ULTRATECH CEMENT LIMITED Andhra Pradesh Cement Works, Tadipatri
GreenCo Gold Certified Unit
Welcomes all the delegates for Second Workshop on "Best Practices in Energy Efficiency in Cement Sector" under KEP initiative on 7th-8th July, 2016
Integrity Commitment Passion Seamlessness Speed
Contents
1. Leadership & Strategy
2. Employees Involvement in Capacity Building-ISO
3. Energy Management System-ISO
4. Reduction in specific energy consumption
5. Best Practices and Identified Projects
6.Awards and Accolades
Integrity Commitment Passion Seamlessness Speed
ABG Business – FY15
3 3 3 3 5 5 5 5 51010 12 13
2628 30
31
4049 49 49 51
54 69
91
0
10
20
30
40
50
60
70
80
90
10019
91
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
ABG Cement Capacity Exponential growth
49
Mixed strategy of takeover and expansion given results
mT/annum After Jaypee
acquisition
Integrity Commitment Passion Seamlessness Speed
APCW Cluster
B
A
D
C
A
C
D
B
Arakkonam Cement Works 1.1 million MT -- ISO Certified
1.2 million MT - ISO Certified
Ginigera Cement Works
ONE million MT ISO Certified
Sankarapally Bulk Terminal
Andhra Pradesh Cement Works
Phase 1 Clinker – 2.7 Million Ton Phase 2 Clinker – 3.4 Million Ton Total Cement – 6.4 Million Ton
Total capacity Clinker : 6.1 Million Ton Cement : 9.7 Million Ton
Integrity Commitment Passion Seamlessness Speed
Unit Vision & Mission
To be a Model Cement Plant by 2020 with a clear focus on Safety, Environment, Quality, Cost,
Productivity, Delivery, Employee & Societal Satisfaction.
Vision 2020
• Safety, Health & Environment
• Quality & Customer Orientation
• Operational Excellence
Key Focus Area
• Employee Engagement
• Societal Satisfaction
To deliver superior value to our customers, shareholders, employees and society at large with
Systems & Team based, Safe & Environment friendly work culture through Innovation, Skill up-
gradation, Conservation and Technological up-gradation adhering to Aditya Birla Group Values.
Mission
Integrity Commitment Passion Seamlessness Speed
Milestones & Achievements
First ISO:50001:2011 certified unit among the ABG cement units
Achieved 28206 ESCERTS in PAT cycle-1
Established first of its kind(in India) WHRPP
First Time Classifier Replacement globally in Loesche Cement Mill (53.3+3)as Jt. Improvement Project.
Best Energy performance awards every year
Successfully completed Steam blowing with coal in place of HSD for Boiler#4 (first time in the history of Thyssen krupp Boilers).
Integrity Commitment Passion Seamlessness Speed
Baseline(2007-10) Kcal/Kg Major Cem. Eq. 802
Major Cement Product in baseline PSC
Target(PAT Cycle-I) Kcal/Kg Major Cem. Eq. 768
Achieved(Without normalization) AY 2014-15 Kcal/Kg Major Cem. Eq. 744
Achieved(With normalization) AY 2014-15 Kcal/Kg Major Cem. Eq. 707
Baseline Production(2007-10) MT 4623915
ES Certificates (Final Awarded) Nos 28206
PAT CYCLE-I Summary, APCW
28206 ESCerts for PAT 1 Cycle
Integrity Commitment Passion Seamlessness Speed
Management System Certificate
Integrity Commitment Passion Seamlessness Speed
Energy Policy Implementation
Energy Policy implemented in Dec – 2011
Energy Policy states unit’s commitment towards continual energy performance improvement.
Energy policy is communicated at all levels.
Energy policy is regularly reviewed and last reviewed on 1st March’16.
Integrity Commitment Passion Seamlessness Speed
Executive President Unit Head
FH-Tech
Champion
LSC RM KCC CM Packing WT
Clinker Loading
CPP AC,P&V
Township Utilities
Energy Manager
Energy Management Structure
Integrity Commitment Passion Seamlessness Speed
Energy Cell- Focus Area
Energy Cell Functioning Focus Area
Restoring basic condition of equipment
Effective PM07
Process/energy optimisation
Technological up-gradation
Awareness / Campaign
Knowledge management
Integrity Commitment Passion Seamlessness Speed
Annual Business
Plans
Technical Journals,
Consultants etc. KIP Visit, Best practices
Energy mapping
Plant performance
Report
Audit process
Bench-marking report Loss & Cost
Report
Opportunities for improvement
Identified
Identification of Opportunities
EE Credit 1.1
Integrity Commitment Passion Seamlessness Speed
21 19 20
75 47 70
46 42
167
215
0
50
100
150
200
250
2012-13 2013-14 2014-15 2015-16 2016-17
No. Of Projects Investment (in Lakhs)
Energy Saving Projects and Investments
Integrity Commitment Passion Seamlessness Speed
Team:
Frequency:
Responsible Person:
Gross Root Team
Daily
Operator
Daily Coordination
Team
Daily
Sr. Management
Energy Conservation Cell
Monthly
Energy Manager
Energy Audit
Quarterly
Technical Cell
Mandatory Energy Audits
Once in 3 Years
Energy Manager
Energy performance Review Methodology
ENCON team comprises of 8 BEE certified energy Managers and 3 Energy Auditor, and overall EnMS is
supported by 18 internal auditors
Integrity Commitment Passion Seamlessness Speed
Employees Involvement & Capacity Building
Integrity Commitment Passion Seamlessness Speed
Strategies Adopted for employee involvement
Organization Knowledge
KIP Visits
External trainings
Internal trainings
Participation in Seminars
Team competition
Energy conservation Week
Awareness creating to all Colony residents
Training need identification through Poornata
Rewarding & Recognition
Knowledge sharing & recognition at shop floor
Integrity Commitment Passion Seamlessness Speed
Kaizen & Suggestion summary in APCW FY2013-16
We believe there is always scope for improvements
Monitoring of KPE
Team Competition
Monitoring of KPI
Rewards & Recognition
11
64
84
0
20
40
60
80
100
13-14 14-15 15-16
Energy saving suggestion
16
120
148
0
20
40
60
80
100
120
140
160
13-14 14-15 15-16
Energy saving kaizens
Integrity Commitment Passion Seamlessness Speed
Display of Employees Photos along with his achievement on pathway
Out of 10 commandments for FY2015-16 our 1st foremost commandment is reduction SEC
Integrity Commitment Passion Seamlessness Speed
Intranet portal for Energy Management Information
Integrity Commitment Passion Seamlessness Speed
Energy conservation Week at APCW
Inauguration of energy week by UH Poster Competition
Poster Competition Energy speech competition for families
Integrity Commitment Passion Seamlessness Speed
Energy conservation Week at APCW
Greeting to Dr. K. Ravi Kumar(HOD –Phys. Anatapur Degree Collg)
Energy awareness test for families
UH Speech on Energy conservation
Integrity Commitment Passion Seamlessness Speed
Industry-Institute-Interface
As a part of Industry-Institute-Interface, Mr. D.C. Chandrasekhar, HOD-Instrmn. given speech in the name of topic “Role of Automation Engineer for optimization plant operation” and Mr. Suresh Kadali has given speech about Company orientation at Sri Krishnadevaraya Engineering College, Gooty, Anantapur District on 22-03-2012.
