ucsb 4-hybrid thermal test system status

6
UCSB CMS Weekly Status Meeting CMS 4-Hybrid Test System Sam Burke EE Slide 1 UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group

Upload: wylie-mathews

Post on 30-Dec-2015

32 views

Category:

Documents


2 download

DESCRIPTION

UCSB 4-Hybrid Thermal Test System Status. 10 June Sam Burke UCSB HEP Group. Progress. Work on system design Breakout boards ordered Sensor connectors specified and ordered Solenoid Valves received ARC PC Card Cage received. Progress. Solid State Relays Arrived - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: UCSB 4-Hybrid Thermal Test System Status

UCSB CMS Weekly Status Meeting CMS 4-Hybrid Test System Sam Burke EE Slide 1

UCSB 4-Hybrid Thermal Test System Status

10 June

Sam Burke

UCSB HEP Group

Page 2: UCSB 4-Hybrid Thermal Test System Status

UCSB CMS Weekly Status Meeting CMS 4-Hybrid Test System Sam Burke EE Slide 2

Progress

• Work on system design Breakout boards ordered Sensor connectors specified and ordered

• Solenoid Valves received

• ARC PC Card Cage received

Page 3: UCSB 4-Hybrid Thermal Test System Status

UCSB CMS Weekly Status Meeting CMS 4-Hybrid Test System Sam Burke EE Slide 3

Progress

• Solid State Relays Arrived

• Lab View Errors Resolved File for digital temperature sensor addresses File for run history required

• Power Transformer Board Layout

Page 4: UCSB 4-Hybrid Thermal Test System Status

UCSB CMS Weekly Status Meeting CMS 4-Hybrid Test System Sam Burke EE Slide 4

Current Needs

• NIM Crate from SLAC with plugins

• Move BaBar Chiller in CMS Test Lab

• Plumb dry air to test system

Page 5: UCSB 4-Hybrid Thermal Test System Status

UCSB CMS Weekly Status Meeting CMS 4-Hybrid Test System Sam Burke EE Slide 5

Future Plans

• Solenoid Valve Panel Layout for shop

• Complete Schematics for Analog I/O and Digital I/O Breakout Boards

• Set up Temperature Sensors and verify calibration and Communication Read unique sensor firmware addresses Generate Digital Sensor file

Page 6: UCSB 4-Hybrid Thermal Test System Status

UCSB CMS Weekly Status Meeting CMS 4-Hybrid Test System Sam Burke EE Slide 6

Future Plans

• Fabricate Analog I/O Breakout Board

• Test Humidity Sensor against Sensirion sensor

• Fabricate Power Transformer board

• Reverse Engineer Peltier Relay Board from CERN