u:acad09-028a05 cd01 working cad files04 sheetsts1.1 title ... lab/uccssimlab.pdf · neca/bicsi...

30

Upload: others

Post on 15-Feb-2021

6 views

Category:

Documents


1 download

TRANSCRIPT

  • Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

    PM.1MECHANICAL

    LEGEND

    MAH

  • PD.1PLUMBING

    DEMOLITION

    KDP

    BAI

    Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

  • P1.1PLUMBING

    NEW WORK

    KDP

    BAI

    Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

  • P2.1PLUMBING

    SCHEDULES &RISER DIAGRAMS

    KDP

    BAI

    Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    Uni

    vers

    ity o

    f Col

    orad

    o at

    Col

    orad

    o S

    prin

    gs14

    20 A

    ustin

    Blu

    ffs P

    arkw

    ay

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    15 September 2011

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    farris-usa.com

  • Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

    MD.1MECHANICALDEMOLITION

  • Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

    M1.1MECHANICAL

    PLANS

  • Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

    M2.1MECHANICAL DETAILS

    AND SCHEDULES

  • Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

    M2.2MECHANICALSCHEMATIC

  • Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

    F1.1FIRE PROTECTION

    PLAN

  • E0.1ELECTRICAL

    LEGEND

    KDP

    BAI

    Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

  • ED.1PARTIAL

    ELECTRICALDEMOLITION PLAN

    KDP

    BAI

    Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

  • E1.1

    KDP

    BAI

    Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

  • E2.1

    KDP

    BAI

    Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

  • E3.1EXISTING ONELINE DIAGRAM

    KDP

    BAI

    Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

  • E4.1ELECTRICALSCHEDULES

    KDP

    BAI

    Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

  • E4.2ELECTRICALSCHEDULES

    KDP

    BAI

    Drawn:Checked:

    Revised:Issued:

    Project No. 09.028a

    farr

    is-u

    sa.c

    om

    Uni

    vers

    ity o

    f Col

    orad

    o C

    olor

    ado

    Spr

    ings

    1420

    Aus

    tin B

    luffs

    Par

    kway

    UC

    CS

    Uni

    vers

    ity H

    all R

    emod

    elS

    imul

    atio

    n La

    b

    Col

    orad

    o S

    prin

    gs, C

    O 8

    0918

    17 November 2011

  • PROJECT NOTES

    ALL CONDUIT BENDS SHALL BE SWEEPING, SHALL CONFORM TO

    TIA/EIA 569 BEND RADIUS REQUIREMENTS, AND SHALL BE A MINIMUM

    OF NO LESS THAN 6 TIMES THE INTERNAL DIAMETER OF THE

    CONDUIT FOR CONDUITS 2�INCHES OR LESS, AND 10 TIMES THE

    INTERNAL DIAMETER OF THE CONDUIT FOR CONDUITS GREATER

    THAN 2�INCHES

    CAMERAS WILL BE PROVIDED BY OTHERS UNDER SEPARATE

    CONTRACT TO THE OWNER. LOCATIONS SHOWN ARE APPROXIMATE.

    THE CONTRACTOR PROVIDING THE CAMERAS IS RESPONSIBLE FOR

    LOCATING CAMERAS IN THEIR FINAL POSITION SUCH THAT VIEWING

    ANGLES ARE OPTIMIZED, AND THAT BLIND SPOTS, OBSTRUCTIONS,

    AND OTHER LIMITATIONS TO CAMERA EFFECTIVENESS ARE

    ELIMINATED TO THE GREATEST EXTENT POSSIBLE

    CONDUIT STUBS FROM DEVICE BOXES SHALL EXTEND A MINIMUM OF

    6�INCHES INTO ACCESSIBLE SPACE AND SHALL BE ANGLED AT 30

    DEGREES

    COORDINATION IS REQUIRED PRIOR TO ROUGH�IN. LOCATIONS

    SHOWN MAY NOT REPRESENT THE FINAL LOCATION NECESSITATED

    BY FIELD CONDITIONS. FURTHERMORE, NON�TYPICAL

    REQUIREMENTS FOR ROUGH�IN BOXES, MOUNTING, SUPPORT,

    FACEPLATES AND/OR INTERFACES MAY BE NECESSARY.

    COORDINATE LOCATION AND REQUIREMENTS WITH ARCHITECTURAL

    ELEVATIONS, SHOP DRAWINGS, RESPECTIVE TRADE(S), AND/OR

    OWNER PRIOR TO ROUGH�IN. PROVIDE AS REQUIRED

    DO NOT TERMINATE CABLES UNTIL CABLE TERMINATION

    PLAN/ORDER HAS BEEN COORDINATED WITH AND APPROVED BY THE

    OWNER

    DRAWING ELEMENTS SHOWN IN GRAY ARE PROVIDED BY OTHERS

    UNDER SEPARATE CONTRACT TO THE OWNER, OR ARE EXISTING

    AND TO REMAIN IN PLACE. WHERE SUCH ELEMENTS AFFECT THE

    CONTRACTORS WORK, COORDINATE DEPENDENCIES WITH THE

    OTHER TRADES AND/OR THE OWNER IN A TIMELY MANNER BEFORE

    SUCH DEPENDENCIES ARISE IN THE FIELD

    DRAWINGS SHALL NOT BE SCALED FOR BOX, DEVICE, AND/OR

    EQUIPMENT LOCATIONS. PRIOR TO ELECTRICAL ROUGH�IN, THE

    CONTRACTOR SHALL COORDINATE DIMENSIONS, LOCATIONS,

    LEVELS, AND MOUNTING HEIGHTS TO SUIT FIELD CONDITIONS AND

    EQUIPMENT OPERATING PARAMETERS AND SHALL FURTHERMORE

    COORDINATE WITH THE RELEVANT AND/OR AFFECTED TRADE(S).

    WHERE COORDINATION DICTATES THAT FINAL LOCATIONS VARY

    SIGNIFICANTLY FROM THAT SHOWN ON THE DRAWINGS, THE

    CONTRACTOR SHALL NOTIFY THE ENGINEER AND AWAIT APPROVAL

    PRIOR TO ELECTRICAL ROUGH�IN

    PROVIDE ALL RACEWAY/PATHWAY (SLEEVES, PENETRATIONS, CABLE

    SUPPORTS, ETC.) NECESSARY FOR SUPPORTING AND ROUTING

    CABLE NOT WITHIN PRIMARY RACEWAY/PATHWAYS. USE EXISTING

    PATHWAYS WHEREVER POSSIBLE. J�HOOK PATHWAY SHOWN IS FOR

    AUDIOVISUAL CABLING, DO NOT PLACE DATA CABLING IN J�HOOK

    PATHWAY SHOWN. PLACE DATA CABLING IN CABLE TRAY

    PROVIDE CABLE PATHWAY FIRESTOPPING DEVICES FOR ALL

    LOCATIONS WHERE CABLE WILL PENETRATE FIRE RATED BARRIERS.