As a part of Industry-Institute-Interface, Mr. D.C. Chandrasekhar, HOD-Instrmn. given speech in the name of topic “Role of Automation Engineer for optimization plant operation” and Mr. Suresh Kadali has given speech about “Company orientation” at GATES Institute of Technology, at Gooty, Anantapur District on 22-03-2012.
Integrity Commitment Passion Seamlessness Speed
Program Name Faculty Faculty Type Program Base No of Days
Advanced Training on Energy Efficiency CII, Bangalore External Functional 2.0
Heat Integration for Energy Conservation by Pinch
Gyanodaya Team External Functional 3.0
Heat Integration for Energy Conservation by Pinch
Gyanodaya Team External Functional 3.0
Heat Integration for Energy Conservation by Pinch
Gyanodaya Team External Functional 3.0
Best Practices in Energy Efficiency in Power Generation in Thermal Power Sector
K K Chakravarthi - BEE Consultant
External Functional 1.0
13th Edition of Energy Efficiency Summit 2014 CII, Hyderabad External Functional 1.0
Energy Management and Energy Efficiency Kiran Internal Functional 1.0
Energy Savings in Power Plants Kiran, CII Internal Functional 1.0
Internal Auditor - Energy Management Mr. Durga Prasad Dora Internal Functional 1.0
Training and capacity building programs
Integrity Commitment Passion Seamlessness Speed
First Thermal Power Best Practice Workshop conducted by IIP & BEE on 28 Oct 2015,Reliance Power plant ,Dahanu,mumbai
Integrity Commitment Passion Seamlessness Speed
Knowledge sharing portal on Energy Management
Integrity Commitment Passion Seamlessness Speed
Training Identification & Project assignment
Integrity Commitment Passion Seamlessness Speed
Reduction in SEC
Integrity Commitment Passion Seamlessness Speed
Equipment Efficiency Monitoring Schedule
Integrity Commitment Passion Seamlessness Speed
67 65
94.5
88.6 87.8 86.4 87.3 86.4
77.3
60
65
70
75
80
85
90
95
NBM IBM '10-11 '11-12 '12-13 '13-14 14-15 15-16
International Benchmark @
100% PPC
(kWh / MT of cement)
Reduction in Specific Energy Consumption
8.1% Reduction
AT 100% PPC
Blended Cement Ratio%: 48.0 47.00 45.70 43.00 42.78 42.00
National Benchmark
Utilities power increased by 2KW/MT Due to one plant only running
Integrity Commitment Passion Seamlessness Speed
(KCal / Kg. of Clinker)
Specific Heat Consumption
699.9
697
692
692
702
718
675
680
685
690
695
700
705
710
715
720
'10-11 '11-12 '12-13 '13-14 14-15 15-16
Kcal/KgClnkr
Sp.Heat consumption high due to
usage of 100% pet coke in kiln
Integrity Commitment Passion Seamlessness Speed
802.37
768.23
743
707
500
650
800
950
BLY Target 2014-15(GtG) 2015-16(AN)
After
Normalisation
tentative
actual SEC
APCW- PAT Status SEC: kCal/kg Equivalent Cement
Integrity Commitment Passion Seamlessness Speed
Energy Saving Projects
Integrity Commitment Passion Seamlessness Speed
Energy Saving Projects 2015-16 (With Investment)
S.NO Description of Project Imp. Year
Annual Electrical Savings achieved (KWH in Lakhs)
Annual Savings (INR)
(In Lakhs)
Investment (INR)
(In Lakhs)
