UNIVERSIDAD NACIONAL DE INGENIERÍA FACULTAD DE INGENIERIA GEOLOGICA, MINERA Y METALURGICA OPERACIONES MINERAS EN MINERA SAN SIMON INFORME DE COMPETENCIA PROFESIONAL PARA OPTAR EL TITULO PROFESIONAL DE: INGENIERO DE MINAS PRESENTADO POR: EFRAIN JACINTO PATIÑO QUISPE LIMA-PERÚ 2008

Upload: vuhanh

Post on 24-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

UUNNIIVVEERRSSIIDDAADD NNAACCIIOONNAALL DDEE IINNGGEENNIIEERRÍÍAA

FFAACCUULLTTAADD DDEE IINNGGEENNIIEERRIIAA GGEEOOLLOOGGIICCAA,, MMIINNEERRAA

YY MMEETTAALLUURRGGIICCAA

OPERACIONES MINERAS EN MINERA SAN SIMON

IINNFFOORRMMEE DDEE CCOOMMPPEETTEENNCCIIAA PPRROOFFEESSIIOONNAALL

PPAARRAA OOPPTTAARR EELL TTIITTUULLOO PPRROOFFEESSIIOONNAALL DDEE::

IINNGGEENNIIEERROO DDEE MMIINNAASS

PPRREESSEENNTTAADDOO PPOORR::

EEFFRRAAIINN JJAACCIINNTTOO PPAATTIIÑÑOO QQUUIISSPPEE

LLIIMMAA--PPEERRÚÚ

22000088

2

Tabla de contenido

RESUMEN EJECUTIVO 6

CAPITULO I 7

1.0 Introducción 7

CAPITULO II 8

2.0 Generalidades 8

2.1 Ubicación 8

2.2 Accesibilidad 8

2.3 Altitud 9

2.4 Recursos Económicos 9

2.5 Flora y fauna 10

CAPITULO III 11

3.0 Geología 11

3.1 Geología Local 11

3.1.1 Formación Chicama (Js - Chic): 11

3.1.2 Formación Chimú (Ki - Chim.): 11

3.1.3 Formación Santa (Ki - Sa): 12

3.1.4 Formación Carhuaz (Ki - Ca): 12

3.1.5 Formación Farrat (Ki-fa): 13

3.2 Geología Estructural 14

3.2.1 Falla Alumbre: 15

3.2.2 Falla Yamobamba: 15

3.2.3 Falla Suro 15

3.3 Geología de la zona Suro Sur 16

3.4 Geología Económica 16

3

3.4.1 Brechas Hidrotermales: 17

3.4.2 Brechas Tectónicas: 17

3.5 Mineralogía 18

3.6 Comentarios 18

CAPITULO IV 20

4.0 Perforación 20

4.1 Equipo de perforación 20

4.2 Especificaciones técnicas de la DM45E 21

4.3 Parámetros de perforación 21

4.3.1 Diámetro 21

4.3.2 Longitud de taladro 21

4.3.3 Velocidad de perforación 22

4.3.4 Diseño de malla de perforación 22

4.3.5 Posibles fallas de perforación 23

4.4 Malla de perforación 23

4.4.1 Malla de perforación equilátera 23

4.4.2 Malla de perforación cuadrada 23

4.5 Descripción del Proceso 24

CAPITULO V 26

5.0 Voladura 26

5.1 Explosivos 27

5.2 Explosivos usados en Minera San Simón 28

5.2.1 Booster de Pentolita 28

5.2.2 Detonador no eléctrico de retardo (Exel Nº 24) 29

5.2.3 ANFO (Examon) 30

4

5.2.4 Emulsión (Emulsión Oxidante Inerte Slurrex-MA) 31

5.2.5 Cordón detonante 31

5.2.6 Mecha de seguridad 33

5.2.7 Retardos de superficie para cordón detonante 34

5.2.8 Fulminante Nº 8 36

5.3 Proceso de fracturamiento 37

5.3.1 Descripción del proceso 38

5.4 Diagrama de flujo de la iniciación y detonación 39

CAPITULO VI 40

6.0 Carguio 40

6.1 Descripción del proceso 40

6.2 Condiciones operativas de las palas RH 90-C y excavadoras 345C 40

6.2.1 Especificaciones Pala Hidráulica RH 90-C 42

6.2.2 Especificaciones Excavadora 345C 43

6.3 Diagrama de flujo de Carguio 45

CAPITULO VII 46

7.0 Acarreo 46

7.1 Descripción del proceso 46

7.1.1 Especificaciones Camiones 777F 47

7.1.2 Condiciones operativas para el acarreo 49

7.1.3 Peralte de las curvas 50

7.2 Diagrama de flujo de acarreo 50

CAPITULO VIII 52

8.0 Servicios Auxiliares Mina 52

8.1 Tractor de ruedas 824H 52

5

8.1.1 Especificaciones tractor de ruedas 824H 53

8.2 Tractor de orugas D10T 53

8.2.1 Especificaciones tractor de orugas D10T 53

8.3 Cargador de ruedas 966G 53

8.3.1 Especificaciones cargador de ruedas 966G 54

8.4 Motoniveladora 16H y motoniveladora 160H 54

8.4.1 Especificaciones de motoniveladora 16H 55

8.4.2 Especificaciones de motoniveladora 160H 55

CAPITULO IX 56

9.0 Conclusiones 56

CAPITULO X 57

10.0 Recomendaciones 57

CAPITULO XI 58

11.0 Referencia bibliográfica 58

CAPITULO XII 59

12.0 Apéndices 59

6

RESUMEN EJECUTIVO

Minera San Simón es una mina a tajo abierto dedicado a la extracción de oro,

ubicado en el Norte del Perú.

En este informe se hace la descripción, el uso adecuado de todos los equipos

en todo el proceso de minado, además las descripción del proceso operativo.

Dentro de la descripción del proceso se observa el buen uso de equipos de

gran dimensión como son la perforadora DM45E, los camiones 777F y las

palas O&K.

Donde después de analizar los datos se llega a la conclusión que el empleo de

los equipos de gran dimensión, dan como consecuencia productividades altas y

costos de operación bajos que nos permite aumentar la seguridad, ya que el

número de equipos disminuye en la operación minera.

7

CAPITULO I

1.0 Introducción

En el presente informe se describe el proceso de la operación minera (los

trabajos de perforación, voladura, carguio, transporte y descarga de mineral),

se describe los procesos productivos, adicionando información acerca de la

teoría de los puntos que se esta describiendo. Luego se adicionara información

técnica de los productos y equipos que se utiliza en operación minera.

Cabe mencionar que los datos que se menciona en este informe son el

resultado de los datos recolectados en el trabajo diario, que vienen a ser el

estándar de la mina, estos datos se puede tomar como referencia para el

estudio y comparación con otras operaciones mineras de igual magnitud en la

explotación superficial minera.

8

CAPITULO II

2.0 Generalidades

2.1 Ubicación

La Compañía Minera San Simón se encuentra ubicado en el caserío de Tres

Ríos, distrito de Cachicadán, provincia de Santiago de Chuco, a 160 Km. al

Este de ciudad de Trujillo y a 32 Km. al Sur de la ciudad de Huamachuco.

2.2 Accesibilidad

El acceso desde la Ciudad de Lima hasta la Mina se realiza tanto por vía

terrestre como vía aérea. Lima – Trujillo 560 Km.

Trujillo – Tres Ríos 160 Km.

Por vía terrestre el viaje desde Lima se realiza se realiza en bus por la

autopista Panamericana Norte hasta Trujillo. De la ciudad de Trujillo en

camioneta por autopista hasta Otuzco y por carretera afirmada hasta la Mina,

siendo punto de paso Shorey.

Lima – Trujillo 8 horas

Trujillo – Tres Ríos 4 horas

Por vía aérea el viaje desde Lima hasta el aeropuerto de Huanchaco (Trujillo).

De Trujillo a Tres Ríos en camioneta.

Lima – Trujillo 40 minutos

Trujillo – Tres Ríos 4 horas

9

Figura 1.- Plano de ubicación

2.3 Altitud

La compañía se encuentra ubicada a una altitud variable de 3000 a 3500

msnm.

2.4 Recursos Económicos

La zona cuenta con abundantes recursos hídricos cerca al área de operación,

la mano de obra es fácil conseguir en la zona, quienes se dedican

principalmente a la actividad agrícola - ganadera y eventualmente en labores

mineras de yacimientos no- metálicos como la extracción de carbón en forma

artesanal. Para el abastecimiento de víveres y materiales de uso industrial se

tiene cerca la ciudad de Huamachuco.

El relieve del área es moderadamente accidentado predominando superficies

planas cubiertas por vegetación típica de la zona como el ichu y la grama.

El clima esta diferenciado en dos estaciones, de Abril – Noviembre el clima es

seco y de Diciembre – Marzo, se caracteriza por las lluvias constantes.

Variando la temperatura desde 0º C – 20º C.

OC

EA

NO

PA

CIF

ICO

CHILE

ECUADORCOLOMBIA

BRASIL

BO

LIV

IA

OCEANO

PACIFIC

O

ECUADOR

LAMBAYEQUE

PIURA

CAJAMARCA

AM

AZO

NAS

SAN

MAR

TIN

Chachapoyas

Trujillo

Chimbote

Chiclayo

Piura

Cajamarca

TUMBES

Proyecto La Virgen

LA LIBERTAD

Proyecto

La Virgen

10

2.5 Flora y fauna

La vegetación ribereña de los ríos Suro, Paloquián y Tres Cruces es bastante

peculiar, y en donde destacan el “aliso” (Alnus acuminata) y el “quinual”

(Polylepis racemosa). Las laderas y valles en “U”, mayormente están cubiertas

por pastos, en los que predominan los géneros Calamagrostis, Festuca y

Cortadería, combinándose con otras especies de gramíneas. La evaluación de

la flora ha permitido identificar 123 especies y 75 géneros distribuidos en 40

familias, sobresaliendo la familia de Asteráceas y Gramíneas.

En la cuenca del río Suro, se ha observado la presencia de algunas aves, entre

las que sobresale la “china linda” Phalcobaenus megaloptheus, que por lo

general suele presentarse en parejas, así como de algunas especies

granívoras, tales como “paloma” Zenaida auriculata y “tórtola” Metropelia

aymará; y especies asociadas a ambientes acuáticos como el “lic lic” vanelius

resplendes.

11

CAPITULO III

3.0 Geología

3.1 Geología Local

La geología del Proyecto Suro reconocida en el área de estudio se encuentra

expuesta de la siguiente manera:

3.1.1 Formación Chicama (Js - Chic):

Constituida por horizontes de lutita gris negruzca de estratificación delgada de

hasta 2 cm de potencia, intercalada con arenisca de grano fino silicificado y

Rumbo N 36º E y buzamiento 62º NW, aflora en el eje del río alumbre.

3.1.2 Formación Chimú (Ki - Chim.):

Son horizontes de areniscas cuarzosas con potencia de estratos hasta de 0.50

m, grano fino a medio de color gris blanquecino a pardo amarillento, moderado

a fuerte silicificación, localmente friable ante la presencia de fallas.

Esta formación presenta cambios en la estratigrafía local producto de la

variación de profundidad de cuenca y en el yacimiento La Virgen se ha logrado

diferenciar tres unidades estratigráficas locales:

3.1.2.1 Miembro A

Constituida por intercalaciones de estratificación delgada de Lutitas, limonitas,

lutitas carbonosas, carbón y cuarcitas de grano fino, esta secuencia

corresponde a la zona de transición entre la formación Chicama (Jur-Sup) y la

Formación Chimu (K- inf).

12

3.1.2.2 Miembro B

Constituida por cuarcitas de grano medio a grueso en estratificación gruesa

hasta 80 cm de espesor con diferente grado de alteración cuarzo sericita

intersticial y en relleno de fracturas delgadas esta unidad presenta niveles

delgados de arcillas y algunos lentes de carbón, también se observa la

presencia de brechas hidrotermales monomicticas y polimicticas con matriz

soporte, sílice y óxidos, esta es la unidad donde se emplazo la mineralización.

3.1.2.3 Miembro C

Constituida por intercalación de limonitas, lutitas carbonosas, lentes de carbón

y estratos delgados de areniscas y cuarcitas de grano fino a medio que hacia el

contacto inferior con la secuencia de cuarcitas descritas anteriormente

presentan alteración argilica intermedia.

3.1.3 Formación Santa (Ki - Sa):

Consiste en una intercalación de lutitas, calizas margosas y areniscas gris

oscuras que suprayacen e infrayacen en discordancia paralela a la formación

Chimú y Carhuaz.

3.1.4 Formación Carhuaz (Ki - Ca):

En la parte Inferior consiste en una alternancia de areniscas y lutitas; en la

parte superior son bancos de cuarcitas blancas con intercalación de lutitas

abigarradas y areniscas; se observa en las inmediaciones de los ríos

Cuchicorral y Suro y en la parte Oeste del proyecto posiblemente debajo de la

Formación Chimú por efecto de un sobreescurrimiento.

13

3.1.5 Formación Farrat (Ki-fa):

Son cuarcitas y areniscas blancas de grano medio a grueso, se presenta en

forma de escarpas y altas cumbres agudas y largas, se diferencia de la

Formación Chimú por no presentar lentes de carbón. Volcánicos Calipuy (Ti -

vca). Presenta rocas fuertemente alteradas y otras casi inalteradas, son

andesitas y tobas de grano fino intercaladas con aglomerados y

esporádicamente ignimbritas, se observa al sur de la Falla Yamobamba y al

Este del río alumbre.

14

Figura 2.- Columna estratigráfica y mineralización

3.2 Geología Estructural

El control estructural esta enmarcado por lineamientos principales como la

Falla Alumbre al Este, la falla del Río Suro al Norte y al Sur por la prolongación

de la falla Yamobamba, dándole la apariencia de un triángulo que limita el área

mineralizada cuya base sería la falla Yamobamba.

15

Las principales fallas reconocidas en esta zona son:

3.2.1 Falla Alumbre:

Tiene un rumbo N-S y al parecer es de tipo Normal en la cual el bloque del lado

Este ha bajado mientras el bloque del lado Oeste ha subido; esta falla es de

gran longitud que ha sido reconocida por Gitennes y Cambior en una longitud

de 1000 m y con ancho variable de 5m a 15m. Esta falla ha provocado el

fracturamiento y craquelamiento de la roca favoreciendo la mineralización en la

zona de Suro Sur.

3.2.2 Falla Yamobamba:

Tiene un rumbo de N 40º-45º W y es del tipo Rumbo y Rotación (según

Cambior); esta falla se une con la Falla Alumbre al Sur de la Zona Suro Sur,

formando de esta manera una especie de cuña en la cual coincidentemente los

valores de oro disminuyen; todas estas fallas son pre-minerales.

3.2.3 Falla Suro

Tiene un rumbo N 70º-90º E ha levantado la parte Norte de la Zona Suro Sur,

según Gitennes al parecer es pre-mineral pero no se descarta que pudiera

haber una segunda reactivación post-mineral.

Las Fallas Alumbre, Yamobamba y Río Suro forman una triangulación siendo

justamente la zona media una zona de debilidad por la conjunción de estas tres

fallas.

16

3.3 Geología de la zona Suro Sur

La Zona Suro Sur, es un típico yacimiento de Alta sulfuración de Oro, la roca

principal que trajo la mineralización es la brecha oxidada heterolítica, presenta

clastos angulosos a redondeados de composición arenisca cuarzosa, rocas

volcánicas y areniscas cristalizadas, la matriz es muy fina y fuertemente

silicificada.

Se encuentra localizada al Oeste de la Falla Alumbre y se acerca a ésta a

medida que va profundizando; en su parte superior la brecha se comporta

como “dedos” que afloran en superficie y en profundidad se unen formando un

solo cuerpo llegando a tener una dimensión de 100 x 200 metros.

La mineralización también está contenida en la brecha fracturada-craquelada

que en sí es la arenisca cuarzosa la cual se encuentra totalmente

metamorfizada y fracturada semejándose a una brecha monomíctica; este

fracturamiento es típico en las uniones de fallas, el cual está rellenado por

oxido de Fierro.

También presenta una brecha arenisca cuarzosa que está compuesta por

clastos angulares a sub redondeados de arenisca de cuarzo y raramente de

limonitas (>90% de arenisca de cuarzo) con una matriz de óxidos: La matriz

soporta a los clastos (matrix supported), indicando un gran movimiento de la

falla Alumbre; esta brecha se encuentra mayormente en la parte alta del

yacimiento.

3.4 Geología Económica

La mineralización importante del proyecto tiene como roca huésped favorable a

las areniscas cuarzosas de la Formación Chimú además el aporte significativo

17

de valores de oro se encuentra en el paquete de brechas hidrotermales

heterolíticas que presenta las siguientes características:

3.4.1 Brechas Hidrotermales:

Brecha oxidada heterolítica, constituye la roca principal que trajo la

mineralización, tiene un rumbo de N42º E / 32º SE, presenta clastos angulosos

a sub redondeados de composición arenisca cuarzosa, rocas volcánicas y

areniscas friables, la matriz es muy fina y fuertemente silicificada con

diseminación de Oxido de Fe principalmente goetita, limonita y en menor

porcentaje hematita. Se encuentra localizada al Oeste de la Falla Alumbre y se

acerca a ésta a medida que va profundizando.

3.4.2 Brechas Tectónicas:

La mineralización también está contenida en la brecha fracturada- craquelada

que en sí es la arenisca cuarzosa la cual se encuentra muy fracturada

semejándose a una brecha monomíctica; este fracturamiento es típico en las

uniones de fallas, permitiendo una falsa pseudo estratificación, el cual está

rellenado por Oxido de Fe.

También presenta una brecha arenisca cuarzosa que está compuesta por

clastos angulares a sub redondeados de arenisca de cuarzo y raramente de

limonitas (>90% de arenisca de cuarzo) con una matriz de óxidos: La matriz

soporta a los clastos (matrix supported), indicando un gran movimiento de la

Falla Alumbre; esta brecha se encuentra mayormente en la parte alta del

yacimiento.

18

3.5 Mineralogía

La mineralogia se presenta en los afloramientos y brechas de cuarzo areniscas,

en forma de minerales oxidados de limolitas, hematitas, especularita y pirita

(singenética y epigenetica) las que se presentan en fracturas, diseminaciones

y vetillas de cuarzo y dentro de la matriz silícea. Los afloramientos han sufrido

fuertes erosiones debido a los procesos dinámicos de la tectónica del área

presentándose a “flor de tierra” valores altos de oro, los sulfuros son muy raros

en las brechas superficiales y su presencia se los ha determinado por los

relictos de su cristalización.

Al microscopio se ha observado en la zona de óxidos: Hematita, gohetita,

especularita, jamesonita, oro nativo (1-20 micrones), electrum, trazas de rutilo-

leucoxeno. En la zona de enriquecimiento se tiene: Calcosina, covelita. En

sulfuros tenemos: Calcopirita, pirita, esfalerita, marcasita, melnikovita,

tetrahedrita, enargita, anatasa, titanio, rutilo. Los que se presentan en las

fracturas, diseminaciones, dentro de las brechas.

Los ensambles y asociaciones de estos minerales nos indican que se trata de

un yacimiento formado a temperaturas bajas e intermedias y con una buena

cristalización no teniendo problemas en los procesos metalúrgicos, sea en el

mineral oxidado o de sulfuro.

3.6 Comentarios

La unidad minera La virgen es un Yacimiento Epitermal de Alta Sulfuración. Se

encuentra ubicado en la ladera de un gran Simoide, superior en dimensión al

de Alto Chicama, visible mediante fotos satelitales.

19

El recurso mineral La Virgen tiene como roca huésped favorable a la

mineralización a las areniscas cuarzosas de la formación Chimú, con potencia

superior a los 100 m y dentro de ellos se encuentra un paquete mineralizado de

brecha hidrotermal heterolítica fuertemente silicificada que presenta altos

valores de oro asociado a óxidos, principalmente gohetita, limolita, jarosita y en

menor proporción hematita.

Se han realizado estudios de Mapeo Geológico y Taladros en las Zonas de

Alumbre, éstas deben ser verificadas para una mejor interpretación del

proyecto realizando mapeos y muestreos superficiales van a llevar a una mejor

interpretación Geológica del Proyecto La Virgen y así poder reevaluar o

descubrir nuevos targets.

Realizamos los Taladros de exploración con la máquina RCD (Reverse

Circulatory Drill), perteneciente a la compañía AK Drilling S.A.

El control estructural esta enmarcado por lineamientos como la Falla Alumbre

al Este; la falla Río Suro Al Norte y al Sur por la prolongación de la falla

Yamobamba, dándole la apariencia de un triángulo mineralizado, limitando el

tajo Suro Sur.

20

CAPITULO IV

4.0 Perforación

La perforación es la primera operación en el proceso productivo. Su propósito

es el de abrir taladros destinados a alojar al explosivo y su accesorios

iniciadores.

Se basa en principios mecánicos de percusión y rotación, cuyos efectos de

golpe y fricción producen el astillamiento y trituración de la roca en un área

equivalente al diámetro de la broca y hasta una profundidad dada por la

longitud del barreno usado. La eficiencia en perforación consiste en lograr la

penetración en menor costo.

En perforación tienen gran importancia la resistencia al corte o dureza de la

roca (que influye en la facilidad y velocidad de penetración) y la abrasividad.

Esta última influye en el desgaste de la broca y por ende en el diámetro final de

los taladros.

4.1 Equipo de perforación

Las perforadoras usadas son las DM45E es un carro de perforación rotativo de

paso múltiple, montado sobre una oruga, con cabezal hidráulico, diseñada

específicamente para la perforación para voladuras de producción. La DM45

estándar utiliza un motor diesel para hacer funcionar el compresor de aire y el

sistema hidráulico. La operación de la perforadora se realiza utilizando

controladores eléctricos sobre hidráulicos situados de manera ergonómica para

que el operador esté delante del centralizador de perforación durante su

funcionamiento.

21

4.2 Especificaciones técnicas de la DM45E

TABLA I

DM45E (Alta presión)

Potencia 500 Hp

Entrada 45 000 libras

Aire 1200 cfm

Tamaño de tubo 30 pies (9.1 metros)

Profundidad de perforación Hasta 53 metros

Referencia bibliográfica R4

4.3 Parámetros de perforación

4.3.1 Diámetro

El diámetro usado con la perforadora DM45E es de 6 3/4 pulgadas, siendo una

broca con inserto de botones de carburo de tungsteno.

4.3.2 Longitud de taladro

La perforación es perpendicular a la superficie, la longitud del taladro viene a

ser la altura de banco más la sobreperforación.

Es este caso seria

Altura de banco = 6.00 metros

Sobreperforación = 0.50 metros

22

4.3.3 Velocidad de perforación

La velocidad de perforación no solamente depende de la fuerza; también del

barrido o la limpieza de los detritus del taladro con aire comprimido y/o con

agua a presión a través de la misma barra conforme avanza la penetración.

La lubricación también es importante en el sistema de varillaje, ya que cada

maquina tiene su propio sistema, sea con agua, aire o ambos, con

pulverización o nebulización de aceite.

La velocidad para cuarcita es: 5 taladros/hora; para taladros de 6.5 metros

4.3.4 Diseño de malla de perforación

Cuando se analiza el mejor tipo de malla a ser usado se debe tener en

consideración una distribución de energía efectiva del volumen a fragmentar.

Entonces, se debe seleccionar la geometría de iniciación para alcanzar el

mejor uso de energía.

El concepto de fragmentos cilíndricos de rocas, alrededor de cada carga (en

ausencia de una cara libre), es una herramienta útil que debemos tener en

cuenta. Una consideración es la influencia de la roca por cada taladro, limitada

por un cilindro de radio de influencia. La roca fuera de este radio también se ve

afectada, pero en un menor sentido.

En Mina La virgen hemos estado usando la malla triangular equilátera con un

espaciamiento de 6 metros y la malla cuadrada de 5.5 metros en todos los

proyectos disparados ya que esta nos proporciona una mayor distribución de la

energía del explosivo, ya que si se tiene la suficiente energía de tal manera que

ésta se distribuya uniformemente entre cada taladro.

23

4.3.5 Posibles fallas de perforación

En el sistema usado en Minera San Simón la causa mas posible de falla son

los errores de espaciamiento entre taladros, ya que al ser marcados

manualmente las chutas de perforación en el momento de la perforación debe

de tenerse el mayor cuidado respectivo, lo que propicia una fragmentación

gruesa o una zona dura (voladura amarrada)

4.4 Malla de perforación

Según el diseño de malla de perforación, en Mina La Virgen se usa las

siguientes mallas:

4.4.1 Malla de perforación equilátera

Burdén = 3√3 = 5.2 m

Espaciamiento = 6 m

h = altura de banco

Para una densidad de roca de 2,55 TM/m3

Toneladas de roca volada por taladro = B x E x h x D

5.2 x 6 x 6 x 2.55 = 477 TM/taladro

4.4.2 Malla de perforación cuadrada

Burden =5.5

Espaciamiento = 5.5

h = altura de banco = 6

Para una densidad de roca de 2,55 TM/ m3

Toneladas de roca volada por taladro = B x E x h x D

5.5 x 5.5 x 6 x 2.55 = 463 TM/taladro

24

Figura 3.- Perforación con perforadoras DM45E

4.5 Descripción del Proceso

Antes del armado de malla debe colocarse alrededor una berma de seguridad.

Las chutas son colocadas y enumeradas según el diseño establecido en la

malla de perforación, en cada chuta es colocada una cinta, donde esta indicado

su respectivo número y los metros que deben ser perforados en ella

Estas chutas que han sido enumeradas se les denominan puntos de

perforación.

La maquina perforadora se traslada hacia la ubicación de los puntos de

perforación.

La maquina debe ubicarse de tal manera que encuentre estabilidad para

proceder con la perforación.

25

Una vez hecha la perforación la maquina se traslada al próximo punto de

perforación.

El personal de Ore Control recoge la muestra de detritus del taladro la cual es

llenada en una bolsa plástica, la cual al ser etiquetada, es recogida por el

personal de Ore Control, para llevarlo al laboratorio químico para su debido

proceso.

26

CAPITULO V

5.0 Voladura

La voladura es un proceso inserto en el negocio minero y sobre la cual tiene un

gran impacto, tanto en el corto como en el largo plazo.

En el corto plazo lograr un adecuado grado de fragmentación de la roca, de tal

modo que haga mínimo el costo combinado de las operaciones de carguío y

acarreo del material disparado.