    REFER TO ARCHITECTURAL DRAWINGS FOR WALL TYPE

    INFORMATION

    PROVIDE CABLE QUANTITIES AND TYPES PER THE STATION

    CALLOUTS SCHEDULE ON THE TITLE SHEET

    REFER TO DETAIL DRAWING(S) FOR ADDITIONAL STRUCTURAL

    SUPPORT, MOUNTING, AND RACEWAY REQUIREMENTS

    SEE SYMBOL SCHEDULE (ON THE TITLE SHEET) FOR IMPORTANT

    INSTALLATION NOTES AND DETAILS SPECIFIC TO EACH SYMBOL

    USED ON THIS SHEET

    SLEEVES AND/OR CONDUITS SHALL NOT BE SHARED BETWEEN

    BACKBONE AND HORIZONTAL CABLING. THE CONTRACTOR SHALL

    USE SEPARATE SLEEVES AND/OR CONDUITS FOR EACH

    SPEAKERS WILL BE PROVIDED BY OTHERS UNDER SEPARATE

    CONTRACT TO THE OWNER. SPEAKERS MOUNTED WITHIN DROP TILE

    SHALL BE SUPPORTED BY HANGER WIRE PROVIDED BY OTHERS AND

    AFFIXED TO STRUCTURE

    TELECOM CONTRACTOR SHALL COORDINATE WITH OWNER PRIOR

    TO INSTALLING EQUIPMENT OR MATERIALS WITHIN TELECOM

    AND/OR OTHER COMMUNICATIONS ROOMS

    TELECOMMUNICATIONS BONDING AND GROUNDING PLANNING AND

    INSTALLATION SHALL BE INSTALLED IN ACCORDANCE WITH

    NECA/BICSI 607�2011, STANDARD FOR BONDING AND GROUNDING

    PLANNING AND INSTALLATION METHODS FOR COMMERCIAL

    BUILDINGS, TIA/EIA�607 GROUNDING AND BONDING STANDARD, NEC,

    AND SPECIFICATIONS

    WORK REQUIRING UTILITY AND/OR COMMUNICATIONS OUTAGES

    SHALL BE COORDINATED WITH THE OWNER IN ADVANCE AND MUST

    BE PRE�APPROVED IN WRITING

    WORK SHALL COMPLY WITH THE GOVERNING REQUIREMENTS

    LISTED IN THE SPECIFICATIONS

    A

    B

    C

    D

    E

    F

    G

    H

    J

    K

    L

    M

    N

    P

    R

    T

    U

    W

    Drawn:

    Checked:

    Revised:

    Issued:

    Project No. 09.028a

    14

    20

    Au

    stin

    Blu

    ffs P

    ark

    way

    JMW

    UC

    CS

    Un

    ive

    rsity H

    all

    Rem

    odel

    Sim

    ula

    tion L

    ab

    17 November 2011

    Co

    lora

    do

    Sp

    rin

    gs, C

    O 8

    0918

    JRM

    S:\

    Clie

    nts

    \LK

    A\1

    0�0

    01

    UC

    CS

    �Un

    ive

    rsityH

    all\

    De

    sig

    n\D

    raw

    ing

    s\M

    aste

    rs\1

    0�0

    01 T

    0.2

    TE

    CH

    NO

    LO

    GY

    SC

    HE

    DU

    LE

    S�L

    EG

    EN

    DS

    SH

    EE

    T.d

    wg

    mittjr

    No

    v.1

    6.2

    011

    9:2

    1 a

    m

    Univ

    ers

    ity o

    f C

    olo

    rad

    o C

    olo

    rado S

    prings

    T0.2

    TECHNOLOGY

    SCHEDULES/LEGENDS

    SHEET

    EQUIPMENT SCHEDULE � CB (CONDUIT BOX)

    Manufacturer/Part Number

    ID DESCRIPTION Chief Special Rqmt

    CB120 DISPLAY WALL BOX (LARGE) PAC516

    EQUIPMENT SCHEDULE � CR (COMMUNICATIONS ROOMS)

    Manufacturer/Part Number

    ID DESCRIPTION CPI Cooper B�Line Special Rqmt

    CR505 HORIZONTAL CABLE MGMT PANEL (2U) 30330�x19 SB�870�19S�2xx

    EQUIPMENT SCHEDULE � FC (FACEPLATE AND CONNECTORS)

    ID DESCRIPTION AMP Special Rqmt

    FC010 WALL MOUNT TELEPHONE FACEPLATE See Special Rqmt Semtron 1�0E�A5�PHONE�DP

    FC020 SPECIALIZED FACEPLATE/MOUNTING See Special Rqmt As required by Equipment and Connector mfrs

    FC050 STAINLESS STEEL LABELLED FACEPLATE 1FM�(x)0E�AMP�LAB

    FC100 COPPER CONNECTOR (CAT5E) 1375191�x

    EQUIPMENT SCHEDULE � FS (FIRESTOP)

    ID DESCRIPTION STI WIREMOLD Special Rqmt

    FS100 CABLE PATHWAY FIRESTOPPING DEVICE EZ�Path FSx

    EQUIPMENT SCHEDULE � GB (GROUNDING BUSBAR)

    Manufacturer/Part Number

    ID DESCRIPTION CPI Erico Cooper B�Line Special Rqmt

    GB020 TELECOMMUNICATIONS GROUNDING BUSBAR (TGB) 13622�010 TGB�A14L06PT SB477

    EQUIPMENT SCHEDULE � HC (HORIZONTAL CABLE)

    ID DESCRIPTION AMP Special Rqmt

    HC100 HORIZONTAL COPPER CABLE (CAT5E) 5782x�x

    EQUIPMENT SCHEDULE � JS (J�HOOK STRAPS)

    Manufacturer/Part Number

    ID DESCRIPTION Erico CPI Arlington Special Rqmt

    JS010 WIDE BASE CABLE SUPPORTS (J�HOOKS) CADDY CableCat See Erico See Erico

    JS020 STRAPS/SLINGS CADDY CableCat See Arlington THE LOOP

    JS030 SCREW�MOUNT, REUSABLE CABLE TIES See Special Rqmt See Special Rqmt See Special Rqmt Hubbell MCCMV9BS10

    EQUIPMENT SCHEDULE � PC (PATCH CORDS)

    ID DESCRIPTION AMP Special Rqmt

    PC100 COPPER PATCH CORD (CAT5E) � BOOTED 219xxx�x

    EQUIPMENT SCHEDULE � TE (TERMINATION EQUIPMENT)

    ID DESCRIPTION AMP Special Rqmt

    TE048 HORIZONTAL COPPER PATCH PANEL�CAT 5E (48 PORT, 2U) 1479155�2

  • *

    #

    *

    #

    *

    A

    B

    C

    D#

    #

    #

    #

    #

    FSD

    V

    PB P

    SR

    J

    EC AC

    E

    SYMBOL SCHEDULE NOTES

    *#

    *#

    *#

    KEY NOTE

    DRAWING NOTE

    EQUIPMENT SCHEDULE NUMBER

    REVISION NUMBER

    SECTION OR ELEVATION LETTER

    REFERENCE DRAWING NUMBER

    SECTION OR ELEVATION TAG

    REFERENCE TAGREFERENCE LETTER

    REFERENCE DRAWING NUMBER

    ROOM WALL ELEVATION BUBBLEREFERENCE NUMBER

    REFERENCE DRAWING NUMBER

    WALL ELEVATION REFERENCE

    DRAWING ANNOTATIONS

    ABBREV. DEFINITION

    ABBREVIATIONS

    DESCRIPTIONSYMBOL

    CONTINUATION LINE

    TELECOM OUTLET � VOICE/DATA FLUSH/WALL

    FLUSH/WALL

    FLUSH/WALL

    FLUSH/COUNTER

    FLUSH/WALL

    FLUSH/WALL

    FLOOR BOX

    FLUSH/WALL

    FLUSH/WALL

    FLUSH/WALL

    ��

    +XY"

