are a few migrations outstanding for

companies with unique situations.• EXPRESS BPA Holders:

BPA Migration Completed for 4 BPA holders BPA Migrations in Process for 4 BPA holders GSA Migrations are pending for 2 BPA holders Awaiting Submission of 1 BPA holder’s BPA Migration

Package• Target Date for Completion of In Process Migrations is 16

NOV 2015UNCLASSIFIED 10

Page 11: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

Open Season & Self Assessments

• Open Season FedBizOps Notice was posted 13 October 2015 Packages are due 17 November 2015 at 2:00 PM CST Reminder: Subcontractors are no longer being tracked Please leave your old schedules on the matrix for

tracking

• Self Assessments Performance Review Reports are due 15 November

(email) Times for Face-to-Face Meetings are currently being

scheduled Please review the itinerary for details on the meeting NEWSBLAST will be issued containing additional details

UNCLASSIFIED 11

Page 12: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

AMRDEC SED Acquisitions

UNCLASSIFIED 12

Page 13: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

AMRDEC SED Actions

• Current SCRS Task Order 0037 Limited Sources Justification was staffed and approved for an

extension thru February 20, 2017 SCRS project will phase out with expiration of task order

• SED Redefined Requirements Three requirements defined along functional lines have been

established Virtual Systems Strategic Systems Battlefield Systems

UNCLASSIFIED 13

Page 14: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

SCRS RE-COMPETE TIMELINE• Awaiting final decisions from Senior Leadership

regarding the best procurement approach

• All three requirements are currently in the Acquisition Planning phase

• OASIS is still the contract vehicle of choice

UNCLASSIFIED 14

Page 15: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

AMRDEC SED Virtual, Battlefield, & Strategic

AcquisitionsNAICS Code Determination for All Three (3) actions:

NAICS 541330 – Engineering Services

Comprises establishments primarily engaged in applying physical laws and principles of engineering in the design, development, and utilization of machines, materials, instruments, structures, processes, and systems. The assignments undertaken by these establishments may involve any of the following activities: provision of advice, preparation of feasibility studies, preparation of preliminary and final plans and designs, provision of technical services during the construction or installation phase, inspection and evaluation of engineering projects, and related services

We will utilize Exception A “Engineering for Military and Aerospace Equipment and Military Weapons”

UNCLASSIFIED 15

Page 16: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

AMRDEC SED Virtual, Battlefield, & Strategic

Acquisitions (cont)

“ANTICIPATED APPROACH”

• Use of GSA OASIS Contract Vehicle (Pool 3) www.gsa.gov/oasis

• All Three (3) acquisitions to be competed as unrestricted based upon market research responses

UNCLASSIFIED 16

Page 17: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

AMRDEC SED Virtual, Battlefield, & Strategic

Acquisitions (cont)

• The Government anticipates staggered approach

• There will be opportunity for site visits and briefings by SED

• Government will publish draft PWS for each action

• The Government discourages exclusive agreements that will inhibit competition – will likely be included as part of evaluation criteria.

UNCLASSIFIED 17

Page 18: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

PROJECTIONS AND STATUS OF RE- COMPETES

• ESS DIVISION A – AMRDEC (ALL DOMAINS)

• DIVISION CHIEF – Shirley Martin

Page 19: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

19

UNCLASSIFIED

CCAM-ESA SSEB – KO Detra Battle-Blue

• TORFQ: 2015T-3• Engineering and Evaluation Support Services

(EESS) formerly BASES• Base plus Options (5yrs)

• Major events

• SRB Brief 7/22/15

• Grant Clearance approved 8/20/15

• Customer informed to start preparing an LSJ for ceiling increase/task order extension 9/10/15

• EDA 4th Quarter FY16

• Ready to issue TORFQ

• Planned

• Working on D&F for T&M/LH for approval by HCA for a 5 year procurement, customer wants a 5 year Task Order

• Time & Material/Labor Hour (T&M/LH)• Small Business Set aside

Action

Status

Strategy

Projected Milestones

Page 20: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

20

UNCLASSIFIED

CCAM-ESA SSEB – KO Detra Battle-Blue

• TORFQ: 2014T-21• System and Software Security Engineering

(S3E) • Base plus Options (5 yrs)

• Major events

• SRB Brief 8/26/15

• Grant Clearance approved 9/2/15

• TORFQ release o/r/a – Feb 2016

• Customer informed to start preparing an LSJ for ceiling increase/task order extension 9/10/15

• EDA 3rd Quarter FY16

• Ready to issue TORFQ

• Planned

• Working on D&F for T&M/LH for approval by HCA for a 5 year procurement.