En el largo plazo, minimizar el daño al macizo rocoso en su entorno,

protegiendo la integridad de los bancos y la estabilidad de los taludes,

asegurando ángulos de diseño, cuidando las instalaciones e infraestructuras

más próximas, permitiendo una operación sin riesgo.

La minería es una actividad que no controla los precios de venta de sus

productos por lo que para seguir siendo competitiva debe trabajar en bajar los

costos en forma permanente.

La voladura es parte importante del ciclo de minado y como tal se le debe dar

todas las condiciones para tener un adecuado control.

La determinación del explosivo a usar va a depender de las características del

macizo rocoso, el grado de fragmentación requerido dependerá de la

concentración de la energía del explosivo provisto en los taladros perforados y

serán gobernados por la potencia y la densidad del explosivo empleado.

27

Figura 4.- Voladura

5.1 Explosivos

Los materiales explosivos son compuestos o mezclas de sustancias en estado

sólido, liquido o gaseoso, que por medio de reacciones químicas de oxido –

reducción son capaces de transformarse en un tiempo muy breve, del orden de

una fracción de microsegundo, en productos gaseosos y condensados, cuyo

volumen inicial se convierte en una masa gaseosa que llega a alcanzar muy

elevadas temperaturas y en consecuencia altas presiones.

Estos fenómenos son aprovechados para realizar trabajo mecánico aplicado

para el rompimiento de material pétreo.

28

5.2 Explosivos usados en Minera San Simón

5.2.1 Booster de Pentolita

El booster de pentolita corresponde a un moderno explosivo desarrollado a

base de PENT y TNT como materias primas. Algunas de sus principales

características son el desarrollar una alta presión de detonación, lo que le

convierte en un excelente iniciador de cargas poco sensibles.

Es un explosivo sumamente estable. No obstante su sensibilidad a un

detonador Nº 8, presenta gran seguridad con relación al roce como al choque.

Los iniciadores cilíndricos están destinados a servir como cebos para detonar

cargas primarias pocos sensibles, tales como los nitrocarbonatos, emulsiones y

mezclas de ANFO con emulsiones en perforaciones de mediano y gran

diámetro.

Figura 5.- Booster de pentolita

TABLA II

Características Booster de pentolita

Densidad 1.60 – 1.72 gr/cc

29

Velocidad de detonación (VOD) >5500 m/s

Resistencia al agua Indefinida

Iniciador mínimo Detonador Nº 8

Calor desarrollado 1343 Kcal/ Kg

Volumen de gases 932 l/Kg

Potencia en peso 1.4 Equivalente al ANFO

Potencia en volumen 2.9 Equivalente al ANFO

Referencia bibliográfica R6

5.2.2 Detonador no eléctrico de retardo (Exel Nº 24)

El Detonador No Eléctrico de Retardo es un sistema integrado compuesto por

los siguientes elementos:

Tubo de choque flexible que al ser activado por medio de un agente externo,

transmite por su interior una onda explosiva de baja energía hasta llegar al

detonador de retardo. Este tubo es de plástico laminado y contiene en su

superficie interior una capa de material reactivo. La onda explosiva tiene la

capacidad de desplazarse a través de las dobleces y nudos que podrían existir

por alguna razón en el tubo, además tiene la característica que no se

transmitirá hacia el exterior y no afectará al explosivo con el cual puede estar

en contacto. El tubo tiene una resistencia a la tracción de 45 kgf y trasmite una

onda de choque con velocidad promedio de 2000 m/s

Detonador con elemento de retardo y el sello antiestático.

Etiqueta que indica la serie, el período de retardo y el tiempo nominal de

detonación.

Conector que sirve para conectar el tubo de choque a una línea troncal de

cordón detonante en forma perpendicular.

30

Figura 6.- Detonador no eléctrico de retardo

5.2.3 ANFO (Examon)

Son agentes de voladura granulares para terreno seco, con alto rendimiento

energético, seguridad y facilidad en manipuleo.

TABLA III

Densidad, en gr/cm cúbico 0.85

Densidad, en gr/cm cúbico (compactado) 1.00

Velocidad de detonación 2900 – 5000

Poder rompedor o brisance (Macro Hess) en mm 37

Potencia relativa por peso (Anfo=100) 125

Potencia relativa por volumen (Anfo=100) 130

Energía en cal/gr 1140

Presión de detonación en Kbar 50

Categoría de humos 1ra

31

Volumen normal de gases, en l/Kg 920

Vida útil 12 meses

Referencia bibliográfica R6

5.2.4 Emulsión (Emulsión Oxidante Inerte Slurrex-MA)

Es una emulsión oxidante inerte no detonable para efectos de transporte, hasta

ser sensibilizada en el lugar de aplicación para formar un agente de voladura:

como Anfo pesado al mezclarlo con Anfo en determinadas proporciones o

como emulsión normal de alto nivel de energía al añadirle un elemento

sensibilizador.

TABLA IV

Densidad, en gr/cm 1.33

Potencia absoluta por volumen, en J/cm3 3700

Potencia absoluta por volumen (Anfo=100) 120

Resistencia al agua excelente

Vida útil 6 meses

Referencia bibliográfica R6

5.2.5 Cordón detonante

El Cordón Detonante es un accesorio para voladura constituido por un núcleo

granulado fino y compacto de un alto explosivo llamado pentrita y además se

encuentra recubierto con papel de características especiales, fibras sintéticas,

hilos de algodón y tiene una cobertura exterior cuya constitución cambiará

según sea simple o reforzado.

Se activa generalmente por medio de un fulminante y el núcleo de explosivo

detonará a una velocidad de 7 000 m/s aproximadamente, creando una onda

32

de choque que permitirá activar una carga sensible al referido impulso. Es

manipulado con gran facilidad y seguridad.

Este accesorio para voladura tiene múltiples aplicaciones en minería,

explotación de canteras, movimientos de tierra y diferentes trabajos de

ingeniería civil. Funciona adecuadamente en todo tipo de voladuras,

independiente del diámetro y longitud del taladro. Se le usa

complementariamente con los booster, retardos de superficie y detonadores no

eléctricos.

Figura 7.- Cordón detonante

TABLA V

Unidad 5G

Contenido PENT g/cm 5.20

Diámetro exterior mm 3.40

Resistencia a la tensión kg 75

33

Velocidad de detonación m/s 7000

Impermeabilidad % 100

Sensibilidad al fulminante Nº 8 si

Color PVC (forro de plastico) rojo

Referencia bibliográfica R6

5.2.6 Mecha de seguridad

La Mecha de Seguridad es uno de los componentes del sistema tradicional de

voladura.

Su estructura está compuesta por capas de diferentes características; las

cuales protegen al núcleo de pólvora y tiene un recubrimiento final de material

plástico que asegura una excelente impermeabilidad y buena resistencia a la

abrasión.

La Mecha de Seguridad es manufacturada usando un proceso por vía húmeda,

reduciendo significativamente los peligros del manipuleo en seco de la pólvora

y como consecuencia de la misma se tiene un accesorio final con

características de calidad superiores a los productos fabricados por vía seca.

Se usa complementariamente con el fulminante simple y al momento de

quemarse la potencia de chispa tiene la capacidad suficiente para activarlo sin

restricciones de ninguna naturaleza, siempre que se cumplan con las

recomendaciones de la forma correcta de fijar el fulminante simple a la mecha

de seguridad. El fulminante simple activado iniciará al cebo conformado por un

explosivo sensible y permisible al referido impulso y el mismo activará a la

columna explosiva correspondiente.

34

Figura 8.- Mecha de seguridad

TABLA VI

Características Unidades Especificaciones

Núcleo de pólvora g/cm 5.50 +- 0.50

Tiempo de combustión a nivel del mar s/m 160+-5

Diámetro externo mm 5.15 +-0.10

Recubrimiento externo plástico

Impermeabilidad buena

Resistencia a la abrasión buena

Referencia bibliográfica R6

5.2.7 Retardos de superficie para cordón detonante

Esta conformado por un tubo de choque flexible de aproximadamente 60 cm en

cuyos entremos se encuentran insertados detonadores especialmente

diseñados y con idéntico tiempo de retardo, cada uno de los cuales, se

encuentran alojados en candados plásticos que permiten fijar en forma sencilla

35

y rápida al cordón detonante de las líneas troncales de un circuito de disparo.

En el lugar donde se inserte, permitirá retardar la detonación de acuerdo a la

secuencia programada.

Este retardo es del tipo bidireccional y según una escala de fabricación

proporcionará el tiempo necesario para obtener la adecuada formación de

caras libres de un disparo.

La correcta selección de los tiempos de retardo de una voladura, tiene múltiples

ventajas técnicas y económicas, entre ellas podemos mencionar las siguientes:

Mejora la fragmentación y el desplazamiento del material volado.

Reduce las vibraciones.

Minimiza la proyección de rocas sin control.

Se puede acomodar el material volado de acuerdo a nuestras necesidades.

Se controla mejor la rotura hacia atrás de la última fila.

Figura 9.- Retardo de superficie

36

5.2.8 Fulminante Nº 8

El Fulminante Simple Nº 8 es uno de los componentes del sistema tradicional

de voladura.

Está conformado por un casquillo cilíndrico de aluminio cerrado en uno de sus

extremos, en cuyo interior lleva una carga primaria de un explosivo sensible y

otra carga secundaria de alto poder explosivo. Su diseño permite que la carga

primaria sea activada por la chispa de la mecha de seguridad, la cual inicia la

carga secundaria y ésta al explosivo. En su desarrollo se ha tenido cuidado

especial en la compatibilidad del funcionamiento que debe existir con la mecha

de seguridad.

El Fulminante Simple Nº 8 tiene todas las garantías para un buen

funcionamiento, siempre y cuando, se cumplan con las recomendaciones de un

adecuado fijado a la mecha de seguridad, controlando principalmente la

impermeabilidad en el lugar donde se encuentra el referido fijado.

Se usa complementariamente con el fulminante simple y al momento de

quemarse la potencia de chispa tiene la capacidad suficiente para activarlo sin

restricciones de ninguna naturaleza, siempre que se cumplan con las

recomendaciones de la forma correcta de fijar el fulminante simple a la mecha

de seguridad. El fulminante simple activado iniciará al cebo conformado por un

explosivo sensible y permisible al referido impulso y el mismo activará a la

columna explosiva correspondiente.

37

Figura 10.- Fulminante N° 8

TABLA VII

Característica Unidades Especificaciones

Longitud mm 45.00 +- 0.10

Diámetro externo mm 6.30 +- 0.10

Diámetro interno mm 5.86 +- 0.10

Volumen de Trauzl Cm3 23.36

Resistencia al impacto 2 kg en un metro Si cumple

Carga explosiva total mg 900

Sensibilidad a la chispa de la

mecha de seguridad

Buena

Referencia bibliográfica R6

5.3 Proceso de fracturamiento

La fragmentación de rocas por voladura comprende a la acción de un explosivo

y a la consecuente respuesta de la masa de roca circundante, involucrando

38

factores de tiempo, energía termodinámica, ondas de presión, mecánica de

rocas en un rápido y complejo mecanismo de interacción.

5.3.1 Descripción del proceso

Inmediatamente después de la detonación, el efecto de la onda y de los gases

en rápida expansión sobre la pared del taladro, se transfiere a la roca

circundante, difundiéndose a través de ella en forma de ondas o fuerzas de

compresión, ya que las rocas son muy resistentes a la compresión. Al llegar

estas ondas a la cara libre en el frente de voladura causan esfuerzos de

tensión en la masa de roca, entre la cara libre y el taladro. Si la resistencia a la

tensión de la roca es excedida, esta se rompe en el área de la línea de menos

resistencia (burden), en este caso las ondas reflejadas son ondas de tensión

que retornan al punto de origen creando fisuras y grietas de tensión a partir de

puntos planos de debilidad naturales existentes, agrietándola profundamente.

Casi simultáneamente, el volumen de gases liberados y en expansión penetra

en las grietas iniciales ampliándolas por acción de cuña y creando otras

nuevas, con lo que se produce la acción efectiva de la roca.

39

5.4 Diagrama de flujo de la iniciación y detonación

Inicio

Retiro de personal

y maquinaria fuera

del área de peligro

Verificación de la

zona de

influencia del

radio de voladura

Confirmación si área

esta liberada

SI

No

Mensaje de

silencio Radial

Amarre de la

mecha de

seguridad

Orden del

chispeo

Retiro de

personal de

EXSA de la zona

de voladura

Quemado de la

mecha de

seguridad

Observacion de la

detonacion de la

voladura

Si

Espera de 5

minutos

Orden de entrada

y verificación de

disparo

Verificacion del

disparo

Si

Fin de Disparo

Espera de 30

minutos

Amarre de los

taladros no

detonados

No

No

Figura 11.- Diagrama de flujo de iniciación y detonación

40

CAPITULO VI

6.0 Carguio

Los equipos que utiliza Minera San Simón son las palas RH 90-C (O&K Terex)

y las excavadoras 345C (Caterpillar), las cuales son utilizados en el carguio de

mineral y desmonte.

6.1 Descripción del proceso

El carguio de material se realiza en coordinación del personal de Ore Control,

ya que ellos nos definen el tipo de material (mineral o desmonte), lo cual se

comunica a los operadores de los camiones. El frente debe de presentar

condiciones adecuadas para el carguio por lo cual se apoya con un tractor de

ruedas la cual facilita el adecuado mantenimiento del frente de carguio. Al

tener la pala con el material el material en el cucharón comunica al camión, el

cual se ubica en posición de llenado el cual retrocede y se cuadra hasta que el

camión llena su carga. En ese momento el camión se retira y procede a cargar

el camión que se encuentra en el otro carril.

6.2 Condiciones operativas de las palas RH 90-C y

excavadoras 345C

Para realizar el carguio, la pala RH 90-C y el camión deben de estar en un

mismo plano de trabajo, manteniendo un ancho operativo para los camiones y

pala de 24 metros lo que permite trabajar a dos carriles. Siendo el ángulo de

giro no mayor de 90 grados para evitar demoras en el ciclo de carguio además

41

el rápido posicionamiento de los camiones reduce el tiempo muerto en los

camiones.

Figura 12.- Especificaciones técnica de pala RH 90C TEREX O&K

El carguio con la excavadora 345 lo realiza previa preparación de plataforma,

ya que el carguio es mas eficiente trabajando a desnivel con los volquetes FM,

el ancho operativo debe de ser 12 metros.

42

6.2.1 Especificaciones Pala Hidráulica RH 90-C

Figura 13.- Pala hidráulica RH 90C

TABLA VIII

Potencia 1018 Hp

Peso 165 ton

Capacidad de cucharón 10 metros cúbicos

Capacidad de tanque de combustible 800 galones

Consumo 30 galones/hora

Rendimiento 1800 ton/hora

Referencia bibliográfica R4

43

6.2.2 Especificaciones Excavadora 345C

Figura 14.- Excavadora hidráulica 345C Caterpillar

TABLA IX

Potencia 321 Hp

Peso 45.3 ton

Capacidad de cucharón 2.7 metros cúbicos

Capacidad de tanque de combustible 190 galones

Consumo 11 galones/hora

Rendimiento 800 ton/hora

Referencia bibliográfica R4

44

Figura 15.- Especificaciones técnica de excavadora hidráulica 345C

45

6.3 Diagrama de flujo de Carguio

Inicio

Marcado de

poligonos de

mineral y

desmonte

Frente de

carguio limpio

Si

Ubicación de

equipo de Carguio

Mantenimiento de

frente de carguio

por equipos

auxiliares

No

Carguio a equipos

de transporte

Frente de

carguio limpio

Mantenimiento de

frente de carguio

por equipos

auxiliares

No

Si

Carguio a equipos

de transporte

Fin

Figura 16.- Diagrama de flujo de carguio

46

CAPITULO VII

7.0 Acarreo

Los equipos utilizados en el transporte son los camiones 777F (Caterpillar) y

los camiones FM12 Volvo, los cuales son los equipos encargados del acarreo

del mineral y desmonte.

7.1 Descripción del proceso

El acarreo de mineral o desmonte se realiza en función al material que se va a

acarrear, lo cual es coordinado al inicio de guardia. Los camiones comienza a

cargar y transportan el material hacia el destino coordinado, llegado al punto de

destino el camión procede a descargar y vuelve a la zona de carguio.

Figura 17.- Pala O&K cargando camiones 777F

47

Figura 18.- Camión 777F

7.1.1 Especificaciones Camiones 777F

TABLA X

Potencia 938 Hp

Peso 64.296 ton

Capacidad de tolva 90.6 TM (100 toneladas cortas)

Capacidad de tanque de combustible 300 galones

Consumo 16 galones/hora

48

Figura 19.- Especificaciones Técnicas del 777F

Especificaciones Camiones Volvo FM12

TABLA XI

Potencia 400 Hp

Peso 15 ton

49

Capacidad de tolva 23.25 ton (15 metros cubicos)

Capacidad de tanque de combustible 73 galones

Consumo 2.6 galones/hora

Referencia bibliográfica R4

Figura 20.- Volquetes FM 12 Volvo

7.1.2 Condiciones operativas para el acarreo

Para realizar un transporte eficiente, las vías deben de estar bien diseñadas y

tener un mantenimiento constante.

El diseño adecuado debe de considerarse una gradiente máxima de 10% para

lograr una velocidad máxima de descenso que pueda utilizarse con seguridad,

sin exceder la capacidad de enfriamiento de los frenos, y al subir tener

velocidades muy bajas que no permiten un mayor rendimiento de los camiones.

50

El tiempo de espera, las demoras y la experiencia del operador en la zona de

carguio son factores que afectan el tiempo de ciclo. Si se reduce a mínimo el

tiempo necesario para cargar el camión se puede mejorar la productividad.

7.1.3 Peralte de las curvas

Al tener una curva es posible que se generen en los neumáticos altas fuerzas

laterales que pueden causar las telas y desgaste elevado. Dando peralte a la

curva contribuye a eliminar estas fuerzas. La cantidad de peralte depende del

radio de la curva y de la velocidad a que se toma.

TABLA XII

Radio de giro

(m)

Velocidad

16 km/h

Velocidad

24 km/h

Velocidad

32 km/h

Velocidad

40 km/h

Velocidad

48 km/h

Velocidad

56 km/h

Velocidad

64 km/h

Velocidad

72 km/h

15.2 13% 30% - - - - - -

30.5 7% 15% 27% - - - - -

45.7 4% 10% 18% 28% - - - -

61.1 3% 8% 13% 21% 30% - - -

91.5 2% 5% 9% 14% 20% 27% - -

152.4 1% 3% 5% 8% 12% 16% 21% 27%

213.4 1% 2% 4% 6% 9% 12% 15% 19%

304.9 1% 2% 3% 4% 6% 8% 11% 14%

Referencia bibliográfica R3

51

7.2 Diagrama de flujo de acarreo

Inicio

Limpieza de zona

de carguio

Carguio a equipos

de transporte

Material que se

transportaDesmonteMineral

Rumbo hacia el

Pad

Rumbo hacia el

Botadero

Llegada a zona de

descarga

Entrada a zona de

descarga

Descarga en forma

perpendicular a la berma

de seguridad

Si

Levanta la tolva

Retorno al frente

de carguio

Se vuelve a

cuadrar

adecuadamente

No

Figura 21.- Diagrama de flujo de acarreo

52

CAPITULO VIII

8.0 Servicios Auxiliares Mina

Dentro de las operaciones mineras que se realiza en mina tenemos los equipos

auxiliares que realizan los servicios de apoyo en las principales actividades de

la mina.

8.1 Tractor de ruedas 824H

Es el equipo encargado del mantenimiento en la zona de carguio, el cual

cumple la función limpiar los carriles donde se va ubicar los camiones.

Figura 22.- Tractor de ruedas 824H

53

8.1.1 Especificaciones tractor de ruedas 824H

TABLA XIII

Potencia 315 Hp

Peso 26.620 ton

Capacidad de tanque de combustible 166.5 galones

Consumo 4.7 galones/hora

Referencia bibliográfica R3

8.2 Tractor de orugas D10T

Es el equipo encargado del realizar el desarrollo de la mina (construcción de

accesos, preparación de botaderos, desbroce)

8.2.1 Especificaciones tractor de orugas D10T

TABLA XIV

Potencia 570 Hp

Peso 65.400 ton

Capacidad de tanque de combustible 293 galones

Consumo 19 galones/hora

Referencia bibliográfica R3

8.3 Cargador de ruedas 966G

Equipo auxiliar de apoyo en los botaderos y zona de descarga de mineral,

equipo muy versátil ya que también es usado en la construcción de bermas de

seguridad, mantenimiento de vías.

54

Figura 23.- Especificaciones técnicas de cargador 966F

8.3.1 Especificaciones cargador de ruedas 966G

TABLA XV

Potencia 246 Hp

Peso 22.870 ton

Capacidad de tanque de combustible 100.4 galones

Consumo 4 galones/hora

Capacidad de cucharón 4.25 metros cúbicos

Referencia bibliográfica R3

55

8.4 Motoniveladora 16H y motoniveladora 160H

Equipos destinados al mantenimiento de vías, son los equipos que se encargan

que las vías se encuentren en buen estado sin encalaminado y libre de material

que pueda dañar las llantas de los camiones.

8.4.1 Especificaciones de motoniveladora 16H

TABLA XVI

Potencia 75 Hp

Peso 24.748 ton

Capacidad de tanque de combustible 130 galones

Consumo 6.5 galones/hora

Referencia bibliográfica R3

8.4.2 Especificaciones de motoniveladora 160H

TABLA XVII

Potencia 200 Hp

Peso 14.416 ton

Capacidad de tanque de combustible 90 galones

Consumo 3.6 galones/hora

Referencia bibliográfica R3

56

CAPITULO IX

9.0 Conclusiones

Minera San Simón es una mina a tajo abierto dedicado a la extracción de oro,

el proceso productivo es realizado por equipos de gran dimensión lo cual les

permite el gran movimiento de tierras, el cual cumple los estándares de una

mina de mediana minería.

Dentro de la descripción del proceso se observa el buen uso de los equipos lo

que permite el cumplimiento mensual de los objetivos trazados.

Se observa que en el uso de equipos de gran dimensión como son los

camiones 777F y las palas O&K se muestra mayor eficiencia y rendimiento con

respecto a los volquetes Volvo y excavadoras 345 Caterpillar.

El mantenimiento de vías es importante, ya que este parámetro es importante

en el buen desempeño de los equipos de transporte

57

CAPITULO X

10.0 Recomendaciones

Dentro del proceso productivo para un tajo de mediana minería como es Minera

San Simón es adecuado el cambio de equipos de gran volumen como son los

camiones 777F y las palas O&K.

El proceso productivo es el adecuado ya que cumple con los requerimientos

que se necesita en el pad de lixiviación que es mineral con granulometría al 80

% menor a 6 pulgadas.

Se recomienda que todos los equipos sean equipos de mediana minería y

evitar los Volquetes Volvo y las excavadoras Caterpillar, ya que de esa manera

tendremos un mejor flujo en transporte de y un avance mayor en el carguio.

Otro parámetro importante es la gradiente de las rampas, recomendándose un

máximo de 8% para camiones 777F y 10% para volquetes Volvo

58

CAPITULO XI

11.0 Referencia bibliográfica

N° Ref Autor Titulo Editorial Año

R1 Katsabanis

Takis

Tecnología de Explosivos y

Técnicas de Voladura

Queen’s

University

Kingston Notario

Canada

1993

R2 Carlos

López

Jimeno

Manual de arranque, carga y

transporte en Minería a Cielo

Abierto

Instituto

Tecnológico

Geominero de

España

1995

R3 Caterpillar Manual de rendimiento

Caterpillar

Caterpillar 2005

R4 San Simón Informes Mensuales

Planeamiento de Minera San

Simón

San Simón 2007

R5 San Simón Informes Mensuales

Geológicos de Minera San

Simón

San Simón 2007

R6 EXSA Manual Practico de Voladura EXSA 2005

59

CAPITULO XII

12.0 Apéndices

Diseño de control de paredes

Estudio de tiempos del camión fabrica

Consumo de explosivos para el 2006en Minera San Simón

Costo de minador operación unitario mes de enero 2007

Costo de minador operación unitario mes de febrero 2007

Costo de minador operación unitario mes de marzo 2007

Costo de minador operación unitario mes de abril 2007

Indicadores de gestión enero 2007

Indicadores de gestión febrero 2007

Indicadores de gestión marzo 2007

Indicadores de gestión abril 2007

Control de perforación enero 2007

Control de perforación febrero 2007

Control de perforación marzo 2007

Control de perforación abril 2007

Disponibilidad Mecánica y uso de la disponibilidad de equipos de carguio

60

DISEÑO DE CONTROL DE PAREDES SURO SUR

LINEA DE CRESTA

BANCO A DISPARAR 5.5 mts

4.5

5.5 mts

4.5

5.5 mts 5.5 mts

4 mts

TACO TACO

2 mts 1.5 mts

3 mts

EXPLOSIVO

6 mt 1 mt

EXPLOSIVO

4.8 mts

PARED TALUD

65º PIE

2.80 mts 5.20 mts 0.30 mts

DISEÑO DE CONTROL DE PAREDES SURO NORTE

LINEA DE CRESTA

BANCO A DISPARAR 6 mts

4.5 6 mts

4.5

6 mts

6 mts

4.5 mts

TACO TACO

2 mts 1.5 mts

3 mts

EXPLOSIVO

6 mt 1 mt

EXPLOSIVO

4.8 mts

PARED TALUD

65º PIE

2.80 mts 6.20 mts 0.30 mts

DISTANCIAS HORIZONTALES C-T CON DIFERENTES ANGULOS DE TALUD PARA BANCOS DE 6m

º TALUD DIST. C-T º TALUD DIST. C-T º TALUD DIST. C-T

45º 6.00 56º 4.05 67º 2.55

46º 5.79 57º 3.90 68º 2.42

47º 5.60 58º 3.75 69º 2.30

48º 5.40 59º 3.61 70º 2.18

49º 5.22 60º 3.46 71º 2.07

50º 5.03 61º 3.33 72º 1.95

51º 4.86 62º 3.19 73º 1.83

52º 4.69 63º 3.06 74º 1.72

53º 4.52 64º 2.93 75º 1.61

54º 4.36 65º 2.80 76º 1.50

55º 4.20 66º 2.67 77º 1.39

4.5 mts

4 mts

61

CARGUIO

DESPLAZAMIENTO

PARAMETROS DE CARGUIO DE TALADROS20 Seg. / Taladro

20 Seg. / Taladro

TRASLADO AL POLVORIN

LLENADO DE HILOS

RETORNO AL TAJO

1.5 Hrs

ESTUDIOS DE TIEMPOS DE CAMION FABRICA EXSA

CALCULO DE TIEMPO PARA CARGUIO DE TALADROSNº DE TALADROS

TIEMPO INVERTIDO (Hrs.)