    AC

    BC

    E

    F

    FB

    FP

    W

    WAP

    ��

    NON�STANDARD HEIGHT

    ABOVE COUNTER

    BELOW COUNTER

    EMERGENCY INFORMATION BOARD

    FURNITURE

    FLOOR BOX

    FLAT PANEL

    WALL TELEPHONE

    WIRELESS ACCESS POINT

    TELECOM OUTLET � VOICE/DATA

    (CEILING)

    CEILING

    CEILING

    CEILING

    CEILING

    CEILING

    CEILING

    CEILING

    ��

    AV

    DP

    FUT

    P

    SC

    WAP

    ��

    AUDIOVISUAL

    DISPLAY PANEL

    FUTURE

    PROJECTOR

    SECURITY CAMERA

    WIRELESS ACCESS POINT

    TELECOMMUNICATION SYSTEM NOTATION

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    NOTESMOUNTINGSUBSCRIPT DESCRIPTIONSUBSCRIPTSYMBOL DESCRIPTIONSYMBOL

    TELECOM OUTLET � VOICE/DATA

    (FIELD COORDINATED)

    ��

    AV

    B

    ELEC

    ELV

    FACP

    M

    OXYGEN

    S

    SC

    SM

    U

    ��

    AUDIOVISUAL

    BUILDING AUTOMATION

    ELECTRICAL

    ELEVATOR

    FIRE ALARM CONTROL PANEL

    MECHANICAL/HVAC

    OXYGEN

    SECURITY PANEL

    SECURITY CAMERA

    SURFACE MOUNTED

    UPS

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ELECTRICAL TECHNOLOGY SYSTEM NOTATION

    NOTESDETAILSMOUNTINGSUBSCRIPT DESCRIPTIONSUBSCRIPTSYMBOL DESCRIPTIONSYMBOL

    PLENUM ENLOSURE CEILING

    CEILING

    A

    B

    18x18x6�INCH

    12x12x6�INCH

    ��

    ��

    ��

    ��

    CABLE PATHWAY FIRESTOPPING DEVICE ���� �� 24/T5.1

    TELECOM UNDERGROUND VAULT ���� �� ����

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    OSP UNDERGROUND DUCTBANK

    CONDUIT UP/DOWN

    GROUND CONNECTION

    CONDUIT UNDERFLOOR OR UNDERSLAB

    BUSHED CONDUIT

    CAPPED CONDUIT OR DUCT

    PULL BOX CEILING/WALL�� �� ����

    ���� �� ��

    ���� �� ��

    ��

    ��

    ��

    W

    ��

    WEATHERHEAD

    ��

    ��

    ���� �� ��

    ���� �� ��

    ���� �� ����

    ��

    ��

    ��

    ��

    ��

    ��

    SECURITY SYSTEM NOTATION

    NOTESDETAILSMOUNTINGSUBSCRIPT DESCRIPTIONSUBSCRIPTSYMBOL DESCRIPTIONSYMBOL DETAILS

    1/T5.1

    1/T5.1

    1/T5.1

    1/T5.1

    1/T5.1

    1/T5.1

    ��

    1/T5.1

    1/T5.1

    1/T5.1

    2/T5.1

    2/T5.1

    2/T5.1

    2/T5.1

    2/T5.1

    2/T5.1

    2/T5.1

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    AUDIOVISUAL SYSTEM NOTATION

    NOTESDETAILSMOUNTINGSUBSCRIPT DESCRIPTIONSUBSCRIPTSYMBOL DESCRIPTIONSYMBOL

    CABLE � END LOOP

    CABLE � CONTINUOUS LOOP

    �� ��

    �� ��

    �� ��

    �� ��

    ��

    ��

    TELECOM OUTLET � VOICE/DATA

    (FIELD COORDINATED) (CEILING)

    ��

    AV

    TA

    ��

    AUDIOVISUAL

    TIME ATTENDANCE

    CEILING

    ABOVE CEILING

    ABOVE CEILING

    ��

    ��

    ��

    2/T5.1

    2/T5.1

    2/T5.1

    TELECOM OUTLET � SPECIALTY ��

    +XY"

    AV

    OR

    ��

    NON�STANDARD HEIGHT

    AUDIOVISUAL

    OR INTEGRATION

    FLUSH/WALL

    FLUSH/WALL

    FLUSH/WALL

    FLUSH/WALL

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    TELECOM OUTLET � SPECIALTY (CEILING) �� �� CEILING ����

    DEVICE BOX AV1

    AV2

    AV3

    EMPTY DOUBLE GANG BOX

    EMPTY DOUBLE GANG BOX

    EMPTY DOUBLE GANG BOX

    FLUSH/WALL

    FLUSH/WALL

    FLUSH/WALL

    1,3

    1

    1

    ��

    3/T5.1

    3/T5.1

    X BUSHED CONDUIT SLEEVE ��

    ��

    ��

    ��

    ��

    ��

    1�1/4

    2

    3

    4

    ��

    1 1/4�INCH

    2�INCH

    3�INCH

    4�INCH

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    STRUCTURAL BLOCKOUT FLOORXX" x YY" BLOCKOUT DIMENSIONS ����

    or

    SURFACE RACEWAY �� ���� �� ��

    J�HOOK PATHWAY �� ���� �� 5/T5.1

    SYMBOL SCHEDULE

    FURNISH | INSTALL CALLOUT � SEE SCHEDULE

    AC

    ACEG

    ACP

    ACS

    AFF

    AHJ

    ALS

    AO

    AOC

    APC

    APP

    APPROX

    AR

    ARCH

    AV

    AVSC

    AWG

    BB

    BC

    BCT

    BEP

    BI

    BLDG

    BO

    C

    C

    CAB

    CAN

    CAT3

    CAT5E

    CAT6

    CAT6A

    CATV

    CC

    CO

    COAX

    COM

    CON

    CPU

    CPV

    CR

    CT

    CV

    (D)

    DB

    DD

    DEMARC

    DIA

    DNS

    DPDT

    DPS

    DR

    DVI

    DWG

    (E)

    ECP

    EEB

    EF

    EL

    ELEC

    ELR

    EMT

    ENCL

    EQPMT

    ER

    ES

    ESC

    ESO

    FACP

    FB

    FD

    FLEX

    FPA

    FSD

    FUT

    G

    HB

    HC

    HCS

    HO

    ID

    IDF

    IDS

    IG

    IMC

    IP

    IR

    ISP

    IT

    LAN

    LBS

    LL

    LM

    LPS

    LR

    MAG

    MECH

    MFR

    MIC

    MIN

    ML

    MM

    MREX

    (NL)

