  • SAKTHI TRADERSS.No Description Of Work Unit Qty Unit Rate

    1 Earth Work1.1

    Cum 100 4001.1.A

    Cum 500 5501.1.1

    1.1.1.1 One Lift Cum 100 10501.1.1.2 Two Lift Cum 100 1300

    1.2

    Cum 300 1551.3

    Cum 100 11001.6

    Cum 100 1952 Concrete Works

    2.1 Plain Concrete ( PCC) 2.1.1

    Cum 43 45002.2 Re-inforced Cement Concrete ( RCC)

    Earth work in excavation including clearing away vegetation, if any, in foundations, trenches, drains etc. in soft/loose soil as classified in the specifications in both dry and wet conditions { including de-watering) up to a depth of 3m. The rate shall include cost of all tools & tackles, labours, stacking & spreading of excavated soil within plant boundary, dressing of sides, ramming of bottom. Excavation shall be measured as PCC size+5OOmm on either sides.Same as above but soft / hard rock ( not requiring blasting)Extra charges over rate for item 1.1 above for every additional 3.0 meters lift or part therof

    Backfilling with above available excavated earth rn trenches, plinth, sides of foundations in layers not exceeding 200mm in depth including onsolidation of each layer by ramming and watering, all complete

    Supplying and filling suitable earth in trenches, pliat h, sides of foundations in layers not exceeding 200mm in depth including consolidation of each layer by ramming and watering. all complete

    Disposal of surplus earth/ excavated material. by mechanicatransport outside plant boundary as directed by Engineer-in-Charge.

    Providing and laying machine mixed plain cement concrete with cement. approved coarse sand and 40 mm nominal size graded coarse aggregate m the proporuon of 1:4:8 including supply of all materials labour and T & P required for proper completion of work In foundations for all depths & thickness but excluding shuttering

  • 2.2.1

    2.2.1.1 From+ 0.00 to -9.00 M Cum 140 63002.2.1.2 From + 0.00 to +9.00M Cum 10 6850

    2.2.2Same as item no 2.1.6 but controlled grade of M30

    2.2.2.1 From + 0.00 to -9.00 M Cum2.2.2.2 From + 0.00 to +9.00M Cum

    3 Form Work3.1

    Providing and laying machine mixed cement concrete of controlled grade of M2S, using 20 mm and down size graded coarse aggregate of approved stone, approved coarse sand and cement for structures reinforced heavily or lightly including providing & mixing of any integral compound, additives, placing concrete in position in foundation and superstructures of any required size and shape, all arrangements of hoisting, transporting of concrete to its final pcs.uon, lorm.ng pockets, leaving openings, providing and fixing sleeves, embedding necessary inserts of any description, size and shape.holding down bolts, hooks, angles, channels, pipes, anchor plates etc. (all inserts holding down bolts, anchor plates, pipes, bolts and nuts etc. shall be measured and paid by weight under separate item) Tamping, vibrating, curing, rendering and finishing if required to give a smooth and even Surface etc. and also including supply of all required materials, labour T&P etc. required for proper completion of work, all complete for the respective levels as under:

    Providing and fixing in position to correct line level and plumb plain form work in all shapes, sizes and directions, of wooden, MS sheets, or any other approved materials of rigid design, faces dressed with approved form oil to prevent adhesion of concrete to forms etc., including splayed edges, notching, , including leaving necessary recesses, openings for pockets, inserts etc., including providing and fixing all staging scaffoldings, struts, braces, supports, props etc., including easing, striking and removing formwork from site etc. all complete. The rate should also include supply of all materials, labour and T & P etc. required for satisfactory completion of works all complete for the respective levels as under

  • 3.1.1 from + 0.00 to - 9.00 M Sqm 275 7503.1.2 From + 0.00 to+ 9.00 M Sqm 25 800

    4 Re-inforcement Steel4.1

    MT 20 6300011 Grouting

    11.1

    Cum 0.5 8000011.2

    Cum 1 8500014 Miscellaneous

    14.3Cum 10 4750

    14.4Cum 55 5250

    14.6

    MT 2 650014.7

    Sqm 25 20014.9

    MT 5 7000Total

    Supplying, straightening, cleaning, cutting, bending to required shape and lengths as per Bar Bending Schedules and placing of high yield strength deformed bars conforming to IS-1786 having a minimum yield stress 500 N/Sq.mm in all types of RCC work including structures of slipform/curved constructions for all heights and depths with proper cover blocks, supports, chairs, spacers etc. fixing and binding of reinforcement with 16 SWG black soft annealed wire (Binding wire will not be measured and paid for). Only such dowels chairs, pins etc. as approved by Engmeer- in-Charge shall be measured and paid. The rate shall also include labour, T & P, cost of binding wire, preparation of detailed bar bending schedule (BBS) etc. required for proper completion of work.

    Providing and laying non-shrink grout Such as "Conbextra GP2" or other equivalent grout as approved by Engineer in-Charge including shuttering, vibrating/ temping, T & P, Labour, curing etc. all complete.

    Providing and laying cement concrete grout in proportion 1:1:2 with 12mm and down graded aggregates including shuttering, vibrating / tempimg, T & P, Labour, curing etc. all complete.

    Demolishing of PCC including disposal of material within plant boundaryDemolishing of RCC including disposal of material within plant boundary

    Demolishing of structural steel including stacking of serviceable material and disposal of unservicable material within plant boundary.

    Demolishing of AC/ Metal sheeting including stacking of serviceable material and disposal of unservicable material within plant boundary.Dismantling of equipment including placing it at designated place within plant boundary

  • Terms & Conditions

    25% Advance along with purchase orderThe Rate Of All Earth work Will be changed As per Site condition in futureAny extra work from above mentioned items shall be claimed as additional.Quotation valid for 15 days from the date of quote.After submission of Invoice, balance payment to be paid within 15 days from the date of invoice

  • SAKTHI TRADERS Date22/08/2015Amount Remarks

    40000

    275000

    105000130000

    46500

    110000

    19500

    193500

  • 88200068500

    Rate OnlyRate Only

  • 20625020000

    1260000

    40000

    85000

    47500

    288750

    13000

    5000

    350003870500

  • After submission of Invoice, balance payment to be paid within 15 days from the date of invoice