500

14.59

TALADROS X CAMION 83

* NOTA : el tapado de taladros se realiza durante el tiempo que el camion fabrica

va a abastecerse de explosivo

62

DA

TO

S D

E O

PE

RA

CIÓ

N

Altura

Banco P

rom

(m

.)6.0

Dia

metr

o b

roca (

pulg

.)5 3

/4

Espacio

Pro

m.

(m

.)6.0

Burd

en P

rom

. (m

.)6.0

Pro

fundid

ad P

rom

.(m

.)6.3

540

AP

46 (

KG

EX

PL /

m.)

24

AP

37 (

KG

EX

PL /

m.)

21

AP

28 (

KG

EX

PL /

m.)

19

TM

Ta

l.C

AR

GA

NO

RM

AL

(40%

)D

EC

K (

60%

)8

m.

5 m

.4

63

72

8

En

ero

44

53

81

82

59

38

63

96

95

10

43

25

63

21

78

62

56

31

04

33

16

05

15

95

01

50

13

87

10

16

79

77

65

74

8

Fe

bre

ro5

01

20

19

28

11

38

63

98

43

12

65

30

37

25

81

23

03

71

26

53

83

45

80

10

69

23

01

68

26

61

98

76

67

64

22

Ma

rzo

5

24

44

59

71

11

52

04

78

53

12

80

31

05

26

38

93

10

51

28

03

87

96

07

11

18

82

01

70

24

72

03

32

77

88

02

Ab

ril

52

94

16

98

01

00

20

47

74

21

11

32

83

62

41

06

28

36

11

13

33

74

61

30

98

82

41

48

08

01

87

64

15

92

63

Ma

yo

51

06

66

94

61

05

03

66

77

81

16

72

89

12

45

72

28

91

11

67

35

37

59

10

95

32

41

55

22

11

90

90

45

96

41

Ju

nio

48

34

72

89

51

10

03

66

81

51

22

32

93

32

49

31

29

33

12

23

37

05

56

00

90

24

81

62

61

01

93

26

15

95

96

Ju

lio

54

41

65

10

08

91

68

12

67

91

01

92

70

62

29

97

27

06

10

19

30

87

63

00

10

15

77

13

54

84

17

94

92

57

57

0

Ag

osto

52

79

85

97

89

16

81

26

79

10

19

26

76

22

74

22

67

61

01

93

08

76

11

09

85

57

13

54

84

17

73

78

56

66

4

Se

ptie

mb

re4

38

99

58

13

12

01

05

28

90

13

35

30

37

25

81

63

03

71

33

54

04

45

08

08

19

46

17

74

89

19

93

53

60

08

1

Octu

bre

42

55

75

78

81

20

10

52

89

01

33

53

01

22

56

04

30

12

13

35

40

44

49

30

79

44

11

77

48

91

97

60

05

93

30

Novie

mb

re4

42

16

58

19

82

60

92

61

29

18

23

49

19

96

32

34

99

18

27

81

51

20

82

53

71

22

07

81

55

43

94

91

77

Dic

iem

bre

60

16

46

11

14

82

60

92

61

29

18

26

44

22

47

42

64

49

18

27

81

69

60

11

23

07

12

20

78

17

62

78

58

10

8

Su

b T

ota

l5

97

51

12

11

06

51

22

70

01

69

08

91

36

33

33

78

72

87

19

23

37

87

13

63

34

13

13

69

16

31

38

19

84

07

63

18

13

23

62

22

74

14

74

04

04

CA

RG

A

CO

RR

IDA

(40%

)D

EC

K (

60%

)

ME

ZC

LA

PR

OM

ED

IOM

EZ

CLA

46

37

28

28

TO

NE

LA

DA

ST

M1

47

10

27

45

04

08

54

90

80

06

.47

36

20

09

.6

TA

LA

DR

OS

Unid

ad

27

24

.18

34

0.9

90

88

.91

36

33

.4

PR

OF

. P

RO

ME

DIO

/Ta

l.m

.6

.36

.36

.36

.3

TA

CO

PR

OM

ED

IO/T

al.

m.

1.5

1.5

1.5

2.5

CA

RG

A E

xp

los

iva

/Ta

l.m

.4

.84

.84

.83

.8

CA

RG

A E

xp

los

iva

/Ta

l.K

g.

11

5.2

10

0.8

91

.27

2.2

SU

B T

OT

AL

EX

PL

OS

.K

g.

31

38

19

.18

40

76

2.5

82

89

07

.79

84

32

8.0

TO

TA

L E

XP

LO

SIV

OK

g.

EN

ER

OF

EB

RE

RO

MA

RZ

OA

BR

ILM

AY

OJU

NIO

JU

LIO

AG

OS

TO

SE

TIE

MB

RE

OC

TU

BR

EN

OV

IEM

BR

ED

ICIE

MB

RE

TO

TA

LF

.S. 1.2

NIT

RA

TO

DE

AM

ON

IOK

g1

67

97

71

98

76

62

03

32

71

87

64

11

90

90

41

93

26

11

79

49

21

77

37

81

99

35

31

97

60

01

55

43

91

76

27

82

22

74

16

26

72

89

9

EM

UL

SIÓ

N M

AT

RIZ

Kg

65

74

87

64

22

78

80

25

92

63

59

64

15

95

96

57

57

05

66

64

60

08

15

93

30

49

17

75

81

08

74

04

02

88

84

82

BO

OS

TE

R H

DP

1 L

b.

Kg

51

55

80

60

76

13

59

15

60

63

06

11

50

84

93

51

26

96

69

16

82

99

BO

OS

TE

R B

N 2

x 1

6"

Kg

31

60

38

34

38

79

33

74

35

37

37

05

30

87

30

87

40

44

40

44

27

81

27

81

41

31

34

95

76

CO

RD

ON

DE

TO

NA

NT

E 5

Pm

.2

17

86

25

81

52

63

93

24

10

62

45

74

24

93

12

30

01

22

74

62

58

15

25

60

21

99

67

22

47

42

87

20

73

44

64

8

EX

EL

24

de

8 m

ts.

Pza

25

63

30

37

31

05

28

36

28

91

29

33

27

06

26

76

30

37

30

12

23

49

26

44

33

78

94

05

47

EX

EL

24

de

5 m

ts.

Pza

10

43

12

65

12

80

11

13

11

67

12

23

10

19

10

19

13

35

13

35

91

89

18

13

63

51

63

62

RE

TA

RD

O B

IDIR

EC

CIO

NA

L 2

5 m

s.

Pza

16

71

67

16

71

67

16

71

67

16

71

67

16

71

67

16

71

67

20

04

24

05

RE

TA

RD

O B

IDIR

EC

CIO

NA

L 3

5 m

s.

Pza

16

71

67

16

71

67

16

71

67

16

71

67

16

71

67

16

71

67

20

04

24

05

RE

TA

RD

O B

IDIR

EC

CIO

NA

L 4

2 m

s.

Pza

16

71

67

16

71

67

16

71

67

16

71

67

16

71

67

16

71

67

20

04

24

05

ME

CH

A D

E S

EG

UR

IDA

Dm

.1

25

12

51

25

12

51

25

12

51

25

12

51

25

12

51

25

12

51

50

01

80

0

FU

LM

INA

NT

E C

OM

UN

# 8

Pza

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

12

00

14

40

DIN

AM

ITA

Kg

10

00

12

00

NO

TA

: S

e e

stá

co

nsid

era

nd

o u

na

me

zcla

AP

46

pa

ra lo

s m

ese

s d

e E

NE

RO

A M

AR

ZO

DE

L 2

00

6,

po

r te

mp

ora

da

de

llu

via

s

14

27

73

8

15

61

03

2

15

83

83

8

16

76

49

2

15

31

46

3

DE

SM

ON

TE

TO

TA

L M

AT

ER

IAL

AN

UA

L

TM

TM

TA

LA

DR

OS

NIT

RA

TO

(K

g.)

CO

NS

UM

O D

E E

XP

LO

SIV

OS

PA

RA

EL

O 2

00

6 E

N M

INA

SA

N S

IMO

N /

LA

VIR

GE

N

EM

UL

SIÓ

N

(Kg

.)

TO

TA

L N

º

Ta

l.

TM

/Tal.

PR

OD

UC

CIÓ

N E

ST

IMA

DA

PA

RA

EL

O 2

006

oM

es

MIN

ER

AL

PA

ME

TR

OS

GE

NE

RA

LE

S D

E C

AR

GA

MIN

ER

AL

/ D

ES

MO

NT

E

14

60

97

7

14

44

79

7

16

40

04

7

16

26

62

7

18

24

51

28

12

68

25

7

20

06

13

84

02

0

16

39

84

0

C U

A D

R O

R

E S

U M

E N

C

O N

S U

M O

E

X P

L O

S I V

O S

2

006

MIN

ER

AL

TM

.

EX

PL

OS

IVO

S (

Kg

.)E

XE

L N

º 2

4C

OR

N (

m.)

BN

(k

g.)

pe

nto

lita

(k

g.)

11

54

58

1.6

18

13

23

5.7

DE

SM

ON

TE

TM

.

63

CC

OS

TO

AC

TIV

IDA

D02/0

1/2

007

03/0

1/2

007

04/0

1/2

007

05/0

1/2

007

06/0

1/2

007

07/0

1/2

007

08/0

1/2

007

09/0

1/2

007

10/0

1/2

007

11/0

1/2

007

12/0

1/2

007

13/0

1/2

007

14/0

1/2

007

15/0

1/2

007

16/0

1/2

007

17/0

1/2

007

18/0

1/2

007

19/0

1/2

007

20/0

1/2

007

21/0

1/2

007

22/0

1/2

007

23/0

1/2

007

24/0

1/2

007

25/0

1/2

007

26/0

1/2

007

27/0

1/2

007

28/0

1/2

007

29/0

1/2

007

30/0

1/2

007

31/0

1/2

007

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

in

Pe

rfo

racio

n0

.00

00

.00

00

.08

50

.12

60

.12

00

.11

80

.13

80

.13

30

.14

40

.14

20

.14

70

.14

80

.14

40

.15

20

.15

60

.16

10

.15

20

.14

60

.14

60

.14

80

.15

20

.15

50

.15

80

.15

70

.16

40

.17

70

.18

50

.19

20

.19

70

.20

3

Vo

lad

ura

0.3

01

0.0

44

0.0

32

0.0

25

0.0

99

0.1

16

0.1

01

0.1

08

0.1

16

0.1

17

0.1

07

0.1

01

0.1

14

0.1

11

0.1

14

0.1

11

0.1

17

0.1

13

0.1

08

0.1

04

0.1

13

0.1

17

0.1

15

0.1

19

0.1

24

0.1

30

0.1

37

0.1

41

0.1

49

0.1

50

Carg

uio

0.5

96

0.2

36

0.2

33

0.1

98

0.1

94

0.1

96

0.1

97

0.2

02

0.1

96

0.2

00

0.2

02

0.2

04

0.2

04

0.2

11

0.2

12

0.2

14

0.2

16

0.2

20

0.2

23

0.2

24

0.2

31

0.2

42

0.2

46

0.2

50

0.2

61

0.2

74

0.2

86

0.2

98

0.3

09

0.3

21

Aca

rre

o1

.21

60

.60

60

.61

50

.57

70

.57

00

.56

80

.56

90

.58

50

.58

60

.60

20

.61

20

.61

90

.62

30

.63

50

.63

90

.64

50

.65

00

.65

30

.65

90

.65

90

.67

10

.69

00

.69

50

.70

50

.73

30

.76

10

.78

80

.81

50

.84

20

.87

0

Rem

ocio

n0

.09

40

.03

80

.04

50

.02

90

.02

40

.02

20

.02

10

.02

20

.02

40

.02

30

.02

30

.02

10

.01

90

.01

80

.01

70

.01

70

.01

70

.01

90

.02

20

.02

10

.02

20

.02

40

.02

50

.02

40

.02

50

.02

50

.02

60

.02

70

.02

80

.02

9

Con

str

uccio

n d

e B

ota

de

ros

0.0

00

0.0

00

0.0

00

0.0

05

0.0

04

0.0

03

0.0

02

0.0

02

0.0

02

0.0

02

0.0

03

0.0

05

0.0

05

0.0

05

0.0

07

0.0

07

0.0

06

0.0

06

0.0

08

0.0

07

0.0

07

0.0

07

0.0

08

0.0

09

0.0

10

0.0

11

0.0

11

0.0

11

0.0

11

0.0

11

Ma

nte

nim

ien

to -

Via

s0

.44

20

.08

00

.07

00

.06

10

.06

40

.06

40

.06

90

.06

90

.07

00

.06

90

.06

70

.06

50

.06

50

.06

50

.06

90

.06

80

.06

80

.06

80

.06

90

.07

00

.07

20

.07

40

.07

50

.07

80

.08

30

.08

80

.09

10

.09

40

.09

60

.09

8

Pre

pa

racio

n d

e A

cce

so

s0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

40

.00

30

.00

30

.00

30

.00

80

.00

80

.00

80

.01

00

.00

90

.01

10

.01

00

.01

10

.01

50

.02

10

.02

60

.03

00

.03

00

.03

20

.03

50

.03

60

.03

60

.03

60

.03

60

.03

6

Em

pu

je d

e

Bo

tad

ero

s.

0.1

70

0.0

31

0.0

27

0.0

20

0.0

20

0.0

20

0.0

22

0.0

25

0.0

27

0.0

30

0.0

30

0.0

30

0.0

33

0.0

39

0.0

42

0.0

46

0.0

50

0.0

49

0.0

50

0.0

51

0.0

54

0.0

58

0.0

59

0.0

62

0.0

66

0.0

71

0.0

73

0.0

75

0.0

77

0.0

79

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)0

.00

00

.00

00

.00

20

.00

10

.00

10

.00

10

.00

10

.00

10

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

2

Dre

na

je0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

0

Ad

min

istr

ació

n m

ina

0.6

93

0.1

01

0.0

73

0.0

58

0.0

53

0.0

50

0.0

48

0.0

48

0.0

46

0.0

46

0.0

46

0.0

45

0.0

45

0.0

46

0.0

46

0.0

46

0.0

46

0.0

46

0.0

46

0.0

46

0.0

48

0.0

49

0.0

50

0.0

51

0.0

53

0.0

55

0.0

57

0.0

59

0.0

61

0.0

63

Ma

teri

ale

s0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

0

mis

ce

lan

eo

s0

.05

50

.00

80

.00

60

.00

50

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

50

.00

50

.00

5

TO

TA

L3

.51

21

.13

51

.18

31

.10

11

.14

81

.15

71

.17

21

.19

81

.21

41

.23

71

.24

51

.24

71

.26

11

.29

11

.31

11

.32

51

.33

21

.33

31

.34

51

.35

11

.39

71

.44

81

.46

11

.48

71

.55

71

.63

01

.69

31

.75

01

.80

81

.86

2

CC

OS

TO

AC

TIV

IDA

D02/0

1/2

007

03/0

1/2

007

04/0

1/2

007

05/0

1/2

007

06/0

1/2

007

07/0

1/2

007

08/0

1/2

007

09/0

1/2

007

10/0

1/2

007

11/0

1/2

007

12/0

1/2

007

13/0

1/2

007

14/0

1/2

007

15/0

1/2

007

16/0

1/2

007

17/0

1/2

007

18/0

1/2

007

19/0

1/2

007

20/0

1/2

007

21/0

1/2

007

22/0

1/2

007

23/0

1/2

007

24/0

1/2

007

25/0

1/2

007

26/0

1/2

007

27/0

1/2

007

28/0

1/2

007

29/0

1/2

007

30/0

1/2

007

31/0

1/2

007

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

Pe

rfo

racio

n0

.00

00

.00

00

.05

70

.09

40

.09

10

.09

10

.10

70

.10

20

.11

30

.10

90

.11

20

.11

20

.10

90

.11

20

.11

50

.11

70

.10

90

.10

40

.10

20

.10

30

.10

30

.10

00

.10

00

.09

80

.10

00

.10

50

.10

80

.11

00

.11

10

.11

1

Vo

lad

ura

0.0

79

0.0

30

0.0

21

0.0

19

0.0

75

0.0

89

0.0

78

0.0

83

0.0

91

0.0

90

0.0

82

0.0

76

0.0

86

0.0

82

0.0

83

0.0

81

0.0

84

0.0

80

0.0

76

0.0

73

0.0

76

0.0

75

0.0

73

0.0

74

0.0

76

0.0

78

0.0

80

0.0

81

0.0

84

0.0

82

Carg

uio

0.1

57

0.1

59

0.1

55

0.1

48

0.1

48

0.1

51

0.1

52

0.1

54

0.1

54

0.1

54

0.1

54

0.1

54

0.1

54

0.1

55

0.1

56

0.1

56

0.1

55

0.1

57

0.1

56

0.1

56

0.1

57

0.1

56

0.1

56

0.1

56

0.1

60

0.1

63

0.1

67

0.1

71

0.1

74

0.1

76

Aca

rre

o0

.32

00

.41

00

.41

00

.43

10

.43

40

.43

80

.44

00

.44

60

.46

00

.46

20

.46

80

.46

90

.47

10

.46

80

.47

00

.47

00

.46

70

.46

50

.46

10

.46

00

.45

40

.44

60

.44

20

.44

10

.44

70

.45

40

.46

10

.46

80

.47

60

.47

7

Rem

ocio

n0

.02

50

.02

60

.03

00

.02

10

.01

80

.01

70

.01

60

.01

70

.01

90

.01

80

.01

70

.01

60

.01

40

.01

30

.01

20

.01

20

.01

20

.01

30

.01

50

.01

40

.01

50

.01

60

.01

60

.01

50

.01

50

.01

50

.01

50

.01

50

.01

60

.01

6

Con

str

uccio

n d

e B

ota

de

ros

0.0

00

0.0

00

0.0

00

0.0

04

0.0

03

0.0

02

0.0

02

0.0

02

0.0

02

0.0

02

0.0

03

0.0

04

0.0

04

0.0

03

0.0

05

0.0

05

0.0

05

0.0

05

0.0

05

0.0

05

0.0

05

0.0

05

0.0

05

0.0

06

0.0

06

0.0

07

0.0

06

0.0

06

0.0

06

0.0

06

Ma

nte

nim

ien

to -

Via

s0

.11

60

.05

40

.04

70

.04

50

.04

80

.04

90

.05

30

.05

30

.05

50

.05

30

.05

10

.04

90

.04

90

.04

80

.05

00

.05

00

.04

90

.04

90

.04

80

.04

90

.04

90

.04

80

.04

80

.04

90

.05

10

.05

30

.05

30

.05

40

.05

40

.05

4

Pre

pa

racio

n d

e A

cce

so

s0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

30

.00

30

.00

20

.00

20

.00

60

.00

60

.00

60

.00

70

.00

70

.00

80

.00

70

.00

80

.01

00

.01

50

.01

80

.01

90

.01

90

.02

00

.02

10

.02

10

.02

10

.02

10

.02

10

.02

0

Em

pu

je d

e

Bo

tad

ero

s.

0.0

45

0.0

21

0.0

18

0.0

15

0.0

15

0.0

15

0.0

17

0.0

19

0.0

21

0.0

23

0.0

23

0.0

23

0.0

25

0.0

29

0.0

31

0.0

34

0.0

36

0.0

35

0.0

35

0.0

35

0.0

37

0.0

38

0.0

38

0.0

39

0.0

40

0.0

42

0.0

43

0.0

43

0.0

44

0.0

43

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)0

.00

00

.00

00

.00

10

.00

10

.00

10

.00

10

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

1

Dre

na

je0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

0

Ad

min

istr

ació

n m

ina

0.1

82

0.0

68

0.0

49

0.0

43

0.0

40

0.0

38

0.0

37

0.0

36

0.0

36

0.0

36

0.0

35

0.0

34

0.0

34

0.0

34

0.0

34

0.0

34

0.0

33

0.0

33

0.0

32

0.0

32

0.0

32

0.0

32

0.0

32

0.0

32

0.0

32

0.0

33

0.0

33

0.0

34

0.0

35

0.0

35

Ma

teri

ale

s0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

0

mis

ce

lan

eo

s0

.01

40

.00

50

.00

40

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

20

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

3

TO

TA

L0

.92

50

.76

80

.78

80

.82

10

.87

40

.89

20

.90

50

.91

50

.95

30

.94

90

.95

10

.94

50

.95

30

.95

20

.96

30

.96

50

.95

80

.94

90

.94

20

.94

40

.94

70

.93

50

.93

00

.93

10

.95

10

.97

10

.99

01

.00

41

.02

31

.02

2

CC

OS

TO

AC

TIV

IDA

D02/0

1/2

007

03/0

1/2

007

04/0

1/2

007

05/0

1/2

007

06/0

1/2

007

07/0

1/2

007

08/0

1/2

007

09/0

1/2

007

10/0

1/2

007

11/0

1/2

007

12/0

1/2

007

13/0

1/2

007

14/0

1/2

007

15/0

1/2

007

16/0

1/2

007

17/0

1/2

007

18/0

1/2

007

19/0

1/2

007

20/0

1/2

007

21/0

1/2

007

22/0

1/2

007

23/0

1/2

007

24/0

1/2

007

25/0

1/2

007

26/0

1/2

007

27/0

1/2

007

28/0

1/2

007

29/0

1/2

007

30/0

1/2

007

31/0

1/2

007

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

Pe

rfo

racio

n0

04

,44

11

1,0

28

14

,48

21

8,1

07

25

,77

42

8,4

21

35

,52

23

9,0

49

44

,90

85

0,0

67

52

,86

55

9,0

22

64

,98

87

1,1

80

71

,42

87

2,7

30

76

,74

28

1,4

25

85

,53

78

7,9

91

92

,84

69

4,3

80

98

,95

61

06

,45

41

11

,41

81

15

,43

81

18

,73

51

22

,14

2

Vo

lad

ura

55

21

,10

41

,65

72

,20

91

2,0

01

17

,84

71

8,7

60

23

,06

62

8,7

28

32

,17

03

2,8

06

34

,00

44

1,9

34

43

,28

94

7,2

04

48

,99

45

4,9

83

56

,07

95

6,6

76

57

,53

36

3,2

81

66

,20

36

7,4

94

71

,42

27

4,8

00

78

,59

08

2,6

39

85

,06

38

9,6

57

90

,21

0

Carg

uio

1,0

95

5,9

62

12

,12

91

7,3

95

23

,53

03

0,2

41

36

,68

14

3,1

55

48

,39

75

5,1

07

61

,83

86

8,7

59

74

,96

38

1,8

57

88

,07

89

4,6

17

10

1,6

14

10

9,5

87

11

6,9

30

12

3,3

97

12

9,8

73

13

7,3

94

14

4,4

13

15

0,5

94

15

7,5

16

16

5,0

87

17

2,2

72

17

9,3

67

18

5,9

30

19

3,3

31

Aca

rre

o2

,23

41

5,3

31

32

,02

05

0,6

28

69

,00

88

7,5

27

10

6,0

97

12

4,7

75

14

4,9

37

16

5,6

22

18

7,3

33

20

9,0

79

22

8,9

36

24

6,7

87

26

5,5

40

28

5,8

05

30

5,7

94

32

5,2

91

34

5,5

96

36

3,5

29

37

6,7

31

39

2,0

66

40

8,8

11

42

4,6

34

44

1,4

27

45

8,6

70

47

5,1

57

49

1,2

67

50

7,3

86

52

4,0

80

Rem

ocio

n1

73

97

32

,32

72

,51

92

,91

03

,44

23

,97

04

,72

55

,95

16

,44

96

,95

96

,95

96

,95

96

,95

96

,95

97

,45

77

,95

29

,24

61

1,3

15

11

,31

51

2,2

32

13

,76

41

4,4

34

14

,43

41

5,0

71

15

,07

11

5,5

91

16

,21

91

6,9

77

17

,64

5

Con

str

uccio

n d

e B

ota

de

ros

00

04

64

46

44

64

46

44

64

60

96

09

1,0

54

1,7

74

1,7

74

1,7

74

2,7

34

2,9

85

2,9

85

3,2

34

4,0

23

4,0

23

4,0

23

4,2

43

4,8

40

5,3

63

6,3

15

6,5

79

6,6

34

6,6

34

6,6

34

6,6

34

Ma

nte

nim

ien

to -

Via

s8

12

2,0

28

3,6

35

5,3

49

7,7

01

9,8

25

12

,79

71

4,7

20

17

,19

91

8,9

98

20

,52

42

2,0

48

23

,91

52

5,4

37

28

,51

23

0,2

01

31

,99

63

4,0

91

35

,99

73

8,8

60

40

,33

44

2,1

92

44

,05

74

6,8

48

50

,28

05

3,0

94

54

,89

95

6,5

66

57

,64

15

8,9

14

Pre

pa

racio

n d

e A

cce

so

s0

00

00

07

15

71

57

15

89

62

,51

12

,80

32

,80

33

,74

83

,74

84

,68

74

,68

75

,61

27

,70

41

1,7

79

14

,79

51

6,9

14

17

,44

51

9,3

70

20

,87

92

1,4

18

21

,95

32

1,9

53

21

,95

32

1,9

53

Em

pu

je d

e

Bo

tad

ero

s.