1 Installation of low air pressure screw compressors in place of high pressure compressors for fly ash unloading.
2015-16 5.54 24.95 52.58
2 Rawmill3 &Rawmill-4 Suction line Venturi replacement work
2015-16 3.91 17.58 40.00
3 Modification of Kiln coal firing pipe line. 2015-16 6.10 27.44 25.00
4 VFD for Line2 RA fan 2015-16 1.85 8.32 7.77 5 VFD for Line2 BH fan 2015-16 0.79 3.56 7.67
6 Removal of Venturi in CM-3 bag house fan inlet duct. 2015-16 7.76 34.90 6.00
7 Replacement of Venture with straight duct at Cement Mill 3 bag house outlet duct.
2015-16 6.98 31.41 6.00
8 Power reduction by production enhancement by installing pneumatic barrier in CM5.
2015-16 14.68 66.08 6.00
9 Replacement of 108 nos 70W HPSV light fittings with 36W LED light fittings in colony
2015-16 0.17 0.78 5.18
10 Optimisation of Coal mill after removal of Venturi 2015-16 2.81 12.62 5.00
Integrity Commitment Passion Seamlessness Speed
Energy Saving Projects 2015-16 (With Investment)
S.NO Description of Project Imp.Year Annual Electrical Savings achieved (KWH in Lakhs)
Annual Savings (INR)
(In Lakhs)
Investment (INR)
(In Lakhs)
11 Replacement of 28 nos 150W HPSV light fittings with 72W LED light fittings in
2015-16 0.09 0.40 3.22
12 Replacement of 225nos 36W CFL tube lights with 18W LED lights in CCR & other area
2015-16 0.15 0.67 0.90
13 Installation of chutes in place of air slides in intermediate storage silo.
2015-16 0.56 2.54 0.50
14 Modification in Coal mill Bag house Product Transport for reducing specic power consumption
2015-16 0.20 0.88 0.40
15 Installation DP transmitters on 10 JPFs 2015-16 0.06 0.27 0.30
16 Drive derating in P2U19 from 15 KW to 7.5 KW 2015-16 0.07 0.30 0.22
17 Drive derating in P2U11 from 15 KW to 7.5 KW 2015-16 0.04 0.20 0.22
18 Shifting the Line-2 Kiln HTD scs to main PLC & removed split AC.
2015-16 0.10 0.45 0.10
19 Installation light pipe system at PP 2015-16 0.02 0.09 0.06
20 Auto operation of water cooling tower motor with o/l temp of CM pump house.
2015-16 0.02 0.09 0.02
Integrity Commitment Passion Seamlessness Speed
Energy Saving Projects 2015-16 (Without Investment)
S.NO Description of Project Imp.Year Annual Electrical Savings achieved (KWH in Lakhs)
Annual Savings (INR)
(In Lakhs)
21 Bedash cooler Air Optimisation 2015-16 0.27 1.20
22 ACC-3 fan1 Bundle Gap filling with MS Plate 2015-16 0.16 0.72
23 ON/OFF Switch control of Lighting has been provided for Ph-1 DCS I/O Panel Room Lights
2015-16 0.23 1.02
24 Reduction of Power consumption of ACC FANS at TPP 3& 4 Units by providing VFD
2015-16 7.20 32.40
25 ACC 3 &4 fans Power Optimization with Vacuum based Setpoint 2015-16 1.81 8.16
26 ACC-2 fan5 blades changed with Energy efficient profile blades 2015-16 0.87 3.92
27 Single Boiler Feed Pump Operation 2015-16 0.34 1.55 28 Single Boiler Fans Operation 2015-16 0.10 0.45 29 PH-2 Crusher DE fan with DP logic 2015-16 0.25 1.14
30 Stop 11 KW motor operation by separating power feeders for chillers AHU
2015-16 1.39 6.27
31 Local lighting control switch Provided for Ph-1 TG & ESP cable cellar and WTP MCC room.
2015-16 0.24 1.10
32 Occupancy Sensor Provided at Ph-1 Battery & Battery charger room, WTP DCS Room
2015-16 0.07 0.30
Integrity Commitment Passion Seamlessness Speed
S.NO Description of Project Imp.Year Annual Electrical Savings achieved (KWH in Lakhs)
Annual Savings (INR)
(In Lakhs)
33 ACW pump corrocoating 2015-16 0.07 0.30
34 Bypass Line arrangement for Make up Water 2015-16 0.06 0.28
35 CBD Heat recovery 2015-16 0.14 0.64 36 Boiler-1&2 IGCV removal 2015-16 0.74 3.32
37 L.P.Heater drain line connection to CRT (Hot well Bypass) 2015-16 0.21 0.94
38 Ph-2 DE Systems VFD 2015-16 2.84 12.76 39 Lube Oil Heaters indication in DCS 2015-16 0.01 0.04
40 2- Pumps modification in Final waste water pit 2015-16 0.01 0.05
41 1- ETP pumps modification done in ETP pit replaced submersible pumps instead of negative suction pumps.
2015-16 0.02 0.08
42 VFD arrangemnet for Service &inst air compresor 2015-16 3.36 15.12
43 BC-3A low Capacity motor replacement 2015-16 0.11 0.49
44 Pentane pump VFD arrangement 2015-16 5.69 25.61
45 Lighting control in all Electrical Substations 2015-16 1.83 8.21
46 Lighting control in conveyor galleries 2015-16 0.76 3.43
47 Optimizing CCR AC ,P&V operation 2015-16 0.36 1.62
Energy Saving Projects 2015-16 (Without Investment)
Integrity Commitment Passion Seamlessness Speed
Energy Saving Projects 2015-16 (Without Investment)
S.NO Description of Project Imp.Year
Annual Electrical Savings achieved (KWH in Lakhs)
Annual Savings (INR)
(In Lakhs)
48 Lighting control of down the Hill area Road to packing plant 2015-16 0.18 0.82
49 Single start command for Line-2 Crusher & RMs 2015-16 0.20 0.90
50 Occupancy sensor provided at various locations. 2015-16 0.00 0.02
51 Provision of PID for Line-2 RM-3 fans speed Vs KW 2015-16 0.08 0.34
52 Reduction of power consumption in phase – II cement mills , by stopping Booster fan.
2015-16 9.06 40.77
53 Power saving by stopping JPF in line-1 cement mills 2015-16 1.80 8.10
54 Sp. Power reduction by improvement of Kiln TPD by optimizing raw mix.
2015-16 73.62 331.30
55 Optimisation of Phase-2 raw mills to reduce the Sp.Power consumption.
2015-16 11.73 52.79
Integrity Commitment Passion Seamlessness Speed
Energy Saving Projects 2015-16 (Without Investment)
S.NO Description of Project Imp.Year
Annual Electrical Savings achieved (KWH in Lakhs)
Annual Savings (INR)
(In Lakhs)
