ultra hpht dst’s – pushing the envelope - win cubed hpht hpht ls andard ls) temperature (ºf)...

14
Ultra HPHT DST’s – Pushing the Envelope Vince Zeller

Upload: vuongquynh

Post on 25-Jun-2018

247 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Ultra HPHT DST’s – Pushing the Envelope - Win Cubed HPHT HPHT LS ANDARD LS) TEMPERATURE (ºF) HPHT ... 29 9-5/8 Packer 3.00" 8.220" 10.00' 5190 ... 9 5/8 47# 8K Champ IV Packer

Ultra HPHT DST’s – Pushing the Envelope

Vince Zeller

Page 2: Ultra HPHT DST’s – Pushing the Envelope - Win Cubed HPHT HPHT LS ANDARD LS) TEMPERATURE (ºF) HPHT ... 29 9-5/8 Packer 3.00" 8.220" 10.00' 5190 ... 9 5/8 47# 8K Champ IV Packer

Operating Envelopes

300 400 450350 500

10

15

20

30

25

ULTRA

HPHTHP

HT

TO

OL

S

STA

ND

AR

D

TO

OL

S

PR

ES

SU

RE

(K

PS

I)

TEMPERATURE (ºF)

HPHT

LPLT

EXTREME

HPHT

© 2011 HALLIBURTON. ALL RIGHTS RESERVED.

2

Page 3: Ultra HPHT DST’s – Pushing the Envelope - Win Cubed HPHT HPHT LS ANDARD LS) TEMPERATURE (ºF) HPHT ... 29 9-5/8 Packer 3.00" 8.220" 10.00' 5190 ... 9 5/8 47# 8K Champ IV Packer

Operator Inquiries Pushing

the Envelope

Middle East 23ksi 390 F

N.A. 30ksi 250 F

N.A. 28ksi 450 F

Asia Pacific 15ksi 480 F

Far East 7.5ksi 425 F

Far East 18ksi 430 F

© 2011 HALLIBURTON. ALL RIGHTS RESERVED.

3

Page 4: Ultra HPHT DST’s – Pushing the Envelope - Win Cubed HPHT HPHT LS ANDARD LS) TEMPERATURE (ºF) HPHT ... 29 9-5/8 Packer 3.00" 8.220" 10.00' 5190 ... 9 5/8 47# 8K Champ IV Packer

Asia-Pacific Operator

Anticipated bottom hole temperature of 450 F

Anticipated bottom hole pressure 13,000+ psi

High pH completion brine

Required demonstration of tool performance at

conditions for 20 days

Tools qualified per operator requirements

– Excessive tool operations at expected conditions

– Tested to rated burst and collapse pressures

– All operations third party witnessed

© 2011 HALLIBURTON. ALL RIGHTS RESERVED.

4

Page 5: Ultra HPHT DST’s – Pushing the Envelope - Win Cubed HPHT HPHT LS ANDARD LS) TEMPERATURE (ºF) HPHT ... 29 9-5/8 Packer 3.00" 8.220" 10.00' 5190 ... 9 5/8 47# 8K Champ IV Packer

Deep Water Operator

Hydrostatic pressure range 25,000 to 30,000 psi

Temperature range 225 to 300 F

Multi-cycle tools required

Single shot tools required for contingency

Time on bottom up to 60 days

Concerns about compressive loads on BHA

Concerns about rupture disc accuracy

Third party witness all testing

© 2011 HALLIBURTON. ALL RIGHTS RESERVED.

5

Page 6: Ultra HPHT DST’s – Pushing the Envelope - Win Cubed HPHT HPHT LS ANDARD LS) TEMPERATURE (ºF) HPHT ... 29 9-5/8 Packer 3.00" 8.220" 10.00' 5190 ... 9 5/8 47# 8K Champ IV Packer

Multi-Cycle Ultra HPHT System

Rated for >30,000 PSI at 450 F

Ultra HPHT Test Tools

Over 4,000 hrs of HPHT

Qualification Testing

Multiple tools qualified

Rupture Discs

Enhanced

© 2011 HALLIBURTON. ALL RIGHTS RESERVED.