31

27

74

1,4

15

1,7

19

2,4

66

3,0

94

4,1

87

5,3

11

6,5

65

8,3

52

9,0

89

10

,23

81

2,1

45

15

,11

81

7,4

99

20

,36

52

3,2

82

24

,60

82

6,3

27

27

,94

43

0,5

55

33

,22

23

4,7

36

37

,52

93

9,7

84

42

,65

14

3,8

31

45

,06

84

6,5

15

47

,51

8

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)0

01

16

11

61

16

11

61

16

11

61

16

11

61

16

11

61

16

11

61

61

16

11

61

25

73

79

48

55

80

71

48

35

93

31

,07

51

,16

61

,22

71

,22

71

,22

71

,22

7

Dre

na

je0

00

00

00

00

00

00

00

02

82

82

82

82

82

81

96

22

52

25

22

52

25

22

52

25

22

5

Ad

min

istr

ació

n m

ina

1,2

73

2,5

45

3,8

18

5,0

90

6,3

63

7,6

36

8,9

08

10

,18

11

1,4

54

12

,72

61

3,9

99

15

,27

11

6,5

44

17

,81

71

9,0

89

20

,36

22

1,6

34

22

,90

72

4,1

80

25

,45

22

6,7

25

27

,99

72

9,2

70

30

,54

33

1,8

15

33

,08

83

4,3

61

35

,63

33

6,9

06

38

,17

8

Ma

teri

ale

s0

00

00

00

00

00

00

00

00

00

00

00

00

00

00

0

mis

ce

lan

eo

s1

00

20

13

01

40

25

02

60

27

03

80

39

04

1,0

04

1,1

05

1,2

05

1,3

05

1,4

06

1,5

06

1,6

07

1,7

07

1,8

07

1,9

08

2,0

08

2,1

09

2,2

09

2,3

10

2,4

10

2,5

10

2,6

11

2,7

11

2,8

12

2,9

12

3,0

12

TO

TA

L6

,45

12

8,7

18

61

,55

79

6,5

17

13

9,0

41

17

8,2

99

21

8,4

69

25

5,6

49

30

0,1

92

34

0,0

94

38

1,1

35

42

1,1

18

46

2,9

54

50

1,9

23

54

4,5

12

58

6,8

14

62

6,5

44

66

3,6

70

70

5,8

96

74

5,7

70

78

4,6

93

82

2,7

28

85

9,3

79

89

6,2

76

93

8,1

45

98

2,0

93

1,0

20

,20

71

,05

4,6

61

1,0

89

,78

71

,12

2,0

58

CC

OS

TO

AC

TIV

IDA

D02/0

1/2

007

03/0

1/2

007

04/0

1/2

007

05/0

1/2

007

06/0

1/2

007

07/0

1/2

007

08/0

1/2

007

09/0

1/2

007

10/0

1/2

007

11/0

1/2

007

12/0

1/2

007

13/0

1/2

007

14/0

1/2

007

15/0

1/2

007

16/0

1/2

007

17/0

1/2

007

18/0

1/2

007

19/0

1/2

007

20/0

1/2

007

21/0

1/2

007

22/0

1/2

007

23/0

1/2

007

24/0

1/2

007

25/0

1/2

007

26/0

1/2

007

27/0

1/2

007

28/0

1/2

007

29/0

1/2

007

30/0

1/2

007

31/0

1/2

007

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

Pe

rfo

racio

n0

04

,44

16

,58

73

,45

43

,62

57

,66

72

,64

77

,10

13

,52

85

,85

85

,15

92

,79

86

,15

75

,96

66

,19

32

48

1,3

02

4,0

12

4,6

83

4,1

12

2,4

54

4,8

56

1,5

33

4,5

76

7,4

98

4,9

65

4,0

19

3,2

97

3,4

08

Vo

lad

ura

55

25

52

55

25

52

9,7

92

5,8

46

91

34

,30

65

,66

23

,44

26

35

1,1

98

7,9

30

1,3

55

3,9

15

1,7

89

5,9

89

1,0

96

59

78

57

5,7

48

2,9

22

1,2

91

3,9

28

3,3

78

3,7

90

4,0

49

2,4

24

4,5

95

55

2

Carg

uio

1,0

95

4,8

68

6,1

67

5,2

66

6,1

35

6,7

11

6,4

41

6,4

74

5,2

42

6,7

10

6,7

31

6,9

21

6,2

04

6,8

94

6,2

21

6,5

39

6,9

97

7,9

72

7,3

43

6,4

67

6,4

76

7,5

21

7,0

20

6,1

81

6,9

21

7,5

72

7,1

85

7,0

95

6,5

64

7,4

00

Aca

rre

o2

,23

41

3,0

97

16

,68

91

8,6

09

18

,38

01

8,5

18

18

,57

11

8,6

78

20

,16

22

0,6

85

21

,71

12

1,7

46

19

,85

71

7,8

51

18

,75

32

0,2

65

19

,98

91

9,4

97

20

,30

51

7,9

32

13

,20

21

5,3

36

16

,74

41

5,8

23

16

,79

31

7,2

42

16

,48

71

6,1

10

16

,11

81

6,6

94

Rem

ocio

n1

73

80

01

,35

41

91

39

15

33

52

87

55

1,2

26

49

85

10

00

00

49

84

95

1,2

94

2,0

69

09

18

1,5

32

67

00

63

70

52

06

29

75

76

68

Con

str

uccio

n d

e B

ota

de

ros

00

04

64

00

00

14

50

44

57

20

00

96

02

51

02

48

78

90

02

20

59

85

23

95

12

64

55

00

0

Ma

nte

nim

ien

to -

Via

s8

12

1,2

16

1,6

07

1,7

15

2,3

52

2,1

24

2,9

71

1,9

23

2,4

79

1,7

99

1,5

26

1,5

24

1,8

67

1,5

22

3,0

75

1,6

90

1,7

94

2,0

95

1,9

07

2,8

63

1,4

73

1,8

59

1,8

65

2,7

91

3,4

32

2,8

14

1,8

05

1,6

67

1,0

76

1,2

72

Pre

pa

racio

n d

e A

cce

so

s0

00

00

07

15

00

18

11

,61

52

92

09

45

09

39

09

25

2,0

92

4,0

75

3,0

16

2,1

18

53

11

,92

51

,51

05

39

53

50

00

Em

pu

je d

e

Bo

tad

ero

s.

31

24

62

64

13

04

74

76

28

1,0

92

1,1

25

1,2

53

1,7

87

73

71

,15

01

,90

72

,97

22

,38

12

,86

62

,91

71

,32

61

,71

81

,61

72

,61

12

,66

71

,51

42

,79

32

,25

52

,86

71

,18

01

,23

71

,44

71

,00

3

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)0

01

16

00

00

00

00

00

04

50

09

71

21

10

79

51

34

12

19

81

42

91

61

00

0

Dre

na

je0

00

00

00

00

00

00

00

02

80

00

00

16

82

90

00

00

0

Ad

min

istr

ació

n m

ina

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

1,2

73

Ma

teri

ale

s0

00

00

00

00

00

00

00

00

00

00

00

00

00

00

0

mis

ce

lan

eo

s1

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

0

TO

TA

L6

,45

12

2,2

67

32

,83

93

4,9

60

42

,52

43

9,2

58

40

,17

13

7,1

80

44

,54

23

9,9

02

41

,04

13

9,9

82

41

,83

63

8,9

69

42

,58

84

2,3

02

39

,73

03

7,1

26

42

,22

63

9,8

74

38

,92

43

8,0

34

36

,65

13

6,8

97

41

,86

84

3,9

48

38

,11

43

4,4

54

35

,12

63

2,2

71

DIARIOC

OS

TO

MIN

A P

OR

OP

ER

AC

IÓN

UN

ITA

RIO

ME

S D

E E

NE

RO

DE

L 2

007

COST ACUM. en US$/T-min COST ACUM. en US$/T-roca ACUMULADO

64

CC

OS

TO

AC

TIV

IDA

D01/0

2/2

007

02/0

2/2

007

03/0

2/2

007

04/0

2/2

007

05/0

2/2

007

06/0

2/2

007

07/0

2/2

007

08/0

2/2

007

09/0

2/2

007

10/0

2/2

007

11/0

2/2

007

12/0

2/2

007

13/0

2/2

007

14/0

2/2

007

15/0

2/2

007

16/0

2/2

007

17/0

2/2

007

18/0

2/2

007

19/0

2/2

007

20/0

2/2

007

21/0

2/2

007

22/0

2/2

007

23/0

2/2

007

24/0

2/2

007

25/0

2/2

007

26/0

2/2

007

27/0

2/2

007

28/0

2/2

007

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

in

Pe

rfo

racio

n0

.00

00

.01

00

.04

40

.06

30

.07

40

.09

50

.11

30

.12

00

.14

30

.15

30

.15

80

.16

30

.16

40

.17

40

.17

40

.17

70

.18

10

.18

80

.18

90

.19

10

.19

10

.19

10

.19

10

.19

50

.20

90

.22

30

.23

50

.24

7

Vo

lad

ura

0.0

08

0.0

11

0.0

18

0.0

41

0.0

54

0.0

54

0.0

80

0.0

89

0.0

98

0.1

05

0.1

08

0.1

07

0.1

04

0.1

02

0.1

00

0.1

11

0.1

12

0.1

18

0.1

25

0.1

27

0.1

30

0.1

32

0.1

34

0.1

35

0.1

38

0.1

55

0.1

58

0.1

68

Ca

rgu

io0

.05

20

.09

00

.11

30

.13

40

.15

30

.17

20

.18

30

.19

70

.21

70

.22

60

.23

50

.23

70

.24

00

.24

20

.24

40

.24

80

.25

00

.25

30

.25

30

.25

70

.27

00

.28

30

.29

60

.30

90

.32

10

.33

40

.34

70

.36

0

Aca

rre

o0

.12

30

.21

80

.29

50

.34

90

.39

00

.43

50

.46

90

.49

70

.52

80

.55

30

.56

90

.57

80

.58

00

.58

70

.60

10

.61

30

.62

10

.62

80

.63

00

.64

50

.67

50

.70

40

.73

20

.76

50

.79

50

.82

30

.84

90

.87

7

Re

mo

cio

n0

.00

00

.00

00

.00

00

.00

80

.01

30

.01

20

.01

10

.01

40

.01

80

.02

20

.02

20

.02

10

.02

00

.01

90

.02

10

.02

00

.02

10

.02

20

.02

30

.02

30

.02

50

.02

70

.03

00

.03

00

.03

20

.03

20

.03

30

.03

6

Co

nstr

uccio

n d

e B

ota

de

ros

0.0

00

0.0

01

0.0

01

0.0

01

0.0

01

0.0

01

0.0

01

0.0

01

0.0

05

0.0

04

0.0

04

0.0

04

0.0

04

0.0

03

0.0

03

0.0

03

0.0

04

0.0

04

0.0

04

0.0

04

0.0

06

0.0

06

0.0

07

0.0

10

0.0

12

0.0

20

0.0

20

0.0

20

Ma

nte

nim

ien

to -

Via

s0

.01

00

.01

40

.02

20

.03

30

.04

30

.05

60

.06

40

.06

50

.06

40

.06

50

.06

10

.06

00

.06

00

.05

80

.05

70

.05

70

.06

50

.07

50

.08

00

.08

20

.08

70

.09

10

.09

50

.09

90

.10

10

.10

50

.10

90

.11

3

Pre

pa

racio

n d

e A

cce

so

s0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

30

.00

20

.00

60

.00

80

.00

90

.01

00

.01

40

.01

50

.01

50

.01

40

.01

30

.01

40

.01

60

.01

80

.01

80

.01

80

.01

80

.01

80

.01

80

.01

8

Em

pu

je d

e

Bo

tad

ero

s.

0.0

23

0.0

37

0.0

49

0.0

46

0.0

47

0.0

52

0.0

58

0.0

59

0.0

60

0.0

62

0.0

61

0.0

61

0.0

62

0.0

66

0.0

67

0.0

72

0.0

70

0.0

69

0.0

67

0.0

66

0.0

67

0.0

71

0.0

72

0.0

76

0.0

79

0.0

82

0.0

86

0.0

90

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)0

.00

00

.00

00

.00

00

.00

00

.00

10

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

3

Dre

na

je0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

20

.00

30

.00

40

.00

40

.00

40

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

2

Ad

min

istr

ació

n m

ina

0.0

10

0.0

18

0.0

22

0.0

26

0.0

29

0.0

33

0.0

35

0.0

37

0.0

40

0.0

43

0.0

44

0.0

44

0.0

45

0.0

45

0.0

46

0.0

47

0.0

47

0.0

48

0.0

48

0.0

49

0.0

51

0.0

53

0.0

56

0.0

58

0.0

61

0.0

63

0.0

66

0.0

68

Ma

teri

ale

s0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

0

mis

ce

lan

eo

s0

.00

10

.00

10

.00

20

.00

20

.00

20

.00

20

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

50

.00

50

.00

50

.00

5

TO

TA

L0

.22

60

.39

70

.56

30

.70

00

.80

40

.91

21

.01

81

.08

41

.18

21

.24

21

.27

51

.28

91

.29

21

.31

21

.33

01

.36

81

.39

01

.42

41

.43

71

.46

21

.52

21

.57

91

.63

41

.69

91

.77

01

.85

91

.92

62

.00

2

CC

OS

TO

AC

TIV

IDA

D01/0

2/2

007

02/0

2/2

007

03/0

2/2

007

04/0

2/2

007

05/0

2/2

007

06/0

2/2

007

07/0

2/2

007

08/0

2/2

007

09/0

2/2

007

10/0

2/2

007

11/0

2/2

007

12/0

2/2

007

13/0

2/2

007

14/0

2/2

007

15/0

2/2

007

16/0

2/2

007

17/0

2/2

007

18/0

2/2

007

19/0

2/2

007

20/0

2/2

007

21/0

2/2

007

22/0

2/2

007

23/0

2/2

007

24/0

2/2

007

25/0

2/2

007

26/0

2/2

007

27/0

2/2

007

28/0

2/2

007

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

Pe

rfo

racio

n0

.00

00

.00

70

.03

10

.04

40

.05

10

.06

20

.07

20

.07

50

.08

40

.08

80

.09

00

.09

30

.09

50

.10

10

.10

10

.10

20

.10

40

.10

80

.11

00

.11

10

.10

90

.10

60

.10

40

.10

20

.10

60

.11

00

.11

30

.11

6

Vo

lad

ura

0.0

06

0.0

08

0.0

12

0.0

29

0.0

37

0.0

35

0.0

51

0.0

56

0.0

58

0.0

60

0.0

62

0.0

61

0.0

60

0.0

59

0.0

58

0.0

65

0.0

65

0.0

68

0.0

72

0.0

74

0.0

74

0.0

73

0.0

73

0.0

71

0.0

70

0.0

77

0.0

76

0.0

79

Ca

rgu

io0

.04

20

.06

40

.08

00

.09

50

.10

50

.11

20

.11

70

.12

30

.12

80

.13

00

.13

40

.13

60

.13

80

.14

00

.14

20

.14

40

.14

40

.14

60

.14

70

.14

90

.15

40

.15

70

.16

10

.16

20

.16

30

.16

50

.16

60

.16

9

Aca

rre

o0

.09

80

.15

50

.20

90

.24

50

.26

90

.28

40

.30

00

.31

00

.31

20

.31

80

.32

40

.33

10

.33

40

.34

00

.35

00

.35

50

.35

80

.36

10

.36

50

.37

40

.38

50

.39

10

.39

80

.40

20

.40

40

.40

60

.40

70

.41

2

Re

mo

cio

n0

.00

00

.00

00

.00

00

.00

60

.00

90

.00

80

.00

70

.00

90

.01

10

.01

30

.01

30

.01

20

.01

20

.01

10

.01

20

.01

20

.01

20

.01

30

.01

40

.01

40

.01

40

.01

50

.01

60

.01

60

.01

60

.01

60

.01

60

.01

7

Co

nstr

uccio

n d

e B

ota

de

ros

0.0

00

0.0

01

0.0

00

0.0

00

0.0

00

0.0

01

0.0

01

0.0

01

0.0

03

0.0

03

0.0

02

0.0

02

0.0

02

0.0

02

0.0

02

0.0

02

0.0

02

0.0

02

0.0

02

0.0

02

0.0

04

0.0

03

0.0

04

0.0

05

0.0

06

0.0

10

0.0

10

0.0

10

Ma

nte

nim

ien

to -

Via

s0

.00

80

.01

00

.01

50

.02

30

.03

00

.03

70

.04

10

.04

00

.03

80

.03

70

.03

50

.03

40

.03

50

.03

40

.03

30

.03

30

.03

70

.04

30

.04

70

.04

80

.04

90

.05

00

.05

10

.05

20

.05

10

.05

20

.05

20

.05

3

Pre

pa

racio

n d

e A

cce

so

s0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

10

.00

10

.00

30

.00

40

.00

50

.00

60

.00

80

.00

90

.00

90

.00

80

.00

80

.00

80

.00

90

.01

00

.01

00

.00

90

.00

90

.00

90

.00

80

.00

8

Em

pu

je d

e

Bo

tad

ero

s.

0.0

18

0.0

26

0.0

35

0.0

32

0.0

32

0.0

34

0.0

37

0.0

37

0.0

36

0.0

36

0.0

35

0.0

35

0.0

36

0.0

38

0.0

39

0.0

42

0.0

40

0.0

40

0.0

39

0.0

38

0.0

38

0.0

39

0.0

39

0.0

40

0.0

40

0.0

40

0.0

41

0.0

42

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)0

.00

00

.00

00

.00

00

.00

00

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

1

Dre

na

je0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

10

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

1

Ad

min

istr

ació

n m

ina

0.0

08

0.0

12

0.0

16

0.0

18

0.0

20

0.0

21

0.0

22

0.0

23

0.0

24

0.0

24

0.0

25

0.0

25

0.0

26

0.0

26

0.0

27

0.0

27

0.0

27

0.0

28

0.0

28

0.0

28

0.0

29

0.0

30

0.0

30

0.0

31

0.0

31

0.0

31

0.0

31

0.0

32

Ma

teri

ale

s0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

0

mis

ce

lan

eo

s0

.00

10

.00

10

.00

10

.00

10

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

2

TO

TA

L0

.17

90

.28

30

.39

80

.49

30

.55

40

.59

50

.65

10

.67

70

.69

90

.71

50

.72

60

.73

90

.74

50

.76

00

.77

50

.79

20

.80

20

.81

90

.83

30

.84

80

.86

80

.87

70

.88

70

.89

30

.89

90

.91

60

.92

30

.94

0

CC

OS

TO

AC

TIV

IDA

D01/0

2/2

007

02/0

2/2

007

03/0

2/2

007

04/0

2/2

007

05/0

2/2

007

06/0

2/2

007

07/0

2/2

007

08/0

2/2

007

09/0

2/2

007

10/0

2/2

007

11/0

2/2

007

12/0

2/2

007

13/0

2/2

007

14/0

2/2

007

15/0

2/2

007

16/0

2/2

007

17/0

2/2

007

18/0

2/2

007

19/0

2/2

007

20/0

2/2

007

21/0

2/2

007

22/0

2/2

007

23/0

2/2

007

24/0

2/2

007

25/0

2/2

007

26/0

2/2

007

27/0

2/2

007

28/0

2/2

007

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

Pe

rfo

racio

n0

1,5

00

7,8

90

13

,00

11

6,8

88

23

,35

03

0,2

31

34

,47

44

2,5

78

47

,91

35

3,1

67

58

,91

46

3,7

40

71

,65

47

6,1

11

80

,97

68

6,6

81

93

,74

09

9,5

01

10

4,8

48

10

4,8

48

10

4,8

48

10

4,8

48

10

6,5

23

11

4,7

12

12

2,2

69

12

8,6

96

13

5,4

04

Vo

lad

ura

1,0

24

1,6

16

3,1

81

8,5

20

12

,28

51

3,1

89

21

,25

32

5,6

35

29

,36

23

2,8

54

36

,31

43

8,8

15

40

,49

34

2,0

00

43

,60

75

0,9

85

53

,66

35

8,9

54

65

,72

16

9,4

99

71

,14

37

2,2

11

73

,16

37

4,1

91

75

,71

08

5,0

75

86

,70

89

2,1

59

Ca

rgu

io7

,15

21

3,6

56

20

,38

42

7,8

07

34

,77

54

2,1

19

48

,93

05

6,6

21

64

,70

67

0,8

49

79

,01

58

5,8

80

93

,16

79

9,8

08

10

6,7

55

11

3,5

03

11

9,9

27

12

6,1

67

13

3,1

51

14

0,7

51

14

7,6

82

15

4,8

60

16

1,8

94

16

9,0

30

17

5,8

85

18

3,0

44

18

9,9

68

19

7,0

16

Aca

rre

o1

6,7

74

33

,10

45

3,1

13

72

,15

28

8,9

13

10

6,7

19

12

5,1

96

14

2,6

11

15

7,7

57

17

3,0

26

19

1,1

96

20

9,1

66

22

5,2

38

24

2,3

75

26

3,0

67

28

0,6

60

29

7,5

88

31

3,3

24

33

1,2

58

35

3,0

34

36

9,8

04

38

5,3

65

40

1,0

52

41

9,0

73

43

5,3

79

45

0,8

74

46

5,1

15

48

0,3

03

Re

mo

cio

n0

00

1,6

93

2,8

97

2,8

97

2,8

97

4,0

62

5,4

87

6,9

10

7,4

02

7,6

77

7,8

33

7,8

33

9,1

62

9,1

62

10

,19

51

0,9

72

12

,25

61

2,8

17

13

,64

91

4,5

88

16

,37

31

6,3

73

17

,29

81

7,2

98

18

,25

11

9,6

67

Co

nstr

uccio

n d

e B

ota

de

ros

21

11

61

16

11

61

16

27

62

76

37

41

,40

71

,40

71

,40

71

,40

71

,40

71

,40

71

,40

71

,40

71

,91

21

,91

21

,91

22

,16

03

,37

33

,37

33

,66

55

,32

26

,32

51

0,7

38

11

,17

51

1,1

75

Ma

nte

nim

ien

to -

Via

s1

,30

42

,13

73

,91

66

,72

69

,77

91

3,7

94

17

,02

51

8,5

31

19

,14

52

0,2

81

20

,53

72

1,7

08

23

,29

92

4,0

32

24

,92

42

6,0

52

31

,12

33

7,3

71

42

,27

84

5,0

82

47

,46

24

9,6

17

51

,81

85

4,2

29

55

,31

65

7,2

36

59

,57

86

1,8

34

Pre

pa

racio

n d

e A

cce

so

s0

00

00

00

07

54

75

42

,00

92

,71

83

,30

44

,21

95

,94

27

,09

07

,09

07

,09

07

,09

07

,74

28

,68

79

,69

49

,69

49

,69

49

,69

49

,69

49

,69

49

,69

4

Em

pu

je d

e

Bo

tad

ero

s.

3,1

58

5,6

28

8,7

95

9,4

57

10

,64

41

2,8

14

15

,54

91

7,0

55

18

,03

21

9,5

49

20

,61

82

2,1

15

23

,94

92

7,3

82

29

,56

33

2,8

89

33

,39

63

4,4

09

35

,15

23

5,9

70

36

,80

23

8,8

65

39

,37

64

1,5

09

43

,35

04

4,9

21

47

,28

84

9,0

18

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)0

00

29

27

94

13

56

56

22

62

26

22

67

97

96

87

41

,01

01

,01

01

,01

01

,01

01

,01

01

,01

01

,01

01

,01

01

,01

01

,01

01

,01

01

,01

01

,13

91

,23

61

,41

0

Dre

na

je0

00

00

04

46

80

11

,24

91

,24

91

,24

91

,24

91

,24

91

,24

91

,24

91

,24

91

,24

91

,24

91

,24

91

,24

91

,24

91

,24

91

,24

91

,24

91

,24

91

,24

91

,24

91

,24

9

Ad

min

istr

ació

n m

ina

1,3

31

2,6

63

3,9

94

5,3

25

6,6

57

7,9

88

9,3

19

10

,65

01

1,9

82

13

,31

31

4,6

44

15

,97

61

7,3

07

18

,63

81

9,9

70

21

,30

12

2,6

32

23

,96

32

5,2

95

26

,62

62

7,9

57

29

,28

93

0,6

20

31

,95

13

3,2

83

34

,61

43

5,9

45

37

,27

6

Ma

teri

ale

s0

00

00

00

00

00

00

00

00

00

00

00

00

00

0

mis

ce

lan

eo

s1

00

20

13

01

40

25

02

60

27

03

80

39

04

1,0

04

1,1

05

1,2

05

1,3

05

1,4

06

1,5

06

1,6

07

1,7

07

1,8

07

1,9

08

2,0

08

2,1

09

2,2

09

2,3

10

2,4

10

2,5

10

2,6

11

2,7

11

2,8

12

TO

TA

L3

0,7

64

60

,42

01

01

,38

91

44

,82

61

83

,23

32

23

,55

92

71

,68

83

11

,43

63

53

,08

13

88

,72

84

28

,23

84

66

,42

25

01

,86

15

41

,60

85

82

,76

86

26

,28

56

66

,46

77

10

,16

27

55

,87

38

00

,78

88

33

,66

88

64

,96

98

94

,76

19

30

,15

59

69

,21

11

,01

8,1

53

1,0

54

,90

41

,09

6,2

07

CC

OS

TO

AC

TIV

IDA

D01/0

2/2

007

02/0

2/2

007

03/0

2/2

007

04/0

2/2

007

05/0

2/2

007

06/0

2/2

007

07/0

2/2

007

08/0

2/2

007

09/0

2/2

007

10/0

2/2

007

11/0

2/2

007

12/0

2/2

007

13/0

2/2

007

14/0

2/2

007

15/0

2/2

007

16/0

2/2

007

17/0

2/2

007

18/0

2/2

007

19/0

2/2

007

20/0

2/2

007

21/0

2/2

007

22/0

2/2

007

23/0

2/2

007

24/0

2/2

007

25/0

2/2

007

26/0

2/2

007

27/0

2/2

007

28/0

2/2

007

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

Pe

rfo

racio

n0

1,5

00

6,3

90

5,1

11

3,8

87

6,4

61

6,8

82

4,2

43

8,1

04

5,3

35

5,2

54

5,7

48

4,8

26

7,9

15

4,4

56

4,8

65

5,7

05

7,0

60

5,7

61

5,3

47

00

01

,67

58

,19

07

,55

76

,42

66

,70

8

Vo

lad

ura

1,0

24

59

21

,56

65

,33

93

,76

59

04

8,0

64

4,3

82

3,7

27

3,4

92

3,4

61

2,5

01

1,6

78

1,5

07

1,6

07

7,3

78

2,6

78

5,2

91

6,7

67

3,7

78

1,6

45

1,0

68

95

21

,02

81

,51

99

,36

51

,63

35

,45

2

Ca

rgu

io7

,15

26

,50

36

,72

87

,42

36

,96

97

,34

46

,81

17

,69

18

,08

56

,14

38

,16

66

,86

57

,28

76

,64

16

,94

76

,74

86

,42

46

,24

06

,98

47

,60

06

,93

17

,17

87

,03

37

,13

76

,85

47

,16

06

,92

47

,04

8

Aca

rre

o1

6,7

74

16

,33

02

0,0

09

19

,03

91

6,7

61

17

,80

51

8,4

78

17

,41

41

5,1

46

15

,26

91

8,1

70

17

,97

01

6,0

71

17

,13

82

0,6

92

17

,59

31

6,9

28

15

,73

61

7,9

34

21

,77

61

6,7

70

15

,56

01

5,6

87

18

,02

11

6,3

05

15

,49

51

4,2

41

15

,18

8

Re

mo

cio

n0

00

1,6

93

1,2

04

00

1,1

65

1,4

25

1,4

23

49

22

75

15

60

1,3

29

01

,03

37

77

1,2

84

56

18

32

93

91

,78

50

92

60

95

21

,41

7

Co

nstr

uccio

n d

e B

ota

de

ros

21

95

00

01

61

09

71

,03

40

00

00

00

50

50

02

47

1,2

13

02

92

1,6

57

1,0

04

4,4

13

43

70

Ma

nte

nim

ien

to -

Via

s1

,30

48

33

1,7

79

2,8

10

3,0

54

4,0

15

3,2

31

1,5

06

61

31

,13

72

55

1,1

71

1,5

91

73

38

92

1,1

28

5,0

72

6,2

47

4,9

07

2,8

04

2,3

81

2,1

55

2,2

02

2,4

11

1,0

87

1,9

20

2,3

42

2,2

56

Pre

pa

racio

n d

e A

cce

so

s0

00

00

00

07

54

01

,25

57

08

58

69

15

1,7

24

1,1

48

00

06

51

94

51

,00

70

00

00

0

Em

pu

je d

e

Bo

tad

ero

s.