56 Stopping of 1 No roots blower for Line 2 CF silo aeration system
2015-16 1.27 5.72
57 Burner pipe tip cooling fan replacement with fan 2015-16 0.14 0.65
58 Stopping of air slide blower for feeding of 431 BE-1 2015-16 0.07 0.29
59 Stopping of air slide blower for feeding of 431 BE-2 2015-16 0.07 0.29
60 Granados make pump arrangement for Cooler water injection 2015-16 0.18 0.82
61 Modification of Coal Mill-1 fine coal circuit screw con-veyor K1j06 feed chute(Nov-15).
2015-16 0.02 0.07
62 Avoid the operation of flow conveyor (L61CV3) in Coal mill 2 mill reject conveying system(Dec-15)
2015-16 0.04 0.20
Integrity Commitment Passion Seamlessness Speed
Energy Saving Projects 2015-16 (Without Investment)
S.NO Description of Project Imp.Year Annual Electrical Savings achieved (KWH in Lakhs)
Annual Savings (INR)
(In Lakhs)
63 Optimization of cycle time of Coal mill 2 rejects con-veyor pneumatic cylinder(Jan-16)
2015-16 0.00 0.02
64 Changing of magnetic separator operational interlock with F1J08(Mar-16)
2015-16 0.00 0.02
65 Replacement of Venture with straight duct at Coal mill 2 bag house outlet duct(Dec-15).
2015-16 0.37 1.69
66 Reduction of energy of water pumps from 135 Kw to 105 Kw for operation of Line-1 preclinceration plant.
2015-16 1.78 8.02
67 Water supply to CCR AC from Line-2 water system instead of Line-1 pump running during Line-1 stoppage.
2015-16 0.89 4.01
68 Optimization of energy of Line-2 cement mill cooling tower With temperature interlock.
2015-16 0.99 4.46
Integrity Commitment Passion Seamlessness Speed
Energy Saving Projects 2015-16 (Without Investment)
S.NO Description of Project Imp.Year
Annual Electrical Savings achieved (KWH in Lakhs)
Annual Savings (INR)
(In Lakhs)
69 Reduction of Idle run hours of Line-2 Girth Gear compressor with replacement from 15 KW to lower size available Kw compressor 11
2015-16 0.14 0.63
70 Operation of WHRP with 37 kW compressors instead of 160 Kw compressors.
2015-16 2.25 10.13
71 Stand by arrangement of air dryer with existing air dryers in Line-2 main Compressor house.
2015-16 0.18 0.80
72 Stopping of air slide blowers for feeding of RM-3 CF Silo Bucket elevator
2015-16 0.76 3.42
73 Stopping of air slide blowers for feeding of RM-4 CF Silo Bucket elevator
2015-16 0.57 2.57
Integrity Commitment Passion Seamlessness Speed
Energy Saving Projects 2015-16 (Thermal)
S.NO Title of Energy Saving project
implemented Year of Implementation
Annual Thermal Savings achieved
(Tons of coal or oil)
Annual Savings (INR)
(In Lakhs)
Investment (INR)(In Lakhs)
1 Insulation doing for improving the effective heat utilisation
2015-16 1058 5.0784 20.15
2 Kiln heat up with Petro-polymer fuel instead of HSD for cost reduction
2015-16 253 4.048 0
3 False air decrease in preheater 2015-16
4 Cooler MFR modification-5KCal/Kg 2015-16
5 Calciner firing line modification-Line 1 2015-16
6 Radiation losses decrease(refractory) 2015-16
Integrity Commitment Passion Seamlessness Speed
Some Projects and Details
Integrity Commitment Passion Seamlessness Speed
Project -1 HOT AIR DUCT3
43
Annual power saving Annual cost saving Invest. Made CO2 reduction
Million kWh Rs Million Rs Million Million Ton
6.15 / 1,302KL 58.314 130.4 3.44
Integrity Commitment Passion Seamlessness Speed
Increase in WHRPP run hours due to hot air duct
(7,962 hours in 2014-15 - ever highest )
7,482
7,037
5,556 5,807
5,247
4,320
5,984
7962 7,858
7,341
6,298
6,066
5,373
4,499
3,923 4048
6,869
6039
3,800
4,300
4,800
5,300
5,800
6,300
6,800
7,300
7,800
8,300
2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15WHR Run Hours Kiln - 1 run hours Kiln - 2 run hours
Increase due to Hot Air Duct
Integrity Commitment Passion Seamlessness Speed
Line-2 CM-3 Process optimization by installing new LSVS Classifier
Background of the project
Line 2 Cement Mills were running at a lower TPH and higher specific power consumption compare to line-1 Cement mills.
To reduce the specific power consumption in line-2 cement mills, installed high efficiency LSVS classifier in Cement mill-3 in the month of Mar’13.
Description of project
High efficiency LSVS classifier installed in Cement Mill-3 with the help of Loesche Germany in Mar’2013.
Cement mill-3 classifier static vanes modification was carried out in May13.
Classifier rotor cassettes gap modification was carried out in Jun’13.
Achieved desired mill output through above modifications.
Integrity Commitment Passion Seamlessness Speed
Line-2 CM-3 Process optimization by installing new LSVS Classifier
Before
Gap b/w Static Vanes and Rotor is 330mm
After
Gap b/w Static Vanes and Rotor is 230mm
Benefits After above modifications the mill output is increased from 189 TPH to 230 TPH in OPC and the power is reduced from 29.5 Kwh/ton of cement to 26.56 Kwh/ton of cement .