6

Page 7: Ultra HPHT DST’s – Pushing the Envelope - Win Cubed HPHT HPHT LS ANDARD LS) TEMPERATURE (ºF) HPHT ... 29 9-5/8 Packer 3.00" 8.220" 10.00' 5190 ... 9 5/8 47# 8K Champ IV Packer

Qualification Tests +/-250 F & 25Ksi

Qualified the

circulating valve and

tubing string tester

Qualified the tester

valve and rupture

disc SCV

Operator specified

completion fluid

Identified potential

problem with fluid

formulation

30-day Multi-cycle Circulating Valve & Tubing String Tester

30-day Tester Valve & Safety Circulating Valve

© 2011 HALLIBURTON. ALL RIGHTS RESERVED.

7

Page 8: Ultra HPHT DST’s – Pushing the Envelope - Win Cubed HPHT HPHT LS ANDARD LS) TEMPERATURE (ºF) HPHT ... 29 9-5/8 Packer 3.00" 8.220" 10.00' 5190 ... 9 5/8 47# 8K Champ IV Packer

5.38" XHP OMNI CIRCULATION VALVE QUALIFICATION TESTING

11/06/2009 to 12/06/2009

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

06:0

0:00

07:0

0:00

08:0

0:00

09:0

0:00

10:0

0:00

11:0

0:00

12:0

0:00

13:0

0:00

14:0

0:00

15:0

0:00

16:0

0:00

17:0

0:00

18:0

0:00

19:0

0:00

20:0

0:00

21:0

0:00

22:0

0:00

23:0

0:00

24:0

0:00

25:0

0:00

26:0

0:00

27:0

0:00

28:0

0:00

29:0

0:00

30:0

0:00

01:0

0:00

02:0

0:00

03:0

0:00

04:0

0:00

05:0

0:00

06:0

0:00

07:0

0:00

TIME (DD:HH:MM)

PR

ES

SU

RE

(P

SI)

0

50

100

150

200

250

300

TE

MP

ER

AT

UR

E (

oF

)

Annulus

Above

Below

TempD

ay 1

Cycling

Day 2

& 3

Cycling

Day 4

Ru

ptu

re

Dis

k T

est

Day 7 Temp

Anomaly

Day 9

Cycling

First Flow

Day 1

3 C

ycling

Build Up Flow Period

Day 2

4 C

ycling

Day 3

0 C

ycling

Build Up

Day 14 POWER

OUTAGE

5.38" XHP OMNI CIRCULATION VALVE QUALIFICATION TESTING

11/06/2009 to 12/06/2009

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

06:0

0:00

07:0

0:00

08:0

0:00

09:0

0:00

10:0

0:00

11:0

0:00

12:0

0:00

13:0

0:00

14:0

0:00

15:0

0:00

16:0

0:00

17:0

0:00

18:0

0:00

19:0

0:00

20:0

0:00

21:0

0:00

22:0

0:00

23:0

0:00

24:0

0:00

25:0

0:00

26:0

0:00

27:0

0:00

28:0

0:00

29:0

0:00

30:0

0:00

01:0

0:00

02:0

0:00

03:0

0:00

04:0

0:00

05:0

0:00

06:0

0:00

07:0

0:00

TIME (DD:HH:MM)

PR

ES

SU

RE

(P

SI)

0

50

100

150

200

250

300

TE

MP

ER

AT

UR

E (

oF

)