3,1

58

2,4

71

3,1

67

66

21

,18

72

,17

02

,73

51

,50

69

76

1,5

17

1,0

69

1,4

97

1,8

35

3,4

32

2,1

82

3,3

26

50

71

,01

27

43

81

88

32

2,0

63

51

12

,13

41

,84

01

,57

12

,36

71

,73

0

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)0

00

29

25

01

34

15

25

80

05

61

17

78

13

50

00

00

00

00

00

13

09

71

74

Dre

na

je0

00

00

04

46

35

44

49

00

00

00

00

00

00

00

00

00

0

Ad

min

istr

ació

n m

ina

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

1,3

31

Ma

teri

ale

s0

00

00

00

00

00

00

00

00

00

00

00

00

00

0

mis

ce

lan

eo

s1

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

0

TO

TA

L3

0,7

64

29

,65

64

0,9

69

43

,43

73

8,4

07

40

,32

64

8,1

29

39

,74

84

1,6

45

35

,64

73

9,5

09

38

,18

43

5,4

39

39

,74

64

1,1

60

43

,51

74

0,1

82

43

,69

54

5,7

11

44

,91

53

2,8

80

31

,30

12

9,7

93

35

,39

43

9,0

55

48

,94

23

6,7

51

41

,30

3

DIARIO

CO

ST

O M

INA

PO

R O

PE

RA

CIÓ

N U

NIT

AR

IO M

ES

DE

FE

BR

ER

O D

EL

2007

COST ACUM. en US$/T-min COST ACUM. en US$/T-roca ACUMULADO

65

CC

OS

TO

AC

TIV

IDA

D01/0

3/2

007

02/0

3/2

007

03/0

3/2

007

04/0

3/2

007

05/0

3/2

007

06/0

3/2

007

07/0

3/2

007

08/0

3/2

007

09/0

3/2

007

10/0

3/2

007

11/0

3/2

007

12/0

3/2

007

13/0

3/2

007

14/0

3/2

007

15/0

3/2

007

16/0

3/2

007

17/0

3/2

007

18/0

3/2

007

19/0

3/2

007

20/0

3/2

007

21/0

3/2

007

22/0

3/2

007

23/0

3/2

007

24/0

3/2

007

25/0

3/2

007

26/0

3/2

007

27/0

3/2

007

28/0

3/2

007

29/0

3/2

007

30/0

3/2

007

31/0

3/2

007

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

in

Pe

rfo

racio

n0

.01

30

.03

80

.05

60

.06

80

.08

10

.10

50

.11

10

.11

70

.12

70

.13

50

.13

40

.14

20

.14

40

.14

50

.15

00

.15

40

.16

00

.16

30

.16

80

.16

60

.16

30

.16

10

.16

10

.17

10

.17

70

.18

70

.19

30

.19

80

.20

20

.20

80

.20

8

Vo

lad

ura

0.0

19

0.0

33

0.0

48

0.0

67

0.0

66

0.0

63

0.0

83

0.1

01

0.1

03

0.0

99

0.1

00

0.1

12

0.1

12

0.1

09

0.1

07

0.1

21

0.1

23

0.1

27

0.1

24

0.1

27

0.1

23

0.1

23

0.1

23

0.1

31

0.1

43

0.1

44

0.1

45

0.1

57

0.1

70

0.1

71

0.1

72

Carg

uio

0.0

44

0.0

79

0.1

05

0.1

25

0.1

40

0.1

56

0.1

64

0.1

72

0.1

79

0.1

84

0.1

89

0.1

91

0.1

96

0.2

01

0.2

09

0.2

14

0.2

25

0.2

34

0.2

37

0.2

36

0.2

33

0.2

30

0.2

28

0.2

37

0.2

46

0.2

54

0.2

63

0.2

71

0.2

81

0.2

91

0.3

01

Aca

rre

o0

.10

60

.17

90

.23

70

.28

20

.31

80

.34

70

.36

90

.39

40

.41

30

.43

10

.44

90

.45

90

.47

30

.48

20

.49

70

.50

80

.52

20

.53

40

.54

10

.54

20

.54

10

.54

00

.53

90

.56

00

.58

20

.60

60

.62

00

.63

50

.65

90

.68

30

.71

0

Rem

ocio

n0

.00

00

.00

30

.01

00

.00

90

.00

90

.00

80

.00

70

.00

80

.01

10

.01

10

.01

50

.01

40

.01

50

.01

40

.01

40

.01

60

.01

70

.01

80

.01

90

.01

80

.01

90

.01

80

.01

80

.01

90

.01

90

.01

90

.01

90

.01

90

.02

00

.02

00

.02

0

Con

str

uccio

n d

e B

ota

de

ros

0.0

00

0.0

08

0.0

20

0.0

25

0.0

23

0.0

21

0.0

19

0.0

22

0.0

20

0.0

22

0.0

24

0.0

23

0.0

25

0.0

25

0.0

26

0.0

25

0.0

24

0.0

24

0.0

23

0.0

22

0.0

21

0.0

20

0.0

19

0.0

19

0.0

22

0.0

22

0.0

22

0.0

24

0.0

25

0.0

25

0.0

25

Ma

nte

nim

ien

to -

Via

s0

.01

10

.02

10

.02

60

.03

30

.03

70

.04

00

.04

40

.04

70

.04

70

.04

70

.04

80

.05

10

.05

40

.05

50

.05

80

.06

00

.06

30

.06

50

.06

70

.06

80

.06

70

.06

80

.06

80

.07

10

.07

40

.07

70

.08

10

.09

00

.09

40

.09

70

.10

0

Pre

pa

racio

n d

e A

cce

so

s0

.00

40

.01

60

.01

70

.01

80

.01

70

.01

80

.02

00

.02

00

.01

90

.01

70

.01

60

.01

70

.01

60

.01

70

.01

70

.01

80

.01

80

.01

80

.01

70

.01

60

.01

50

.01

50

.01

40

.01

40

.01

40

.01

40

.01

50

.01

50

.01

50

.01

50

.01

5

Em

pu

je d

e

Bo

tad

ero

s.

0.0

12

0.0

19

0.0

21

0.0

23

0.0

24

0.0

34

0.0

36

0.0

36

0.0

39

0.0

42

0.0

45

0.0

47

0.0

47

0.0

48

0.0

54

0.0

58

0.0

60

0.0

60

0.0

60

0.0

59

0.0

58

0.0

57

0.0

56

0.0

57

0.0

58

0.0

59

0.0

62

0.0

64

0.0

66

0.0

68

0.0

69

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)0

.00

10

.00

10

.00

20

.00

20

.00

20

.00

30

.00

30

.00

30

.00

20

.00

20

.00

20

.00

20

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

3

Dre

na

je0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

30

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

30

.00

30

.00

30

.00

30

.00

30

.00

3

Ad

min

istr

ació

n m

ina

0.0

08

0.0

14

0.0

19

0.0

22

0.0

25

0.0

28

0.0

30

0.0

31

0.0

32

0.0

33

0.0

34

0.0

34

0.0

35

0.0

36

0.0

37

0.0

38

0.0

40

0.0

41

0.0

41

0.0

41

0.0

41

0.0

41

0.0

40

0.0

42

0.0

44

0.0

46

0.0

47

0.0

49

0.0

51

0.0

53

0.0

54

Ma

teri

ale

s0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

0

mis

ce

lan

eo

s0

.00

10

.00

10

.00

20

.00

20

.00

20

.00

20

.00

20

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

4

TO

TA

L0

.21

90

.41

20

.56

10

.67

40

.74

20

.82

30

.88

80

.95

40

.99

51

.02

71

.05

61

.09

51

.12

21

.13

81

.17

41

.21

81

.25

61

.28

81

.30

11

.30

01

.28

51

.27

61

.27

11

.32

61

.38

31

.43

41

.47

31

.52

91

.58

81

.63

61

.67

9

CC

OS

TO

AC

TIV

IDA

D01/0

3/2

007

02/0

3/2

007

03/0

3/2

007

04/0

3/2

007

05/0

3/2

007

06/0

3/2

007

07/0

3/2

007

08/0

3/2

007

09/0

3/2

007

10/0

3/2

007

11/0

3/2

007

12/0

3/2

007

13/0

3/2

007

14/0

3/2

007

15/0

3/2

007

16/0

3/2

007

17/0

3/2

007

18/0

3/2

007

19/0

3/2

007

20/0

3/2

007

21/0

3/2

007

22/0

3/2

007

23/0

3/2

007

24/0

3/2

007

25/0

3/2

007

26/0

3/2

007

27/0

3/2

007

28/0

3/2

007

29/0

3/2

007

30/0

3/2

007

31/0

3/2

007

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

Pe

rfo

racio

n0

.01

20

.03

20

.04

50

.05

30

.06

30

.07

90

.08

40

.08

80

.09

40

.09

90

.09

70

.10

30

.10

20

.10

10

.10

10

.10

20

.10

30

.10

30

.10

60

.10

60

.10

60

.10

60

.10

90

.11

40

.11

70

.12

20

.12

10

.12

10

.12

10

.12

30

.12

2

Vo

lad

ura

0.0

18

0.0

28

0.0

39

0.0

53

0.0

51

0.0

48

0.0

62

0.0

76

0.0

77

0.0

73

0.0

73

0.0

81

0.0

79

0.0

76

0.0

72

0.0

80

0.0

79

0.0

81

0.0

78

0.0

81

0.0

80

0.0

82

0.0

83

0.0

88

0.0

94

0.0

94

0.0

91

0.0

96

0.1

01

0.1

01

0.1

01

Carg

uio

0.0

41

0.0

66

0.0

85

0.0

99

0.1

08

0.1

18

0.1

24

0.1

28

0.1

33

0.1

35

0.1

37

0.1

38

0.1

39

0.1

40

0.1

41

0.1

42

0.1

45

0.1

48

0.1

50

0.1

50

0.1

51

0.1

53

0.1

54

0.1

58

0.1

62

0.1

66

0.1

65

0.1

65

0.1

68

0.1

72

0.1

77

Aca

rre

o0

.09

80

.14

90

.19

30

.22

30

.24

60

.26

30

.27

90

.29

50

.30

70

.31

70

.32

50

.33

20

.33

50

.33

60

.33

60

.33

70

.33

70

.33

80

.34

10

.34

50

.35

10

.35

80

.36

30

.37

30

.38

30

.39

50

.39

00

.38

70

.39

40

.40

40

.41

6

Rem

ocio

n0

.00

00

.00

30

.00

90

.00

70

.00

70

.00

60

.00

50

.00

60

.00

80

.00

80

.01

10

.01

00

.01

10

.01

00

.01

00

.01

00

.01

10

.01

10

.01

20

.01

20

.01

20

.01

20

.01

20

.01

30

.01

20

.01

20

.01

20

.01

20

.01

20

.01

20

.01

2

Con

str

uccio

n d

e B

ota

de

ros

0.0

00

0.0

06

0.0

16

0.0

20

0.0

18

0.0

16

0.0

15

0.0

16

0.0

15

0.0

16

0.0

17

0.0

17

0.0

17

0.0

17

0.0

17

0.0

17

0.0

16

0.0

15

0.0

14

0.0

14

0.0

14

0.0

13

0.0

13

0.0

13

0.0

15

0.0

15

0.0

14

0.0

15

0.0

15

0.0

15

0.0

15

Ma

nte

nim

ien

to -

Via

s0

.01

00

.01

80

.02

10

.02

60

.02

80

.03

00

.03

30

.03

50

.03

50

.03

50

.03

50

.03

70

.03

80

.03

90

.03

90

.04

00

.04

10

.04

10

.04

20

.04

30

.04

40

.04

50

.04

60

.04

70

.04

80

.05

00

.05

10

.05

50

.05

60

.05

70

.05

9

Pre

pa

racio

n d

e A

cce

so

s0

.00

40

.01

30

.01

40

.01

50

.01

30

.01

30

.01

50

.01

50

.01

40

.01

30

.01

20

.01

20

.01

20

.01

20

.01

10

.01

20

.01

20

.01

10

.01

10

.01

00

.01

00

.01

00

.01

00

.01

00

.01

00

.00

90

.00

90

.00

90

.00

90

.00

90

.00

9

Em

pu

je d

e

Bo

tad

ero

s.

0.0

11

0.0

16

0.0

17

0.0

18

0.0

19

0.0

26

0.0

27

0.0

27

0.0

29

0.0

31

0.0

33

0.0

34

0.0

34

0.0

34

0.0

36

0.0

39

0.0

38

0.0

38

0.0

38

0.0

37

0.0

38

0.0

38

0.0

38

0.0

38

0.0

38

0.0

38

0.0

39

0.0

39

0.0

40

0.0

40

0.0

41

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)0

.00

10

.00

10

.00

10

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

2

Dre

na

je0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

20

.00

20

.00

20

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

20

.00

20

.00

20

.00

20

.00

10

.00

1

Ad

min

istr

ació

n m

ina

0.0

07

0.0

12

0.0

15

0.0

18

0.0

19

0.0

21

0.0

22

0.0

23

0.0

24

0.0

24

0.0

25

0.0

25

0.0

25

0.0

25

0.0

25

0.0

26

0.0

26

0.0

26

0.0

26

0.0

26

0.0

27

0.0

27

0.0

27

0.0

28

0.0

29

0.0

30

0.0

30

0.0

30

0.0

30

0.0

31

0.0

32

Ma

teri

ale

s0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

0

mis

ce

lan

eo

s0

.00

10

.00

10

.00

10

.00

10

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

30

.00

30

.00

3

TO

TA

L0

.20

20

.34

30

.45

50

.53

30

.57

30

.62

20

.67

20

.71

30

.74

00

.75

50

.76

60

.79

10

.79

50

.79

30

.79

20

.80

80

.81

00

.81

50

.82

00

.82

90

.83

60

.84

50

.85

70

.88

40

.91

10

.93

40

.92

50

.93

10

.94

90

.96

70

.98

5

CC

OS

TO

AC

TIV

IDA

D01/0

3/2

007

02/0

3/2

007

03/0

3/2

007

04/0

3/2

007

05/0

3/2

007

06/0

3/2

007

07/0

3/2

007

08/0

3/2

007

09/0

3/2

007

10/0

3/2

007

11/0

3/2

007

12/0

3/2

007

13/0

3/2

007

14/0

3/2

007

15/0

3/2

007

16/0

3/2

007

17/0

3/2

007

18/0

3/2

007

19/0

3/2

007

20/0

3/2

007

21/0

3/2

007

22/0

3/2

007

23/0

3/2

007

24/0

3/2

007

25/0

3/2

007

26/0

3/2

007

27/0

3/2

007

28/0

3/2

007

29/0

3/2

007

30/0

3/2

007

31/0

3/2

007

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$

Pe

rfo

racio

n2

,07

46

,48

11

0,9

96

14

,79

41

9,5

44

27

,44

03

1,8

10

36

,57

64

2,9

32

49

,65

85

2,8

07

60

,50

86

4,8

09

68

,12

57

3,0

79

77

,99

08

3,1

32

87

,41

39

3,8

41

97

,77

01

01

,06

41

05

,25

41

11

,61

61

18

,28

11

22

,56

71

29

,29

61

33

,53

81

37

,26

51

39

,86

01

43

,81

21

43

,81

2

Vo

lad

ura

3,0

18

5,7

29

9,4

04

14

,66

51

5,9

36

16

,47

12

3,6

25

31

,48

63

4,9

65

36

,50

63

9,6

46

47

,72

25

0,3

04

51

,31

25

2,0

38

60

,93

06

3,7

40

68

,06

26

9,2

27

74

,79

97

6,5

48

80

,79

08

5,2

09

90

,97

29

9,0

82

99

,61

61

00

,61

51

08

,87

71

17

,34

11

18

,41

81

18

,95

3

Carg

uio

6,9

08

13

,60

52

0,6

14

27

,35

23

3,7

86

40

,71

64

6,9

04

53

,47

86

0,5

34

67

,46

37

4,5

15

81

,19

88

7,9

34

94

,66

11

01

,63

71

08

,27

41

16

,72

31

24

,99

51

32

,77

21

38

,44

51

44

,37

61

50

,95

61

57

,91

21

63

,94

41

69

,90

01

75

,99

81

81

,85

01

87

,62

81

94

,66

42

01

,47

82

08

,27

1

Aca

rre

o1

6,4

74

30

,67

54

6,6

25

61

,73

97

6,7

51

90

,76

31

05

,66

91

22

,86

31

39

,82

11

58

,49

11

77

,27

51

95

,42

62

12

,34

72

26

,62

62

41

,99

72

56

,62

82

70

,93

92

85

,53

93

02

,88

93

18

,05

53

35

,22

83

53

,79

93

73

,10

13

87

,53

44

02

,82

74

19

,12

04

29

,14

04

39

,41

24

56

,27

04

72

,88

84

90

,99

0

Rem

ocio

n0

54

52

,05

92

,05

92

,05

92

,05

92

,05

92

,52

93

,57

14

,14

05

,86

25

,86

26

,68

36

,68

37

,03

27

,86

28

,83

89

,55

31

0,6

64

10

,66

41

1,4

77

11

,47

71

2,6

47

13

,08

81

3,0

88

13

,08

81

3,0

88

13

,08

81

3,6

49

14

,01

51

4,0

15

Con

str

uccio

n d

e B

ota

de

ros

77

1,3

01

3,9

26

5,4

99

5,4

99

5,4

99

5,4

99

6,7

50

6,9

34

8,1

79

9,3

07

9,9

48

11

,03

51

1,8

09

12

,56

81

2,5

68

12

,56

81

2,5

68

12

,74

41

2,9

75

12

,97

51

3,1

75

13

,31

81

3,3

18

15

,53

41

5,5

34

15

,53

41

6,6

92

17

,13

71

7,1

37

17

,13

7

Ma

nte

nim

ien

to -

Via

s1

,74

63

,67

15

,03

27

,19

58

,88

51

0,4

27

12

,47

71

4,6

94

16

,02

01

7,2

71

19

,06

72

1,7

89

24

,02

22

6,0

77

28

,20

73

0,4

54

32

,74

33

4,9

39

37

,67

84

0,0

23

41

,73

54

4,2

45

46

,88

04

9,1

12

50

,95

95

3,4

26

56

,24

86

2,4

37

65

,22

96

7,1

35

69

,31

2

Pre

pa

racio

n d

e A

cce

so

s6

61

2,6

63

3,4

35

4,0

36

4,0

36

4,5

92

5,6

74

6,2

81

6,2

81

6,3

06

6,3

33

7,3

31

7,3

31

8,0

70

8,0

70

8,8

72

9,3

67

9,3

67

9,3

67

9,5

04

9,5

04

9,9

98

9,9

98

10

,02

71

0,0

27

10

,02

71

0,1

98

10

,19

81

0,1

98

10

,19

81

0,1

98

Em

pu

je d

e

Bo

tad

ero

s.

1,8

16

3,2

66

4,1

03

4,9

60

5,8

82

8,8

82

10

,39

61

1,2

76

13

,17

41

5,5

42

17

,74

32

0,0

29

21

,28

92

2,7

99

26

,17

12

9,5

15

30

,91

23

2,2

04

33

,66

13

4,5

01

36

,11

43

7,5

17

38

,54

43

9,7

25

40

,11

44

0,7

79

42

,87

84

4,6

12

45

,79

44

6,7

86

47

,84

1

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)1

04

24

83

25

45

45

67

70

28

31

83

18

31

83

18

31

90

81

,21

31

,31

41

,39

01

,46

31

,61

51

,70

21

,70

21

,70

21

,70

21

,70

21

,77

11

,77

11

,85

51

,86

91

,86

91

,86

91

,86

91

,86

91

,86

9

Dre

na

je0

00

41

41

41

74

47

44

74

47

44

74

47

44

74

47

44

74

47

44

74

47

44

74

47

44

74

47

44

74

47

44

74

41

,75

21

,75

21

,75

21

,75

21

,75

21

,75

2

Ad

min

istr

ació

n m

ina

1,2

14

2,4

28

3,6

42

4,8

56

6,0

70

7,2

84

8,4

99

9,7

13

10

,92

71

2,1

41

13

,35

51

4,5

69

15

,78

31

6,9

97

18

,21

11

9,4

25

20

,63

92

1,8

53

23

,06

82

4,2

82

25

,49

62

6,7

10

27

,92

42

9,1

38

30

,35

23

1,5

66

32

,78

03

3,9

94

35

,20

83

6,4

22

37

,63

6

Ma

teri

ale

s0

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

mis

ce

lan

eo

s1

00

20

13

01

40

25

02

60

27

03

80

39

04

1,0

04

1,1

05

1,2

05

1,3

05

1,4

06

1,5

06

1,6

07

1,7

07

1,8

07

1,9

08

2,0

08

2,1

09

2,2

09

2,3

10

2,4

10

2,5

10

2,6

11

2,7

11

2,8

12

2,9

12

3,0

12

3,1

13

TO

TA

L3

4,0

91

70

,61

11

10

,16

11

47

,65

01

79

,05

72

14

,87

62

54

,18

62

97

,22

03

36

,73

53

77

,27

14

17

,48

44

66

,03

35

03

,49

45

35

,21

75

71

,14

46

14

,72

66

51

,95

86

88

,93

97

28

,35

67

63

,46

27

96

,96

18

36

,36

78

79

,66

39

17

,65

39

57

,04

99

92

,07

01

,01

9,4

89

1,0

57

,82

31

,09

8,9

72

1,1

31

,91

11

,16

1,7

86

CC

OS

TO

AC

TIV

IDA

D01/0

3/2

007

02/0

3/2

007

03/0

3/2

007

04/0

3/2

007

05/0

3/2

007

06/0

3/2

007

07/0

3/2

007

08/0

3/2

007

09/0

3/2

007

10/0

3/2

007

11/0

3/2

007

12/0

3/2

007

13/0

3/2

007

14/0

3/2

007

15/0

3/2

007

16/0

3/2

007

17/0

3/2

007

18/0

3/2

007

19/0

3/2

007

20/0

3/2

007

21/0

3/2

007

22/0

3/2

007

23/0

3/2

007

24/0

3/2

007

25/0

3/2

007

26/0

3/2

007

27/0

3/2

007

28/0

3/2

007

29/0

3/2

007

30/0

3/2

007

31/0

3/2

007

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$

Pe

rfo

racio

n2

,07

44

,40

84

,51

43

,79

84

,75

07

,89

64

,37

04

,76

66

,35

66

,72

53

,14

97

,70

24

,30

13

,31

64

,95

44

,91

15

,14

14

,28

26

,42

83

,92

93

,29

44

,19

06

,36

26

,66

54

,28

76

,72

84

,24

23

,72

72

,59

53

,95

30

Vo

lad

ura

3,0

18

2,7

11

3,6

75

5,2

62

1,2

71

53

47

,15

47

,86

13

,47

91

,54

13

,13

98

,07

72

,58

11

,00

87

27

8,8

92

2,8

09

4,3

22

1,1

65

5,5

72

1,7

49

4,2

42

4,4

19

5,7

63

8,1

10

53

49

99

8,2

62

8,4

64

1,0

77

53

4

Carg

uio

6,9

08

6,6

97

7,0

09

6,7

38

6,4

34

6,9

30

6,1

88

6,5

73

7,0

56

6,9

29

7,0

52

6,6

83

6,7

36

6,7

27

6,9

77

6,6

37

8,4

48

8,2

72

7,7

77

5,6

73

5,9

30

6,5

81

6,9

55

6,0

33

5,9

55

6,0

98

5,8

52

5,7

78

7,0

36

6,8

15

6,7

93

Aca

rre

o1

6,4

74

14

,20

01

5,9

51

15

,11

41

5,0

12

14

,01

21

4,9

07

17

,19

31

6,9

58

18

,67

01

8,7

84

18

,15

11

6,9

22

14

,27

81

5,3

71

14

,63

21

4,3

10

14

,60

11

7,3

50

15

,16

61

7,1

73

18

,57

11

9,3

02

14

,43

31

5,2

94

16

,29

31

0,0

20

10

,27

21

6,8

58

16

,61

81

8,1

02

Rem

ocio

n0

54

51

,51

50

00

04

70

1,0

41

56

91

,72

20

82

20

34

88

30

97

67

15

1,1

12

08

13

01

,17

04

41

00

00

56

13

65

0

Con

str

uccio

n d

e B

ota

de

ros

77

1,2

24

2,6

25

1,5

73

00

01

,25

11

84

1,2

45

1,1

28

64

21

,08

67

74

75

90

00

17

62

31

02

00

14

30

2,2

16

00

1,1

58

44

50

0

Ma

nte

nim

ien

to -

Via

s1

,74

61

,92

61

,36

02

,16

31

,69

11

,54

22

,05

02

,21

71

,32

71

,25

01

,79

72

,72

22

,23

32

,05

62

,13

02

,24

72

,28

92

,19

62

,73

92

,34

51

,71

32

,51

02

,63

52

,23

21

,84

72

,46

72

,82

36

,18

92

,79

31

,90

62

,17

6

Pre

pa

racio

n d

e A

cce

so

s6

61

2,0

01

77

36

00

05

56

1,0

82

60

70

24

27

99

80

74

00

80

24

95

00

13

70

49

40

29

00

17

10

00

0

Em

pu

je d

e

Bo

tad

ero

s.