    NC

    NO

    NTS

    NVR

    OB

    OC

    OD

    OFCI

    OFOI

    OHM

    OPE

    OR

    OSP

    P

    PDS

    PDU

    POS

    PP

    PR

    PS

    PWR

    (R)

    (RL)

    R

    REV

    REX

    RF

    RFG

    RGB

    RGBHV

    RI

    RM

    RMC

    RNC

    S

    SB

    SC

    SCHED

    SCNS

    SCPP

    SCPS

    SH

    SM

    SMR

    SN

    SP

    SPEC

    SPKR

    SPR

    SR

    SSC

    STP

    SV

    TB

    TBB

    TBD

    TC

    TGB

    TMGB

    TP

    TR

    TSC

    TYP

    UCV

    UG

    UPP

    UPS

    USB

    V

    VB

    VLAN

    VUTP

    W

    WAP

    ABOVE COUNTER

    ALTERNATING CURRENT ELECTRICAL GROUND

    ACCESS CONTROL PANEL

    ACCESS CONTROL SYSTEM

    ABOVE FINISHED FLOOR

    AUTHORITY HAVING JURISDICTION

    ASSISTED LISTENING SYSTEM

    AUTOMATIC OPERATOR

    AUTOMATIC OPENER CONTROLLER

    ANGLE POLISHED CONNECTOR

    AUDIO PATCH PANEL

    APPROXIMATELY

    AUXILIARY RELAY

    ARCHITECTURAL

    AUDIOVISUAL

    AUDIOVISUAL SYSTEMS CONTRACTOR

    AMERICAN WIRE GAUGE

    BACKBONE

    BELOW COUNTER

    BONDING CONDUCTOR FOR TELECOMMUNICATIONS

    BUILDING ENTRANCE PROTECTOR

    BIOMETRIC INTERFACE

    BUILDING

    BY OTHERS

    CONDUIT

    CENTERLINE

    CABINET

    CONTROLLED AREA NETWORK

    CATEGORY 3 COPPER CABLE

    CATEGORY 5E COPPER CABLE

    CATEGORY 6 COPPER CABLE

    CATEGORY 6 AUGMENTED COPPER CABLE

    CABLE TELEVISION

    CLOSE CONTACT

    CONDUIT ONLY (NO CABLE)

    COAXIAL CABLE

    COMMON

    CONDUCTOR

    COMPUTER PROCESSING UNIT

    COMPONENT VIDEO

    CARD READER

    COUNT

    COMPOSITE VIDEO

    DEMOLISH

    DATA�GRADE COPPER BACKBONE

    DEAD

    DEMARCATION

    DIAMETER

    DATA NETWORK SWITCH

    DOUBLE POLE, DOUBLE THROW

    DOOR POSITION SWITCH

    DOOR RELEASE

    DIGITAL VIDEO INTERFACE

    DRAWING

    EXISTING

    ELEVATOR CONTROL PANEL

    EMERGENCY EXIT BUTTON

    ENTRANCE FACILITY (DEMARC)

    ELECTRIC LATCH

    ELECTRICAL

    ELECTRIC LATCH RETRACTION

    ELECTRICAL METALLIC TUBING

    ENCLOSURE (SPLICE)

    EQUIPMENT

    EQUIPMENT ROOM

    ELECTRIC STRIKE

    ELECTRICAL SYSTEMS CONTRACTOR

    ELECTRIC SOLENOID

    FIRE ALARM CONTROL PANEL

    FIBER BACKBONE

    FLOOR DISTRIBUTOR

    FLEXIBLE

    FLOOR PENETRATION ASSEMBLY

    FIRE STOP DEVICE

    FUTURE

    GROUND

    HANDICAP BUTTON

    HEAT CONTAINMENT SYSTEM

    HORIZONTAL CABLE

    HOLD OPEN

    INSIDE DIAMETER

    INTERMEDIATE DISTRIBUTION FACILITY

    INTRUSION DETECTION SYSTEM

    ISOLATED GROUND

    INTERMEDIATE METAL CONDUIT

    INTERNET PROTOCOL

    INFRARED

    INSIDE PLANT

    INFORMATION TECHNOLOGY

    LOCAL AREA NETWORK

    LATCH BOLT SWITCH

    LINE LEVEL LEFT CHANNEL AUDIO

    LINE LEVEL MONO AUDIO

    LOCK POWER SUPPLY

    LINE LEVEL RIGHT CHANNEL AUDIO

    MAGNETIC LOCK

    MECHANICAL

    MANUFACTURER

    MICROPHONE (CONNECTION)

    MINIMUM

    MONITORED LATCH

    MULTIMODE FIBER OPTIC CABLE

    MOTION REQUEST TO EXIT

    NEW LOCATION

    NORMALLY CLOSED CONTACT

    NORMALLY OPEN CONTACT

    NOT TO SCALE

    NETWORK VIDEO RECORDER

    OVERRIDE BUTTON

    ON CENTER

    OUTSIDE DIAMETER

    OWNER FURNISHED, CONTRACTOR INSTALLED

    OWNER FURNISHED, OWNER INSTALLED

    RESISTIVE NETWORK

    OWNER PROVIDED EQUIPMENT

    OPERATING ROOM

    OUTSIDE PLANT

    PROJECTOR

    PROTECTIVE DISTRIBUTION SYSTEM

    POWER DISTRIBUTION UNIT

    POINT OF SALE

    PATCH PANEL(S)

    PAIR

    POWER SUPPLY

    POWER (SUPPLY)

    REMOVE

    REMOVE AND RELOCATE

    RISER

    REVISION

    REQUEST TO EXIT SWITCH

    RADIO FREQUENCY

    RAISED FLOOR GROMMET

    HIGH RESOLUTION VIDEO

    HIGH RESOLUTION ANALOG VIDEO

    READER INTERFACE

    ROOM

    RIGID METALLIC CONDUIT

    RIGID NONMETALLIC CONDUIT

    STATION

    SMART BOARD

    SECURITY CAMERA

    SCHEDULE

    SECURITY CAMERA NETWORK SWITCH

    SECURITY CAMERA PATCH PANEL

    SECURITY CAMERA POWER SUPPLY

    SURFACE HOUSING

    SINGLEMODE FIBER OPTIC CABLE

    SURFACE METAL RACEWAY

    SERIAL NETWORK MODULE

    SURGE PROTECTOR

    SPECIFICATION

    LOUDSPEAKER LEVEL AUDIO

    SURFACE PLASTIC RACEWAY

    SERVER ROOM

    SECURITY SYSTEMS CONTRACTOR

    SHIELDED TWISTED PAIR

    S�VIDEO

    TERMINATION BLOCK(S)