Annulus

Above

Below

TempD

ay 1

Cycling

Day 2

& 3

Cycling

Day 4

Ru

ptu

re

Dis

k T

est

Day 7 Temp

Anomaly

Day 9

Cycling

First Flow

Day 1

3 C

ycling

Build Up Flow Period

Day 2

4 C

ycling

Day 3

0 C

ycling

Build Up

Day 14 POWER

OUTAGE

5.38" XHP OMNI CIRCULATION VALVE QUALIFICATION TESTING

11/06/2009 to 12/06/2009

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

06:0

0:00

07:0

0:00

08:0

0:00

09:0

0:00

10:0

0:00

11:0

0:00

12:0

0:00

13:0

0:00

14:0

0:00

15:0

0:00

16:0

0:00

17:0

0:00

18:0

0:00

19:0

0:00

20:0

0:00

21:0

0:00

22:0

0:00

23:0

0:00

24:0

0:00

25:0

0:00

26:0

0:00

27:0

0:00

28:0

0:00

29:0

0:00

30:0

0:00

01:0

0:00

02:0

0:00

03:0

0:00

04:0

0:00

05:0

0:00

06:0

0:00

07:0

0:00

TIME (DD:HH:MM)

PR

ES

SU

RE

(P

SI)

0

50

100

150

200

250

300

TE

MP

ER

AT

UR

E (

oF

)

Annulus

Above

Below

TempD

ay 1

Cycling

Day 2

& 3

Cycling

Day 4

Ru

ptu

re

Dis

k T

est

Day 7 Temp

Anomaly

Day 9

Cycling

First Flow

Day 1

3 C

ycling

Build Up Flow Period

Day 2

4 C

ycling

Day 3

0 C

ycling

Build Up

Day 14 POWER

OUTAGE

5.38" XHP OMNI CIRCULATION VALVE QUALIFICATION TESTING

11/06/2009 to 12/06/2009

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

06:0

0:00

07:0

0:00

08:0

0:00

09:0

0:00

10:0

0:00

11:0

0:00

12:0

0:00

13:0

0:00

14:0

0:00

15:0

0:00

16:0

0:00

17:0

0:00

18:0

0:00

19:0

0:00

20:0

0:00

21:0

0:00

22:0

0:00

23:0

0:00

24:0

0:00

25:0

0:00

26:0

0:00

27:0

0:00

28:0

0:00

29:0

0:00

30:0

0:00

01:0

0:00

02:0

0:00

03:0

0:00

04:0

0:00

05:0

0:00

06:0

0:00

07:0

0:00

TIME (DD:HH:MM)

PR

ES

SU

RE

(P

SI)

0

50

100

150

200

250

300

TE

MP

ER

AT

UR

E (

oF

)

Annulus

Above

Below

TempD

ay 1

Cycling

Day 2

& 3

Cycling

Day 4

Ru

ptu

re

Dis

k T

est

Day 7 Temp

Anomaly

Day 9

Cycling

First Flow

Day 1

3 C

ycling

Build Up Flow Period

Day 2

4 C

ycling

Day 3

0 C

ycling

Build Up

Day 14 POWER

OUTAGE

30 Day Qualification Test

© 2011 HALLIBURTON. ALL RIGHTS RESERVED.

Page 9: Ultra HPHT DST’s – Pushing the Envelope - Win Cubed HPHT HPHT LS ANDARD LS) TEMPERATURE (ºF) HPHT ... 29 9-5/8 Packer 3.00" 8.220" 10.00' 5190 ... 9 5/8 47# 8K Champ IV Packer

Ultra HPHT Rupture Disc

Rupture discs could be needed as high as

32,000 psi

Anticipated multiple rupture disc operations

Reduce rupture disc pressure variation band to

ease casing pressure test requirements

Improve error band to reduce casing test

pressure by 1000 psi

Pressure cycles cannot cause drift in burst

pressure

© 2011 HALLIBURTON. ALL RIGHTS RESERVED.

9

Page 10: Ultra HPHT DST’s – Pushing the Envelope - Win Cubed HPHT HPHT LS ANDARD LS) TEMPERATURE (ºF) HPHT ... 29 9-5/8 Packer 3.00" 8.220" 10.00' 5190 ... 9 5/8 47# 8K Champ IV Packer

30-day HP RD Qualification Objectives

Verify burst pressure does not

shift with annulus pressure

cycles

Verify pressure cycles to within

96% of burst cause no shift in

burst pressure

Verify less than 1.5% burst

variation

© 2011 HALLIBURTON. ALL RIGHTS RESERVED.