Integrity Commitment Passion Seamlessness Speed
LSKS (old design)
• High Velocity Differences
• Energy Loss
LSVS (new design) * Homogeneous Velocity * Distribution
Classifier modification in Cement Mill-3 with new LSVS Classifier
Integrity Commitment Passion Seamlessness Speed
Sl No Implemented section Status Remarks Savings
1 Line-2 Crusher Completed
Observed savings of 5-6 min idle running of
entire RBC group. 80kwh for each start
2 Line-2 Raw Mill-3 Completed
Observed group to group start delay avoided,
saving of 9 minutes. 590 kwh in each start
3 Line-2 Raw Mill-4 Completed
Observed group to group start delay avoided,
saving of 9 minutes 590 kwh in each start
4 Line-1 Cement Mill-1 Completed
Trails taken Observed group to group start
delay avoided, saving of 10 minutes 350kwh in each start
5 Line-1 Cement Mill-2 Completed
Trails taken Observed group to group start
delay avoided, saving of 10 minutes 350kwh in each start
6 Line-2 Cement Mill-3 Completed
Trails taken Observed group to group start
delay avoided, saving of 10 minutes. 397kwh in each start
7 Line-2 Cement Mill-4 Completed
Trails taken Observed group to group start
delay avoided, saving of 10 minutes. 397kwh in each start
8 Line-2 Cement Mill-5 Completed
Trails taken Observed group to group start
delay avoided, saving of 10 minutes. 397kwh in each start
9 Line-2 Coal Mill Completed Saving of 6 minutes idle running. 105kwh in each start
Single start/ Stop for all crushers and Mills
Integrity Commitment Passion Seamlessness Speed
Guillotine Damper at WHRS inlet
Benefits:
By introducing damper at WHRS inlet
WHRPP gross output increased by 90kW.
HAD fan power consumption reduced by 40kW due to reduction in false air entry.
Overall, a gain of 130kW achieved i.e. 3,120 kWh per day.
Integrity Commitment Passion Seamlessness Speed
Venturi Modification in Cement mill 3
BEFORE AFTER
Benefits Saving of 0.5KWH/MT of cement due to pressure drop
reduction
Saving of 100KW to 110KW fan power
Integrity Commitment Passion Seamlessness Speed
Power generation increased with dummy at HAD fan2
KAIZEN THEME :Power Generation increase at WHRP by provide dummy at HAD Fan 2
BEFORE KAIZEN (Photo / Sketch)
PROBLEM BEFORE KAIZEN: : ESP fan 1 False air taking from chimney through HAD fan 2
KAIZEN ACTIVITIES : 1. Identified the area for power generation by arrest the false air leak through HAD Fan 2 2. Dummy plate fixed before the HAD fan 2 and arrested the false air entry.
BENEFITS TANGIBLE:
1.) Per day power saving 960 KWh
2.) Per annum expected Power savings will be
3.36 lakh KWh and In terms of cost Rs.11.76/-
@ Rs.3.50 per unit.
KAIZEN SCHEDULE: Start Date : 20.04.2016 Completion Date : 22.04.2016
AFTER KAIZEN (Photo / Sketch)
BENEFITS INTANGIBLE:
1. Avoided the dust removing at HAD fan 2.
Had Gas
WHOH ESP FAN
HAD FAN
CHIMNEY
Had Gas
WHOH ESP FAN
HAD FAN
DUMMY
CHIMNEY
Integrity Commitment Passion Seamlessness Speed
Modification of HSLM from 3 power pack to single power pack
Problem Statement At APCW, vertical roller mills were supplied by M/s. Loesche for clinker grinding. In clinker mill -1, great concern in grinding process was unstable operation of mill with high mill body vibration, which lead to frequent tripping of mill without change in process parameters Observations Hydraulic disturbances were creating problem in high vibration of mill. The clinker mill was supplied with individual hydraulic packs for each roller (3 no’s) instead of
conventional hydraulic pack (one power pack for all 3 rollers).
Improper feed material distribution beneath master rollers.
Improper water spray on the grinding table.
Integrity Commitment Passion Seamlessness Speed
Modifications Done
Modified existing hydro-pneumatic spring system with single hydraulic system.
Optimization of hydraulic pack with different pressure settings.
Incorporation of baffle plate in the feed chute for proper distribution of material flow.
Water nozzle was taken out about 100 mm towards dam ring side.
Modification of HSLM from 3 power pack to single power pack
Integrity Commitment Passion Seamlessness Speed
Modification of HSLM from 3 power pack to single power pack
Single HSLM Cabinet 3 power pack HSLM Cabinet
Integrity Commitment Passion Seamlessness Speed
Benefits Mill operation has become very stable
Mill trippings on vibration are almost eliminated (from 4 to 5 trippings per day)
Mill vibrations are reduced from 10 mm/sec to 7-8 mm/sec.
Mill water injection/spray reduced to 5 m3/hr from 7 m3/Hr.
Modification of HSLM from 3 power pack to single power pack
Integrity Commitment Passion Seamlessness Speed
Benefits Mill is in operating with OPC grinding without the support of Hot Gas generator
during absence of kiln hot gases.(Kiln -2 under shutdown)
Achieved saving of Rs.95 Lacs on furnace oil consumption during kiln shutdowns
Mill is responding to operator actions & auto loop operation of air flow.
Good control of product residue standard deviation.
Modification of HSLM from 3 power pack to single power pack
Integrity Commitment Passion Seamlessness Speed
Modification of HSLM from 3 power pack to single power pack
Trend of 24 Hrs Mill operation after modification
Vibration level
Integrity Commitment Passion Seamlessness Speed
HPSV fittings replacement with LED lights in colony
Before After
HPSV Lamps replacement with LED lights in colony
Integrity Commitment Passion Seamlessness Speed
150W HPSV fittings replaced with 72W LED light fittings Benefits Saving of 18250 units/ Per year and thus saving of Rs.0.9Lakhs per year
Improved look of the colony roads
HPSV Lamps replacement with LED lights in colony
Integrity Commitment Passion Seamlessness Speed
Line-2 pre-heater across down comer duct pressure drop is more i.e. in string-1 is 125mmWG and string-2 is 133mmWG. CFD analysis carried out with the help of TRC to reduce the pressure drop in PH down comer. They suggested that baffle plates are to be installed at top to avoid turbulent flow inside duct. As suggested by TRC 4 no's baffle plates are installed at top. By which pressure drop in string-1 reduced from 125 to 101mmWG & in string-2 from 133 to 120 mmWG.