    TELECOMMUNICATIONS BONDING BACKBONE

    TO BE DETERMINED

    TELECOMMUNICATIONS CONTRACTOR

    TELECOMMUNICATIONS GROUNDING BUSBAR

    TELECOMMUNICATIONS MAIN GROUNDING BUSBAR

    TWISTED PAIR

    TELECOMMUNICATIONS ROOM

    TELECOMMUNICATION SYSTEMS CONTRACTOR

    TYPICAL

    UNDERGROUND CABLE VAULT

    UNDERGROUND

    UNSHIELDED TWISTED PAIR PATCH PANEL

    UNINTERRUPTIBLE POWER SUPPLY

    UNIVERSAL SERIAL BUS

    VOICE

    VOICE�GRADE COPPER BACKBONE

    VIRTUAL LOCAL AREA NETWORK

    VIDEO UNSHIELDED TWISTED PAIR CABLE

    WALL MOUNTED

    WIRELESS ACCESS POINT

    TELECOM AREA BOUNDARY LINE

    LADDER RACK ���� �� ����

    OSP

    FLOOR BOX FLOOR

    FLOOR

    FLOOR

    4

    11

    FC

    4 � GANG

    11 � GANG

    FLEXIBLE CONDUIT

    ��

    ��

    ��

    ��

    ��

    ��

    FPA FIRE�RATED FLOOR

    PENETRATION ASSEMBLY

    ���� �� ��

    1. COORDINATE LOCATION AND REQUIREMENTS WITH ARCHITECTURAL ELEVATIONS

    2. PROVIDE CABLE PATHWAY FIRESTOPPING DEVICES FOR ALL LOCATIONS WHERE CABLE WILL PENETRATE FIRE RATED BARRIERS. REFER TO ARCHITECTURAL DRAWINGS FOR WALL TYPE INFORMATION

    3. PROVIDE 1 1/4�INCH CONDUIT STUBBED UP ABOVE CEILING WITH PULL STRING AND BLANK FINISH FACE PLATE; UNDER A SEPARATE CONTRACT TO THE OWNERS, OTHERS WILL PROVIDE CABLES AND INTERFACE PLATE WITH ALL CONNECTORS AND JACKS REQUIRED FOR SIMULATOR MONITOR, MANIKIN AND AUDIOVISUAL SYSTEM

    4. PROVIDE DOUBLE GANG BOX WITH 1 1/4�INCH CONDUIT STUBBED UP ABOVE CEILING WITH CABLES AND INTERFACE PLATE

    5. PROVIDE WALL BOX FOR DISPLAY AS SHOWN IN DETAIL; PROVIDE DATA CABLING AND TERMINATION; UNDER A SEPARATE CONTRACT TO THE OWNERS, OTHERS WILL PROVIDE DISPLAY, ALL AV CABLING, AND DISPLAY MOUTING BRACKETS; REFER TO ELECTICAL DRAWINGS FOR POWER

    6. PROVIDE DATA CABLING AND TERMINATION; NO RECESSED WALL BOX FOR DISPLAY REQUIRED; UNDER A SEPARATE CONTRACT TO THE OWNERS, OTHERS WILL PROVIDE DISPLAY, DISPLAY MOUNTING BRACKETS AND ALL AV CABLING; REFER TO ELECTICAL DRAWINGS FOR POWER

    7. AS PART OF BASE BID PROVIDE WALL BOX FOR DISPLAY AS SHOWN IN DETAIL; PROVIDE DATA CABLING AND TERMINATION; UNDER A SEPARATE CONTRACT TO THE OWNERS, OTHERS WILL PROVIDE DISPLAY, ALL AV CABLING, AND DISPLAY MOUTING BRACKETS; REFER TO ELECTICAL DRAWINGS FOR POWER; AS PART OF ALTERNATE NO.1 DELETE WALL BOX, DATA, AND ALL ELECTRCIAL

    INFRASTRUCTER AT THIS DISPLAY LOCATION

    CATV OUTLET �� �� FLUSH/WALL ����

    RFG RAISED FLOOR GROMMET ���� ��

    TELECOM OUTLET

    (FLOOR BOX)

    �� �� ����FLOOR BOX

    CABLE TRAY ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    6

    8

    12

    18

    24

    AC

    BF

    LT

    UT

    6�INCH TRAY

    8�INCH TRAY

    12�INCH TRAY

    18�INCH TRAY

    24�INCH TRAY

    ABOVE CEILING

    BELOW FLOOR

    LOWER TIER

    UPPER TIER

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    # AA

    WALL BOX �� �� WALL 1��

    PLENUM BOX �� �� CEILING ����

    POKE�THRU FLOORPT8 POKE�THRU 8 ����

    L

    ��

    ����

    X

    IC

    X W

    X S

    S

    S

    S

    ACCESS CONTROLLED DOOR �� �� ����

    PERSONNEL VERIFICATION DEVICE

    (WALL)

    ��

    K

    M

    CARD READER

    ACCESS CONTROL KEYPAD

    MULLION MOUNTED

    ��

    ��

    ��

    ��

    ��

    ��

    HEAD END EQUIPMENT LOCATION A

    I

    V

    ACCESS CONTROL SYSTEM

    INTRUSION DETECTION SYSTEM

    VIDEO SURVEILLANCE SYSTEM

    ��

    ��

    ��

    ��

    ��

    ��

    WALL

    WALL

    RACK

    ��

    WALL

    WALL

    MULLION

    FIXED CAMERA

    (CEILING)

    CEILING

    CEILING

    CEILING

    CEILING

    CEILING

    TYPICAL

    N

    P

    PVE

    V

    ACCESSIBLE CEILING

    NON�ACCESSIBLE CEILING

    PENDANT MOUNTED

    PENDANT VANDAL ENVIRONMENTAL

    VANDAL

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    FIXED CAMERA

    (WALL)

    TYPICAL

    V

    VE

    WALL MOUNTED

    VANDAL

    VANDAL ENVIRONMENTAL PROOF

    ��

    ��

    ��

    ��

    ��

    ��

    WALL

    WALL

    WALL

    PAN � TILT � ZOOM CAMERA

    (WALL)

    TYPICAL

    PAR

    WALL MOUNTED

    PARAPET MOUNTED

    ��

    ��

    ��

    ��

    WALL

    WALL

    PERSONNEL VERIFICATION DEVICE

    (DOOR)

    �� CARD READER ����DOOR

    WORKSTATION/COMPUTER LOCATION A

    I

    V

    ACCESS CONTROL WORK STATION

    INTRUSION DETECTION WORK STATION

    VIDEO SURVEILLANCE WORK STATION

    ��

    ��

    ��

    ��

    ��

    ��

    WALL

    WALL

    WALL

    DURESS BUTTON D

    R

    DURESS ALARM

    DOOR RELEASE

    ��

    ��

    ��

    ��

    VARIES

    VARIES

    INTERCOM CA

    CV

    MA

    MV

    AUDIO CALL STATION

    VIDEO CALL STATION

    AUDIO MASTER STATION

    VIDEO MASTER STATION

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    ��

    WALL

    WALL

    WALL/DESK

    WALL/DESK

    STROBE (WALL) �� SECURITY STROBE ����WALL

    KEY SWITCH LAR LOCAL ALARM RESET ����WALLK

    S PAN � TILT � ZOOM CAMERA

    (CEILING)

    �� �� ����CEILING

    S FIXED CAMERA

    (POLE)

