UAE GO TEAM VISIT 2014

Erwin Lassooij

PBN Programme Manager

30 January 2014

Visit Summary

Page 2: UAE GO TEAM VISIT 2014

2

Purpose

• Increase the global implementation of PBN through:

– Improved capability in the use of the PBN concept in planning / designing airspace

– Improved capability in approving PBN Operations (Operations Approvals)

Page 3: UAE GO TEAM VISIT 2014

3

Page 4: UAE GO TEAM VISIT 2014

ROUTES - WORLD

ConventionalPBN

Page 5: UAE GO TEAM VISIT 2014

5

41%

Page 6: UAE GO TEAM VISIT 2014

6

MID implementation status

Bahrai

nEg

ypt

Iran

Iraq

Jordan

Kuwait

Leban

onLib

yaOman

Qatar

Saudi A

rabia

Sudan

Syria UAE

Yemen

0

20

40

60

80

100

120

ApproachesSIDsSTARs

Dec 2013

Dec 2014

Page 7: UAE GO TEAM VISIT 2014

7

Participation

• Bahrain• Iraq• Sudan• UAE

Page 8: UAE GO TEAM VISIT 2014

8

Go-Team Overview

• 10 day PBN Airspace Design Workshop• ICAO Doc 9992: PBN in Airspace Design

– Plan, Design, Validate, Implement– 17 steps

• Integration of ICAO Doc 9931 & 9993: CDO and CCO• ICAO Circ 330: Civil / Miitary Cooperation in ATM• Designed routes and airspace in TMA

– “Centerville”: Civil / Military: Conditional Routes - CDR 1, 2, 3 • Routes designed for dual airports

– Phuket / Krabi• Enroute design and multi-TMA integration practice

– Southeast Asia

Page 9: UAE GO TEAM VISIT 2014

9

Lessons Learned• Team concept: diverse points of view and sources of information add strength• Setting goals and scope early helps insure success• Smaller projects allow for quick success• Take advantage of RNAV flexibility to design for shortest route• Design routes first then design airspace to contain routes• Design routes to minimize conflicts• Avoid the 100% trap – 80% of something is better than 100% of nothing• Rightsize the airspace according to tasks required • Avoid CDO route shortcuts to the extent possible• Shortcut CCO to the extent possible

Page 10: UAE GO TEAM VISIT 2014

10

Next Steps

• Encourage participants to apply lessons learned in adapting PBN plan and Implement PBN targets – Submit PBN plans as per June 2014 (PBN Sub

group)

• ICAO Regional Office – Follow-up with letter to DG on focus points– First level of support

Page 11: UAE GO TEAM VISIT 2014

11

Next steps - assistance– ICAO Regional Office with assistance from

experts out of the Region through• Regional Go-Teams 2014

– Oman– Jordan (Ops Approval only)– Qatar– Egypt

– ICAO HQ• Standards and guidance material• Customized Go Teams

Page 12: UAE GO TEAM VISIT 2014

12

PBN Productsto help you with implementation

• PBN related Publications and Annexes– Bundled specifically for Stakeholders– Hard and soft copies

• eLibrary Solutions• PBN ikit• CBT Training (iLearn)

Page 13: UAE GO TEAM VISIT 2014

13

eLibrary• Built for Stakeholders• Simplifies search for relevant PBN information

– From all ICAO Documentation

• By March, 3 eLibrary based bundles:– PBN for Regulators (PBN_REGS)– PBN for ANSP-Airspace Designers (PBN_ANSP_AD)– PBN for Aircraft Operators (PBN_AC_OPS)

• More stakeholder bundles to follow:– Executives– Manufacturers– ANSPs – Master, AIM/AIS, ATC, Instrument Flight Procedures

Available through ICAO e-store: www.store1.icao.int

Page 14: UAE GO TEAM VISIT 2014

14

Documentation Framework• PANS Ops Volume II• PBN Manual (Doc 9613) 4th Edition• RNP AR Procedure Design Manual

(Doc 9905)• PBN Ops Approval Manual (Doc 9997)• Manual on Use of PBN in Airspace

Design (Doc 9992)• CDO Manual (Doc 9931)• CCO Manual (Doc 9993• GNSS Manual (Doc 9849)• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906)

4 th Edition

Page 15: UAE GO TEAM VISIT 2014

The Future of PBN GO Teams• One more GO Team visit planned under Phase II

– China (Dates and location TBD)

• Future GO Team Visits will be specific to Region and State requirements for PBN Implementation– On request basis

• Focus/Services provided will be:– PBN Assessments/Gap Analysis– PBN Plans– Training– Implementation Assistance

Completed Global Visits Phase (I and II)

Thailand (2) UAE (2)Mexico KenyaGermany IndiaEcuador RussiaSouth Africa USA (CAR/SAM)