unc charlotte - october 9, 2000 · 2020. 10. 16. · shiel sexton addendum addendum no: 3 project:...

12
SHIEL SEXTON ADDENDUM Addendum No: 3 Project: UNC Charlotte East Village Infrastructure State Project No: 13-11004-02 Date: October 16, 2020 By: Josh Craft, Shiel Sexton Co. 5950 Fairview Road, Charlotte, NC 28210 Phone 704.679.4050 www.shielsexton.com This addendum is issued and to be included as part of the bid documents. This Addendum includes: Supplemental Information To Bidders: 1. Bid Bond requirements will be waived for bid packages under $500,000. 2. Bid Forms i) 01 Sitework ii) 02 Electrical iii) 03 Landscape 3. Cuts from Revised Plans with City Comments: 4. Note: The last addendum will be issued on Thursday Oct 22, 2020

Upload: others

Post on 07-Mar-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UNC Charlotte - October 9, 2000 · 2020. 10. 16. · SHIEL SEXTON ADDENDUM Addendum No: 3 Project: UNC Charlotte East Village Infrastructure State Project No: 13-11004-02 Date: October

SHIEL SEXTON

ADDENDUM Addendum No: 3 Project: UNC Charlotte East Village Infrastructure State Project No: 13-11004-02 Date: October 16, 2020 By: Josh Craft, Shiel Sexton Co.

5950 Fairview Road, Charlotte, NC 28210 Phone 704.679.4050 www.shielsexton.com

This addendum is issued and to be included as part of the bid documents. This Addendum includes: Supplemental Information To Bidders:

1. Bid Bond requirements will be waived for bid packages under $500,000. 2. Bid Forms

i) 01 Sitework ii) 02 Electrical iii) 03 Landscape

3. Cuts from Revised Plans with City Comments: 4. Note: The last addendum will be issued on Thursday Oct 22, 2020

Page 2: UNC Charlotte - October 9, 2000 · 2020. 10. 16. · SHIEL SEXTON ADDENDUM Addendum No: 3 Project: UNC Charlotte East Village Infrastructure State Project No: 13-11004-02 Date: October

ADDENDUM

ADDENDUM NO. 1 ADD-1 - 2 of 6

902 North Capitol Avenue, Indianapolis, Indiana 46204 Phone 317-423-6000 Fax 317-423-6300 www.shielsexton.com

Revised Plans with City comments: 1. Plan Sheet 6: Updates to bike ramp which includes 6’ minimum width and reconfiguring the

tactile strip as shown in yellow. Adding fillets to the sharp edges.

2. Sheet PM-1: Updates to bike ramp which includes 6’ minimum width and reconfiguring the

tactile strip as shown in yellow. Adding fillets to the sharp edges.

Page 3: UNC Charlotte - October 9, 2000 · 2020. 10. 16. · SHIEL SEXTON ADDENDUM Addendum No: 3 Project: UNC Charlotte East Village Infrastructure State Project No: 13-11004-02 Date: October

ADDENDUM

ADDENDUM NO. 1 ADD-1 - 3 of 6

902 North Capitol Avenue, Indianapolis, Indiana 46204 Phone 317-423-6000 Fax 317-423-6300 www.shielsexton.com

3. Sheet PM-1: i) Gore out old bike lane with white diagonals ii) Tie yellow diagonals into existing pavement markings iii) Pavement markings for right turn lane need to match city standard for a drop turn lane iv) Center arrow within lane

4. Sheet PM-2: i) Add right turn arrow and replace turn arrow with ONLY marking.

Page 4: UNC Charlotte - October 9, 2000 · 2020. 10. 16. · SHIEL SEXTON ADDENDUM Addendum No: 3 Project: UNC Charlotte East Village Infrastructure State Project No: 13-11004-02 Date: October