    �� �� ����POLE

    STROBE (CEILING) �� SECURITY STROBE ����CEILING

    DOOR RELEASE �� DOOR RELEASE ����WALLDR

    DOOR BELL �� DOOR BELL ����WALLDR

    DETECTOR (WALL) �� AUDIO VIDEO DETECTOR ����WALL

    DETECTOR (CEILING) �� AUDIO VIDEO DETECTOR ����CEILING

    IFIF

    M

    S

    S

    A

    A

    A

    IFIF

    V

    CP

    PA

    VC

    LOUDSPEAKER

    (CEILING)

    ��

    N

    ACCESSIBLE CEILING

    NON�ACCESSIBLE CEILING

    ��

    ��

    ��

    ��

    LOUDSPEAKER

    (WALL)

    �� �� ����

    EQUIPMENT RACK

    (FLOOR)

    �� �� ����

    ANTENNA

    (CEILING)

    ��

    A

    B

    ��

    WIRELESS MIC ANTENNA

    ASSISTED LISTENING

    ��

    ��

    ��

    ��

    ��

    ��

    ANTENNA

    (WALL)

    �� �� ����

    VIDEO DISPLAY

    (WALL)

    C

    E

    EA

    S

    CISCO MONITOR

    EMS MONITOR

    EMS MONITOR, ALTERNATE LOCATION

    SIMULATOR MONITOR, VITALS

    5

    5

    7

    6

    3/T5.1

    3/T5.1

    3/T5.1

    ��

    PROJECTION SCREEN

    (CEILING)

    ��

    A

    56 x 75�INCH

    72 x 115�INCH

    ��

    ��

    ��

    ��

    PROJECTION SCREEN

    (WALL)

    �� �� ����

    INTERFACE PLATE S1

    S2

    9�PIN SERIAL CONNECTOR, USB PORT,

    STEREO 3.5 AUDIO JACK

    VGA JACK, 9�PIN SERIAL CONNECTOR,

    (2) USB PORTS, STEREO 3.5

    AUDIO JACK

    4

    4

    ��

    ��

    PROJECTOR �� �� ����

    CEILING

    CEILING

    WALL

    FLOOR

    CEILING

    CEILING

    CEILING

    WALL

    WALL

    WALL

    WALL

    WALL

    CEILING

    CEILING

    WALL

    WALL

    WALL

    CEILING

    MICROPHONE �� �� ����CEILING

    EQUIPMENT RACK

    (WALL)��

    PA

    ��

    PUBLIC ADDRESS

    WALL

    WALL

    ��

    ��

    ��

    ��

    FIXED CAMERA

    (CEILING)

    CEILING�� �� ����

    FIXED CAMERA

    (WALL)

    �� �� ����WALL

    PAN � TILT � ZOOM CAMERA

    (WALL)

    C

    E

    CISCO CAMERA

    EMS CAMERA

    ��

    ��

    ��

    ��

    WALL

    WALL

    PODIUM �� �� ����FLOOR

    INTERFACE PLATE

    (FLOOR BOX)

    (SEE ABOVE) (SEE ABOVE) ����FLOOR BOX

    VOLUME CONTROL �� �� ����WALL

    CONTROL PANEL L

    S

    LARGE WIRELESS W/ DOCKING

    STATION

    SMALL FIXED

    ��

    ��

    ��

    ��

    WALL

    WALL

    PA LOUDSPEAKER

    (CEILING)

    ��

    N

    ACCESSIBLE CEILING

    NON�ACCESSIBLE CEILING

    ��

    ��

    ��

    ��

    CEILING

    CEILING

    VOLUME CONTROLLER �� �� ����WALL

    SCREEN SWITCH �� �� ��WALL ��

    PAPA LOUDSPEAKER

    (WALL)

    �� �� ����WALL

    A PAN � TILT � ZOOM CAMERA

    (CEILING)

    CEILING

    CEILING

    E

    EF

    EMS CAMERA

    FUTURE EMS CAMERA

    ��

    ��

    ��

    ��

    X Y

    SHEET LIST

    2 VOICE/DATA (CAT5E)2

    #

    STATION CALLOUT SCHEDULE

    USAGE

    EXAMPLES

    TITLESHEET#

    FURNISH | INSTALL CALLOUT SCHEDULE

    SYMBOL

    (#) NUMBER OF VOICE/DATA (CAT5E) PORTS/CABLES

    ENTITY RESPONSIBLE FOR INSTALLING

    ENTITY

    ELECTRICAL CONTRACTOR

    TELECOM CONTRACTOR

    AUDIOVISUAL CONTRACTOR

    SECURITY CONTRACTOR

    GENERAL CONTRACTOR

    LOW VOLTAGE/SPECIALTY CONTRACTOR

    BY OTHERS

    OWNER

    EC

    TC

    AC

    SC

    GC

    LC

    BO

    O

    ENTITY RESPONSIBLE FOR FURNISHING

    TECHNOLOGY TITLE SHEET

    TECHNOLOGY SCHEDULES/LEGENDS SHEET

    MAIN LEVEL TECHNOLOGY PLAN

    TECHNOLOGY DETAILS

    T0.1

    T0.2

    T2.1

    T5.1

    Drawn:

    Checked:

    Revised:

    Issued:

    Project No. 09.028a

    14

    20

    Au

    stin

    Blu

    ffs P

    ark

    way

    JMW

    UC

    CS

    Un

    ive

    rsity H

    all

    Rem

    odel

    Sim

    ula

    tion L

    ab

    17 November 2011

    Co

    lora

    do

    Sp

    rin

    gs, C

    O 8

    0918

    JRM

    S:\

    Clie

    nts

    \LK

    A\1

    0�0

    01

    UC

    CS

    �Un

    ive

    rsityH

    all\

    De

    sig

    n\D

    raw

    ing

    s\M

    aste

    rs\1

    0�0

    01 T

    0.1

    TE

    CH

    NO

    LO

    GY

    TIT

    LE

    SH

    EE

    T.d

    wg

    mittjr

    No

    v.1

    6.2

    011

    9:2

    0 a

    m

    Univ

    ers

    ity o

    f C

    olo

    rad

    o C

    olo

    rado S

    prings

    T0.1

    TECHNOLOGY

    TITLE SHEET

  • 1

    2

    3

    3

    3

    M

    S

    2

    M

    M

    S

    S

    2

    E

    S

    SM

    2

    E

    1

    AE

    1

    C

    1

    AC

    2

    2

    M

    S

    S

    AE

    M

    S

    S

    2

    2

    S

    2

    2M M

    S

    S

    C

    IF

    1

    M

    S

    AC

    4

    2

    2

    2

    AC

    4

    AC4

    WAP

    1

    FSD

    6 x

    4 A

    C

    6 x

    4 A

    C6

    x 4

    AC

    6 x

    4 A

    C6

    x 4

    AC

    6 x 4 AC 6 x 4 AC 6 x 4 AC

    6 x

    4 A

    C

    E1

    C

    1A

    C

    C

    1 A

    C

    E1

    W

    1

    M

    A

    E

    EA

    SEE ALT NO.1

    1

    6 x

    4 A

    C

    6 x

    4 A

    C

    6 x

    4 A

    C

    +84"

    4

    +84"

    4

    +84"

    4

    1

    1

    W

    1

    W

    1

    W

    1

    2

    2

    AV1

    +60"

    AV1+60"

