ultima presentacion-csc-tdo-asecarga ingles 2016

26
Administra: FIDUCIRIA ALIANZA Construye: Edgardo Navarro Vives Operador Logístico: Transporte Sánchez Polo Comercializa: Araujo & Segovia Mercadeo: Guido Ulloa & 08/07/2014 SRL. MS E 1

Upload: christian-francois

Post on 24-Jan-2017

124 views

Category:

Documents


0 download

TRANSCRIPT

Administra: FIDUCIRIA ALIANZAConstruye: Edgardo Navarro VivesOperador Logístico: Transporte Sánchez PoloComercializa: Araujo & SegoviaMercadeo: Guido Ulloa & AsociadosDiseño: Carlos Cabal, Arquitectos

08/07/2014 SRL. MS E 1

08/07/2014 SRL. MS E 2

Generar una fácil movilidad para usted y su empresa es una de nuestras prioridades, es por eso, que contamos con una ubicación privilegiada a tan solo 5 minutos de Santa Marta, unido a la futura interseccion vial "YE DE CIENAGA”, en la doble calzada RUTA DEL SOL, la cual conecta la costa caribe con el resto del país.

Por su ubicación estratégica entre Santa Marta, Barranquilla, Bogotá y el resto del país TRIANGULO DE ORO, es sin duda, el lugar donde se proyectan las más valiosas oportunidades para empresarios e inversionistas .

TRIANGULO DE ORO - LOCALIZACION

02

SANTA MARTA_

CIENAGA_

AEROPUERTO SIMON BOLIVAR_

CIENAGA

RUTA DEL SOL 1

RUTA DEL SOL 2

INTERSECCION YE DE CIENAGA

08/07/2014 3

INICIO DOBLE CALZADARUTA DEL SOL

Predio C.S.L.Triangulo de Oro

sectors of marketing análisis

08/07/2014 SRL. MS E 5

08/07/2014 SRL. MS E 6

The national planning department conducted a study to identify the most important logistics centers in the country.

Our project is located in the center of the most important port area of Colombia on the Caribbean Sea.

We also identified others, in the major consumption centers and border areas.

08/07/2014 SRL. MS E 7

• Most trafficked highways were identified.

• Road crossings are the ideal places for the location of logistics centers for attention to the load, for this reason we stand at the crossroads of the highway of Americas with the Sun Road (Ruta del Sol).

TRIANGULO DE ORO

STRATEGIC LOCATION IN A PORT AREA,  SEVEN PORTS IN A RADIUS OF 120 KM.

08/07/2014 8

Santa Marta is the only deepwaters port in Colombia with natural draft, the infrastructure and logistics services allows to offer to foreign trade enterprises, quality and efficiency throughout its operation. Its geostrategic position facilitates the reception of ships of up to 60,000 tons, which offers advantages over other ports in the Colombian Caribbean .

1

2

3

4

1- Proyecto

5

Global Investment$ 463 MM

•Funding:

• SPSM : $ 113 MM• Private: $ 296 MM• Public: $ 53 MM

08/07/2014 11

This project will be conducted in Lots of 434,335 m2, storage warehouses from 819 m2, Offices

from 32 m2, local premises from 45 m2 and area of logistics activity services with:

Weight Scale Service..

Automated office.

Solar and emergency power plant.

Automatice service center and Gas station.

Business center, offices, conference room.

Mall with food court.

Local wholesalers, Local parts.

Hotel.

Digital Passport users (debit payment card services TDO).

Large parking areas for trucks.

CCTV.

INTEGRATED LOGISTICS CENTER  GOLDEN TRIANGLE

08/07/2014 12

08/07/2015 SRL. MS E 13

08/07/2015 14

You will be the owner of THE INTEGRATED LOGISTICS CENTER GOLDEN TRIANGLE (TDO), receiving the benefits of the services of a business with high profitability and valuation, which operates 24 hours.•Roadside hotel with 120 rooms•Roadside restaurant•Parking 300 tract mules•Services and gas station•Container yard and workshop•Center of premises, offices and parts Mall

For sale 2000 trust rights, reverse today, and earn appreciation!

Trust Rights production at day and night!

08/07/2014 SRL. MS E 16

08/06/2016 SRL. MS E 17

FIRST STAGEHe is designed to be built in 18 months, is funded with the expedition of 2000 trust rights which make investors about the operation of the bus (1, 2, 3, 5, 6).1.Carter hotel with 120 rooms.2.Tourist Inn restaurant.3.Station service and Mechanical Workshop4.Mall of spare parts5.Container yard6.Parking for 250 tract trucks.7.Bag loading and digital passport for partners

The estimated investment will be of the order of $22,500 million (U$ 7.2 million dollars), which were financed with the sale of the trust rights.

08/06/2016 GOLDEN TRIANGLE 18

SERVICE CENTER

HOTEL-RESTAURANT

08/07/2014 SRL. MS E 19

Roadside

08/06/2016 SRL. MS E 20

Service Center

08/06/2016 SRL. MS E 21

FIRST STAGEHe is designed to be built in 18 months, is funded with the expedition of 2000 trust rights which make investors about the operation of the bus (1, 2, 3, 5, 6).1.Carter hotel with 120 rooms.2.Tourist Inn restaurant.3.Station service and Mechanical Workshop4.Mall of spare parts5.Container yard6.Parking for 250 tract trucks.7.Bag loading and digital passport for partners

The estimated investment will be of the order of $22,500 million (U$ 7.2 million dollars), which were financed with the sale of the trust rights.

08/06/2016 SRL. MS E 22

SECOND STAGE

This designed to build 24,000 m2 of wineries in 12 months, is financed with the sale or rental of the wineries

•Urban planning of the Logistics Centre.•24,000 m2 of warehouses

•The estimated investment will be of the order of the $23,500 million (U$ 7.2 million dollars), which were financed with the sale and rental of warehouses.

Roadside

1° CONSTRUCCION PHASE DE 24.000 M2

1° CONSTRUCCION PHASE OF 24.000 M2 WINERIES

Roadside

OUR ALLIES

08/07/2014 SRL. MS E 25

08/06/2016 SRL. MS E 26

THANK YOU