uae gcaa car 145 exposition supplement - atis … et certificats... · uae gcaa – car 145...

17
Form No: AWFAMO009 UAE GCAA – CAR 145 Maintenance Organization Exposition Supplement DERICHEBOURG Atis Aeronautique GCAA CAR145 Approval No. AMO/144/04 Supplement Reference No. MOE.SUP.01 Revision No./Date Issue 7 of 21/09/2011 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ For GCAA Use: Approval certificate/letter of 05 January 2012 Ref: 21529/55791/DXB/AW/11 HANAN M. BAHAJRI INSPECTION OFFICER Approval and Date General Civil Aviation Authority

Upload: trinhdieu

Post on 04-Sep-2018

227 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

Form No: AWF‐AMO‐009     

             

UAE GCAA – CAR 145 

Maintenance Organization Exposition Supplement    

DERICHEBOURG Atis Aeronautique     GCAA CAR145 Approval No.  

AMO/144/04 

Supplement Reference No.  

MOE.SUP.01 

Revision No./Date  

Issue 7 of 21/09/2011 

  ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ For GCAA Use: 

 Approval certificate/letter of 05 January 2012  

  Ref: 21529/55791/DXB/AW/11  HANAN M. BAHAJRI INSPECTION OFFICER 

 Approval and Date 

General Civil Aviation Authority  

Page 2: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 2 of 17 

 INTRODUCTION      This  supplement  in  conjunction  with  the  latest  revision  of  the  organization  approved  DGAC/OSAC Maintenance  Organization  Exposition  (MOE)  defines  the  organization  and  procedures  upon  which compliance with  the Civil Aviation Regulations  (CARs) of  the United Arab Emirates  is based and  shall form the basis of acceptance by the UAE General Civil Aviation Authority (GCAA) to perform and certify maintenance  on  aircraft  registered  in  the  UAE  or  on  components,  or  on  engines,  or  on  APUs  or propellers installed on aircraft registered in the UAE under the regulatory control of the UAE GCAA.  Whenever  there  is  an  amendment  to  the  organization  approved  DGAC/OSAC  MOE,  the  Quality department shall send a copy of the revised and approved EASA MOE  in the form of a CD to the UAE GCAA. The Same copy of the CD shall contain the latest approved UAE GCAA MOE supplement.  The supplement shall be amended as necessary to remain  in compliance with the requirements of the UAE GCAA Civil Aviation Regulations.  To maintain GCAA CAR 145  approval,  this  supplement  and  any subsequent amendment shall be approved by the GCAA. 

Page 3: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 3 of 17 

LIST OF EFFECTIVE PAGES  Applicable pages: All the pages in this supplement of MOE are at the latest applicable issue (see below). 

LISTE OF UPDATES

Issue Revision date Pages affected and Nature of the modification

1 20/07/06 All pages : MOE.SUP.01 creation

2 09/02/07 Logo and company name change (from ATIS Aviation to Penauille Aeronautics/ATIS Aviation). “During flight” defect report procedure deleted (line maintenance not concerned). Minor changes

3 18/10/07 Logo and company name change (from Penauille Aeronautics/ATIS Aviation to DERICHEBOURG ATIS Aéronautique/ATIS Aviation) Page 13 § 21: light wording modifications

4 01/10/08

Add A330 in the rating Company name change (from DERICHEBOURG ATIS Aéronautique/ATIS Aviation to DERICHEBOURG ATIS Aéronautique)

5 27/10/09 §19 Add Ethiad in the list of UAE Customer §20 Add B777 (GE90-115) in the rating

6 20/09/10 Addition Prague line station §20 Add A340-300 (CFM56)

7 21/09/2011 All pages: MOE SUP 01 modification in accordance with requirement with form AWF-AMO-009 §1.3 Add B777-200/300 ER/LR RR Trent 800 and GE-110/115 at PRG station.