ADDENDUM

ADDENDUM NO. 1 ADD-1 - 4 of 6

902 North Capitol Avenue, Indianapolis, Indiana 46204 Phone 317-423-6000 Fax 317-423-6300 www.shielsexton.com

ii) Add yellow diagonals from station 101+25 to 104+00 spaced every 30’ iii) Add white diagonals station 104+00 to 104+60 iv) Change bike lane stop bar to sharks teeth

v) Shift piano keys to line up with lane markings vi) Relocate stop bar to be 4’ from crosswalk vii) Remove bike lane stencil

Page 5: UNC Charlotte - October 9, 2000 · 2020. 10. 16. · SHIEL SEXTON ADDENDUM Addendum No: 3 Project: UNC Charlotte East Village Infrastructure State Project No: 13-11004-02 Date: October

ADDENDUM

ADDENDUM NO. 1 ADD-1 - 5 of 6

902 North Capitol Avenue, Indianapolis, Indiana 46204 Phone 317-423-6000 Fax 317-423-6300 www.shielsexton.com

viii) For all buffered bike lane striping, the inside lane will be 6” and the outside lane will be 4”

5. Sheet PM-3:

i) TF in the plans will be Methyl Methcrylate instead of thermoplastic

ii) Add speed limit sign at station 108+50 (left) iii) Remove bike symbols within green striping iv) Add white striping between green markings and pedestrian crosswalk

v) All speed limit signs on John Kirk Drive to be 30 mph

Page 6: UNC Charlotte - October 9, 2000 · 2020. 10. 16. · SHIEL SEXTON ADDENDUM Addendum No: 3 Project: UNC Charlotte East Village Infrastructure State Project No: 13-11004-02 Date: October

ADDENDUM

ADDENDUM NO. 1 ADD-1 - 6 of 6

902 North Capitol Avenue, Indianapolis, Indiana 46204 Phone 317-423-6000 Fax 317-423-6300 www.shielsexton.com

6. Sheet PM-4: i) Update striping to end bike lane with full width of 5. Move miniskips to start at 113+00 to

113+75

END OF SHIEL SEXTON ADDENDUM 3

Page 7: UNC Charlotte - October 9, 2000 · 2020. 10. 16. · SHIEL SEXTON ADDENDUM Addendum No: 3 Project: UNC Charlotte East Village Infrastructure State Project No: 13-11004-02 Date: October

Bid Package Manual: All Packages Shiel Sexton Company, Inc.

UNCC East Village Infrastructure October 8, 2020

SUBCONTRACTOR BID FORM-Addendum 3

Subcontractor Bid Form Page 1 of 3

Bid Package 01 – Sitework

UNCC East Village Infrastructure

To: The University of North Carolina at Charlotte Attn: Ms. Kathy Fisher – Facilities Operations 9201 University City Boulevard

From: Contact: Phone:

Charlotte, NC 28223 Email:

704/687-0596

1. The undersigned Bidder proposes to furnish all labor and material, and to perform all work necessary for the Bid Package 01 – Sitework in accordance with the Project Documents, as prepared by Kimley Horn and the Scope of Work - Contract #01 Sitework Bid Package issued in Addendum 1 for the lump sum price of:

Dollars ($ ) (Enter Base Bid Amount in Words Here) (Numerical Value Here)

2. The undersigned Bidder further acknowledges receipt of the following addenda as listed below and represents that any additions or modifications to, or deletions from the work called for in these addenda, have been taken into consideration and included in the Base Bid Sum.

Addendum No.: Addendum No.:

Addendum No.: Addendum No.:

The undersigned Bidder understands that the Owner reserves the right to reject this bid, but that this bid shall remain open and may not be withdrawn for ninety (60) days from the date of opening.

3. Alternates

a. Alternate 1: Martin Village Connector

Dollars ($ ) (Enter Alternate Amount in Words Here) (Numerical Value Here)

b. Alternate 2: Installation of Sediment Trap in Lot 5A sand filter location

Dollars ($ ) (Enter Alternate Amount in Words Here) (Numerical Value Here)

c. Alternate 3: Installation of wooden guiderail around Lot 5A sand filter

Dollars ($ ) (Enter Alternate Amount in Words Here) (Numerical Value Here)

Page 8: UNC Charlotte - October 9, 2000 · 2020. 10. 16. · SHIEL SEXTON ADDENDUM Addendum No: 3 Project: UNC Charlotte East Village Infrastructure State Project No: 13-11004-02 Date: October

Bid Package Manual: All Packages Shiel Sexton Company, Inc.