1,8

16

1,4

51

83

78

57

92

23

,00

01

,51

48

80

1,8

98

2,3

68

2,2

01

2,2

86

1,2

60

1,5

10

3,3

71

3,3

45

1,3

96

1,2

92

1,4

58

83

91

,61

31

,40

31

,02

81

,18

03

90

66

42

,09

91

,73

41

,18

29

92

1,0

55

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)1

04

14

47

71

29

11

31

35

12

90

00

07

73

05

10

07

67

31

52

87

00

00

69

08

41

40

00

00

Dre

na

je0

00

41

00

70

30

00

00

00

00

00

00

00

00

01

,00

80

00

00

Ad

min

istr

ació

n m

ina

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

1,2

14

Ma

teri

ale

s0

00

00

00

00

00

00

00

00

00

00

00

00

00

00

00

mis

ce

lan

eo

s1

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

10

01

00

TO

TA

L3

4,0

91

36

,52

03

9,5

50

37

,48

93

1,4

07

35

,81

93

9,3

10

43

,03

43

9,5

15

40

,53

64

0,2

12

48

,55

03

7,4

60

31

,72

33

5,9

27

43

,58

23

7,2

32

36

,98

13

9,4

17

35

,10

63

3,4

98

39

,40

64

3,2

97

37

,99

03

9,3

96

35

,02

12

7,4

19

38

,33

44

1,1

48

32

,94

02

9,8

74

DIARIO

CO

ST

O M

INA

PO

R O

PE

RA

CIÓ

N U

NIT

AR

IO M

ES

DE

MA

RZ

O D

EL

2007

COST ACUM. en US$/T-min COST ACUM. en US$/T-roca ACUMULADO

66

CC

OS

TO

AC

TIV

IDA

D01/0

4/2

006

02/0

4/2

006

03/0

4/2

006

04/0

4/2

006

05/0

4/2

006

06/0

4/2

006

07/0

4/2

006

08/0

4/2

006

09/0

4/2

006

10/0

4/2

006

11/0

4/2

006

12/0

4/2

006

13/0

4/2

006

14/0

4/2

006

15/0

4/2

006

16/0

4/2

006

17/0

4/2

006

18/0

4/2

006

19/0

4/2

006

20/0

4/2

006

21/0

4/2

006

22/0

4/2

006

23/0

4/2

006

24/0

4/2

006

25/0

4/2

006

26/0

4/2

006

27/0

4/2

006

28/0

4/2

006

29/0

4/2

006

30/0

4/2

006

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

inU

S$/T

_M

in

Pe

rfo

racio

n0

.07

70

.19

50

.28

40

.26

00

.26

20

.25

30

.25

80

.26

40

.25

60

.23

40

.24

10

.24

90

.25

00

.24

30

.25

70

.28

00

.29

60

.30

00

.29

90

.30

90

.32

40

.34

10

.35

50

.38

20

.39

60

.38

70

.38

40

.38

10

.36

00

.34

7

Vo

lad

ura

0.4

05

0.2

59

0.2

34

0.2

63

0.2

63

0.2

38

0.2

69

0.2

59

0.2

55

0.2

39

0.2

37

0.2

37

0.2

57

0.2

39

0.2

40

0.2

45

0.2

60

0.2

69

0.2

61

0.2

52

0.2

93

0.3

08

0.3

10

0.3

21

0.3

15

0.3

05

0.3

47

0.3

51

0.3

35

0.3

21

Ca

rgu

io0

.12

80

.14

20

.17

40

.21

20

.23

50

.24

30

.25

10

.24

80

.27

50

.27

80

.28

20

.28

80

.29

40

.29

50

.29

60

.30

00

.30

00

.30

50

.31

20

.31

40

.33

20

.34

00

.34

40

.35

20

.35

90

.35

90

.36

80

.36

80

.35

70

.34

6

Aca

rre

o0

.41

40

.48

60

.57

30

.66

60

.70

80

.72

80

.74

50

.74

00

.80

10

.81

60

.83

90

.86

20

.88

40

.89

40

.90

60

.92

10

.92

50

.94

10

.95

30

.95

30

.99

31

.00

71

.01

31

.02

81

.04

01

.04

11

.05

81

.05

61

.03

01

.00

0

Re

mo

cio

n0

.00

00

.00

00

.00

00

.00

00

.00

60

.01

20

.02

00

.02

20

.02

50

.02

30

.02

10

.02

10

.01

90

.01

90

.01

90

.01

80

.01

70

.01

70

.01

70

.01

80

.01

80

.01

80

.01

70

.01

70

.01

70

.01

70

.01

70

.01

70

.01

60

.01

5

Co

nstr

uccio

n d

e B

ota

de

ros

0.1

36

0.1

21

0.1

48

0.1

58

0.1

71

0.1

92

0.1

95

0.1

78

0.1

72

0.1

68

0.1

75

0.1

80

0.1

90

0.1

94

0.1

97

0.1

97

0.1

93

0.1

85

0.1

85

0.1

89

0.1

98

0.2

04

0.2

04

0.2

08

0.2

11

0.2

06

0.2

08

0.2

04

0.1

95

0.1

84

Ma

nte

nim

ien

to -

Via

s0

.01

10

.01

00

.01

00

.00

80

.00

70

.01

40

.01

80

.02

30

.02

60

.02

40

.02

50

.02

50

.02

60

.02

80

.02

80

.03

00

.03

10

.03

30

.03

50

.03

60

.03

80

.04

00

.04

20

.04

30

.04

40

.04

50

.04

60

.04

70

.04

60

.04

5

Pre

pa

racio

n d

e A

cce

so

s0

.05

70

.06

00

.07

70

.09

30

.09

40

.09

10

.08

40

.07

30

.07

60

.07

30

.06

80

.06

80

.07

00

.06

50

.06

10

.05

70

.05

40

.05

20

.04

90

.04

70

.04

70

.04

60

.04

40

.04

40

.04

30

.04

10

.04

00

.03

90

.03

80

.03

6

Em

pu

je d

e

Bo

tad

ero

s.

0.0

26

0.0

18

0.0

28

0.0

43

0.0

44

0.0

45

0.0

45

0.0

43

0.0

53

0.0

55

0.0

55

0.0

54

0.0

53

0.0

53

0.0

51

0.0

50

0.0

49

0.0

49

0.0

50

0.0

50

0.0

54

0.0

55

0.0

54

0.0

56

0.0

58

0.0

58

0.0

61

0.0

63

0.0

61

0.0

61

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)0

.01

00

.00

80

.00

80

.00

90

.00

90

.01

00

.01

20

.01

10

.01

20

.01

20

.01

30

.01

40

.01

50

.01

50

.01

60

.01

60

.01

60

.01

50

.01

50

.01

50

.01

60

.01

70

.01

70

.01

70

.01

70

.01

70

.01

70

.01

70

.01

70

.01

6

Dre

na

je0

.00

00

.00

10

.01

10

.01

10

.01

40

.01

30

.01

30

.01

10

.01

10

.01

00

.01

00

.00

90

.00

80

.00

80

.00

70

.00

70

.00

70

.00

60

.00

60

.00

70

.00

70

.00

70

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

50

.00

5

Ad

min

istr

ació

n m

ina

0.0

19

0.0

22

0.0

28

0.0

32

0.0

35

0.0

37

0.0

38

0.0

38

0.0

41

0.0

42

0.0

42

0.0

43

0.0

43

0.0

43

0.0

43

0.0

43

0.0

43

0.0

44

0.0

44

0.0

44

0.0

46

0.0

47

0.0

48

0.0

49

0.0

50

0.0

50

0.0

51

0.0

51

0.0

50

0.0

48

Ma

teri

ale

s0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

0

mis

ce

lan

eo

s0

.00

20

.00

20

.00

20

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

30

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

40

.00

4

TO

TA

L1

.28

31

.32

31

.57

61

.75

51

.84

81

.87

51

.94

81

.91

12

.00

31

.97

42

.00

92

.05

02

.11

12

.09

62

.12

02

.16

52

.19

22

.21

62

.22

72

.23

52

.36

72

.43

02

.45

42

.52

22

.55

62

.53

32

.60

42

.59

92

.51

12

.42

5

CC

OS

TO

AC

TIV

IDA

D01/0

4/2

006

02/0

4/2

006

03/0

4/2

006

04/0

4/2

006

05/0

4/2

006

06/0

4/2

006

07/0

4/2

006

08/0

4/2

006

09/0

4/2

006

10/0

4/2

006

11/0

4/2

006

12/0

4/2

006

13/0

4/2

006

14/0

4/2

006

15/0

4/2

006

16/0

4/2

006

17/0

4/2

006

18/0

4/2

006

19/0

4/2

006

20/0

4/2

006

21/0

4/2

006

22/0

4/2

006

23/0

4/2

006

24/0

4/2

006

25/0

4/2

006

26/0

4/2

006

27/0

4/2

006

28/0

4/2

006

29/0

4/2

006

30/0

4/2

006

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

US

$/T

_ro

ca

Pe

rfo

racio

n0

.05

50

.14

80

.18

90

.15

20

.14

60

.13

90

.13

90

.14

30

.12

40

.11

10

.11

00

.10

90

.10

60

.10

20

.10

60

.11

40

.12

10

.12

00

.11

80

.12

10

.12

00

.12

30

.12

60

.13

30

.13

50

.13

20

.12

70

.12

60

.12

20

.12

2

Vo

lad

ura

0.2

89

0.1

97

0.1

56

0.1

54

0.1

47

0.1

31

0.1

45

0.1

41

0.1

24

0.1

13

0.1

08

0.1

04

0.1

09

0.1

00

0.0

99

0.1

00

0.1

06

0.1

08

0.1

03

0.0

99

0.1

08

0.1

11

0.1

11

0.1

12

0.1

07

0.1

04

0.1

15

0.1

16

0.1

14

0.1

12

Ca

rgu

io0

.09

10

.10

70

.11

60

.12

40

.13

10

.13

30

.13

50

.13

50

.13

40

.13

20

.12

90

.12

70

.12

50

.12

30

.12

30

.12

20

.12

20

.12

20

.12

30

.12

30

.12

30

.12

30

.12

30

.12

30

.12

20

.12

20

.12

20

.12

20

.12

10

.12

1

Aca

rre

o0

.29

60

.36

80

.38

10

.39

00

.39

60

.40

00

.40

20

.40

20

.39

00

.38

70

.38

30

.38

00

.37

50

.37

40

.37

50

.37

60

.37

80

.37

80

.37

50

.37

40

.36

70

.36

40

.36

10

.35

80

.35

40

.35

40

.35

10

.35

00

.35

00

.35

0

Re

mo

cio

n0

.00

00

.00

00

.00

00

.00

00

.00

40

.00

70

.01

10

.01

20

.01

20

.01

10

.01

00

.00

90

.00

80

.00

80

.00

80

.00

70

.00

70

.00

70

.00

70

.00

70

.00

70

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

50

.00

5

Co

nstr

uccio

n d

e B

ota

de

ros

0.0

97

0.0

92

0.0

99

0.0

93

0.0

96

0.1

06

0.1

05

0.0

96

0.0

84

0.0

80

0.0

80

0.0

79

0.0

81

0.0

81

0.0

81

0.0

80

0.0

79

0.0

74

0.0

73

0.0

74

0.0

73

0.0

74

0.0

73

0.0

72

0.0

72

0.0

70

0.0

69

0.0

68

0.0

66

0.0

65

Ma

nte

nim

ien

to -

Via

s0

.00

80

.00

80

.00

60

.00

50

.00

40

.00

70

.01

00

.01

30

.01

30

.01

20

.01

10

.01

10

.01

10

.01

20

.01

20

.01

20

.01

30

.01

30

.01

40

.01

40

.01

40

.01

40

.01

50

.01

50

.01

50

.01

50

.01

50

.01

50

.01

60

.01

6

Pre

pa

racio

n d

e A

cce

so

s0

.04

10

.04

60

.05

10

.05

50

.05

20

.05

00

.04

50

.04

00

.03

70

.03

50

.03

10

.03

00

.03

00

.02

70

.02

50

.02

30

.02

20

.02

10

.01

90

.01

80

.01

70

.01

70

.01

60

.01

50

.01

50

.01

40

.01

30

.01

30

.01

30

.01

3

Em

pu

je d

e

Bo

tad

ero

s.

0.0

18

0.0

14

0.0

19

0.0

25

0.0

25

0.0

25

0.0

24

0.0

23

0.0

26

0.0

26

0.0

25

0.0

24

0.0

23

0.0

22

0.0

21

0.0

21

0.0

20

0.0

20

0.0

20

0.0

20

0.0

20

0.0

20

0.0

19

0.0

20

0.0

20

0.0

20

0.0

20

0.0

21

0.0

21

0.0

21

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)0

.00

70

.00

60

.00

50

.00

50

.00

50

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

70

.00

70

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

60

.00

6

Dre

na

je0

.00

00

.00

10

.00

70

.00

70

.00

80

.00

70

.00

70

.00

60

.00

50

.00

50

.00

50

.00

40

.00

40

.00

30

.00

30

.00

30

.00

30

.00

30

.00

20

.00

30

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

2

Ad

min

istr

ació

n m

ina

0.0

13

0.0

17

0.0

19

0.0

19

0.0

19

0.0

20

0.0

21

0.0

21

0.0

20

0.0

20

0.0

19

0.0

19

0.0

18

0.0

18

0.0

18

0.0

18

0.0

18

0.0

18

0.0

17

0.0

17

0.0

17

0.0

17

0.0

17

0.0

17

0.0

17

0.0

17

0.0

17

0.0

17

0.0

17

0.0

17

Ma

teri

ale

s0

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

00

.00

0

mis

ce

lan

eo

s0

.00

10

.00

10

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

20

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

10

.00

1

TO

TA

L0

.91

71

.00

31

.04

91

.02

91

.03

31

.03

11

.05

01

.03

70

.97

50

.93

70

.91

80

.90

30

.89

60

.87

70

.87

70

.88

40

.89

50

.89

00

.87

60

.87

60

.87

50

.87

90

.87

60

.87

70

.87

00

.86

00

.86

30

.86

10

.85

30

.85

0

CC

OS

TO

AC

TIV

IDA

D01/0

4/2

006

02/0

4/2

006

03/0

4/2

006

04/0

4/2

006

05/0

4/2

006

06/0

4/2

006

07/0

4/2

006

08/0

4/2

006

09/0

4/2

006

10/0

4/2

006

11/0

4/2

006

12/0

4/2

006

13/0

4/2

006

14/0

4/2

006

15/0

4/2

006

16/0

4/2

006

17/0

4/2

006

18/0

4/2

006

19/0

4/2

006

20/0

4/2

006

21/0

4/2

006

22/0

4/2

006

23/0

4/2

006

24/0

4/2

006

25/0

4/2

006

26/0

4/2

006

27/0

4/2

006

28/0

4/2

006

29/0

4/2

006

30/0

4/2

006

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

Pe

rfo

racio

n3

,68

91

5,7

81

26

,93

22

8,9

33

33

,62

53

6,8

94

42

,40

94

9,7

62

49

,76

24

9,7

62

56

,07

66

2,3

90

67

,60

77

1,1

63

80

,76

79

3,1

35

10

4,4

71

11

0,8

15

11

5,6

79

12

5,1

63

13

1,2

05

14

2,1

36

15

2,6

78

16

7,4

82

17

7,4

72

18

0,6

99

18

1,7

55

18

6,4

04

18

7,4

99

19

2,4

99

Vo

lad

ura

19

,32

32

0,9

70

22

,24

42

9,2

61

33

,80

53

4,7

23

44

,22

24

8,8

27

49

,57

25

0,7

28

55

,03

65

9,3

77

69

,51

47

0,0

66

75

,38

08

1,6

77

91

,60

29

9,5

00

10

1,0

58

10

2,0

97

11

8,7

03

12

8,3

39

13

3,5

09

14

0,6

99

14

1,2

51

14

2,4

30

16

4,1

43

17

1,6

04

17

4,5

87

17

7,8

99

Ca

rgu

io6

,09

91

1,4

48

16

,53

52

3,5

98

30

,21

03

5,3

80

41

,28

84

6,8

35

53

,48

75

9,0

52

65

,63

57

2,3

11

79

,57

08

6,2

06

93

,01

79

9,7

54

10

5,7

36

11

2,7

18

12

0,6

62

12

7,4

87

13

4,7

60

14

1,5

85

14

8,2

59

15

4,5

73

16

1,1

31

16

7,6

43

17

4,0

44

17

9,8

13

18

6,1

30

19

1,8

31

Aca

rre

o1

9,7

44

39

,31

25

4,3

51

74

,18

19

0,9

34

10

6,1

37

12

2,5

18

13

9,5

09

15

6,0

01

17

3,4

00

19

4,8

48

21

6,4

17

23

9,2

88

26

1,6

73

28

4,6

42

30

6,5

11

32

6,0

22

34

7,8

19

36

9,1

54

38

6,5

89

40

2,7

97

41

9,3

68

43

6,0

68

45

1,0

50

46

6,7

97

48

5,6

83

50

0,4

67

51

6,7

09

53

6,2

70

55

4,3

49

Re

mo

cio

n0

00

08

20

1,7

68

3,2

94

4,1

29

4,8

65

4,8

65

4,8

65

5,2

54

5,2

54

5,6

69

5,9

67

5,9

67

5,9

67

6,3

32

6,7

39

7,2

99

7,3

70

7,3

70

7,3

70

7,3

70

7,6

33

7,9

01

8,2

70

8,2

70

8,2

70

8,2

70

Co

nstr

uccio

n d

e B

ota

de

ros

6,5

04

9,8

19

14

,08

61

7,5

91

22

,02

92

8,0

75

32

,10

73

3,4

79

33

,47

93

5,6

38

40

,70

34

5,2

77

51

,52

85

6,8

37

61

,79

66

5,5

95

68

,03

06

8,4

96

71

,46

17

6,4

77

80

,35

48

4,7

69

87

,73

39

1,3

04

94

,75

69

5,9

49

98

,14

19

9,7

50

10

1,5

96

10

2,1

02

Ma

nte

nim

ien

to -

Via

s5

29

84

39

12

91

29

12

1,9

71

2,9

18

4,3

96

5,0

52

5,1

58

5,7

28

6,2

54

7,0

29

8,0

55

8,7

46

9,9

02

11

,01

71

2,3

26

13

,72

91

4,7

00

15

,39

01

6,5

79

17

,96

31

8,9

40

19

,75

62

1,0

22

21

,73

92

2,8

22

23

,88

42

5,0

95

Pre

pa

racio

n d

e A

cce

so

s2

,72

24

,86

77

,31

31

0,3

60

12

,03

51

3,2

77

13

,77

21

3,7

72

14

,82

81

5,5

15

15

,85

01

7,1

31

18

,81

91

9,0

36

19

,03

61

9,1

19

19

,11

91

9,1

19

19

,11

91

9,1

19

19

,11

91

9,1

19

19

,11

91

9,1

19

19

,11

91

9,1

19

19

,11

91

9,1

19

19

,85

61

9,8

56

Em

pu

je d

e

Bo

tad

ero

s.

1,2

33

1,4

52

2,6

52

4,8

04

5,6

43

6,5

18

7,3

39

8,0

66

10

,28

01

1,6

40

12

,82

41

3,6

70

14

,42

81

5,4

84

15

,98

61

6,7

36

17

,26

61

8,2

20

19

,37

22

0,3

49

21

,87

82

2,8

11

23

,35

42

4,6

32

25

,98

62

7,2

82

28

,70

93

0,8

00

31

,87

93

3,7

00

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)4

63

63

47

36

97

51

,17

31

,49

31

,90

52

,16

62

,41

22

,54

03

,02

73

,61

14

,11

04

,50

45

,03

55

,34

75

,48

25

,68

95

,95

46

,27

96

,67

57

,05

57

,32

47

,52

07

,78

18

,00

48

,26

28

,52

98

,83

89

,05

1

Dre

na

je0

91

1,0

36

1,2

51

1,8

52

1,8

52

2,1

07

2,1

07

2,1

07

2,1

07

2,2

97

2,2

97

2,2

97

2,2

97

2,2

97

2,2

97

2,3

50

2,3

50

2,3

50

2,7

27

2,7

27

2,7

27

2,7

27

2,7

27

2,7

27

2,7

27

2,7

27

2,7

27

2,7

27

2,7

27

Ad

min

istr

ació

n m

ina

89

51

,79

12

,68

63

,58

24

,47

75

,37

26

,26

87

,16

38

,05

88

,95

49

,84

91

0,7

45

11

,64

01

2,5

35

13

,43

11

4,3

26

15

,22

11

6,1

17

17

,01

21

7,9

08

18

,80

31

9,6

98

20

,59

42

1,4

89

22

,38

42

3,2

80

24

,17

52

5,0

71

25

,96

62

6,8

61

Ma

teri

ale

s0

00

00

00

00

00

00

00

00

00

00

00

00

00

00

0

mis

ce

lan

eo

s7

41

47

22

12

95

36

84

42

51

55

89

66

37

36

81

08

84

95

71

,03

11

,10

51

,17

81

,25

21

,32

51

,39

91

,47

31

,54

61

,62

01

,69

41

,76

71

,84

11

,91

51

,98

82

,06

22

,13

52

,20

9

00

00

00

00

00

00

00

00

00

00

00

00

00

00

0

TO

TA

L6

1,2

00

10

7,0

09

14

9,4

83

19

5,4

48

23

7,5

16

27

3,4

60

32

0,1

47

36

0,2

10

38

9,9

03

41

9,3

59

46

6,7

39

51

4,7

32

57

1,0

82

61

3,5

26

66

6,1

01

72

0,3

66

77

2,2

83

81

9,5

00

86

2,2

89

90

6,1

93

95

9,7

80

1,0

11

,55

61

,05

6,6

98

1,1

06

,90

41

,14

6,7

91

1,1

81

,73

91

,23

1,5

50

1,2

71

,61

81

,30

7,5

02

1,3

44

,24

0

CC

OS

TO

AC

TIV

IDA

D01/0

4/2

006

02/0

4/2

006

03/0

4/2

006

04/0

4/2

006

05/0

4/2

006

06/0

4/2

006

07/0

4/2

006

08/0

4/2

006

09/0

4/2

006

10/0

4/2

006

11/0

4/2

006

12/0

4/2

006

13/0

4/2

006

14/0

4/2

006

15/0

4/2

006

16/0

4/2

006

17/0

4/2

006

18/0

4/2

006

19/0

4/2

006

20/0

4/2

006

21/0

4/2

006

22/0

4/2

006

23/0

4/2

006

24/0

4/2

006

25/0

4/2

006

26/0

4/2

006

27/0

4/2

006

28/0

4/2

006

29/0

4/2

006

30/0

4/2

006

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

EJE

CU

TA

DO

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

US

$U

S$

Pe

rfo

racio

n3

,68

91

2,0

91

11

,15

22

,00

14

,69

23

,26

95

,51

57

,35

20

06

,31

56

,31

45

,21

63

,55

69

,60

41

2,3

68

11

,33

66

,34

44

,86

59

,48

36

,04

21

0,9

31

10

,54

21

4,8

03

9,9

91

3,2

27

1,0

56

4,6

49

1,0

94

5,0

01

Vo

lad

ura

19

,32

31

,64

71

,27

47

,01

74

,54

49

18

9,4

99

4,6

05

74

51

,15

64

,30

84

,34

01

0,1

37

55

25

,31

46

,29

79

,92

57

,89

81

,55

81

,03

91

6,6

06

9,6

36

5,1

70

7,1

90

55

21

,17

92

1,7

13

7,4

61

2,9

83

3,3

12

Ca

rgu

io6

,09

95

,34

95

,08

77

,06

26

,61

25

,17

05

,90

95

,54

76

,65

25

,56

56

,58

46

,67

67

,25

96

,63

66

,81

16

,73

65

,98

26

,98

27

,94

46

,82

57

,27

36

,82

46

,67

46

,31

46

,55

76

,51

26

,40

15

,77

06

,31

65

,70

2

Aca

rre

o1

9,7

44

19

,56

81

5,0

39

19

,83

01

6,7

53

15

,20

31

6,3

81

16

,99

01

6,4

92

17

,39

92

1,4

48

21

,56

82

2,8

71

22

,38

52

2,9

69

21

,86

91

9,5

11

21

,79

72

1,3

35

17

,43

51

6,2

08

16

,57

21

6,6

99

14

,98

31

5,7

46

18

,88

71

4,7

84

16

,24

21

9,5

61

18

,07

8

Re

mo

cio

n0

00

08

20

94

81

,52

68

35

73

60

03

89

04

16

29

80

03

64

40

75

60

71

00

02

63

26

83

70

00

0

Co

nstr

uccio

n d

e B

ota

de

ros

6,5

04

3,3

15

4,2

67

3,5

05

4,4

38

6,0

46

4,0

32

1,3

72

02

,15

95

,06

54

,57

46

,25

15

,30

94

,95

93

,79

92

,43

54

66

2,9

65

5,0

16

3,8

77

4,4

15

2,9

65

3,5

71

3,4

52

1,1

94

2,1

91

1,6

10

1,8

45

50

6

Ma

nte

nim

ien

to -

Via

s5

29

31

56

90

01

,05

99

47

1,4

78

65

71

06

57

05

25

77

61

,02

66

91

1,1

55

1,1

15

1,3

09

1,4

03

97

16

90

1,1

88

1,3

85

97

78

16

1,2

66

71

61

,08

31

,06

21

,21

1

Pre

pa

racio

n d

e A

cce

so

s2

,72

22

,14

52

,44

63

,04

71

,67

61

,24

24

95

01

,05

66

87

33

51

,28

11

,68

82

17

08

20

00

00

00

00

00

07

38

0

Em

pu

je d

e

Bo

tad

ero

s.