Baffle Plates
Description
Energy saving achieved : 3.96 Lac kWh/year
Line-2 PH DC pressure drop reduction by installing baffle plates at PH Top
Integrity Commitment Passion Seamlessness Speed
Compressor motor rating : 160kW Compressor Average Unload Hrs/Month : 148 Hrs Compressor Average Unload Hrs/Day: 4.95 Hrs (148hrs/30days) Unload Power : 55kW Power saving potential/day : 272.25 units ( 4.95hrs*55kw) Unit Cost : Rs. 4.23 Cost Saving / Year : Rs. 3.80 Lac (272.25*4.23*330days)
Energy saving achieved : 3.8 Lac kWh/year
Compressor Power Savings After VFD Installation (Actual)
Integrity Commitment Passion Seamlessness Speed
Implementation : ABB make ACS-850, 160kW VFD Installed to the compressor, As this is a pressure make up compressor a PID loop introduced with main header tank pressure, which varies the speed of compressor motor as per air pressure requirement. Average Units consumed by total compressors (5 nos)in line-2, - Before VFD installation : 238 units/Hr Average Units consumed by total compressors (5 nos)in line-2, - After VFD installation : 223 units/Hr Unit saving per hour : 15 units Savings per day : 360 units Cost Saving/month : 0.45 lacs Cost of VFD panel : 8.15 lacs Payback : 17.8 months
Compressor Power Savings After VFD Installation
Integrity Commitment Passion Seamlessness Speed
Line 1 shell cooling fans are controlled by shell temp. Power consumption after auto On/Off is: 528-132 = 396units/day Consider 4Rs./Unit then 396*4= 1584 Rs./day saving Per year saving: 47520*12= Rs. 570240/- saving per year.
Line-1 Kiln shell cooling fans auto control by its shell Temperatures
Description of Project:
Energy saving achieved : 5.70 Lac Rs/year
Integrity Commitment Passion Seamlessness Speed
Raw Mill -3 &4 Process Optimization
Background of the project
Line 2 Raw Mills were running at a TPH of 440-445 @19 % residue on 90µ. Power consumption at those running conditions was 23.5 KWH.
Power optimisation studies were carried out during 8th Nov’13 to 30th Nov’13 to improve mills TPH and to reduce Specific Power Consumption.
To decrease the load on mill main motor, table dam ring height reduced from 120 MM to 100 MM, due to which, load came down from 5200 KW to 5050 KW ,which help us to apply more grinding pressure & mill feed. To enhance effective grinding, the hydraulic working Pressure increased from 70-72 to 74-76 bar. To reduce the mill body vibrations and to maintain constant bed levels in the mill water injection increased from 12.5 to 17 M3/Hr and more. Stand by water pump was utilized for additional water spray. Further, fan flow optimized with different separator speed to increase the SPRS recovery
Description of project
Integrity Commitment Passion Seamlessness Speed
Raw Mill -3 &4 Process Optimization
As a result of all the above improvements the Mill TPH was improved from 440 to more than 495 and the Power Consumption reduced from 23.5 KWH to 20.3 KWH. Specific Energy Saving of 3.2 KWH was achieved which resulted in a cost saving of Rs.2.18 Lacs per day (Considering Both Mill operation and unit cost of Rs 4.80)
This optimisation also resulted in reduction of Mill Wear Out and increase in Mill availability for maintenance.
Before During execution job
Integrity Commitment Passion Seamlessness Speed
Occupancy sensors provide a means to ensure that electrical devices in a room are turned OFF when there is no occupancy in the room. They can generate significant energy efficiencies, especially when a space is occupied intermittently. We installed at 20 locations like rest rooms & office. Annual saving Aprox. Is 17520 units = Rs 78840
Provision of Occupancy Sensor to control the lights and ACs in the Offices when there is no occupancy of people
Occupancy Sensor installation in offices
Integrity Commitment Passion Seamlessness Speed
About Light Pipe
Light Collector with roof metal kerb can capture ambient Sunlight when mounted on Roofs. Inside having acrylic sheet.
Laser cut acrylic (Poly(methyl methacrylate) (PMMA), acrylic or acrylic glass )panels have been used to redirect sunlight into a Light Pipe or tubular skylight and, from there, to spread it into a room
Day light pipe installation in Various areas
Integrity Commitment Passion Seamlessness Speed
Packing Plant RBC, Truck Loading and Bag Godwon Floor Light pipe installation
Benefits after Light pipe installation
Approx. saving per year is Rs.67452/ Light Pipe cost Rs.3*25000/ = 75000/- Pay back period 1year 2 months Approx. Lighting cover from Morning 06.00 AM To Evening 06.30 PM
Total no fittings
Each light wattage
controlled average time hours
saving in KWH /day
saving in KWH/ YEAR
Saving amount RS/Year
55 80 12 52.8 19272 67451.8
Day light pipe installation in Various areas
Integrity Commitment Passion Seamlessness Speed
A SOLAR BOTTLE BULB using empty Fanta bottle and ordinary water for TPP CHP container. Sunlight falling
on the exposed part of bottle gets refracted and spreads smoothly in the room delivering light equivalent to
40 - 60 Watt incandescent bulb.
SOLAR BOTTLE BULB
Integrity Commitment Passion Seamlessness Speed
Trend display of Line-2 Lime stone transport JPF 311BF3 in DP mode
Purging OFF Time: 20 Min
Purging ON Time: 3 Min
DP Low Limit: 70 mmWC
DP High Limit: 90 mmWC
JPF Purging ON time / hour : 8 Min. JPF Purging OFF time / hour : 52 Min.
DP Transmitter at site
DP transmitters for JPF
Integrity Commitment Passion Seamlessness Speed
Energy Efficiency improvement in Equipment
Integrity Commitment Passion Seamlessness Speed
Activities leading to Energy Efficiency
1. Daily Variance Analysis and Action Plan
2. Fan efficiency Measurements
3. Section Performance Reports with Action Plan
4. Heat balance Measurements
5. False air measurements
6.CFD Analysis in Collaboration with Corporate CFD Cell
7.Condition Monitoring Cell
8.External and Internal Periodic Audits
9.Replication of Successful Implementations
Integrity Commitment Passion Seamlessness Speed
Compressor efficiency Monitoring
Integrity Commitment Passion Seamlessness Speed
Benchmarking with World Class Performance
Integrity Commitment Passion Seamlessness Speed
BENCHMARKING
Benchmarking with world class performance
International Benchmarking White Hople Man
Sr. No.