                  

Page 4: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 4 of 17 

SUPPLEMENT REQUIREMENTS AND COMPLIANCE REFERENCE MATRIX  The  “Supplement  Requirements  and  Compliance  reference Matrix”  provides  reference  on  procedures documented  on  the  Organization  approved  EASA/NAA  MOE  and  also  outlines  the  additional requirements of UAE GCAA Civil Aviation Regulations (CARs).   EASA/NAA MOE Compliance Ref.  REQUIREMENT  UAE GCAA 

Supplement Ref PART 1 – MANAGEMENT DOC MOE 02  Organization address and contact details  1.0 

§1.1  Corporate Commitment by the Accountable Manager  1.1 §1.2  Safety and Quality Policy    §1.3  Management Personnel  1.2 §1.4  Duties and Responsibilities of Management Personnel   §1.5  Management Organization Chart   §1.6  List of Certifying Staff   §1.7  Manpower Resources   §1.8  Facilities   

DOC MOE 15 / §1.9 

Scope of  Work and Line Maintenance Locations 1.3 

MOE SUP 01  Notification Procedure to the GCAA regarding Changes to the Organization’s Activities/Approval/Location/ Personnel 

1.4 

§1.11  Exposition Amendment Procedures   MOE SUP 01  Supplement Amendment Procedures  1.5 MOE SUP 01  Continued Validity of Approval  1.6 MOE SUP 01  Audit by UAE GCAA  1.7 

PART 2 – MAINTENANCE  PROCEDURES §2.1  Supplier Evaluation and Subcontract Control Procedure   §2.2  Acceptance/Inspection of Aircraft Components and Material 

from outside contractors  

§2.3  Storage, Tagging and release of aircraft components and material to aircraft maintenance 

 

§2.4  Acceptance of tools and Equipment   §2.5  Calibration of tools and Equipment   §2.6  Use of Tooling and Equipment by staff               (including 

alternate tools)  

§2.7  Cleanliness standards of Maintenance Facilities   §2.8  Maintenance instructions and relationship to aircraft/aircraft 

component manufacturer’s instructions including updating and availability to staff 

 

§2.9  Repair procedure   §2.10  Aircraft Maintenance Programme Compliance   §2.11  Airworthiness Directive procedure   

Page 5: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 5 of 17 

EASA/NAA MOE Compliance Ref.  REQUIREMENT  UAE GCAA 

Supplement Ref §2.12  Optional Modification Procedure   §2.13  Maintenance Documentation in use and its completion   §2.14  Technical Record control   §2.15  Rectification of defects arising during base maintenance   §2.16  Release to service procedure  2.1 §2.17  Records for the operator   §2.18 

DOC MOE 16 Reporting of defects to the GCAA/Operator/Manufacturer 

2.2 

§2.19  Return of defective aircraft components to store   §2.20  Defective components to outside contractors   §2.21  Control of Computer Maintenance Records Systems   §2.22  Control of Manual planning Versus Scheduled Maintenance 

Work  

§2.23  Control of critical tasks   §2.24  Specific Maintenance procedures   §2.25  Procedures to defect and rectify maintenance errors   §2.26  Shift/task handover procedures   §2.27  Notification of Maintenance Data Inaccuracies and 

Ambiguities   

§2.28  Production Planning Procedures   Not applicable  Certificate of Maintenance Review (CMR) Procedures  2.3 Not applicable  Certificate of Fitness for Flight (CFF) procedures  2.4 §2.23  Duplicate Inspection Procedures  2.5 PART L2 – ADDITIONAL LINE MAINTENANCE PROCEDURES 

L2.1  Line Maintenance Control of Aircraft Components, Tools, Equipment etc… 

 

L2.2  Line Maintenance Procedures Related To Servicing/Fuelling/Deicing etc… 

 

L2.3  Line Maintenance Control of Defects and Repetitive Defects    L2.4  Line Procedure for completion of Technical Log   L2.5  Line Procedure for Pooled Parts and Loan Parts   

L2.6 Line Procedure For Return of Defective Parts Removed From Aircraft 

 

L2.7  Line Procedure For Control of Critical Tasks   PART 3 – QUALITY SYSTEM PROCEDURES 

§3.1  Quality Audit of Organization Procedures   §3.2  Quality Audit of Aircraft   §3.3  Quality Audit Remedial Action Procedure   §3.4 §3.4 

Certifying Staff  and Category B1 and B2 Support Staff  Qualification and Training Procedures 

 