10

Page 11: Ultra HPHT DST’s – Pushing the Envelope - Win Cubed HPHT HPHT LS ANDARD LS) TEMPERATURE (ºF) HPHT ... 29 9-5/8 Packer 3.00" 8.220" 10.00' 5190 ... 9 5/8 47# 8K Champ IV Packer

Ultra HP Rupture Disc Qualification

Rupture

Disc

Pressure

Rating

(psi)

Burst

Pressure

(psi)

Rated

Burst

@ Temp

(psi)

1.5%

Tolerance

(+/-psi)

% Diff

W/Rated

Pressure

#1 29,000 29,080 29,104 437 -0.08%

#2 29,000 29,233 29,095 436 0.47%

#3 29,000 29,087 29,104 347 -0.06%

#4 29,000 29,082 29,085 436 -0.01%

#5 29,000 29,105 29,095 436 -0.03%

#6 31,000 31,174 31,039 466 0.44%

#7 31,000 31,051 31,031 465 0.06%

#8 31,000 30,643 31,046 466 -1.30%

#9 31,000 30,698 31,039 466 -1.10%

#10 31,000 30,823 31,031 465 -0.67%

© 2011 HALLIBURTON. ALL RIGHTS RESERVED.

11

Page 12: Ultra HPHT DST’s – Pushing the Envelope - Win Cubed HPHT HPHT LS ANDARD LS) TEMPERATURE (ºF) HPHT ... 29 9-5/8 Packer 3.00" 8.220" 10.00' 5190 ... 9 5/8 47# 8K Champ IV Packer

Objectives

– Verify HPHT tool functionality in well conditions

– Verify BHA Safety Valves operation under 220,000 lbs of

compressive load

– Verify multi-cycle tools operation under 100,000 lbs of

compressive load

– Verify pump thru capability of RD Pump Thru Safety

Circulating Valve, limited to 5 BPM by facility.

Test Location

– Carrollton test well

Result

– All objectives successfully achieved

System Integration Test

© 2011 HALLIBURTON. ALL RIGHTS RESERVED.

12

Page 13: Ultra HPHT DST’s – Pushing the Envelope - Win Cubed HPHT HPHT LS ANDARD LS) TEMPERATURE (ºF) HPHT ... 29 9-5/8 Packer 3.00" 8.220" 10.00' 5190 ... 9 5/8 47# 8K Champ IV Packer

