unbonded post tensioning construction applications
DESCRIPTION
Sampling of commercial construction that use unbonded post-tensioned concrete reinforcement by AMSYSCO, Inc.TRANSCRIPT
AMSYSCO
UNBONDED POST-TENSIONINGCommercial Construction Applications
Reinforced Concrete Projects
HIGH-RISE HOTEL
J.W. Marriott HotelIndianapolis, IN, USA
Floors: 35Schedule: Nov.2008 to Dec.2009
_________________PT: 910,000 ft. (277,000 meters) 473,000 lbs. (215,000 kg)
MID-RISE HOTEL
Renaissance HotelSchaumburg, IL, USA
Floors: 17Schedule: Dec.2004 to Apr.2005
_________________PT: 515,000 ft. (157,000 meters) 273,000 lbs. (124,000 kg)
PARKING STRUCTURE
Navy Pier GarageChicago, IL, USA
Floors: 7Schedule: 1997
_________________PT: 450,000 ft. (137,000 m) 237,000 lbs. (108,000 kg)
PARKING STRUCTURE
Indianapolis AirportParking GarageIndianapolis, IN, USA
Floors: 5Schedule: Jun.2006 to Oct.2007
_________________PT: 4,600,000 ft. (1,402,000 m) 2,440,000 lbs. (1,107,000 kg)
HIGH-RISE RESIDENTIAL
600 FairbanksChicago, IL, USA
Floors: 42Schedule: Nov.2006 to Jul.2007
_________________PT: 747,000 ft. (228,000 m) 396,000 lbs. (180,000 kg)
HIGH-RISE RESIDENTIAL
One Museum ParkChicago, IL, USA
Floors: 55Schedule: Sept.2008 to Aug.2009
_________________PT: 1,360,000 ft. (415,000 m) 707,000 lbs. (321,000 kg)
RETAIL
Southgate MarketChicago, IL, USA
Floors: 3Schedule: Jul.2005 to Jan.2006
_________________PT: 749,000 ft. (229,000 m) 397,000 lbs. (180,000 kg)
STADIUM
Target FieldMinneapolis, MN, USA
Floors: 5Schedule: Dec.2007 to Sept.2008
_________________PT: 711,000 ft. (217,000 m) 377,000 lbs. (171,000 kg)
THEATER
Guthrie TheatreMinneapolis, MN, USA
Floors: 5Schedule: Dec.2003 to Mar.2004
_________________PT: 82,000 ft. (25,000 m) 42,000 lbs. (19,000 kg)