§3.5  Certifying Staff and Category B1 and B2 support staff Records   

Page 6: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 6 of 17 

EASA/NAA MOE Compliance Ref.  REQUIREMENT  UAE GCAA 

Supplement Ref §3.6  Quality Audit Personnel   §3.7  Qualifying Inspectors   §3.8  Qualifying Mechanics   

§3.9 Aircraft or Aircraft Component Maintenance Tasks Exemption Process Control 

 

§3.10 Concession Control For Deviation from the Organization’s Procedures 

 

§3.11 Qualification Procedure for Specialized Activities such as NDT, Welding, etc… 

 

§3.12 Control of Manufacturers’ and other Maintenance Working Teams 

 

§3.13  Human Factors Training Procedures   §3.14  Competence Assessment of Personnel   

PART 4 – CONTRACTED OPERATORS §4.1 

MOE SUP 01 Contracted Operators 

4.1 

§4.2 MOE SUP 01 

Operators Procedures and Paperwork 4.2 

§4.3  Operator Records Completion   PART 5 – APPENDICES 

MOE SUP 01  Sample of Documents  5.1 §5.2  List of Subcontractors   §5.3 

DOC MOE 02 List of Line maintenance Locations 

 

§5.4  List of Contracted Organizations                     

Page 7: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 7 of 17 

   1.0   ORGANIZATION ADDRESS AND CONTACT DETAILS    Main Facility:   Headquarter   Head of Quality   Address:   DERICHEBOURG Atis Aeronautique    Immeuble Thales – Parc Algorithmes   17 avenue Didier Daurat   31700 BLAGNAC   FRANCE          Accountable Manager  Pascal LANNETTE    Telephone:  +33 (0)5 34 60 61 45   Fax:  +33 (0)5 34 60 61 50   E‐mail:  [email protected]       Quality Manager         Pascal PARISIS  Telephone:  +33 (0)5 34 60 44 32     Fax:  +33 (0)5 34 60 61 50   E‐mail:           [email protected]             

Page 8: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 8 of 17 

1.1   CORPORATE COMMITMENT BY THE ACCOUNTABLE MANAGER        This supplement and the latest DGAC/OSAC approved MOE define the organization and procedures upon which  the  UAE  GCAA  CAR  145  approval  is  based  as  required  by  CAR  145.70.  These  procedures  are approved  by  the  undersigned  and  shall  be  complied with,  as  applicable when work/orders  are  being processed under the terms of GCAA CAR 145 approval.  It  is  accepted  that  these  procedures  do  not  override  the  necessity  of  complying  with  any  new  or amended  regulation  published  by  the  UAE  GCAA  from  time  to  time  where  these  new  or  amended regulations are in conflict with these procedures.  It is understood that the UAE GCAA shall approve this organizations whilst the UAE GCAA is satisfied that the procedures are being followed and work standards maintained. It is further understood that the UAE GCAA reserves the right to suspend, limit or revoke the CAR 145 approval of the organization if the UAE GCAA has evidence that procedures are not followed or standards not upheld.          Signed:   _________________________________________                                Accountable Manager 

for and on Behalf of (DERICHEBOURG Atis Aeronautique) 

                                     Date:     08/11/2011                                                                          

Page 9: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 9 of 17 

1.2   MANAGEMENT PERSONNEL    

The  Senior Managers  shown  below  are  nominated  by  the  organization  and  have  been  accepted  by DGAC/OSAC and recognized by the United Arab Emirates General Civil Aviation Authority (GCAA).  

 These nominated persons are responsible for ensuring that the Company is in compliance with the GCAA approval requirements.   

• Accountable Manager     Pascal LANNETTE • Maintenance Manager    Jean‐Marie LUSSAMAKI    • Quality Manager      Pascal PARISIS 

 In  case,  there  is  any  change  or  transfer  to  the  management  personnel,  letter  of  acceptance  from DGAC/OSAC shall be forward to the GCAA  If the Accountable Manager changes, the corporate commitment statement within this supplement shall be signed  immediately by who supersedes the title. The statement, together  letter of acceptance  from DGAC/OSAC shall be forwarded to the GCAA.    1.3   SCOPE OF WORK AND LINE MAINTENANCE LOCATIONS  

Scope of work Base 

maintenanceLine maintenance  Aircraft (Engine)  UAE 

OperatorB  L4  L3  L2  L1  Station 

B777‐200/300 RR Trent 800  Emirates        X    NICE A330‐200 RR Trent 700  Emirates        X      PRAGUE

