unc modification proposal 0295 - “allocation of daily nts entry capacity within-day”
DESCRIPTION
UNC Modification Proposal 0295 - “Allocation of Daily NTS Entry Capacity Within-Day”. Richard Fairholme. A Summary of the Current Problem. Scope for:. No prescribed timescales. Entry capacity allocations made too late to be of commercial use. Security of Supply implications. - PowerPoint PPT PresentationTRANSCRIPT
Wednesday 19 April 2023
Richard Fairholme
UNC Modification Proposal 0295 -
“Allocation of Daily NTS Entry Capacity
Within-Day”
A bid for daily (firm) entry capacity is submitted on Gemini
National Grid thinks about it…
Shipper is left waiting...
Meanwhile…Time is running out!
Entry capacity allocations made too late to be of commercial use
No prescribed timescales
Scope for:
Security of Supply implications
Disputes as regards when allocations should be made
A Summary of the Current Problem
This Proposal
A bid is submitted (or existing bid amended) on the ‘Gemini’ system
On the next hour bar, National Grid NTS must consider the bid (i.e. initiate a Capacity Allocation Period)
Shipper’s bid must be either accepted or turned down in next Capacity Allocation Period.
or
Max. 1 hour 15 minutes
The Case for Change
• Aim of Proposal is to codify existing operational ‘best practice’ by National Grid NTS - NOT to introduce a completely new way of working.
• ‘Best practice’ works well under favourable conditions, but if the system is pushed (e.g. an entry terminal failure on the day) , where is the guarantee that Shippers’ daily capacity bids will be dealt with in a timely and consistent manner?
19 April 2023, E.ON, Page 4
The Case for Change
• The existing UNC rules are ambiguous and open to interpretation as to when
during the day National Grid NTS must allocate capacity once a bid has been
submitted. If the UNC rules were to be strictly interpreted, National Grid
NTS may only have to initiate one capacity allocation period (per
ASEP) each gas Day – regardless of number / timing of Shipper
bids submitted.
• If UNC Mod 284 is implemented, due to cost pressures, daily entry capacity
bookings are likely to more closely match actual gas flows.
= a much more active within-day market This Mod Proposal provides added flexibility and certainty for
Shippers to bid for within-day firm entry capacity: Important for those
Shippers with a variable supply portfolio.
Any Questions?