Description UOM Best in World
APCW Value
Star Rating
1 Thermal energy Kcal/kg clinker 663.75 715 ****
2 Electrical energy kWh/MT Cem 70.13 84.4 ****
3 Kiln Power kWh/MT clinker 20.9 26.53 ****
4 Grinding Power kWh/MT Cem 21.3 24.07 ****
Integrity Commitment Passion Seamlessness Speed
32
.4
30
.8
25
.3
24
.2 27
.3
20
25
30
35
'09-10 '10-11 '12-13 '13-14 '14-15Actuals
Phase - 1
45
.4
34
.4
30
.3
28
.3
27
.3
20
30
40
50
60
'09-10 '11-12 '12-13 '13-14 '14-15Actuals
Phase - 2
Power consumption - Cement Mills
(kWh / MT of cement)
Up to Dec’14 Up to Dec’14
Sp.Power high
due to received
Fly Ash low
fineness in PPC
grinding
Reduction in Sp.
Power
consumption
due to CM3 out
put increased by
classifier
modification
176
Integrity Commitment Passion Seamlessness Speed
Best Practices
Sl. No Best Practice
1 USAGE OF 100% PET COKE
2 VERTEX ARRANGEMENT in Separator.
3 ONLINE CLEANING OF KILN BURNER TIP
4 KILN HEAT UP WITH POLYMER OIL/ HFO
5 BURNER PIPE CASTABLE LIFE ENHANCEMENT
6 REDUCTION OF WHRPP AULILIARY POWER CONSUMPTION
7 HAZARDOUS MATERIAL INCINERATION IN KILN
8 REDUCTION IN COOLER WATER CONSUMPTION
9 ENHANCEMENT OF BULL NOSE CASTABLE LIFE
10 REDUCTION OF KILN SHUTDOWN TIME
11 ROCKET BLOWERS ON RAIL
12 COAL MILL MODIFICATION
13 REDUCTION OF WATER CONSUMPTION : RAW MILL
14 COMPACTING OF COAL WITH VIBROMAX
15 TEST BED PROVIDED TO CHECK PHASE-2 COOLER UNDER GRATE HYDRAULIC CYLINDER LEAKAGES BEFORE INSTALLATION
16 IN SUITE – ARRANGEMENT OF JIG FOR CHECKING THE COLLAR FITMENT OF ALL TYPES OF JPF BAGS
Integrity Commitment Passion Seamlessness Speed
Sl. No. Best Practice 17 WATER SATURATION SENSORS ARRANGED FOR MONITORING WATER / MOISTURE CONTENT IN KILN MAIN GEARBOX OIL FLOW
18 ONLINE CLEANING OF KILN GIRTH GEAR GREASE SPRAY NOZZLES
19 USAGE OF ALTERNATIVE FUELS
20 MEASURING VOLUMETRIC EFFICIENCY OF COMPRESSOR
21 INSULATION LIFE ENHANCEMENT WITH CHICKEN MESH (RAW MILLS)
22 CAMERA PROVIDED FOR CONTINUOUS MONITORING OF COOLER UNDER GRATE HYDRAULIC CYLINDER OIL LEAKAGE TO AVOID FIRE
23 COOLER UNDERGRATE HYDRAULIC CYLINDERS MODIFIED FROM DOUBLE PORT TO SINGLE PORT
24 MODIFICATION IN PHASE-2 COOLER HYDRAULIC TANK LEVEL SENSOR
25 INSTALLATION OF PNEUMATIC OPERATED KNIFE GATE BETWEEN MULTOCORE AND MULTICELL
26 LOESCHE RAW MILL LM 69.6 MILL ROLLER SEALING ARRANGEMENT
27 FIXING OF PERMANENT MAGNETS IN LINE -2 KILN FEED AIR SLIDES
28 MODIFIED FK PUMP DRIVE CONNECTION WITH DIRECT COUPLED ARRANGEMENT FROM BELT ARRANGEMENT
29 INSTALLED 2 NO‘S OF ADDITIONAL WATER SPRAY NOZZLES
30 PROVIDED DRAUGHT MEASURING POINTS TO BOTH HOT ESP HOPPERS
31 EXPANSION JOINTS PROVIDED TO PH-2 RAW MILL REJECT DISCHARGE CHUTE
32 LED LIGHTS FOR GYPSUM WEIGH FEEDERS
33 MESH TO AVOID LUMPS ENTRY
34 COMMON HEADER TO AVOID DUST ENTRY IN BLOWERS
35 STRENGTHENED DOZING VALVE CYLINDER BY PROVDING ADDITIONAL MS PLATE TO ALUMINIUM CYLINDER BODY TO AVOID FAILURE OF CYLINDER.