UNCC East Village Infrastructure October 8, 2020

SUBCONTRACTOR BID FORM-Addendum 3

Subcontractor Bid Form Page 2 of 3

d. Alternate 4: Relocation of Entrance to Lot 5

Dollars ($ ) (Enter Alternate Amount in Words Here) (Numerical Value Here)

e. Alternate 5: Owner preferred alternate “Unit Pavers” – Provide Pine Hall, English Edge Pavers

Dollars ($ ) (Enter Alternate Amount in Words Here) (Numerical Value Here)

4. Work Sequence:

The Work shall be conducted in the sequences outlined in the project plans. Specifically, the Contractor will refer to sheets TCP-1 through TCP-8.

5. Unit Pricing:

No. 1 Unit Price 1: Removal of unsatisfactory soil and replacement with satisfactory soil material.

• Unit of Measurement: Cubic yard

• $

• Contractor shall include 500 cubic yards of unsuitable soil removal in the base

bid. Unit price shall be utilized to make adjustments in actual quantities

encountered. Unit price shall include replacement with suitable fill. No

additional time will be given to remove unsuitable soil.

No. 2 Unit Price 2: Removal of trench rock replacement with satisfactory soil material.

• Unit of Measurement: Cubic yard

• $

• Contractor shall include 230 cubic yards of trench rock in the base bid. Unit

price shall be utilized to make adjustments in actual quantities encountered.

Unit price shall include replacement with suitable fill. No additional time will

be given to remove trench rock.

No. 3 Unit Price 3: Rock.

• Unit of Measurement: Cubic yard

• $

• Unit price shall be utilized to measure payment for actual quantities

encountered. Unit price shall include replacement with suitable fill. No

additional time will be given to encountering rock.

Page 9: UNC Charlotte - October 9, 2000 · 2020. 10. 16. · SHIEL SEXTON ADDENDUM Addendum No: 3 Project: UNC Charlotte East Village Infrastructure State Project No: 13-11004-02 Date: October

Bid Package Manual: All Packages Shiel Sexton Company, Inc.

UNCC East Village Infrastructure October 8, 2020

SUBCONTRACTOR BID FORM-Addendum 3

Subcontractor Bid Form Page 1 of 3

Bid Package 02 – Electrical

UNCC East Village Infrastructure

To: The University of North Carolina at Charlotte Attn: Ms. Kathy Fisher – Facilities Operations 9201 University City Boulevard

From: Contact: Phone:

Charlotte, NC 28223 Email:

704/687-0596

1. The undersigned Bidder proposes to furnish all labor and material, and to perform all work necessary for the Bid Package 02 – Electrical in accordance with the Project Documents, as prepared by Kimley Horn and the Scope of Work - Contract #02 Electrical Bid Package issued in Addendum 1 for the lump sum price of:

Dollars ($ ) (Enter Base Bid Amount in Words Here) (Numerical Value Here)

2. The undersigned Bidder further acknowledges receipt of the following addenda as listed below and represents that any additions or modifications to, or deletions from the work called for in these addenda, have been taken into consideration and included in the Base Bid Sum.

Addendum No.: Addendum No.:

Addendum No.: Addendum No.:

The undersigned Bidder understands that the Owner reserves the right to reject this bid, but that this bid shall remain open and may not be withdrawn for ninety (60) days from the date of opening.