• Time & Material/Labor Hour (T&M/LH)• Small Business Set aside

Action

Status

Strategy

Projected Milestones

Page 21: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

21

UNCLASSIFIED

CCAM-ESA SSEB – KO Detra Battle-Blue

• TORFQ: 2014T-24• Lower Tier IV & V• Base plus Options (5 yrs)

• Major events

• SRB Brief scheduled – week of 16 Nov

• Customer informed to start preparing an LSJ for ceiling increase/task order extension 9/10/15

• TORFQ release o/r/a – Feb 2016

• EDA 3rd Quarter FY16

• In process of re-scheduling SRB Briefing

• Planned

• Working on D&F for T&M/LH for approval by HCA for a 5 year procurement.

• Time & Material/Labor Hour (T&M/LH)• Small Business Set aside

Action

Status

Strategy

Projected Milestones

Page 22: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

22

UNCLASSIFIED

CCAM-ESA SSEB – KO Judson Alexander

• TORFQ: 2014T-14• Engineering Support for AMRDEC AED NSRW• Base plus Options (5 yrs)

• Major events

• 11/23/15 Receive legal review of D&F for 5 year T&M effort

• TORFQ released 1/16

• Ready to issue TORFQ

• Planned

• Working on D&F for T&M/LH for approval by HCA for a 5 year procurement. Must be signed prior to TORFQ release.

• Customer considering going with a 3 year effort.

• Time & Material/Labor Hour (T&M/LH)• Full & Open

Action

Status

Strategy

Projected Milestones

Page 23: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

23

UNCLASSIFIED

CCAM-ESA SSEB – KO Judson Alexander• TORFQ: 2014T-17• Engineering Support for AMRDEC AED MED • Base plus Options (5 yrs)

• Major events

• PEER Review comments reconciled 5/12/15

• SRB – with COCO 11/15

• TORFQ to be released after D&F is signed by HCA

• Working on D&F for T&M/LH for approval by HCA for a 5 year procurement

• Customer is considering a 3 year effort

• Time & Material/Labor Hour (T&M/LH)• Small Business Set aside

Action

Status

Strategy

Projected Milestones

Page 24: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

24

UNCLASSIFIED

CCAM-ESA SSEB – KO Judson Alexander

• TORFQ: 2015T-2• System Engineering Support for AMRDEC AED

Special Operations Aircraft Division• Base plus Options (5 yrs)

• Major events

• Market Research Report 5/14/15

• DD Form 2579 signed by SBA 5/14/15

• Still awaiting funding for Base effort 10/6/15

• TORFQ cannot be released until the 5 year D&F for T&M is signed by HCA.

• Ready to issue TORFQ

• Planned

• Working on D&F for T&M/LH for approval by HCA for a 5 year procurement.

• Customer is considering a 3 year effort.

• Time & Material/Labor Hour (T&M/LH)• Small Business Set aside

Action

Status

Strategy

Projected Milestones

Page 25: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

25

UNCLASSIFIED

CCAM-ESS-A SSEB – KO Patricia Vail

• TORFQ: 2015T-45• Systems Simulation and Development

Directorate (SSDD) Models and Simulation Program Support

• Base and five options (5 yrs)

• 12/09/15 – CRB

• Award cannot be made until D&F is approved by the HCA. This is currently projected to be January-February 2016.

• D&F for Time and Materials is being staffed. Award cannot be made until D&F approved by the HCA.

• Contract type: T&M• Small Business Set Aside

Action

Status

Strategy

Projected Milestones

Page 26: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

26

UNCLASSIFIED

CCAM-ESS-A SSEB – KO Patricia Vail

• TORFQ: 2015B-15• System Simulation & Development Directorate

(SSDD) Business and Operations Support • Base and five options (5 yrs)

• 11/18/15 – evaluations complete

• Award cannot be made until D&F is approved by the HCA. Approval of the D&F is currently projected to be February-March 2016.

• Currently in the evaluation phase.

• Draft D&F for Time and Materials has been received and is being reviewed by Contracts. After any revisions, it will be staffed for approval by the HCA.