    M

    M

    A

    EF

    A EA

    E

    A EF

    A EA

    E

    AE

    M

    M

    M

    M

    M

    M

    A

    E

    A

    E

    AE

    A

    E

    A

    E

    A

    C

    A

    E

    W

    1

    2

    AV1

    +60"

    M

    2 AV1

    +60" 2

    AV1

    +60"

    A

    E

    A

    E

    A

    EA

    E

    A EF

    A

    EF

    IF S2AC AC

    4

    IF

    S2

    AC

    AV2AC

    AV2AC

    AC

    4

    IFS2

    AC

    AV2AC

    AV2AC

    IFS2

    AC

    IFS2

    AC

    AC

    4

    AV2AC

    AV2AC

    W1

    ALTE

    RNATE

    NO. 1 BO

    UNDARY

    PART OF

    ALTERNATE NO. 1

    PART OF

    ALTERNATE NO. 1

    W1

    W

    1

    W1

    W

    1

    AV1

    AV1

    2

    C

    1 A

    C

    C1

    IF

    AC

    AV1

    AV1

    AV1

    S

    J

    J

    J

    J

    J

    J

    J

    JJ

    JJ

    J

    J

    J

    J J J J J

    JJ

    J

    J

    J J

    JJ

    J

    J J J

    JJ

    J

    2

    J J J J J

    J J J J J

    J

    AV2

    AV3

    2

    2

    AV2

    AV3

    AV3AV2

    AV2

    AV3

    AV2

    AV3

    AV2

    AV3

    AV2

    AV3

    E

    B

    E

    B

    E

    B

    E

    E B

    B

    AV2

    AV3

    GENERAL NOTES

    BOND ALL NON�CURRENT CARRYING METALLIC CABLE TRAY,

    RACEWAY, EQUIPMENT, AND MATERIALS TO THE NEAREST TGB OR

    TMGB

    LOW VOLTAGE CONTRACTOR SHALL PROVIDE ALL

    TELECOMMUNICATIONS INFRASTRUCTURE, SUPPORTS, HORIZONTAL

    CABLING, TERMINATION, AND FACEPLATES AS SPECIFIED

    ELECTRICAL CONTRACTOR SHALL PROVIDE ROUGH�IN, CONDUIT AND

    BOXES, FOR ALL AV AND VTC SYSTEMS; AV EQUIPMENT AND

    CABLING SHALL BE PROVIDED BY OTHERS

    ELECTRICAL CONTRACTOR SHALL PROVIDE TELECOM GROUNDING

    SYSTEM IN NEW AV ROOM FOR AV RACKS

    ELECTRICAL CONTRACTOR SHALL COORDINATE WITH

    ARCHITECTURAL ELEVATIONS AND OTHERS PROVIDING

    AUDIOVISUAL OR SIMULATOR EQUIPMENT TO FINALIZE ALL

    EQUIPMENT LOCATIONS, DEVICE LOCATIONS, AND CONDUIT

    ROUTING REQUIREMENTS PRIOR TO ELECTRICAL ROUGH�IN

    UNLESS OTHERWISE NOTED, RACEWAY FROM DEVICE BOXES SHALL

    CONSIST OF 1�INCH CONDUIT TO ACCESSIBLE CEILING SPACE

    PROVIDE BLANK FACEPLATES AND PULL STRINGS AT ALL EMPTY

    CONDUITS

    PROVIDE ALL WORK SHOWN AS PART OF ALTERNATE NO. 2, EXCEPT

    WHERE WORK IS NOTED AS PART OF ALTERNATE NO. 1

    A

    B

    C

    D

    E

    F

    G

    H

    SOME KEY NOTES BELOW MAY NOT APPEAR ON THIS SHEET

    SIMULATION/AUDIO VISUAL EQUIPMENT RACK PROVIDED BY OTHERS1

    KEY NOTES

    Drawn:

    Checked:

    Revised:

    Issued:

    Project No. 09.028a

    14

    20

    Au

    stin

    Blu

    ffs P

    ark

    way

    JMW

    UC

    CS

    Un

    ive

    rsity H

    all

    Rem

    odel

    Sim

    ula

    tion L

    ab

    17 November 2011

    Co

    lora

    do

    Sp

    rin

    gs, C

    O 8

    0918

    JRM

    S:\

    Clie

    nts

    \LK

    A\1

    0�0

    01

    UC

    CS

    �Un

    ive

    rsityH

    all\

    De

    sig

    n\D

    raw

    ing

    s\M

    aste

    rs\1

    0�0

    01 T

    2.1

    MA

    IN L

    EV

    EL T

    EC

    HN

    OLO

    GY

    PLA

    N.d

    wg

    mittjr

    No

    v.1

    7.2

    011

    3:0

    0 p

    m

    Univ

    ers

    ity o

    f C

    olo

    rad

    o C

    olo

    rado S

    prings

    T2.1

    MAIN LEVEL

    TECHNOLOGY

    PLAN

    1

    T2.1

    MAIN LEVEL TECHNOLOGY PLAN

    0 4'

    1/4" = 1'�0"

    2'4'

    N

    DRAWING NOTES

    TERMINATE HORIZONTAL CABLES IN EXISTING RACK. PROVIDE

    PATCH PANELS AND CABLE MANAGERS PER THE SPECIFICATIONS.

    COORDINATE WITH THE OWNER THE LOCATIONS TO MOUNT THE

    NEW EQUIPMENT IN THE EXISTING RACKS PRIOR TO INSTALLING THE

    CABLES AND PATCH PANELS

    PROVIDE TELECOMMUNICATIONS GROUNDING BUSBAR (TGB)

    MOUNTED ON WALL IN ROOM NEAR CABINETS AND 18�INCHES AFF.

    INSTALL PER THE SPECIFICATIONS

    ELEVATION VARIES; COORDINATE ELEVATION OF OUTLET WITH

    ARCHITECTURAL CASEWORK

    1

    2

    3

  • GENERAL NOTES

    DRAWING ELEMENTS SHOWN IN GRAY ARE EXISTING OR ARE TO BE

    PROVIDED BY OTHERS. WHERE SUCH ELEMENTS AFFECT THE

    CONTRACTORS WORK, COORDINATE DEPENDENCIES WITH THE

    OTHER TRADES AND/OR THE OWNER IN A TIMELY MANNER BEFORE

    SUCH DEPENDENCIES ARISE IN THE FIELD

    A

    WALL STRUCTURE

    CEILING LEVEL

    12" MINIMUM

    BEND RADIUS

    INSULATED THROAT

    BUSHING

    STATION CABLES ROUTED

    THROUGH J HOOK/STRAP

    PATHWAY TO TELECOM ROOM

    "J HOOK/STRAP" TYPE

    SUPPORT MAY BE HUNG

    FROM CEILING AND/OR

    WALL MOUNTED. SEE

    SPECIFICATIONS

    APPROX. 12" TO FIRST

    J HOOK/STRAP IN SERIES

    SPACE CONSECUTIVE

    J HOOKS/STRAPS PER

    SPECIFICATIONS

    1" CONDUIT

    (MINIMUM)

    4 11/16" x 4 11/16"