1,2

33

21

91

,20

02

,15

28

39

87

58

21

72

82

,21

41

,36

01

,18

48

46

75

81

,05

65

03

75

05

30

95

41

,15

39

77

1,5

29

93

35

43

1,2

77

1,3

54

1,2

96

1,4

27

2,0

90

1,0

80

1,8

20

Otr

os S

erv

icio

s

Min

a(L

um

ina

ria

)4

63

17

11

02

23

91

99

32

04

12

26

12

46

12

94

87

58

44

99

39

45

32

31

21

35

20

72

65

32

63

96

38

12

68

19

72

61

22

32

58

26

83

09

21

3

Dre

na

je0

91

94

52

16

60

10

25

50

00

19

00

00

00

53

00

37

70

00

00

00

00

0

Ad

min

istr

ació

n m

ina

89

58

95

89

58

95

89

58

95

89

58

95

89

58

95

89

58

95

89

58

95

89

58

95

89

58

95

89

58

95

89

58

95

89

58

95

89

58

95

89

58

95

89

58

95

Ma

teri

ale

s0

00

00

00

00

00

00

00

00

00

00

00

00

00

00

0

mis

ce

lan

eo

s7

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

47

4

TO

TA

L6

1,2

00

45

,80

84

2,4

75

45

,96

44

2,0

68

35

,94

44

6,6

87

40

,06

32

9,6

93

29

,45

64

7,3

80

47

,99

35

6,3

50

42

,44

35

2,5

75

54

,26

55

1,9

17

47

,21

64

2,7

90

43

,90

35

3,5

88

51

,77

64

5,1

41

50

,20

73

9,8

87

34

,94

74

9,8

11

40

,06

83

5,8

84

36

,73

8

DIARIOC

OS

TO

MIN

A P

OR

OP

ER

AC

IÓN

UN

ITA

RIO

ME

S D

E A

BR

IL D

EL

2006

COST ACUM. en US$/T-min COST ACUM. en US$/T-roca ACUMULADO

67

IND

ICA

DO

RE

S D

E G

ES

TIO

N

ME

SE

NE

RO

DE

DIA

S D

EL

ME

S3

0

DE

DIA

S T

RA

BA

JA

DO

S3

1

PE

RF

OR

AC

ION

ME

TR

OS

M

EN

SU

AL

% C

UM

PM

ET

RO

S

DIA

RIO

% C

UM

PP

ER

FO

RA

CIO

N

PR

OG

RA

MA

EJ

EC

UT

AD

OM

EN

SU

AL

PR

OG

RA

MA

EJ

EC

UT

AD

OD

IA -

DIA

TO

TA

L E

N P

ER

FO

RA

CIO

NT

OT

AL

EN

PE

RF

OR

AC

ION

PE

RF

OR

AC

ION

MIN

A1

6,0

82

.00

11

,09

9.6

5

69

.02

%1

6,6

18

.07

1

1,0

99

.65

6

6.7

9%

PE

RF

OR

AC

ION

MIN

A

CO

ST

OS

ME

NS

UA

L%

CU

MP

DIA

RIO

% C

UM

PC

OS

TO

S

PR

OG

RA

MA

EJ

EC

UT

AD

OM

EN

SU

AL

PR

OG

RA

MA

EJ

EC

UT

AD

OD

IA -

DIA

PE

RF

OR

AC

ION

US

$2

37

,04

8.8

0

12

2,1

42

.35

51

.53

%2

44

,95

0.4

2

1

22

,14

2.3

5

4

9.8

6%

PE

RF

OR

AC

ION

US

$

VO

LA

DU

RA

US

$1

97

,84

3.6

3

90

,20

9.6

6

45

.60

%2

04

,43

8.4

1

9

0,2

09

.66

4

4.1

3%

VO

LA

DU

RA

US

$

$/T

M-R

OC

A1

.25

1.0

2

82

.09

%1

.25

1.0

2

82

.09

%$/T

M-R

OC

A

$/T

M-M

IN2

.61

1.8

6

71

.21

%2

.61

1.8

6

71

.21

%$/T

M-M

IN

MIN

AM

EN

SU

AL

% C

UM

PD

IAR

IO%

CU

MP

MIN

A

PR

OG

RA

MA

EJ

EC

UT

AD

OM

EN

SU

AL

PR

OG

RA

MA

EJ

EC

UT

AD

OD

IA -

DIA

TO

N D

ES

MO

NT

E6

60

,00

0.0

0

49

5,0

85

.50

75

.01

%6

82

,00

0.0

0

4

95

,08

5.5

0

7

2.5

9%

TO

N D

ES

MO

NT

E

TO

N M

INE

RA

L6

00

,00

0.0

0

60

2,6

16

.75

10

0.4

4%

62

0,0

00

.00

60

2,6

16

.75

97

.20

%T

ON

MIN

ER

AL

RA

TIO

1.1

0

0

.82

7

4.6

9%

1.1

0

0

.82

7

4.6

9%

RA

TIO

ON

ZA

S1

1,2

07

.75

11

,20

9.4

8

10

0.0

2%

11

,58

1.3

4

11

,20

9.4

8

96

.79

%O

NZ

AS

LE

Y0

.58

1

0.5

79

99

.58

%0

.58

1

0.5

79

99

.58

%L

EY

68

IND

ICA

DO

RE

S D

E G

ES

TIO

N

ME

SF

EB

RE

RO

DE

DIA

S D

EL

ME

S2

8

DE

DIA

S T

RA

BA

JA

DO

S2

8

PE

RF

OR

AC

ION

ME

TR

OS

M

EN

SU

AL

% C

UM

PM

ET

RO

S

DIA

RIO

% C

UM

PP

ER

FO

RA

CIO

N

PR

OG

RA

MA

EJ

EC

UT

AD

OM

EN

SU

AL

PR

OG

RA

MA

EJ

EC

UT

AD

OD

IA -

DIA

TO

TA

L E

N P

ER

FO

RA

CIO

NT

OT

AL

EN

PE

RF

OR

AC

ION

PE

RF

OR

AC

ION

MIN

A1

2,0

00

.00

12

,30

2.6

0

10

2.5

2%

12

,00

0.0

0

12

,30

2.6

0

10

2.5

2%

PE

RF

OR

AC

ION

MIN

A

CO

ST

OS

ME

NS

UA

L%

CU

MP

DIA

RIO

% C

UM

PC

OS

TO

S

PR

OG

RA

MA

EJ

EC

UT

AD

OM

EN

SU

AL

PR

OG

RA

MA

EJ

EC

UT

AD

OD

IA -

DIA

PE

RF

OR

AC

ION

US

$1

89

,53

7.1

7

13

5,4

03

.84

71

.44

%1

89

,53

7.1

7

1

35

,40

3.8

4

7

1.4

4%

PE

RF

OR

AC

ION

US

$

VO

LA

DU

RA

US

$1

65

,37

0.2

7

92

,15

9.4

8

55

.73

%1

65

,37

0.2

7

9

2,1

59

.48

5

5.7

3%

VO

LA

DU

RA

US

$

$/T

M-R

OC

A0

.98

0.9

4

96

.18

%0

.98

0.9

4

96

.18

%$/T

M-R

OC

A

$/T

M-M

IN2

.20

2.0

0

91

.01

%2

.20

2.0

0

91

.01

%$/T

M-M

IN

MIN

AM

EN

SU

AL

% C

UM

PD

IAR

IO%

CU

MP

MIN

A

PR

OG

RA

MA

EJ

EC

UT

AD

OM

EN

SU

AL

PR

OG

RA

MA

EJ

EC

UT

AD

OD

IA -

DIA

TO

N D

ES

MO

NT

E7

50

,00

0.0

0

61

8,4

03

.50

82

.45

%7

50

,00

0.0

0

6

18

,40

3.5

0

8

2.4

5%

TO

N D

ES

MO

NT

E

TO

N M

INE

RA

L6

00

,00

0.0

0

54

7,6

30

.50

91

.27

%6

00

,00

0.0

0

5

47

,63

0.5

0

9

1.2

7%

TO

N M

INE

RA

L

RA

TIO

1.2

5

1

.13

9

0.3

4%

1.2

5

1

.13

9

0.3

4%

RA

TIO

ON

ZA

S1

1,2

00

.48

11

,20

8.2

2

10

0.0

7%

11

,20

0.4

8

11

,20

8.2

2

10

0.0

7%

ON

ZA

S

LE

Y0

.58

1

0.6

37

10

9.6

4%

0.5

81

0

.63

7

1

09

.64

%L

EY

69

IND

ICA

DO

RE

S D

E G

ES

TIO

N

ME

SM

AR

ZO

DE

DIA

S D

EL

ME

S3

1

DE

DIA

S T

RA

BA

JA

DO

S2

8

PE

RF

OR

AC

ION

ME

TR

OS

M

EN

SU

AL

% C

UM

PM

ET

RO

S

DIA

RIO

% C

UM

PP

ER

FO

RA

CIO

N

PR

OG

RA

MA

EJ

EC

UT

AD

OM

EN

SU

AL

PR

OG

RA

MA

EJ

EC

UT

AD

OD

IA -

DIA

TO

TA

L E

N P

ER

FO

RA

CIO

NT

OT

AL

EN

PE

RF

OR

AC

ION

PE

RF

OR

AC

ION

MIN

A1

5,0

00

.00

12

,48

6.9

0

83

.25

%1

3,5

48

.39

1

2,4

86

.90

9

2.1

7%

PE

RF

OR

AC

ION

MIN

A

CO

ST

OS

ME

NS

UA

L%

CU

MP

DIA

RIO

% C

UM

PC

OS

TO

S

PR

OG

RA

MA

EJ

EC

UT

AD

OM

EN

SU

AL

PR

OG

RA

MA

EJ

EC

UT

AD

OD

IA -

DIA

PE

RF

OR

AC

ION

US

$2

05

,33

1.9

3

13

8,8

27

.04

67

.61

%1

85

,46

1.1

0

1

38

,82

7.0

4

7

4.8

6%

PE

RF

OR

AC

ION

US

$

VO

LA

DU

RA

US

$1

74

,53

5.4

5

79

,35

0.0

4

45

.46

%1

57

,64

4.9

2

7

9,3

50

.04

5

0.3

3%

VO

LA

DU

RA

US

$

$/T

M-R

OC

A0

.97

0.9

2

94

.49

%0

.97

0.9

2

94

.49

%$/T

M-R

OC

A

$/T

M-M

IN2

.18

1.5

1

68

.99

%2

.18

1.5

1

68

.99

%$/T

M-M

IN

MIN

AM

EN

SU

AL

% C

UM

PD

IAR

IO%

CU

MP

MIN

A

PR

OG

RA

MA

EJ

EC

UT

AD

OM

EN

SU

AL

PR

OG

RA

MA

EJ

EC

UT

AD

OD

IA -

DIA

TO

N D

ES

MO

NT

E8

12

,50

0.0

0

44

4,6

79

.50

54

.73

%7

33

,87

0.9

7

4

44

,67

9.5

0

6

0.5

9%

TO

N D

ES

MO

NT

E

TO

N M

INE

RA

L6

50

,00

0.0

0

69

1,9

20

.00

10

6.4

5%

58

7,0

96

.77

69

1,9

20

.00

11

7.8

5%

TO

N M

INE

RA

L

RA

TIO

1.2

5

0

.64

5

1.4

1%

1.2

5

0

.64

5

1.4

1%

RA

TIO

ON

ZA

S1

3,3

74

.71

13

,40

7.0

6

10

0.2

4%

12

,08

0.3

8

13

,40

7.0

6

11

0.9

8%

ON

ZA

S

LE

Y0

.64

0

0.6

03

94

.17

%0

.64

0

0.6

03

94

.17

%L

EY

70

IND

ICA

DO

RE

S D

E G

ES

TIO

N

ME

SA

BR

IL

DE

DIA

S D

EL

ME

S3

0

DE

DIA

S T

RA

BA

JA

DO

S3

0

PE

RF

OR

AC

ION

ME

TR

OS

M

EN

SU

AL

% C

UM

PM

ET

RO

S

DIA

RIO

% C

UM

PP

ER

FO

RA

CIO

N

PR

OG

RA

MA

EJ

EC

UT

AD

OM

EN

SU

AL

PR

OG

RA

MA

EJ

EC

UT

AD

OD

IA -

DIA

PE

RF

OR

AC

ION

MIN

A

DM

13

,94

2.1

7

13

,94

2.1

7

PE

RF

OR

AC

ION

MIN

A D

M

TA

LA

DR

OS

LA

RG

OS

D

M-

-

T

AL

AD

RO

S L

AR

GO

S D

M

TO

TA

L E

N P

ER

FO

RA

CIO

NT

OT

AL

EN

PE

RF

OR

AC

ION

PE

RF

OR

AC

ION

MIN

A1

5,7

50

.00

13

,94

2.1

7

88

.52

%1

5,7

50

.00

1

3,9

42

.17

8

8.5

2%

PE

RF

OR

AC

ION

MIN

A

CO

ST

OS

ME

NS

UA

L%

CU

MP

DIA

RIO

% C

UM

PC

OS

TO

S

PR

OG

RA

MA

EJ

EC

UT

AD

OM

EN

SU

AL

PR

OG

RA

MA

EJ

EC

UT

AD

OD

IA -

DIA

PE

RF

OR

AC

ION

US

$2

48

,26

5.3

8

15

8,1

15

.22

63

.69

%2

48

,26

5.3

8

1

58

,11

5.2

2

6

3.6

9%

PE

RF

OR

AC

ION

US

$

VO

LA

DU

RA

US

$1

97

,35

7.8

9

11

6,3

80

.10

58

.97

%1

97

,35

7.8

9

1

16

,38

0.1

0

5

8.9

7%

VO

LA

DU

RA

US

$

$/T

M-R

OC

A0

.96

0.8

5

88

.92

%0

.96

0.8

5

88

.92

%$/T

M-R

OC

A

$/T

M-M

IN2

.11

1.4

2

67

.42

%2

.11

1.4

2

67

.42

%$/T

M-M

IN

MIN

AM

EN

SU

AL

% C

UM

PD

IAR

IO%

CU

MP

MIN

A

PR

OG

RA

MA

EJ

EC

UT

AD

OM

EN

SU

AL

PR

OG

RA

MA

EJ

EC

UT

AD

OD

IA -

DIA

TO

N D

ES

MO

NT

E9

64

,52

6.4

0

50

2,4

54

.00

52

.09

%9

64

,52

6.4

0

5

02

,45

4.0

0

5

2.0

9%

TO

N D

ES

MO

NT

E

TO

N M

INE

RA

L8

03

,77

2.0

0

75

2,0

91

.00

93

.57

%8

03

,77

2.0

0

7

52

,09

1.0

0

9

3.5

7%

TO

N M

INE

RA

L

RA

TIO

1.2

0

0

.67

5

5.6

7%

1.2

0

0

.67

5

5.6

7%

RA

TIO

ON

ZA

S1

4,9

10

.76

13

,06

6.7

2

87

.63

%1

4,9

10

.76

1

3,0

66

.72

8

7.6

3%

ON

ZA

S

LE

Y0

.57

7

0.5

40

93

.65

%0

.57

7

0.5

40

93

.65

%L

EY

71

Dia Costos Costos Costos COSTO

Dia TaladrosProduc TaladrosReperf. TaladrosLargos T. PRODUC T. REPERF. T.GEOLOGIA T. MES Produccion Reperf. Ore Control TOTAL

Nº Nº Nº m m m m (USD $) (USD $) (USD $) ($)

01/01/07 A - 01/01/07 A 0.00 -

01/01/07 B - 01/01/07 B 0.00 -

02/01/07 A - 02/01/07 A 0.00 -

02/01/07 B - 02/01/07 B 0.00 -

03/01/07 A - 03/01/07 A 0.00 -

03/01/07 B - 03/01/07 B 0.00 -

04/01/07 A 33 206.20 - - 206.20 04/01/07 A 2,268.20 - - 2268.20 2,268.20 -

04/01/07 B 39 197.55 - - 197.55 04/01/07 B 2,173.05 - - 2173.05 2,173.05 -

05/01/07 A 48 298.60 - - 298.60 05/01/07 A 3,284.60 - - 3284.60 3,284.60 -

05/01/07 B 49 300.20 - - 300.20 05/01/07 B 3,302.20 - - 3302.20 3,302.20 -

06/01/07 A 49 294.00 - - 294.00 06/01/07 A 3,234.00 - - 3234.00 3,234.00 -

06/01/07 B 10 - 20.00 - 20.00 06/01/07 B - 220.00 - 220.00 220.00 -

07/01/07 A 8 46.40 - - 46.40 07/01/07 A 510.40 - - 510.40 510.40 -

07/01/07 B 49 283.15 - - 283.15 07/01/07 B 3,114.65 - - 3114.65 3,114.65 -

08/01/07 A 56 346.30 - - 346.30 08/01/07 A 3,809.96 - - 3809.96 3,809.96 -

08/01/07 B 57 350.65 - - 350.65 08/01/07 B 3,857.15 - - 3857.15 3,857.15 -

09/01/07 A 40 220.60 - - 220.60 09/01/07 A 2,426.60 - - 2426.60 2,426.60 -

09/01/07 B 10 - 20.00 - 20.00 09/01/07 B - 220.00 - 220.00 220.00 -

10/01/07 A 87 531.00 - - 531.00 10/01/07 A 5,843.64 - - 5843.64 5,843.64 -

10/01/07 B 19 114.30 - - 114.30 10/01/07 B 1,257.30 - - 1257.30 1,257.30 -

11/01/07 A 19 117.80 - - 117.80 11/01/07 A 1,295.80 - - 1295.80 1,295.80 -

11/01/07 B 32 4 194.90 8.00 - 202.90 11/01/07 B 2,143.90 88.00 - 2231.90 2,231.90 -

12/01/07 A 43 263.10 - - 263.10 12/01/07 A 2,894.76 - - 2894.76 2,894.76 -

12/01/07 B 44 269.30 - - 269.30 12/01/07 B 2,963.62 - - 2963.62 2,963.62 -

13/01/07 A 46 281.30 - - 281.30 13/01/07 A 3,094.30 - - 3094.30 3,094.30 -

13/01/07 B 31 187.70 - - 187.70 13/01/07 B 2,064.70 - - 2064.70 2,064.70 -

14/01/07 A 18 110.00 - - 110.00 14/01/07 A 1,210.00 - - 1210.00 1,210.00 -

14/01/07 B 24 144.40 - - 144.40 14/01/07 B 1,588.40 - - 1588.40 1,588.40 -

15/01/07 A 50 303.10 - - 303.10 15/01/07 A 3,336.08 - - 3336.08 3,336.08 -

15/01/07 B 36 18 220.20 36.00 - 256.20 15/01/07 B 2,424.84 396.00 - 2820.84 2,820.84 -

16/01/07 A 53 327.30 - - 327.30 16/01/07 A 3,600.30 - - 3600.30 3,600.30 -

16/01/07 B 34 214.60 - - 214.60 16/01/07 B 2,365.22 - - 2365.22 2,365.22 -

17/01/07 A 52 327.30 - - 327.30 17/01/07 A 3,607.56 - - 3607.56 3,607.56 -

17/01/07 B 37 234.70 - - 234.70 17/01/07 B 2,585.00 - - 2585.00 2,585.00 -

18/01/07 A - 18/01/07 A 0.00 -

18/01/07 B 1 8 6.50 16.00 - 22.50 18/01/07 B 71.50 176.00 - 247.50 247.50 -

19/01/07 A - 19/01/07 A 0.00 -

19/01/07 B 19 118.40 - - 118.40 19/01/07 B 1,302.40 - - 1302.40 1,302.40 -

20/01/07 A 24 148.20 - - 148.20 20/01/07 A 1,630.20 - - 1630.20 1,630.20 -

20/01/07 B 35 216.50 - - 216.50 20/01/07 B 2,381.50 - - 2381.50 2,381.50 -

21/01/07 A 45 279.20 - - 279.20 21/01/07 A 3,073.84 - - 3073.84 3,073.84 -

21/01/07 B 24 146.30 - - 146.30 21/01/07 B 1,609.30 - - 1609.30 1,609.30 -

22/01/07 A 40 247.80 - - 247.80 22/01/07 A 2,725.80 - - 2725.80 2,725.80 -

22/01/07 B 19 5 116.00 10.00 - 126.00 22/01/07 B 1,276.00 110.00 - 1386.00 1,386.00 -

23/01/07 A - 23/01/07 A 0.00 -

23/01/07 B 36 222.60 - - 222.60 23/01/07 B 2,453.88 - - 2453.88 2,453.88 -

24/01/07 A 44 267.20 - - 267.20 24/01/07 A 2,939.20 - - 2939.20 2,939.20 -

24/01/07 B 28 174.00 - - 174.00 24/01/07 B 1,916.64 - - 1916.64 1,916.64 -

25/01/07 A 2 12.70 - - 12.70 25/01/07 A 139.70 - - 139.70 139.70 -

25/01/07 B 16 13 100.70 26.00 - 126.70 25/01/07 B 1,107.70 286.00 - 1393.70 1,393.70 -

26/01/07 A 35 218.60 - - 218.60 26/01/07 A 2,404.60 - - 2404.60 2,404.60 -

26/01/07 B 31 196.80 - - 196.80 26/01/07 B 2,171.40 - - 2171.40 2,171.40 -

27/01/07 A 70 418.30 - - 418.30 27/01/07 A 4,601.96 - - 4601.96 4,601.96 -

27/01/07 B 40 10 243.10 20.00 - 263.10 27/01/07 B 2,676.08 220.00 - 2896.08 2,896.08 -

28/01/07 A 43 263.00 - - 263.00 28/01/07 A 2,894.32 - - 2894.32 2,894.32 -

28/01/07 B 26 14 160.20 28.00 - 188.20 28/01/07 B 1,762.20 308.00 - 2070.20 2,070.20 -

29/01/07 A 46 274.90 - - 274.90 29/01/07 A 3,023.90 - - 3023.90 3,023.90 -

29/01/07 B 13 5 80.50 10.00 - 90.50 29/01/07 B 885.50 110.00 - 995.50 995.50 -

30/01/07 A 23 143.20 - - 143.20 30/01/07 A 1,575.20 - - 1575.20 1,575.20 -

30/01/07 B 25 156.50 - - 156.50 30/01/07 B 1,721.50 - - 1721.50 1,721.50 -

31/01/07 A 50 309.80 - - 309.80 31/01/07 A 3,407.80 - - 3407.80 3,407.80 -

31/01/07 B - 31/01/07 B 0.00 -

1788 97 - 10905.65 194 - 11099.65 120,008.35 2,134.00 - 122,142.35

11.00 #¡DIV/0!

7.00 17.60 123.20 LARGOS 7.00 123.20

11,092.65 11.00 122019.15 CORTOS 11,092.65 122,019.15

122142.35 122,142.35

- -

0.00 11.00 0.00

0.00 17.60 0.00

0.00

-

RESUMEN DE PERFORACION DE ENERO 2007

TIENE QUE SER CERO

TIENE QUE SER CERO

Turno

Tu

rno

TIENE QUE SER CERO

72

Dia Costos Costos Costos COSTO

Dia TaladrosProduc TaladrosReperf. TaladrosLargos T. PRODUC T. REPERF. T.GEOLOGIA T. MES Produccion Reperf. Ore Control TOTAL

Nº Nº Nº m m m m (USD $) (USD $) (USD $) ($)

01/01/07 A - 01/01/07 A 0.00 -

01/01/07 B - 01/01/07 B 0.00 -

02/01/07 A - 02/01/07 A 0.00 -

02/01/07 B 22 136.40 - - 136.40 02/01/07 B 1,500.40 - - 1500.40 1,500.40 -

03/01/07 A 56 351.30 - - 351.30 03/01/07 A 3,864.30 - - 3864.30 3,864.30 -

03/01/07 B 37 229.60 - - 229.60 03/01/07 B 2,525.60 - - 2525.60 2,525.60 -

04/01/07 A 41 256.50 - - 256.50 04/01/07 A 2,821.50 - - 2821.50 2,821.50 -

04/01/07 B 31 8 192.10 16.00 - 208.10 04/01/07 B 2,113.10 176.00 - 2289.10 2,289.10 -

05/01/07 A 53 325.40 - - 325.40 05/01/07 A 3,579.40 - - 3579.40 3,579.40 -

05/01/07 B 14 - 28.00 - 28.00 05/01/07 B 308.00 - - 308.00 308.00 -

06/01/07 A 43 268.60 - - 268.60 06/01/07 A 2,954.60 - - 2954.60 2,954.60 -

06/01/07 B 54 318.80 - - 318.80 06/01/07 B 3,506.80 - - 3506.80 3,506.80 -

07/01/07 A 56 341.60 - - 341.60 07/01/07 A 3,757.60 - - 3757.60 3,757.60 -

07/01/07 B 45 8 267.70 16.00 - 283.70 07/01/07 B 2,948.00 176.00 - 3124.00 3,124.00 -

08/01/07 A 59 356.00 - - 356.00 08/01/07 A 3,916.00 - - 3916.00 3,916.00 -

08/01/07 B 1 12 5.70 24.00 - 29.70 08/01/07 B 62.70 264.00 - 326.70 326.70 -

09/01/07 A 66 408.60 - - 408.60 09/01/07 A 4,503.18 - - 4503.18 4,503.18 -

09/01/07 B 50 4 318.40 8.00 - 326.40 09/01/07 B 3,512.96 88.00 - 3600.96 3,600.96 -

10/01/07 A 37 225.50 - - 225.50 10/01/07 A 2,480.50 - - 2480.50 2,480.50 -

10/01/07 B 40 259.50 - - 259.50 10/01/07 B 2,854.50 - - 2854.50 2,854.50 -

11/01/07 A 41 250.10 - - 250.10 11/01/07 A 2,751.10 - - 2751.10 2,751.10 -

11/01/07 B 37 227.50 - - 227.50 11/01/07 B 2,502.50 - - 2502.50 2,502.50 -

12/01/07 A 45 279.60 - - 279.60 12/01/07 A 3,075.60 - - 3075.60 3,075.60 -

12/01/07 B 40 242.90 - - 242.90 12/01/07 B 2,671.90 - - 2671.90 2,671.90 -

13/01/07 A 35 210.30 - - 210.30 13/01/07 A 2,313.30 - - 2313.30 2,313.30 -

13/01/07 B 36 5 228.40 - - 228.40 13/01/07 B 2,512.40 - - 2512.40 2,512.40 -

14/01/07 A 60 355.20 - - 355.20 14/01/07 A 3,907.20 - - 3907.20 3,907.20 -

14/01/07 B 60 364.30 - - 364.30 14/01/07 B 4,007.30 - - 4007.30 4,007.30 -

15/01/07 A 57 350.20 - - 350.20 15/01/07 A 3,852.20 - - 3852.20 3,852.20 -

15/01/07 B 8 2 50.90 4.00 - 54.90 15/01/07 B 559.90 44.00 - 603.90 603.90 -

16/01/07 A 66 411.10 - - 411.10 16/01/07 A 4,522.10 - - 4522.10 4,522.10 -

16/01/07 B 3 6 19.20 12.00 - 31.20 16/01/07 B 211.20 132.00 - 343.20 343.20 -

17/01/07 A 41 251.60 - - 251.60 17/01/07 A 2,767.60 - - 2767.60 2,767.60 -

17/01/07 B 44 266.90 266.90 17/01/07 B 2,937.22 2937.22 2,937.22 -

18/01/07 A 51 316.10 316.10 18/01/07 A 3,477.10 3477.10 3,477.10 -

18/01/07 B 53 325.70 325.70 18/01/07 B 3,582.70 3582.70 3,582.70 -

19/01/07 A 60 374.90 374.90 19/01/07 A 4,123.90 4123.90 4,123.90 -

19/01/07 B 22 5 138.80 10.00 148.80 19/01/07 B 1,526.80 110.00 1636.80 1,636.80 -

20/01/07 A 37 242.20 242.20 20/01/07 A 2,689.28 2689.28 2,689.28 -

20/01/07 B 37 5 231.10 10.00 241.10 20/01/07 B 2,547.38 110.00 2657.38 2,657.38 -

21/01/07 A - 21/01/07 A 0.00 -

21/01/07 B - 21/01/07 B 0.00 -

22/01/07 A - 22/01/07 A 0.00 -

22/01/07 B - 22/01/07 B 0.00 -

23/01/07 A - 23/01/07 A 0.00 -

23/01/07 B - 23/01/07 B 0.00 -

24/01/07 A - 24/01/07 A 0.00 -

24/01/07 B 24 152.10 152.10 24/01/07 B 1,675.08 1675.08 1,675.08 -

25/01/07 A 59 363.20 363.20 25/01/07 A 3,995.20 3995.20 3,995.20 -

25/01/07 B 60 381.30 381.30 25/01/07 B 4,194.30 4194.30 4,194.30 -

26/01/07 A 70 442.50 442.50 26/01/07 A 4,867.50 4867.50 4,867.50 -

26/01/07 B 35 8 227.90 16.00 243.90 26/01/07 B 2,513.50 176.00 2689.50 2,689.50 -

27/01/07 A 48 296.50 296.50 27/01/07 A 3,261.50 3261.50 3,261.50 -

27/01/07 B 45 287.70 287.70 27/01/07 B 3,164.70 3164.70 3,164.70 -

28/01/07 A 45 286.40 286.40 28/01/07 A 3,153.04 3153.04 3,153.04 -

28/01/07 B 51 322.30 322.30 28/01/07 B 3,555.20 3555.20 3,555.20 -

29/01/07 A - 29/01/07 A 0.00 -

29/01/07 B - 29/01/07 B 0.00 -

30/01/07 A - 30/01/07 A 0.00 -

30/01/07 B - 30/01/07 B 0.00 -

31/01/07 A - 31/01/07 A 0.00 -

31/01/07 B - 31/01/07 B 0.00 -

1961 77 - 12158.6 144 - 12,302.60 134,127.84 1,276.00 - 135,403.84

11.01 #¡DIV/0!