• Contract type: T&M• Small Business Set Aside

Action

Status

Strategy

Projected Milestones

Page 27: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

27

UNCLASSIFIED

CCAM-ESS-A SSEB – KO Patricia Vail

• TORFQ: 2015T-53• Engineering Support for the Systems Simulation

and Development Directorate (SSDD) Live Technologies Branch

• Base and three options (3 yrs)

• 12/30/15 – All Evaluations complete

• 1/15/16 – CRB

• Award is projected 4 February 2016.

• TORFQ was released on 13 October 2015. The closing date for receipt of proposals is 13 November 2015.

• The acquisition was revised to three years from five years due to the time required for HCA approval.

• The D&F for Time and Materials task order is being staffed for PARC approval.

• Contract type: T&M• Full and Open

Action

Status

Strategy

Projected Milestones

Page 28: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

28

UNCLASSIFIED

CCAM-ESA SSEB – KO Joe Pollard

• 10/15 – Evaluation process• 12/15 – CRB• 01/16 – Anticipated signature of D&F from HCA• 02/16 – Anticipated award (dependent on HCA

approval of D&F as award cannot be made until D&F is signed.

• In evaluation process

• D&F for T&M is being developed and staffed

• Contract type: Time and Materials/ Labor Hours• Full and Open

Action

Status

Strategy

Projected Milestones

• TORFQ: 2015T-8 • Technical Loop Support for the Engineering

Directorate• Base and five options (5 yrs)

Page 29: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

29

UNCLASSIFIED

• Contract type: Time and Materials/ Labor Hours• Full and Open

Action

Status

Strategy

Projected Milestones

• TORFQ: 2015L-2• Logistics Assistance in Value Engineering (VE)

Life Cycle Cost Reduction (LCCR) Tasks for AMCOM Aviation & Missile System Components

• Base and five options (5 yrs)

CCAM-ESA SSEB – KO Joe Pollard

• In evaluation process

• D&F for T&M is being developed and staffed

• 10/15 – Evaluation process• 12/15 – CRB• 01/16 – Anticipated signature of D&F from HCA• 02/16 – Anticipated award (dependent on HCA

approval of D&F as award cannot be made until D&F is signed.

Page 30: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

30

UNCLASSIFIED

• Contract type: Time and Materials/ Labor Hours• Set Aside for Small Business Concerns

Action

Status

Strategy

Projected Milestones

• TORFQ: 2014T-20• Technical Support for

Production/Productability and Systems Engineering

• Base and five options (5 yrs)

CCAM-ESA SSEB – KO Joe Pollard

• In evaluation process

• D&F for T&M is being developed and staffed

• 10/15 – Evaluation process• 12/15 – CRB• 01/16 – Anticipated signature of D&F from HCA• 02/16 – Anticipated award (dependent on HCA

approval of D&F as award cannot be made until D&F is signed.

Page 31: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

31

UNCLASSIFIED

Action

Status

Strategy

Projected Milestones

• Contract type: Time and Materials/ Labor Hours• Full and Open

• TORFQ: 2015T-14• Energy Storage Device and Sensor

Development and Electronic Systems Validation Support for WDI Directorate

• Base and five options (5 yrs)

CCAM-ESA SSEB – KO Joe Pollard

• In evaluation process

• D&F for T&M is being developed and staffed

• 9/15 – Evaluation process• 12/15 – CRB• 01/16 – Anticipated signature of D&F from HCA• 02/16 – Anticipated award (dependent on HCA

approval of D&F as award cannot be made until D&F is signed.

Page 32: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

32

UNCLASSIFIED

Action

Status

Strategy

Projected Milestones

• Contract type: Time and Materials/ Labor Hours• Set Aside for Small Business Concerns

• TORFQ: 2015T-4• Sensors and Protective Technology

Development for Protective Technologies• Base and five options (5 yrs)

CCAM-ESA SSEB – KO Joe Pollard

• In evaluation process

• D&F for T&M is being developed and staffed

• 10/15 – Evaluation process• 12/15 – CRB• 01/16 – Anticipated signature of D&F from HCA• 02/16 – Anticipated award (dependent on HCA

approval of D&F as award cannot be made until D&F is signed.

Page 33: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

33

UNCLASSIFIED

Action

Status

Strategy

Projected Milestones

• Contract type: Time and Materials/ Labor Hours• Full and Open

• TORFQ 2014T-15• Technical Assistance in Value Engineering

(VE)/Life System Cost Reduction (LCCR)• Base and five options (5 yrs)

CCAM-ESA SSEB – KO Joe Pollard

• In evaluation process

• D&F for T&M is being developed and staffed

• 9/15 – Evaluation process• 12/15 – CRB• 01/16 – Anticipated signature of D&F from HCA• 02/16 – Anticipated award (dependent on HCA

approval of D&F as award cannot be made until D&F is signed.

Page 34: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

34

UNCLASSIFIED

Action

Status

Strategy

Projected Milestones

• Contract type: Time and Materials/ Labor Hours• Full and Open

• TORFQ: 2014T-19• Technical Support for Technical Data

Management Division• Base and five options (5 yrs)

CCAM-ESA SSEB – KO Joe Pollard

• In evaluation process

• D&F for T&M is being developed and staffed

• 9/15 – Evaluation process• 12/15 – CRB• 01/16 – Anticipated signature of D&F from HCA• 02/16 – Anticipated award (dependent on HCA

approval of D&F as award cannot be made until D&F is signed.

Page 35: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

35

UNCLASSIFIED

Action

Status

Strategy

Projected Milestones

• Contract type: Time and Materials/ Labor Hours• Full and Open

• TORFQ: 2014T-18• Technical Assistance in Manufacturing

Science and Technology (MST) Tasks for AMCOM Aviation & Missile System Components

• Base and five options (5 yrs)

CCAM-ESA SSEB – KO Joe Pollard

• In evaluation process

• D&F for T&M is being developed and staffed

• 10/15 – Evaluation process• 12/15 – CRB• 01/16 – Anticipated signature of D&F from HCA• 02/16 – Anticipated award (dependent on HCA

approval of D&F as award cannot be made until D&F is signed.

Page 36: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

36

UNCLASSIFIED

Action

Status

Strategy

Projected Milestones

• Contract type: Time and Materials/ Labor Hours• Full and Open

• TORFQ: 2015T-13• Technical Support in Manufacturing Science

and Technology (MST) Obsolescence Tasks for AMCOM Aviation & Missile System Components

• Base and five options (5 yrs)

CCAM-ESA SSEB – KO Joe Pollard

• In evaluation process

• D&F for T&M is being developed and staffed

• 09/15 – Evaluation process• 12/15 – CRB• 01/16 – Anticipated signature of D&F from HCA• 02/16 – Anticipated award (dependent on HCA

approval of D&F as award cannot be made until D&F is signed.

Page 37: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

37

UNCLASSIFIED

No Original Milestones Set

Major events

• 10/15 - MRA received

• 11/15 - Draft MRR needs to coincide with results.

• 12/15 – Anticipated TORFQ release to industry

Action

Status

Strategy

Projected Milestones

• Contract type: Time and Materials/ Labor Hours• Set aside: Unknown

CCAM-ESA SSEB – KO Joe Pollard

• TORFQ: 2015T-15• Technical Services for the Aviation and

Missile Command Corrosion Program Office• Base and five options (5 yrs)

• MRA sent to the Specialist on 20 October 2015.

• Awaiting draft MRR to coincide with the results.

Page 38: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

38

UNCLASSIFIED

Action

Status

Strategy

Projected Milestones

• Contract type: Time and Materials/ Labor Hours• Full and Open

CCAM-ESA SSEB – KO Joe Pollard

• TORFQ: 2015T-16• Technical Services for the Aerospace

Materials Function Nondestructive Testing Center of Excellence Aerospace Materials Function, WDI Directorate, AMRDEC

• Base and five options (5 yrs)

• In evaluation process

• D&F for T&M is being developed and staffed

• 09/15 – Evaluation process• 12/15 – CRB• 01/16 – Anticipated signature of D&F from HCA• 02/16 – Anticipated award (dependent on HCA

approval of D&F as award cannot be made until D&F is signed.

Page 39: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

39

UNCLASSIFIED

No Original Milestones Set

Major events

• 01/16 – Anticipated signature of D&F from HCA

• 02/16- Release of Final TORFQ for solicitation

Action

Status

Strategy

Projected Milestones

• Contract type: Time and Materials/ Labor Hours• Set Aside for Small Business Concerns

CCAM-ESA SSEB – KO Joe Pollard

• TORFQ: 2015T-17• Technical Assistance in Value Engineering

(VE) Workshop and Training Tasks for AMCOM Aviation and Missile Systems

• Base and five options (5 yrs)

• Final revisions needed before proceeding to the next phase

• D&F for T&M is being developed and staffed

Page 40: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

40

UNCLASSIFIED

No Original Milestones Set

Major events

• 11/15 – RFI release to industry

• 12/15 – CRB

• 03/16 – Anticipated signature of D&F from HCA

• 04/16- Release of Final TORFQ for solicitation.