Tool String Systems Integration Test

Key Description I.D. O.D. Length Depth

1 Tubing 2.75" 3.5" 2905.00 0

2 X-0ver 2.75" 6.125" 1.00 2905

3 HW Drill Pipe 2.6" 5.00" 1765.00 2906

4 X-over 2.25" 6.125" 1.00 4671

5 Handling sub 2.25" 5.00" 4.00 4672

6 Multi-cycle Circ Valve 2.220" 5.375" 40.00' 4676

7 Drain Valve 2.220" 5.000" 4.00 4716

8 X-over 2.25" 5.00" 1.00" 4720

9 Drill Collar 1 stand 2.25" 5.00" 93.00' 4721

10 Handling sub 2.75" 4.75" 4.00 4814

11 X-Over 2.25" 5.00" 1.00" 4818

12 Tester Valve 2.220" 5.375" 42.00' 4819

13 X-Over 2.25" 5.00" 1.00 4861

14 Drill Collar 1 stand 2.25" 5.00" 93.00' 4862

15 Handling sub 2.75" 4.75" 4.00" 4955

16 X-Over 2.25" 5.00" 1.00 4959

17 Pump Thru Safety Valve 2.25" 5.00" 4.00 4960

18 X-Over 2.25" 5.00" 1.00 4964

19 Drill Collar 1 stand 2.25" 5.00" 93.00' 4965

20 Handling sub 2.75" 4.75" 4.00 5058

21 X-Over 2.25" 5.00" 1.00' 5062

22 5" TST, XHP Series 2.25" 5.00" 5.00" 5063

23 Gauge Carrier w/4 Gauges 2.25" 5.00" 19.00' 5068

24 X-Over 2.25" 5.00" 1.00' 5087

25 Drill Collar 1 stand 2.25" 5.00" 93.00' 5088

26 Handling sub 2.75" 4.75" 4.00' 5181

27 X-Over 2.27" 6.125" 1.00 5185

28 Safety Joint 3.00" 6.125" 4.00' 5186

29 9-5/8 Packer 3.00" 8.220" 10.00' 5190

Bottom of Packer 5200

Description: I.D. O.D. Length Depth

1 Tubing 3.5” 2,162’ 0

2 Drill Collars 2.25” 6.5” 2,520’ 2162

5 X-Over 3 ½ IF to 3 7/8 CAS 4.220" 5.875" 1.00' 4682

6 3 7/8 CAS Handling Sub 2.25” 5.00” 4.00’ 4683

7 OMNI Multi-cycle Circ Valve w/3 7/8" CAS 2.220" 5.375" 40.00' 4687

8 Drain Valve with 3 7/8" CAS X 3 ½ IF X-Overs 2.220" 5.000" 5.00' 4727

9 3 ½ IF Drill Collar (1 ea. Stand) 4.220" 5.875" 93.00' 4732

10 X-Over 3 ½ IF to 3 7/8 CAS 4.220" 5.875" 1.00' 4825

11 3 7/8 CAS Handling Sub 2.25” 5.00” 4.00” 4826

12 Select Tester Valve with 3 7/8" CAS X 3 ½ IF X-Over 2.220" 5.375" 40.00' 4830

13 3 ½ IF Drill Collar (1 ea. Stand) 4.220" 5.875" 93.00' 4870

14 X-Over 3 ½ IF to 3 7/8 CAS 4.220" 5.875" 1.00' 4963

15 3 7/8 CAS Handling Sub 2.25” 5.00” 4.00” 4964

16 Pump Thru Safety Valve with 3 7/8" CAS X 3 ½ IF X-Overs 2.220" 5.00" 5.00' 4968

17 3 ½ IF Drill Collar (1 ea. Stand) 4.220" 5.875" 93.00' 4973

18 X-Over 3 ½ IF to 3 7/8 CAS 4.220" 5.875" 1.00' 2066

19 5” TST, XHP Series 2.25” 5.00” 5.00” 2067

20

5” DynaString Gauge Carrier w/ 4 ea.30K Gauges w/ 3 7/8" CAS Connections 2.220" 5.00" 19.00' 2072

21 X-Overs from 3 7/8" CAS to 3 ½ IF 2.25” 5.00" 1.00' 2091

22 3 ½ IF Drill Collar (1 ea. Stand) 4.220" 5.875" 93.00' 2092

23 Handling Sub 3 ½ IF 4.220" 5.875" 6.00' 5185

24 X-Over 3 ½ IF to 4 ½ IF 2.220" 5.00" 1.00 5191

25 Upper RTTS Safety Joint 4 ½ IF Connections 2.220" 6.220" 8.00' 5192

26 9 5/8 47# 8K Champ IV Packer with 4 ½ IF Top 2.220" 8.220" 10.00' 5200

1

2

3

4

5

6

7

8

9

1 0

1 1

1 2

1 3

1 4

1 5

1 6

1 7

1 8

1 9

2 0

2 1

2 2

2 3

2 4

2 5

2 6

2 7

2 8

2 9

3 0

3 1

3 2

3 3

3 4

3 5

3 6

3 7

3 8

3 9

4 0

4 1

© 2011 HALLIBURTON. ALL RIGHTS RESERVED.

13

Page 14: Ultra HPHT DST’s – Pushing the Envelope - Win Cubed HPHT HPHT LS ANDARD LS) TEMPERATURE (ºF) HPHT ... 29 9-5/8 Packer 3.00" 8.220" 10.00' 5190 ... 9 5/8 47# 8K Champ IV Packer

Thank you