36 OCCUPANCY SENSORS IN WASH ROOMS AND OFFICES
Best Practices
Integrity Commitment Passion Seamlessness Speed
Sl. No. Best Practice
37 HOOTER WITH CHAIN LOAD INDICATION TO ENSURE SAFETY OF RECLAIMER BUCKETS.
38 HUMAN CONTACT WITH RUNNING BELT AVOIDED BY PROVIDING A SCREEN IN RECLAIMER ITSELF.
39 INSTALLATION OF WIRELESS TRANSMITTERS
40 PI SYSTEM INSTALLATION @ ALL SITE OFFICES
41 CCTV FOR MONITORING COOLER OIL LEAKAGES
42 PRESSURE TRANSMITTERS FOR LINE -2 COOLER ESP HOPPERS DRAUGHT MEASUREMENT
43 MASS FLOW METER FOR GRINDING AID
44 ONLINE PILE CHANGEOVER
45 NON CONTACT TYPE POSITION SENSOR FOR LINE 1 COOLER GRATES
46 AUTO OPERATION OF KILN SHELL COOLING FANS
47 LINE-2 COOLER AUTO CPM SET POINT Vs LANE DP
48 INSTALLATION OF ANNUBAR TYPE FLOW METER IN LOESCHE MILLS FOR MEASURING BH FAN FLOW RATE
49 REFRIGERANCT BEING COLLECTED FOR FURTHER USAGE INSTEAD OF LEAVING INTO ATMOSPHERE.
50 SOLAR STREET LIGHT POLES INSTALLATION IN MINES.
51 REMOTE AUTOMATION TECHNOLOGY ADOPTED IN GROUND MOUTED LIGHTING TOWERS.
52 APPLICATION OF EVALOC TO REDUCE WATER EVAPORATION.
Best Practices
Integrity Commitment Passion Seamlessness Speed
Sl. No. Best Practice
53 PERMANENT WATER SPRINLING SYSTEM ON MIN RAMPS.
54 INSTALLATION OF SLOW SPEED HD INTELINOVA FOR CEMENT MILL ROLLER PRESS ROLLER BEARINGS
55 SCHEDULE OPTIMISATION FOR EQUIPMENT LUBE OIL ANALYSIS
56 NDT FOR NEW SPARES AT STORES
57 EFFECTIVE DOCUMENTATION OF CONDITION MONITORING ACTIVITIES IN SAP
58 SOP FOR REWARDS & RECOGNITIONS @ APCW
59 BRAIN STORMING SESSION & IDEA GENERATION
60 SINGLE SHOT OPERATION FOR BOTH HGG I & II (Hot gas generator)
61 FUEL FEED CONTROL AUTOMATION
62 MAINTIAINING PLFWITH PROCESS COORDINATION
63 IMPROVE THE ENERGY & PLANT AVAILABILITY
64 SOX CONTROL WITH RAW MEAL
65 BOILER-4 STEAM BLOWING WITH COAL INSTEAD OF HSD
66 TG’S & 220KV GRID AUTO SYNCHRONISATION AND OPERATION THRU “LOAD MANAGEMENT SYSTEM’’.
67 ONLINE HOT CHANGOVER OF PA,ID&SA FANS VFD SYSTEM,COMMON FOR BOILER 3&4
68 ENERGY SAVING BY STAGE BLINDING OF BOILER FEED PUMPS
69 BFP & CEP VFD OPERATION WITH DP BASED CLOSED LOOP
70 REDUDNDANCY OF M LINKS IN LINE 2 KILN MCC’s
71 INSTALLATION OF ENERGY MONITORING SYSTEM.
Best Practices
Integrity Commitment Passion Seamlessness Speed
Sl No. Best Practice 72 INSTALLATION OF CONVERTERS IN ABB MNSIS 73 EXT/RET MOTOR REPLACEMENT WITH BRAKE MOTOR. 74 INSTALLATION OF CUT INSULATOR FOR OHE LINE 75 MODIFICATION IN CRUSHER HT MOTOR VCB’S 76 TOWNSHIP- BMP’S 77 REPLACEMENT OF HPSV TO LED LIGHTS IN COLONY 78 MCB ARRANGEMENT FOR VD4 BREAKER TO AVOID CONTROL PLUG CONTACT DAMAGE DURING ISSUE OF PTW. 79 AUTOMATIC OPENING OF BIOMETRIC DOOR IN CASE OF FIRE.
80 REPLACEMENT OF HIGH SPEED MOTOR BEARINGS EVERY 2 YEARS BASED ON RUN HOURS.
81 PROVIDED DIRECT EARTHING TO ALL ABB MAKE VFD PANELS TO AVOID FALSE TRIPPING.
82 MEASUREMENT OF LUX LEVELS ACROSS THE PLANT IN EVERY QUARTER TO ENSURE PROPER ILLUMINATION IN PLANT PREMISES.
83 LIGHTING CIRCUIT MODIFICATION IN COMBINATION OF SWITCH AND TIMER IN SUBSTATION BUILDINGS TO SAVE POWER CONSUMPTION.
84 LIGHTING CIRCUIT MODIFICATION IN PRE-HEATER BUILDING TO SAVE POWER CONSUMPTION.
85 INTRODUCTION OF PID LOOP FOR UTILITY COMPRESSOR WITH PRESSURE SWITCH TO VARIABLE SPEED DRIVE FOR ENERGY SAVING.
86 LIGHTING CONTROL THROUGH OCCUPANCY SENSORS IN SITE OFFICES
87 TRANSPORTATION CONTRACTS THROUGH REVERSE AUCTION (FAIR & TRANSPARENT PRACTICE)
88 RAIL / ROAD RATIO IMPROVEMENT – KPCL PORT TO PLANT (LOGISTICS COST REDUCTION)
89 PULL CORD LOCATOR FOR PIPE CONVEYOR
90 IN-HOUSE ASSEMBLY OF HEXADUR SLEEVE
91 DOUBLE STAGE SUCTION FILTERS FOR ALL AIRSLIDE BLOWERS
92 GRANITE LINING FOR TRUCK LOADING
93 DOUBLE STAGE FILTERS FOR BAG CLEANING DEVICE FANS
94 AUDIO ALARM WITH HOOTER FOR GATE MOVEMENT TO AVOID OHE LINE TRACK MOVEMENT.
Best Practices
Integrity Commitment Passion Seamlessness Speed
AWARDS & ACCOLADES
Integrity Commitment Passion Seamlessness Speed
National Award for Excellence in Energy Management in 2012
Integrity Commitment Passion Seamlessness Speed
State Energy Conservation Award for 2012 - 2013
Integrity Commitment Passion Seamlessness Speed
National Award for Excellence in Energy Management in 2015
Integrity Commitment Passion Seamlessness Speed
Low rain fall
Nearby no natural source of water
Since the area is Rocky in nature retention of ground water is very less
More conveying system for material handling
High SO3 in limestone
High power consumption in Line-2 Cooler
High bond index in limestone
Challenges