t.y. ling emu meeting cern, september 20, 2005 status summary off-chamber electronics
TRANSCRIPT
T.Y. Ling
EMU MeetingCERN, September 20, 2005
Status SummaryStatus SummaryOff-Chamber ElectronicsOff-Chamber Electronics
Status SummaryStatus SummaryOff-Chamber ElectronicsOff-Chamber Electronics
T.Y. Ling, EMU Meeting, September 2005 2
EMU Electronics System LayoutEMU Electronics System LayoutEMU Electronics System LayoutEMU Electronics System Layout
CSC
CFEBCFEBCFEB CFEB
ALCT1 of 24
CFEB
1 of 2
LVDBLV Distribution
Board
1 of 5
1 of 5
Anode Front-end Board
Cathode Front-end Board
Anode LCT Board
MPC
DMB
TMB
DMB
TMB
DMB
TMB
DMB
TMB
DMB
TMB
DMB
TMB
DMB
TMB
DMB
TMB
DMB
TMB
CCBC
ONTROLLER
Peripheral Crate on iron disk
Slow Control
Trigger-Timing-Control
Muon Sector ReceiverLev-1 Trigger
Trig Motherboard
DAQ Motherboard
Clock Control Board
Readout Data
FED Crate in USC55
DDU,DCC Boards
T.Y. Ling, EMU Meeting, September 2005 3
Total Board CountTotal Board CountTotal Board CountTotal Board CountTotal Board CountTotal Board CountTotal Board CountTotal Board Count
CSC Type ME11 ME12 ME13 ME21 ME22 ME31 ME32 ME41TOTAL +10%
CSC No. 72 72 72 36 72 36 72 72CFEB 360 360 288 180 360 180 360 180 2,495AFEB 1,728 864 1,512 1,728 1,296 1,728 1,296 11,167
ALCT-288 72 72 158ALCT-384 72 72 72 238ALCT-672 36 36 36 119
LVDB 72* 72 72 36 72 36 72 36 436TMB 72 72 72 36 72 36 72 36 515DMB 72 72 72 36 72 36 72 36 515CCB 12 66MPC 12 66
Controller 75CRB 66
Backplane 66DDU 40DCC 10
Backplane 5
60
24 12 12
6024 12 12
60
836
4
Per
iph
eral
Cra
tes
FE
D
Cra
tes
On
-ch
amb
erB
oar
ds
DONE
T.Y. Ling, EMU Meeting, September 2005 4
Boards in Peripheral CrateBoards in Peripheral CrateBoards in Peripheral CrateBoards in Peripheral Crate
MPC
DMB
TMB
DMB
TMB
DMB
TMB
DMB
TMB
DMB
TMB
DMB
TMB
DMB
TMB
DMB
TMB
DMB
TMB
CCB
CONTROLLER
Clock Control Board (CCB)• 89 boards produced (need 60).• 72 boards burned-in and tested.• 70 boards equipped with TTCrq (v5) & tested with TTCvi/TTCvx.
Trigger Motherboard (TMB)RPC ALCT Trans Brd (RAT)• Prototype board sets produced. Testing with full backplane prototype in progress. • 30 pre-prod sets by Aug 05.
Muon Port Card (MPC)• 75 boards produced. (need 60)• 70 boards equipped FPGA mezzanine• Burned-in and tested .
DAQ Motherboard (DMB)• 550 boards produced (need 468).• 534 passed all tests, ready to ship.• 16 have BGA problems, being fixed.
Crate Controller• 10 preproduction boards produced. • Rad test completed. No problems• Will produce 75 boards (need 60) by Oct 15, 2005.
T.Y. Ling, EMU Meeting, September 2005 5
Custom Backplane and CRBCustom Backplane and CRBCustom Backplane and CRBCustom Backplane and CRB
9U VME boards
Custom Backplane (enlarged to include
J1 section with split
power plane)
CRB (design similar to
front-end LVDB)
Heat sink
RPC ALCT Transition
Boards
Custom Backplane• Final prototype board delivered. 6/10/05
• Full crate test planned for July/Aug 2005.• Production of 70 boards Aug-Oct 2005.
(need 60)
Crate Regulation Board (CRB)• All 80 boards produced, delivered, and tested at CERN
T.Y. Ling, EMU Meeting, September 2005 6
Prod. Schedule: Peripheral Crate Boards Prod. Schedule: Peripheral Crate Boards Prod. Schedule: Peripheral Crate Boards Prod. Schedule: Peripheral Crate Boards
Jan Feb M ar Apr M ay Jun Jul Aug Sep Oct Nov Dec
DMB 350 450 550TMB-RAT 30* 150 270 390 540CCB 10 20 40 70 89MPC 10 20 40 60 70CRB 10 30 50 80Controller 10* 10 10 75Backplane 12 24 36 48 60
2005
* preproduction boards
T.Y. Ling, EMU Meeting, September 2005 7
Peripheral VME Crate and Mini-rackPeripheral VME Crate and Mini-rackPeripheral VME Crate and Mini-rackPeripheral VME Crate and Mini-rack
• VME Crates– Prototype crate checked at OSU.
(July 04) – Parts purchased, machined for 72
crates (need 60)– All parts delivered to CERN– All VME crates assembled (without
backplanes)
• Mini-Racks– 24 mini-racks ordered and delivered
to CERN (need 24). – Mounts and strain relief installed.
Mini-rack
T.Y. Ling, EMU Meeting, September 2005 8
EMU FED Crate (in USC55) EMU FED Crate (in USC55) EMU FED Crate (in USC55) EMU FED Crate (in USC55)
CRATE
CONTROLLER
DDU
DCC
DDU
DDU
DDU
DDU
DDU
DDU
DCC
DDU
DDU
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
DCC DDUsDDUs DDUs DCCDDUs
optional
5 Wiener Crates ordered/2 delivered (need 4).4 CAEN Controllers ordered.
Detector Dependent Unit (DDU)• Collect data from 15 DMB (15*160MB/s) • Send data to DCC (640MB/s)• Check data, Detect error, send to FMM• Spy data to local DAQ via Gigabit Ethernet links
Status• 10 preproduction boards in August 05. • Full production: Oct, 2005• Will produce 40 boards (need 36). Detector Concentration Card (DCC)• Merge data from 10 DDU (10*640MB/s), send data to CMS DAQ SLINK64 • Receive and fan out TTC fast control Status
• 2 preproduction boards in July 05. • Full production: Sept, 05• Will produce 10 boards (need 8).
Custom Backplane• Full size prototype tested.• 5 boards produced. (need 4).
T.Y. Ling, EMU Meeting, September 2005 9
Prod. Schedule: FED Crate Boards Prod. Schedule: FED Crate Boards Prod. Schedule: FED Crate Boards Prod. Schedule: FED Crate Boards
Jun Jul Aug Sep Oct Nov Dec
DDU 10* 10 40DCC 2* 2 2 10Backplane 5
2005
preproduction boards
USC 55 scheduled for occupancy
Nov 2005.