Action

Status

Strategy

Projected Milestones

• Contract type: Time and Materials/ Labor Hours• Set Aside: Unknown as RFI has not been

created to determine the interest or capability

CCAM-ESA SSEB – KO Joe Pollard

• TORFQ: 2015P-05• U.S. Army Aviation And Missile Research,

Development, And Engineering Center (AMRDEC) Programmatic Support

• Base and five options (5 yrs)

• Waiting on CRP

• Creation of RFI needed

• D&F for T&M is being developed and staffed

Page 41: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

41

UNCLASSIFIED

CCAM-ESA SSEB - KO Ben Henson

• Formerly SCRS divided into three new requirements: Battlefield Systems Support, Strategic Systems Support, Virtual Systems Support

• EDA 2nd Qty FY17• Developing Acq Strategy for each reqmt

• SAW to be set up for each procurement

• LSJ will need to be done on existing contracts so that we have time to award these 3 separate contracts

• Proposed - F&O• Proposed - GSA OASIS

Action

Status

Strategy

Projected Milestones

Page 42: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

ESS Division B - Non-AMRDEC (All Domains)

Projections and Milestones

Division Chief – Pamela Milton

Page 43: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

43

UNCLASSIFIED

Division B SSEB – KO Meredith Taylor

TORFQ: 2015B-1 (2015-Business & Analytical-16)

Customer: PEO AVN CH-47Description: B&A Support to the CH-47 Project ManagerSpecialist: Kimberly Coggin

• Evaluations complete Oct 2015

• Task Order Award Nov 2015

• Evaluation Phase

• Contract type: Time & Material/Labor Hour• Contract length: Base plus Options (5 yrs) • Set-Aside: SB

Action

Status

Strategy

Projected Milestones

Page 44: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

44

UNCLASSIFIED

Division B SSEB – KO Ronald Haws

TORFQ: 2015L-1 (ESSAP 2015-Logistics-26)

Customer: PEO AVN BlackhawkDescription: Provides Logistics Support to PEO AVN BlackhawkSpecialist: Timothy Fugghett

• Evaluations complete Dec 2015

• Task Order Award Mar 2016

• Evaluation Phase

• Contract type: Time & Material/Labor Hour• Contract length: Base plus Options (5 yrs) • Set-Aside: SB

Action

Status

Strategy

Projected Milestones

Page 45: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

45

UNCLASSIFIED

Division B SSEB – KO Ronald Haws

TORFQ: 2015L-4 (ESSAP 2015-Logistics-29)

Customer: IMMCDescription: Logistics Services in support of Product Support Analysis/Performance Based LogisticsSpecialist: Angela Keaton-Simpson

• Evaluations complete Nov 2015

• Anticipated Task Order Award Dec 2015

• Evaluation Phase

• Contract type: Time & Material/Labor Hour• Contract length: Base plus Options (5 yrs) • Set-Aside: SB

Action

Status

Strategy

Projected Milestones

Page 46: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

46

UNCLASSIFIED

Division B SSEB KO – Ronald HAws

TORFQ: 2015L-5 (ESSAP 2015-Logistics-30)

Customer: LOGSADescription: Process Integration Division – Maintenance, Force and Readiness Logistics Support ServicesContract Specialist: Angela Keaton-Simpson

• Evaluations complete Nov 2015

• Anticipated Task Order Award Dec 2015

• Evaluation Phase

• Contract type: Time & Material/Labor Hour• Contract length: Base plus Options (5 yrs)• Set-Aside: SB

Action

Status

Strategy

Projected Milestones

Page 47: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

47

UNCLASSIFIED

Division B SSEB – KO Ronald Haws

TORFQ: 2015L-6 (ESSAP 2015-Logistics-14)

Customer: ALCDescription: Logistics Critical Safety Items/Life Tracking of the Army Maintenance Management Systems- AVNContract Specialist: Melissa Jakes

• RFI Issued Sep 2015

• Anticipated TORFQ Release Dec 2015

• Acquisition Planning Phase - Awaiting complete CRP

• D&F for T&M/LH for approval by HCA for a 5 year procurement is required.