3. Alternates

a. Alternate 1: Martin Village Connector

Dollars ($ ) (Enter Alternate Amount in Words Here) (Numerical Value Here)

b. Alternate 4: Relocation of Entrance to Lot 5

Dollars ($ ) (Enter Alternate Amount in Words Here) (Numerical Value Here)

Page 10: UNC Charlotte - October 9, 2000 · 2020. 10. 16. · SHIEL SEXTON ADDENDUM Addendum No: 3 Project: UNC Charlotte East Village Infrastructure State Project No: 13-11004-02 Date: October

Bid Package Manual: All Packages Shiel Sexton Company, Inc.

UNCC East Village Infrastructure October 8, 2020

SUBCONTRACTOR BID FORM-Addendum 3

Subcontractor Bid Form Page 2 of 3

4. Work Sequence:

The Work shall be conducted in the sequences outlined in the project plans. Specifically, the Contractor will refer to sheets TCP-1 through TCP-8.

5. Unit Pricing:

No. 1 Unit Price 1: Removal of unsatisfactory soil and replacement with satisfactory soil material.

• Unit of Measurement: Cubic yard

• $

• Unit price shall include replacement with suitable fill. No additional time will

be given to remove unsuitable soil.

No. 2 Unit Price 2: Removal of trench rock replacement with satisfactory soil material.

• Unit of Measurement: Cubic yard

• $

• Unit price shall include replacement with suitable fill. No additional time will

be given to remove trench rock.

No. 3 Unit Price 3: Rock.

• Unit of Measurement: Cubic yard

• $

• Unit price shall include replacement with suitable fill. No additional time will

be given to encountering rock during duct bank installation or directional

drilling operations.

Page 11: UNC Charlotte - October 9, 2000 · 2020. 10. 16. · SHIEL SEXTON ADDENDUM Addendum No: 3 Project: UNC Charlotte East Village Infrastructure State Project No: 13-11004-02 Date: October

Bid Package Manual: All Packages Shiel Sexton Company, Inc.

UNCC East Village Infrastructure October 8, 2020

SUBCONTRACTOR BID FORM-Addendum 3

Subcontractor Bid Form Page 1 of 3

Bid Package 03 – Landscaping

UNCC East Village Infrastructure

To: The University of North Carolina at Charlotte Attn: Ms. Kathy Fisher – Facilities Operations 9201 University City Boulevard

From: Contact: Phone:

Charlotte, NC 28223 Email:

704/687-0596

1. The undersigned Bidder proposes to furnish all labor and material, and to perform all work necessary for the Bid Package 03 – Landscaping in accordance with the Project Documents, as prepared by Kimley Horn and the Scope of Work - Contract #03 Landscape Package issued in Addendum 1 for the lump sum price of:

Dollars ($ ) (Enter Base Bid Amount in Words Here) (Numerical Value Here)

2. The undersigned Bidder further acknowledges receipt of the following addenda as listed below and represents that any additions or modifications to, or deletions from the work called for in these addenda, have been taken into consideration and included in the Base Bid Sum.

Addendum No.: Addendum No.:

Addendum No.: Addendum No.:

The undersigned Bidder understands that the Owner reserves the right to reject this bid, but that this bid shall remain open and may not be withdrawn for ninety (60) days from the date of opening.

3. Alternates

a. Alternate 1: Martin Village Connector

Dollars ($ ) (Enter Alternate Amount in Words Here) (Numerical Value Here)

b. Alternate 4: Relocation of Entrance to Lot 5

Dollars ($ ) (Enter Alternate Amount in Words Here) (Numerical Value Here)

Page 12: UNC Charlotte - October 9, 2000 · 2020. 10. 16. · SHIEL SEXTON ADDENDUM Addendum No: 3 Project: UNC Charlotte East Village Infrastructure State Project No: 13-11004-02 Date: October

Bid Package Manual: All Packages Shiel Sexton Company, Inc.

UNCC East Village Infrastructure October 8, 2020

SUBCONTRACTOR BID FORM-Addendum 3

Subcontractor Bid Form Page 2 of 3

4. Work Sequence:

The Work shall be conducted in the sequences outlined in the project plans. Specifically, the Contractor will refer to sheets TCP-1 through TCP-8.

5. Unit Pricing: Not applicable