    OUTLET BOX

    MUDRING

    EXTEND CONDUIT THROUGH EXPOSED

    CEILING(S). J HOOK PATHWAYS ARE

    UNACCEPTABLE IN EXPOSED CEILINGS

    4" MINIMUM CLEARANCE

    BETWEEN BOX AND

    CEILING

    CONDUIT TO

    CABLE TRAY

    (1" MIN)

    THREADED ROD

    CEILING

    GRID

    4 11/16" x 4 11/16"

    OUTLET BOX

    SURFACE

    MOUNT

    HOUSING

    MINIMUM BEND RADIUS =

    6 x INTERNAL DIAMETER

    INSULATED THROAT BUSHING

    STATION CABLES EXIT CONDUIT

    DIRECTLY INTO J HOOK PATHWAY

    TO CEILING

    SUPPORT

    PATCH CORDTO

    DEVICE

    NOTES:

    1. CEILING HEIGHTS MAY VARY. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING HEIGHTS

    2. STEEL STUDS LOCATED WITHIN INTERSTITIAL WALL SPACE. CENTER STEEL STUDS ON DISPLAY LOCATION. STEEL

    STUDS SHALL BE IN ADDITION TO OTHER WALL STRUCTURES AND/OR CONSTRUCTION METHODS

    3. MOUNTING HEIGHT OF DISPLAYS MAY VARY. REFER TO PLAN DRAWINGS FOR MOUNTING HEIGHTS

    4. DEVICE BOX AND CONDUIT LOCATIONS MAY VARY DUE TO FIELD CONDITIONS

    DRAWING NOTES:

    1. CENTER LINE IS DENOTED FOR DEVICE BOXES AND NOT VIDEO DISPLAY MOUNT. CONTRACTOR SHALL LOCATE

    MOUNT AS REQUIRED TO PROVIDE BOTTOM OF SCREEN HEIGHT

    SUBSCRIPT

    NOTES

    FINISHED FLOOR

    FINISHED CEILING

    WALL BOX DETAIL

    TOP/BOTTOM

    E

    FCL

    CL

    VARIES

    D

    A

    C

    VARIES

    FLAT PANEL

    DISPLAY

    AC AC

    DUPLEX AC

    POWER BOTTOM

    EC EC

    DATA TOP

    TC TCWALL STUDS

    (REF: ARCHITECTURAL)

    (2) 1 1/ 4" CONDUITS (AV)

    (1) 1" CONDUIT (TC)EC EC

    FLAT PANEL

    DISPLAY WALL

    MOUNT

    FLAT PANEL DISPLAY WALL BOX

    (REF: WALL BOX DETAIL)

    AC AC

    EC EC

    POWER

    (2) 1" CONDUITS

    EC EC

    4 11/16" x 4 11/16"

    DEVICE BOX WITH

    2 GANG MUD RING

    EC EC

    (2) 1" CONDUITS

    EC EC

    4 11/16" x 4 11/16"

    DEVICE BOX WITH

    1 GANG MUD RING

    FLUSH MOUNTED

    INTO WALL AT

    SWITCH HEIGHT

    EC EC

    B

    REFER TO ELECTRICAL

    PLANS AND

    SPECIFICATIONS FOR

    POWER CONDUIT

    REQUIREMENTS (MIN. 3/4")

    EC EC

    HEIGHT 'A'

    60"

    HEIGHT 'B'

    18"

    HEIGHT 'C'

    VARIES

    HEIGHT 'D'

    VARIES

    HEIGHT 'E'

    14 1/2"

    HEIGHT 'F'

    15 1/2"

    AV/IT

    TERMINATIONS

    AC AC

    AV3

    AV2

    TYPICAL PATHWAY/FIRESTOP

    DEVICE MOUNTING PLATE

    FACING VIEW SIDE VIEW

    CABLE TRAY CABLE

    TRAY

    RADIUS

    DROP

    GUIDE

    RADIUS

    DROP

    GUIDE

    WALL STRUCTURE

    CABLE PATHWAY FIRESTOPPING

    DEVICE(S). PROVIDE SUFFICIENT

    QUANTITY OF PATHWAY

    FIRESTOPPING DEVICES SUCH THAT

    COMBINED USABLE CROSS

    SECTIONAL AREA MATCHES OR

    EXCEEDS THE CROSS SECTIONAL

    AREA OF THE CABLE TRAY TO BE

    SERVED

    J HOOK TYPE SUPPORT

    MAY BE HUNG FROM

    CEILING AND/OR WALL

    MOUNTED. SEE

    SPECIFICATIONSTO

    TELECOM

    ROOM

    TO OUTLET

    BOXSPACE CONSECUTIVE

    J HOOKS PER

    SPECIFICATIONS

    CABLE SUPPORT/STRAP

    J HOOK PATHWAY

    Drawn:

    Checked:

    Revised:

    Issued:

    Project No. 09.028a

    14

    20

    Au

    stin

    Blu

    ffs P

    ark

    way

    JMW

    UC

    CS

    Un

    ive

    rsity H

    all

    Rem

    odel

    Sim

    ula

    tion L

    ab

    17 November 2011

    Co

    lora

    do

    Sp

    rin

    gs, C

    O 8

    0918

    JRM

    S:\

    Clie

    nts

    \LK

    A\1

    0 0

    01

    UC

    CS

    Un

    ive

    rsityH

    all\

    De

    sig

    n\D

    raw

    ing

    s\M

    aste

    rs\1

    0 0

    01 T

    5.1

    TE

    CH

    NO

    LO

    GY

    DE

    TA

    ILS

    .dw

    g

    mittjr

    No

    v.1

    6.2

    011

    9:2

    1 a

    m

    Univ

    ers

    ity o

    f C

    olo

    rad

    o C

    olo

    rado S

    prings

    T5.1

    TECHNOLOGY

    DETAILS

    SCALE: NONE

    J HOOK PATHWAY AND CABLE SUPPORT / STRAP5

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    TECHNOLOGY VIDEO DISPLAY WALL MOUNT DETAIL3

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    NOT USED#

    SCALE: NONE

    TYPICAL PATHWAY FIRESTOPPING DEVICE FOR CABLE TRAY JUNCTION4

    SCALE: NONE

    TYPICAL TELECOM RACEWAY AND OUTLET WITH J HOOK PATHWAY1

    SCALE: NONE

    ABOVE CEILING OUTLET/RACEWAY DIRECT TO CABLE TRAY OR J HOOK PATHWAY2

    10"

    TS1.1TS2.1TS2.2A2.1A3.1A4.1A8.1A8.2A9.110-001 T2.1 MAIN LEVEL TECHNOLOGY PLAN.pdf10-001 T2.1 MAIN LEVEL TECHNOLOGY PLAN.dwgLayout1

    10-001 T0.2 TECHNOLOGY SCHEDULES-LEGENDS SHEET.pdf10-001 T0.2 TECHNOLOGY SCHEDULES-LEGENDS SHEET.dwgLayout1

    10-001 T0.1 TECHNOLOGY TITLE SHEET.pdf10-001 T0.1 TECHNOLOGY TITLE SHEET.dwgLayout1

    10-001 T5.1 TECHNOLOGY DETAILS.pdf10-001 T5.1 TECHNOLOGY DETAILS.dwgLayout1