11.40 17.60 200.64 LARGOS 11.40 200.64

12,291.20 11.00 135203.20 CORTOS 12,291.20 135,203.20

135403.84 135,403.84

- -

0.00 11.00 0.00

0.00 17.60 0.00

0.00

-

RESUMEN DE PERFORACION FEBRERO 2007

TIENE QUE SER CERO

TIENE QUE SER CERO

Turno

Tu

rno

TIENE QUE SER CERO

73

Dia Costos Costos Costos COSTO

Dia TaladrosProduc TaladrosReperf. TaladrosLargos T. PRODUC T. REPERF. T.GEOLOGIA T. MES Produccion Reperf. Ore Control TOTAL

Nº Nº Nº m m m m (USD $) (USD $) (USD $) ($)

01/03/07 A 24 146.10 - - 146.10 01/03/07 A 1,607.10 - - 1607.10 1,607.10 -

01/03/07 B 5 6 30.40 12.00 - 42.40 01/03/07 B 334.40 132.00 - 466.40 466.40 -

02/03/07 A 24 144.20 - - 144.20 02/03/07 A 1,586.20 - - 1586.20 1,586.20 -

02/03/07 B 41 256.50 - - 256.50 02/03/07 B 2,821.50 - - 2821.50 2,821.50 -

03/03/07 A 44 271.20 - - 271.20 03/03/07 A 2,983.20 - - 2983.20 2,983.20 -

03/03/07 B 22 138.90 - - 138.90 03/03/07 B 1,531.20 - - 1531.20 1,531.20 -

04/03/07 A 23 142.50 - - 142.50 04/03/07 A 1,569.48 - - 1569.48 1,569.48 -

04/03/07 B 32 202.60 - - 202.60 04/03/07 B 2,228.60 - - 2228.60 2,228.60 -

05/03/07 A 40 248.70 - - 248.70 05/03/07 A 2,735.70 - - 2735.70 2,735.70 -

05/03/07 B 45 183.15 - - 183.15 05/03/07 B 2,014.65 - - 2014.65 2,014.65 -

06/03/07 A 58 358.50 - - 358.50 06/03/07 A 3,943.50 - - 3943.50 3,943.50 -

06/03/07 B 58 359.30 - - 359.30 06/03/07 B 3,952.30 - - 3952.30 3,952.30 -

07/03/07 A 24 223.90 - - 223.90 07/03/07 A 2,484.68 - - 2484.68 2,484.68 -

07/03/07 B 22 15 141.40 30.00 - 171.40 07/03/07 B 1,555.40 330.00 1885.40 1,885.40 -

08/03/07 A 34 224.10 - - 224.10 08/03/07 A 2,490.84 - - 2490.84 2,490.84 -

08/03/07 B 32 206.50 - - 206.50 08/03/07 B 2,275.46 - - 2275.46 2,275.46 -

09/03/07 A 48 312.70 - - 312.70 09/03/07 A 3,464.78 - - 3464.78 3,464.78 -

09/03/07 B 41 4 254.50 8.00 - 262.50 09/03/07 B 2,803.46 88.00 - 2891.46 2,891.46 -

10/03/07 A 52 327.10 - - 327.10 10/03/07 A 3,606.68 - - 3606.68 3,606.68 -

10/03/07 B 39 238.50 - 30.00 268.50 10/03/07 B 2,623.50 495.00 - 3118.50 3,118.50 -

11/03/07 A 8 49.60 - - 49.60 11/03/07 A 545.60 - - 545.60 545.60 -

11/03/07 B 36 7 222.70 14.00 - 236.70 11/03/07 B 2,449.70 154.00 - 2603.70 2,603.70 -

12/03/07 A 56 352.40 - - 352.40 12/03/07 A 3,876.40 - - 3876.40 3,876.40 -

12/03/07 B 51 7 330.80 14.00 - 344.80 12/03/07 B 3,671.14 154.00 - 3825.14 3,825.14 -

13/03/07 A 24 164.10 - - 164.10 13/03/07 A 1,864.50 - - 1864.50 1,864.50 -

13/03/07 B 34 220.80 - - 220.80 13/03/07 B 2,436.06 - - 2436.06 2,436.06 -

14/03/07 A 37 242.80 - - 242.80 14/03/07 A 2,704.46 - - 2704.46 2,704.46 -

14/03/07 B 8 54.00 - - 54.00 14/03/07 B 611.82 - - 611.82 611.82 -

15/03/07 A 31 215.30 - - 215.30 15/03/07 A 2,463.34 - - 2463.34 2,463.34 -

15/03/07 B 32 217.50 - - 217.50 15/03/07 B 2,490.18 - - 2490.18 2,490.18 -

16/03/07 A 37 238.10 - - 238.10 16/03/07 A 2,634.28 - - 2634.28 2,634.28 -

16/03/07 B 33 207.00 - - 207.00 16/03/07 B 2,277.00 - - 2277.00 2,277.00 -

17/03/07 A 35 224.10 - - 224.10 17/03/07 A 2,478.96 - - 2478.96 2,478.96 -

17/03/07 B 35 5 229.70 10.00 - 239.70 17/03/07 B 2,552.44 110.00 - 2662.44 2,662.44 -

18/03/07 A 49 298.70 - - 298.70 18/03/07 A 3,285.70 - - 3285.70 3,285.70 -

18/03/07 B 14 2 86.55 4.00 - 90.55 18/03/07 B 952.05 44.00 - 996.05 996.05 -

19/033/2007A 45 282.30 - - 282.30 19/033/2007A 3,109.92 - - 3109.92 3,109.92 -

19/033/2007B 46 6 289.20 12.00 - 301.20 19/033/2007B 3,185.82 132.00 - 3317.82 3,317.82 -

20/03/07 A 19 131.00 - - 131.00 20/03/07 A 1,493.14 - - 1493.14 1,493.14 -

20/03/07 B 30 211.50 - - 211.50 20/03/07 B 2,435.40 - - 2435.40 2,435.40 -

21/03/07 A 38 251.40 - - 251.40 21/03/07 A 2,806.98 - - 2806.98 2,806.98 -

21/03/07 B 4 9 26.10 18.00 - 44.10 21/03/07 B 289.08 198.00 - 487.08 487.08 -

22/03/07 A 29 184.90 - - 184.90 22/03/07 A 2,033.90 - - 2033.90 2,033.90 -

22/03/07 B 31 195.90 - - 195.90 22/03/07 B 2,156.22 - - 2156.22 2,156.22 -

23/03/07 A 41 260.60 - - 260.60 23/03/07 A 2,870.56 - - 2870.56 2,870.56 -

23/03/07 B 49 316.50 - - 316.50 23/03/07 B 3,491.40 - - 3491.40 3,491.40 -

24/03/07 A 44 291.70 - - 291.70 24/03/07 A 3,256.22 - - 3256.22 3,256.22 -

24/03/07 B 44 6 292.90 12.00 - 304.90 24/03/07 B 3,276.68 132.00 - 3408.68 3,408.68 -

25/03/07 A 50 329.40 - - 329.40 25/03/07 A 3,662.34 - - 3662.34 3,662.34 -

25/03/07 B 7 3 50.70 6.00 - 56.70 25/03/07 B 558.36 66.00 - 624.36 624.36 -

26/03/07 A 53 342.20 - - 342.20 26/03/07 A 3,789.28 - - 3789.28 3,789.28 -

26/03/07 B 42 266.90 - - 266.90 26/03/07 B 2,939.20 - - 2939.20 2,939.20 -

27/03/07 A 25 160.90 - - 160.90 27/03/07 A 1,777.16 - - 1777.16 1,777.16 -

27/03/07 B 34 222.60 - - 222.60 27/03/07 B 2,465.10 - - 2465.10 2,465.10 -

28/03/07 A 20 128.80 - - 128.80 28/03/07 A 1,419.44 - - 1419.44 1,419.44 -

28/03/07 B 31 206.60 - - 206.60 28/03/07 B 2,307.58 - - 2307.58 2,307.58 -

29/03/07 A 21 139.90 - - 139.90 29/03/07 A 1,562.00 - - 1562.00 1,562.00 -

29/03/07 B 12 8 77.40 16.00 93.40 29/03/07 B 856.68 176.00 1032.68 1,032.68 -

30/03/07 A 41 259.60 259.60 30/03/07 A 2,857.58 2857.58 2,857.58 -

30/03/07 B 16 99.55 99.55 30/03/07 B 1,095.05 1095.05 1,095.05 -

31/03/07 A - 31/03/07 A 0.00 -

31/03/07 B - 31/03/07 B 0.00 -

2000 78 - 12783.45 156 30.00 12,969.45 141,601.35 2,211.00 - 143,812.35

11.11 -

224.00 17.60 3942.40 LARGOS 174.00 3,062.40

12,715.45 11.00 139869.95 CORTOS 12,795.45 140,749.95

143812.35 143,812.35

- -

80.00 11.00 880.00

-50.00 17.60 -880.00

0.00

-

RESUMEN DE PERFORACION MARZO 2007

TIENE QUE SER CERO

TIENE QUE SER CERO

Turno

Tu

rno

TIENE QUE SER CERO

74

Dia Costos Costos Costos COSTO

Dia TaladrosProduc TaladrosReperf. TaladrosLargos T. PRODUC T. REPERF. T.GEOLOGIA T. MES Produccion Reperf. Ore Control TOTAL

Nº Nº Nº m m m m (USD $) (USD $) (USD $) ($)

01/04/07 A - 01/04/07 A 0.00 -

01/04/07 B 21 146.50 - - 146.50 01/04/07 B 1,662.62 - - 1662.62 1,662.62 -

02/04/07 A 13 87.62 - - 87.62 02/04/07 A 984.41 - - 984.41 984.41 -

02/04/07 B - 02/04/07 B 0.00 -

03/04/07 A 20 1 130.10 2.00 - 132.10 03/04/07 A 1,456.66 22.00 - 1478.66 1,478.66 -

03/04/07 B 22 154.00 - - 154.00 03/04/07 B 1,749.44 - - 1749.44 1,749.44 -

04/04/07 A 18 211.70 - - 211.70 04/04/07 A 2,682.58 - - 2682.58 2,682.58 -

04/04/07 B 13 1 167.50 2.00 - 169.50 04/04/07 B 2,150.66 22.00 - 2172.66 2,172.66 -

05/04/07 A 23 296.30 - - 296.30 05/04/07 A 3,804.34 - - 3804.34 3,804.34 -

05/04/07 B 33 9 229.60 18.00 - 247.60 05/04/07 B 2,606.96 198.00 - 2804.96 2,804.96 -

06/04/07 A 64 404.10 - - 404.10 06/04/07 A 4,460.58 - - 4460.58 4,460.58 -

06/04/07 B 22 6 137.50 12.00 - 149.50 06/04/07 B 1,519.34 132.00 - 1651.34 1,651.34 -

07/04/07 A 36 225.60 - - 225.60 07/04/07 A 2,488.08 - - 2488.08 2,488.08 -

07/04/07 B 18 117.70 - - 117.70 07/04/07 B 1,310.90 - - 1310.90 1,310.90 -

08/04/07 A 67 428.30 - - 428.30 08/04/07 A 4,740.10 - - 4740.10 4,740.10 -

08/04/07 B 45 284.30 - - 284.30 08/04/07 B 3,141.34 - - 3141.34 3,141.34 -

09/04/07 A 52 328.00 - - 328.00 09/04/07 A 3,618.80 - - 3618.80 3,618.80 -

09/04/07 B 43 2 275.90 4.00 - 279.90 09/04/07 B 3,045.70 44.00 - 3089.70 3,089.70 -

10/04/07 A 42 261.00 - - 261.00 10/04/07 A 2,873.52 - - 2873.52 2,873.52 -

10/04/07 B 24 148.30 - - 148.30 10/04/07 B 1,633.10 - - 1633.10 1,633.10 -

11/04/07 A 46 281.50 - - 281.50 11/04/07 A 3,098.30 - - 3098.30 3,098.30 -

11/04/07 B 44 4 274.10 8.00 - 282.10 11/04/07 B 3,023.74 88.00 - 3111.74 3,111.74 -

12/04/07 A 19 245.00 - - 245.00 12/04/07 A 3,146.08 - - 3146.08 3,146.08 -

12/04/07 B 19 228.70 - - 228.70 12/04/07 B 2,908.10 - - 2908.10 2,908.10 -

13/04/07 A 12 154.70 - - 154.70 13/04/07 A 1,986.46 - - 1986.46 1,986.46 -

13/04/07 B 30 386.80 - - 386.80 13/04/07 B 4,966.88 - - 4966.88 4,966.88 -

14/04/07 A 32 416.60 - - 416.60 14/04/07 A 5,356.60 - - 5356.60 5,356.60 -

14/04/07 B 5 16 63.70 32.00 - 95.70 14/04/07 B 816.62 352.00 - 1168.62 1,168.62 -

15/04/07 A 9 110.30 - - 110.30 15/04/07 A 1,406.26 - - 1406.26 1,406.26 -

15/04/07 B 2 12 26.20 24.00 - 50.20 15/04/07 B 337.16 264.00 - 601.16 601.16 -

16/04/07 A 44 275.20 - - 275.20 16/04/07 A 3,032.96 - - 3032.96 3,032.96 -

16/04/07 B 31 191.35 - - 191.35 16/04/07 B 2,109.17 - - 2109.17 2,109.17 -

17/04/07 A 48 295.20 - - 295.20 17/04/07 A 3,251.52 - - 3251.52 3,251.52 -

17/04/07 B 30 179.30 - - 179.30 17/04/07 B 1,972.30 - - 1972.30 1,972.30 -

18/04/07 A 43 265.30 - - 265.30 18/04/07 A 2,918.66 - - 2918.66 2,918.66 -

18/04/07 B 2 4 14.00 8.00 - 22.00 18/04/07 B 160.12 88.00 - 248.12 248.12 -

19/04/07 A 56 348.80 - - 348.80 19/04/07 A 3,842.92 - - 3842.92 3,842.92 -

19/04/07 B 35 226.60 - - 226.60 19/04/07 B 2,518.16 - - 2518.16 2,518.16 -

20/04/07 A 56 348.10 - - 348.10 20/04/07 A 3,835.58 - - 3835.58 3,835.58 -

20/04/07 B 54 3 329.50 6.00 - 335.50 20/04/07 B 3,628.10 66.00 - 3694.10 3,694.10 -

21/04/07 A 56 349.90 - - 349.90 21/04/07 A 3,867.26 - - 3867.26 3,867.26 -

21/04/07 B 56 352.60 - - 352.60 21/04/07 B 3,903.44 - - 3903.44 3,903.44 -

22/04/07 A 56 354.00 - - 354.00 22/04/07 A 3,903.72 - - 3903.72 3,903.72 -

22/04/07 B 45 278.30 - - 278.30 22/04/07 B 3,062.74 - - 3062.74 3,062.74 -

23/04/07 A 25 149.70 - - 149.70 23/04/07 A 1,646.70 - - 1646.70 1,646.70 -

23/04/07 B 31 182.40 - - 182.40 23/04/07 B 2,006.40 - - 2006.40 2,006.40 -

24/04/07 A 55 335.60 - - 335.60 24/04/07 A 3,691.60 - - 3691.60 3,691.60 -

24/04/07 B 40 8 247.00 16.00 - 263.00 24/04/07 B 2,717.00 176.00 - 2893.00 2,893.00 -

25/04/07 A - 25/04/07 A 0.00 -

25/04/07 B 5 32.80 - - 32.80 25/04/07 B 365.84 - - 365.84 365.84 -

26/04/07 A 56 321.40 - - 321.40 26/04/07 A 3,561.68 - - 3561.68 3,561.68 -

26/04/07 B 51 4 316.10 8.00 - 324.10 26/04/07 B 3,477.82 88.00 - 3565.82 3,565.82 -

27/04/07 A 52 330.40 - - 330.40 27/04/07 A 3,655.64 - - 3655.64 3,655.64 -

27/04/07 B 58 4 361.20 8.00 - 369.20 27/04/07 B 3,988.32 88.00 - 4076.32 4,076.32 -

28/04/07 A 59 356.00 - - 356.00 28/04/07 A 3,919.24 - - 3919.24 3,919.24 -

28/04/07 B 68 3 422.30 6.00 - 428.30 28/04/07 B 4,657.18 66.00 - 4723.18 4,723.18 -

29/04/07 A 48 297.40 - - 297.40 29/04/07 A 3,275.00 - - 3275.00 3,275.00 -

29/04/07 B 30 185.40 - - 185.40 29/04/07 B 2,040.48 - - 2040.48 2,040.48 -

30/04/07 A 24 149.70 - - 149.70 30/04/07 A 1,649.22 - - 1649.22 1,649.22 -

30/04/07 B 11 71.00 - - 71.00 30/04/07 B 787.12 - - 787.12 787.12 -

31/04/07 A - 31/04/07 A 0.00 -

31/04/07 B - 31/04/07 B 0.00 -

2019 77 - 13788.17 154 - 13,942.17 156,421.22 1,694.00 - 158,115.22

2096

11.34 #¡DIV/0!

1319.82 14.60 19269.37 LARGOS 1319.82 19,269.37

12,622.35 11.00 138845.85 CORTOS 12,622.35 138,845.85

158115.22 158,115.22

- -

0.00 11.00 0.00

0.00 14.60 0.00

0.00

0.00

RESUMEN DE PERFORACION ABRIL 2007

TIENE QUE SER CERO

TIENE QUE SER CERO

Turno

Tu

rno

TIENE QUE SER CERO

75

FE

CH

A

(To

da

s)

TU

RN

O(T

od

as)

AR

EA

SO

LIC

ITA

NT

E D

E O

PE

RA

CIÓ

NM

INA

Su

ma

de

DIF

ER

HO

RA

SE

VE

NT

OS

Cla

se

EQ

UIP

OD

ES

CA

NS

OF

AL

LA

ME

CA

NIC

AM

AN

TE

NIM

IEN

TO

ST

AN

D B

YT

RA

SL

AD

OU

SO

To

tal g

en

era

lD

isp

on

ibil

ida

d

Me

ca

nic

a

Uso

de

la

Dis

po

nib

ilid

ad

Usa

je

Carg

uio

34

5-B

L-4

19

.60

42

9.1

74

.65

45

.75

1.1

71

84

.03

68

4.3

73

7%

82

%7

3%

34

5-B

L-4

34

5-B

L-6

36

.88

16

5.1

32

.53

92

.03

5.8

54

13

.80

71

6.2

37

7%

83

%7

5%

34

5-B

L-6

34

5-C

83

6.6

31

96

.43

1.0

22

5.2

73

.38

42

1.7

56

84

.48

71

%9

5%

87

%3

45

-C8

34

5-C

94

7.5

51

08

.28

4.9

54

1.5

73

.18

49

1.5

76

97

.10

84

%9

3%

84

%3

45

-C9

To

tal

Carg

uio

14

0.6

78

99

.02

13

.15

20

4.6

21

3.5

81

51

1.1

52

78

2.1

86

7%

89

%8

1%

FL

OT

A

DIS

PO

NIB

ILID

AD

ME

CA

NIC

A Y

UT

ILIZ

AC

ION

EN

ER

O 2

00

7

77%

71%

84%

67%

82%

83%

95%

93%

89%

73%

75%

87%

84%

81%

37%

20%

30%

40%

50%

60%

70%

80%

90%

100%

345-B

L-4

345-B

L-6

345-C

8345-C

9F

LO

TA

Dis

po

nib

ilid

ad

Me

ca

nic

aU

so d

e la

Dis

po

nib

ilid

ad

Usaje

76

FE

CH

A

(To

da

s)

TU

RN

O(T

od

as)

AR

EA

SO

LIC

ITA

NT

E D

E O

PE

RA

CIÓ

NM

INA

Su

ma

de

DIF

ER

HO

RA

SE

VE

NT

OS

Cla

se

EQ

UIP

OD

ES

CA

NS

OF

AL

LA

ME

CA

NIC

AM

AN

TE

NIM

IEN

TO

ST

AN

D B

YT

RA

SL

AD

OU

SO

To

tal g

en

era

lD

isp

on

ibil

ida

d

Me

ca

nic

a

Uso

de

la

Dis

po

nib

ilid

ad

Usa

je

Carg

uio

34

5-B

L-4

25

.52

54

.68

39

.13

27

5.0

23

94

.35

86

%8

8%

81

%3

45

-BL

-4

34

5-B

L-6

17

.72

14

4.0

01

5.7

31

84

.93

36

2.3

86

0%

93

%8

5%

34

5-B

L-6

34

5-C

81

5.0

31

92

.00

25

.87

13

9.1

03

72

.00

48

%8

6%

77

%3

45

-C8

34

5-C

95

1.5

81

1.6

74

.55

28

.88

29

9.7

83

96

.47

96

%9

2%

79

%3

45

-C9

To

tal

Carg

uio

10

9.8

54

02

.35

4.5

51

09

.62

89

8.8

31

52

5.2

07

3%

90

%8

0%

FL

OT

A

DIS

PO

NIB

ILID

AD

ME

CA

NIC

A Y

UT

ILIZ

AC

ION

FE

BR

ER

O 2

00

7

60%

48%

96%

73%

88%

93%

86%

92%

90%

81%

85%

77%

79%

80%

86%

20%

30%

40%

50%

60%

70%

80%

90%

100%

345-B

L-4

345-B

L-6

345-C

8345-C

9F

LO

TA

Dis

ponib

ilidad M

ecanic

aU

so d

e la D

isponib

ilidad

Usaje

77

FE

CH

A

(To

da

s)

TU

RN

O(T

od

as)

AR

EA

SO

LIC

ITA

NT

E D

E O

PE

RA

CIÓ

NM

INA

Su

ma

de

DIF

ER

HO

RA

SE

VE

NT

OS

Cla

se

EQ

UIP

OD

ES

CA

NS

OF

AL

LA

ME

CA

NIC

AM

AN

TE

NIM

IEN

TO

ST

AN

D B

YT

RA

SL

AD

OU

SO

To

tal g

en

era

lD

isp

on

ibil

ida

d

Me

ca

nic

a

Uso

de

la

Dis

po

nib

ilid

ad

Usa

je

Carg

uio

34

5-B

L-4

70

7.0

02

4.0

07

31

.00

3%

0%

0%

34

5-B

L-4

34

5-B

L-6

54

.05

60

.80

2.0

73

3.8

73

.57

57

8.3

77

32

.72

91

%9

5%

86

%3

45

-BL

-6

34

5-C

85

6.3

37

9.1

74

.50

43

.63

2.0

75

47

.27

73

2.9

78

9%

93

%8

4%

34

5-C

8

34

5-C

95

3.5

85

4.2

81

.28

28

.83

1.8

25

91

.73

73

1.5

39

2%

96

%8

8%

34

5-C

9

To

tal

Carg

uio

16

3.9

79

01

.25

7.8

51

30

.33

7.4

51

71

7.3

72

92

8.2

26

9%

94

%8

5%

FL

OT

A

RE

ND

IMIE

NT

O Y

UT

ILIZ

AC

ION

MA

RZ

O 2

00

7

91%

89%

92%

69%

0%

95%

93%

96%

94%

0%

86%

84%

88%

85%

3%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

345-B

L-4

345-B

L-6

345-C

8345-C

9F

LO

TA

Dis

ponib

ilidad M

ecanic

aU

so d

e la D

isponib

ilidad

Usaje