 NICE    A340‐300 CFM 56  Emirates        X    NICE 

A330‐200 RR Trent 700  Ethiad          X  DUBLIN B777‐200/300 GE90‐115  Ethiad          X  DUBLIN A340‐300 CFM 56  Emirates        X    PRAGUE B777‐200/300 ER/LR              

RR Trent 800 and  GE‐110/115Emirates        X    PRAGUE 

  SCOPE OF WORK DEFINITION:  B  Base Maintenance L1  Preflight, Transit check, including minor defects rectification L2  L1 checks up to and including Daily Check L3  L2 checks up to and including Weekly/Service check L4  All line maintenance checks up to and including A check   

Page 10: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 10 of 17 

1.4   NOTIFICATION PROCEDURE TO THE GCAA REGARDING CHANGES TO THE ORGANIZATION’S ACTIVITIES/APPROVAL/LOCATION/PERSONNEL 

 In  accordance  with  UAE  GCAA  requirements,  the  Quality  Assurance Manager  or  in  his  absence,  his deputy,  is  responsible  for notifying  the UAE GCAA as  soon as practicable of any of  the  changes  listed below:  

The name of the Organization;  The location of the Organization;  Additional locations of the Organization;  The Accountable Manager;  Any  of  the  senior  persons  specified  in  UAE  MOE  Supplement/Maintenance  Management 

Personnel;  The  facilities,  equipment,  tools, material,  procedures,  certifying  staff  and  scope  of work  that 

could affect the GCAA approval.   The purpose of this notification is to enable the GCAA to determine continued compliance and amend, if necessary, GCAA CAR 145 approval certificate. 

   

1.5   SUPPLEMENT AMENDMENT PROCEDURES  The Quality Manager is responsible for the issuance and administration of this supplement including the submission of proposed amendments to the GCAA for approval.  Whenever the DGAC/OSAC MOE is amended, the Quality Manager shall ensure that the changes affecting UAE GCAA supplement are also addressed simultaneously for GCAA approval.  The GCAA approval of the supplement shall be made by stamping the cover page of the supplement.      1.6   CONTINUED VALIDITY OF APPROVAL 

 The UAE GCAA approval certificate is valid for 1 year from the date of issue, or as stated in the certificate. The approved Organization shall  forward a  request  for  renewal  to  the UAE GCAA 60 days prior  to  the expiry date.  The renewal shall be applied using GCAA form AWF‐AMO‐001 Application for CAR 145 Approval.  The approval shall be renewed upon satisfying the following:  a) The approved organization remains in compliance with GCAA requirements. b) Payment of any charges as prescribed by the GCAA.       1.7   AUDITS BY UAE GCAA  

Page 11: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 11 of 17 

       The GCAA  reserves  the  right  to  audit  the  organization’s  facility  and  station(s)  at  any  time  during  the validity period of  the GCAA CAR 145 approval  for which prior notice  shall be  served. The organization shall provide the GCAA with the necessary arrangements to access the facility and station(s)  in order to determine continued compliance with GCAA requirements. 

  2.1  Release to Service Procedure   The UAE GCAA requires that the performance of maintenance of UAE registered aircraft are carried out by UAE GCAA approved Aircraft Maintenance Organizations and certified  in accordance with UAE GCAA Civil Aviation Regulations (CAR) and the organization’s release to service procedures.  A  certificate of  release  to  service  (CRS)  shall be  issued by  an  appropriately  authorized  certifying  staff when satisfied that all required maintenance had been properly carried out in accordance With UAE Civil Aviation  Regulations  and  DERICHEBOURG  Atis  Aeronautique  (DAA)  release  to  services  procedures specified in MOE §2.16   Additionally,  DERICHEBOURG  Atis  Aeronautique  (DAA)  being  identified  as  a  UAE  GCAA  approved maintenance organization shall annotate the UAE GCAA  approval number on the aircraft   Certificate of Release  to Service. The Certificate of Release  to  service  shall  contain  the  statement  laid down  in CAR AMC 145.50(b)  “Certifies that the work specified except as otherwise indicated was carried out in accordance with CAR 145 and in respect to that work the aircraft/aircraft component is considered fit for release to service”.  AW  Form 1 or  EASA  Form 1 with GCAA dual  release  shall be used, when  releasing  to  service  aircraft components, engines, or APUs.   2.2   Reporting Defects to the GGCAA/Operator/Manufacturer . Refer to CAAP 22 and ROSI online 

form.  