• Contract type: Time & Material/Labor Hour• Contract length: Base plus Options (5 yrs) • Set-Aside: SB

Action

Status

Strategy

Projected Milestones

Page 48: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

48

UNCLASSIFIED

Division B SSEB – KO Meredith Taylor

TORFQ: 2015P-2 (2015-Programmatic-11)

Customer: PEO AVN NSDescription: Provides Programmatic Support to the Non-Standard Rotary Wing Aircraft PMOContract Specialist: Kimberly Tipton

• Evaluation complete Dec 2015

• Anticipated Task Order Award Feb 2016

• Evaluation Phase

• Contract type: Time & Material/Labor Hour• Contract length: Base plus Options (5 yrs)• Set-Aside: SB

Action

Status

Strategy

Projected Milestones

Page 49: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

49

UNCLASSIFIED

Division B SSEB – KO Meredith Taylor

TORFQ: 2015P-3 (ESSAP 2015-Programmatic-13)

Customer: AMCOM G-3Description: Programmatic Support for AMCOM G-3/OperationsContract Specialist: Kimberly Coggin

• Anticipated Issuance of RFI Nov 2015

• Anticipated TORFQ Release Dec 2015

• Acquisition Planning Phase – Awaiting complete CRP

• D&F for T&M/LH for approval by HCA for a 5 year procurement is required.

• Contract type: Time & Material/Labor Hour• Contract length: Base plus options (5 yrs) • Set-Aside: Full & Open

Action

Status

Strategy

Projected Milestones

Page 50: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

50

UNCLASSIFIED

Division B SSEB – KO Meredith Taylor

TORFQ: 2015P-4 (ESSAP 2015-Programmatic-12)

Customer: UH-60 PMODescription: Programmatic Support for the Utility Helicopter Project Manager’s OfficeContract Specialist: Kristy Landers

• Anticipated Issuance of RFI Dec 2015

• Anticipated release of TORFQ Jan 2016

• Acquisition Planning Phase – Awaiting complete CRP

• D&F for T&M/LH for approval by HCA for a 5 year procurement required.

• Contract type: Time & Material/Labor Hour• Contract length: Base plus Options (5 yrs) • Set-Aside: Full & Open

Action

Status

Strategy

Projected Milestones

Page 51: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

51

UNCLASSIFIED

Division B SSEB – KO Meredith Taylor

TORFQ: 2015P-6 (ESSAP 2015-Programmatic-66)

Customer: SAMDDescription: Programmatic Support for SAMDContract Specialist: Michael Nickelson

• Anticipated Issuance of RFI Nov 2015

• Anticipated TORFQ Release Dec 2015

• Acquisition Planning Phase – Awaiting complete CRP

• D&F for T&M/LH for approval by HCA for a 5 year procurement is required.

• Contract type: Time & Material/Labor Hour • Contract length: Base plus Options (5 yrs)• Set-Aside: Full & Open

Action

Status

Strategy

Projected Milestones

Page 52: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

52

UNCLASSIFIED

Division B SSEB – KO Meredith Taylor

TORFQ: TBDCustomer: CMDSDescription: Programmatic Support Services for the Cruise Missile Defense Systems (CMDS) Project Office Contract Specialist: Michael Nickelson

• Anticipated Issuance of RFI Jan 2016

• Anticipated TORFQ Release Mar 2016

• Acquisition Planning Phase – Awaiting complete CRP

• D&F for T&M/LH for approval by HCA for a 5 year procurement is required.

• Contract type: Time & Material/Labor Hour• Contract length: TBD• Set-Aside: Full & Open

Action

Status

Strategy

Projected Milestones

Page 53: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

53

UNCLASSIFIED

Division B SSEB – KO Meredith Taylor

TORFQ: TBDCustomer: LTPODescription: Programmatic Support for the Lower Tier Project Office Contract Specialist: Kimberly Coggin

• Anticipated Issuance of RFI TBD

• Anticipated TORFQ Release TBD

• Acquisition Planning Phase – Initial Stages of CRP

• D&F for T&M/LH for approval by HCA for a 5 year procurement is required.

• Contract type: Time & Material/Labor Hour• Contract length: TBD • Set-Aside: Full & Open

Action

Status

Strategy

Projected Milestones

Page 54: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

54

UNCLASSIFIED

Division B SSEB – KO Brenda Tate

TORFQ: 2015T-5 (2015-Technical-5)Customer: UHPODescription: Technical Support Services for UH PMO in support to the UH-60 FleetContract Specialist: Timothy Sibley

• RFI lssued Aug 2015

• Anticipated SRB Dec 2015

• Anticipated TORFQ Release Jan 2016

• Acquisition Planning Phase – Requires SRB • D&F for T&M/LH for approval by HCA for a 5

year procurement is required.

• Contract type: Time & Material/Labor Hour• Contract length: Base plus Options (5 yrs)• Set-Aside: SB

Action

Status

Strategy

Projected Milestones

Page 55: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

55

UNCLASSIFIED

Division B SSEB – KO Ronald Haws

TORFQ: 2015T-6 (ESSAP 2015-Techncial-6)

Customer: AMCOM G3Description: Technical Support for ALC Sustainment Optimization and AnalysisContract Specialist: Melissa Jakes

• Anticipated Issuance of RFI Dec

2015

• Anticipated TORFQ Release Jan 2016

• Acquisition Planning Phase – Awaiting complete CRP

• D&F for T&M/LH for approval by HCA for a 5 year procurement is required.

• Contract type: Time & Material/Labor Hour• Contract length: Base plus Options (5 yrs)• Set-Aside: TBD

Action

Status

Strategy

Projected Milestones

Page 56: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

56

UNCLASSIFIED

Division B SSEB – KO Valorie Ritchey

TORFQ: 2015T-7 (ESSAP 2015-Technical-50)

Customer: PEO AVNDescription: Technical Support for Program Management Office AGSE Contract Specialist: Joaquin Tucker

• Evaluation complete Nov 2015

• Anticipated Task Order Award Jan 2016

• Evaluation Phase

• Contract type: Time & Material/Labor Hour• Contract length: Base plus Options (5 yrs)• Set-Aside: SB

Action

Status

Strategy

Projected Milestones

Page 57: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

57

UNCLASSIFIED

Division B SSEB – KO Brenda Tate

TORFQ: 2015T-9 (ESSAP 2015-Technical-8)

Customer: PEO AVN ApacheDescription: Technical Support for the Apache Project Management Office Contract Specialist: Sharon Miller

• Evaluation complete Jan 2016

• Anticipated Task Order Award Feb 2016

• Evaluation Phase

• Contract type: Time & Material/Labor Hour • Contract length: Base plus Option (5 yrs)• Set-Aside: SB

Action

Status

Strategy

Projected Milestones

Page 58: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

58

UNCLASSIFIED

Division B SSEB – KO Brenda Tate

TORFQ: 2015T-18 (ESSAP 2015-Technical-62)

Customer: PEO MSLDescription: General Engineering Support for PFRMS Contract Specialist: Valorie Ritchey

• RFI Issued Nov 2015

• Anticipated Date of SRB Dec 2015

• Anticipated TORFQ Released Jan 2016

• Acquisition Planning Phase – Requires SRB• D&F for T&M/LH for approval by HCA for a 5

year procurement is required.

• Contract type: Time & Material/Labor Hour • Contract length: Base plus Options (5 yrs)• Set-Aside: SB

Action

Status

Strategy

Projected Milestones

Page 59: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

59

UNCLASSIFIED

Division B SSEB – KO Brenda Tate

TORFQ: 2015T-19 (ESSAP 2015-Technical-61)

Customer: PEO AVN Fixed WingDescription: Technical Support for Fixed Wing Project Management Office Contract Specialist: Sharon Miller

• Anticipated Completion of Evaluations Jan 2016

• Anticipated Task Order Award Mar 2016

• Evaluation Phase

• Contract type: Time & Material/Labor Hour • Contract length: Base plus Options (5 yrs)• Set-Aside: SB

Action

Status

Strategy

Projected Milestones

Page 60: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

UNCLASSIFIED 60

ESS Division B – OASIS Requirements

Page 61: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

61

UNCLASSIFIED

Division B SSEB – KO Sonya Anderson

Solicitation #: W31P4Q-15-T-1004Customer: CRAMDescription: OASIS Requirement providing Technical, Logistics and Program Management Support Services for CRAM System of Systems (SOS)Contract Specialist: Joaquin Tucker

• RFI Issued Aug 2015

• Anticipated RFP Released Jan 2016

• Anticipated Task Order Award Oct 2016

• Acquisition Planning Phase

• Contract type: Cost Plus• Contract length: Base plus Option (5 yrs)• Set-Aside: SB Pool 1

Action

Status

Strategy

Projected Milestones

Page 62: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

62

UNCLASSIFIED

Division B SSEB – KO Brenda Tate

• Anticipated Issuance of RFI Jan 2016

• Anticipated RFP Released Feb 2016

• Anticipated Date of Award Nov 2016

• Acquisition Planning Phase – Initial Stages of CRP

.

• Contract type: TBD• Contract length: TBD• Set-Aside: TBD

Action

Status

Strategy

Projected Milestones

Solicitation #: TBDCustomer: NSWRADescription: OASIS Requirement providing Technical Non-Standard Rotary Wind Aircraft Program Management Office Contract Specialist: Joaquin Tucker

Page 63: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

63

UNCLASSIFIED

Division B SSEB – KO Valorie Ritchey

Solicitation #: TBDCustomer: CMDS Project OfficeDescription: OASIS Requirement providing Logistics Support Services for the Cruise Missile Defense Systems Contract Specialist: Melissa Jakes

• Anticipated Issuance of RFI Jan 2016

• Anticipated RFP Released Feb 2016

• Anticipated Task Order Award Oct 2016

• Acquisition Planning Phase – Initial Stages of CRP

.

• Contract type: TBD• Contract length: TBD• Set-Aside: TBD

Action

Status

Strategy

Projected Milestones

Page 64: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

DIVISION C – INFORMATION TECHNOLOGY – PROJECTIONS AND MILESTONES

DIVISION CHIEF – TAMMI COCHRAN

Page 65: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

65

UNCLASSIFIED

CCAM-ES-C LOAP II SSEB

• LOGSA Oil Analysis Program (LOAP II)

• Requirement Description: Laboratories that provide maintenance diagnostic programs to monitor lubricant conditions and detect impending component failures for locations throughout the world with CONUS and OCONUS regional locations.

• Contracting Officer – Brenda Tate

• EDA – 1st Quarter of FY16• Evaluations are complete.

• Source Selection documents are in process.

• Contract type – FFP

• Set aside – SB

Action

Status

Strategy

Projected Milestones

Page 66: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

66

UNCLASSIFIED

CCAM-ES-C LITeS II Re-compete

• LOGSA Information Technology Support II (LITeS II)

• Requirement Description: High quality, efficient and effective full range of Information Technology (IT) support and Data Center services.

• Contracting Officer – Nicholas Haas

• Contract Specialist – Cassandra Patton

• Event 1: ICE LITeS II – November/December

2015, date to be determined

• Draft Solicitation – 2nd Quarter of FY16

• Final Solicitation – 3rd Quarter of FY16

• EDA – 2nd or 3rd Quarter of FY17

• Current LITeS contract expires 30 November 2015.

• J&A in process to extend the current contract to 2nd or 3rd Quarter of FY17.

• Re-compete Planning stages – CRP is currently in development. Acquisition Plan/Acquisition Strategy have not been approved at this time.

• Planned Contract type – Hybrid of T&M/FFP/Cost Reimbursable

• Set aside – No

• Possible Contract Vehicles – GSA Alliant; CHESS; or Full and Open Competition

Action

Status

Strategy

Projected Milestones

Page 67: UNCLASSIFIED Industry Communications Event (ICE) 28 October 2015 UNCLASSIFIED

67

UNCLASSIFIED

CCAM-ES-C ITSS III Re-compete

• AMCOM G6 Information Technology Support Services III (ITSS III)

• Requirement Description: A full range of IT support services that focus in the areas of IT Services, Enterprise Design/Integration/Consolidation, IT Education/Training, IT Program/Project Management, Systems Operations and Maintenance, Network Support and embedded Information Systems Security and Information Assurance.

• Contracting Officer – Laquetta Atkins

• Contract Specialist – Amelia Flournoy

• Event 1: ICE ITSS III – TBD

• Draft Solicitation – 2nd Quarter of FY16

• Final Solicitation – 3rd Quarter of FY16

• EDA – 1st Quarter of FY17

• Current ITSS II contract expires 31 December 2016. The contract was extended because the not-to-exceed ceiling had not been breached and was projected to allow performance to continue through 31 December 2016.

• Re-compete Planning stages – CRP is currently in development. Acquisition Plan/Acquisition Strategy have not been approved at this time.

• Planned Contract type – Hybrid of CPFF/Cost Reimbursable

• Set aside – No

• Possible Contract Vehicles – GSA Alliant; CHESS; or Full and Open Competition

Action

Status

Strategy

Projected Milestones