Any un‐airworthy condition or defect on UAE registered aircraft, aircraft engine or aircraft component as defined  in GCAA Civil Aviation Advisory Publication CAAP 22, Appendix C  shall be  reported  to Quality Department and Line Maintenance Manager of DERICHEBOURG Atis Aeronautique (DAA) within 24 hours from  identification  of  the  condition,  using  the  “Reporting  of  Safety  Incident  (ROSI)”  or  “Occurrence Reporting Detected in Maintenance (DOC MOE 16) of (DAA)” by Station Manager (DAA).  Any un‐airworthy condition or defect on UAE registered aircraft shall be reported to the GCAA within 72 hours from identification of the condition, using the “Reporting Of Safety Incident (ROSI) form, on line or  print  hard  copies,  and  submit  after  filling  in  thought  the  GCAA  FAX  +971  4  2820847  by  Quality Department (DAA).  http://www.gcaa.ae/en/rosi/pages/reportform.aspx   

Page 12: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 12 of 17 

2.3   Certificate of Maintenance Review Procedures      Not applicable  2.4   Certificate of Fitness for Flight Procedures   Not applicable   2.5   Duplicate Inspection Procedures    Reference GCAA CAR Part V, Chapter 2, Section 9, and §2.23 of MOE DERICHEBOURG Atis Aeronautique (DAA).  All vital points or control systems must be identified in the Aircraft Maintenance Manuel. Whether vital points or control systems were not identified, the customer must be informed.  Where vital point have been  identified  in the maintenance documents for the aircraft, such points shall be subject to duplicate  inspection  following  initial assembly or following any disturbance to them or to any control system.  1. A duplicate inspection of all vital points/control systems (as indicated/provided by the UAE operator) 

in an aircraft  shall be made after  initial assembly and before  the  first  flight after overhaul,  repair, replacement, modification or adjustment.  

2. Vital points/control systems subject to duplicate inspection shall not be disturbed or readjusted after the  first  certified  inspection  and  the  second  part  of  the  duplicate  inspection  shall,  as  nearly  as possible, follow immediately after the first part. 

 3.  If  a  vital point/control  system  is disturbed after  completion of  the duplicate  inspection,  that part 

which has been disturbed shall again be inspected in duplicate before the aircraft flies.  

4. The  duplicate  inspection  shall  be  the  final  operation  to  establish  the  integrity  of  the  vital point/control system when all the work has been completed. 

 An additional  inspection shall be made, when all covers and bearings are finally secured, to ensure that full, free and correct movement of the controls is obtained.  5. Persons holding valid customers approval letter with appropriate aircraft type and rating are qualified 

to make first and/or second duplicate inspection.   3.1   RESERVED     

Page 13: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 13 of 17 

4.1   Contracted Operators  

The following list contains all the UAE organizations DERICHEBOURG Atis Aéronautique provides with service:   ‐Emirates   ‐Ethiad 

   

4.2   Operators Procedures and Paperwork      This shall be done in accordance with approved operator procedure but in all cases it shall be specified within Maintenance Support Agreement with the operator.     5.1   SAMPLE OF DOCUMENTS  

‐ Sample of ROSI form:  

  

  

Page 14: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 14 of 17 

    

 

  

 

Page 15: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 15 of 17 

    

‐ Samples of ETHIAD form:  

  

Page 16: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 16 of 17 

  

    

Page 17: UAE GCAA CAR 145 Exposition Supplement - atis … et certificats... · uae gcaa – car 145 maintenance organization exposition supplement form no: awf‐amo‐009 supplement ref

     

UAE GCAA – CAR 145   MAINTENANCE ORGANIZATION EXPOSITION  SUPPLEMENT Form No: AWF‐AMO‐009 

Supplement Ref. № MOE.SUP.01 Rev. № 7 Rev. Date 21/09/2011 

 

     

    Page 17 of 17 

‐ Sample of EMIRATES form: