TVA Watts Bar Nuclear PlantDog Bone Seal Failure, Installation,
and Inspection
Presented by: Billy SharpPresented to: FSRUG
January 28, 20161
![Page 2: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary](https://reader033.vdocuments.site/reader033/viewer/2022042122/5e9d46af0cca0645621668fa/html5/thumbnails/2.jpg)
Dog Bone Seal Failure
• Watts Bar
– 2 unit, 4 Loop Westinghouse PWR.
– TVA designed Secondary Side
– Ingersol Rand Main Condenser
• WBN1 was manually tripped at 10:32 a.m. on 02/21/15 in anticipation of an automatic turbine and reactor trip due to low condenser vacuum.
2
![Page 3: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary](https://reader033.vdocuments.site/reader033/viewer/2022042122/5e9d46af0cca0645621668fa/html5/thumbnails/3.jpg)
3
Dog Bone Seal FailureMain Condenser Design
Failure of C Zone Dog Bone Seal
3 Cascading Condenser Zones27,410 115ft-long Tubes
NormalVacuum Exhaust
![Page 4: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary](https://reader033.vdocuments.site/reader033/viewer/2022042122/5e9d46af0cca0645621668fa/html5/thumbnails/4.jpg)
Dog Bone Seal Failure
4
Horizontal Tear along the clamping bar
Vertical Tear along the vulcanized splice
![Page 5: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary](https://reader033.vdocuments.site/reader033/viewer/2022042122/5e9d46af0cca0645621668fa/html5/thumbnails/5.jpg)
Dog Bone Seal Failure
Splice Transition to seal
Outside deterioration of the seal
Internal deterioration of the seal
5
![Page 6: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary](https://reader033.vdocuments.site/reader033/viewer/2022042122/5e9d46af0cca0645621668fa/html5/thumbnails/6.jpg)
Dog Bone Water Seal
• In-service for the life of the failed seal
• Interior Durometerreadings were normal.
• Recommended to only use for air in-leakage troubleshooting.
• Water seal is shut off for new seal
6
Dog Bone Water Seal
Water inside seal
Water Seal Side
Condenser Side
![Page 7: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary](https://reader033.vdocuments.site/reader033/viewer/2022042122/5e9d46af0cca0645621668fa/html5/thumbnails/7.jpg)
Dog Bone Seal Clamps
Seal, Clamp, Shield Side View
7
Clamping bar design is to hold on the bulb of the seal. Minimal pressure should be on the belt center.
![Page 8: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary](https://reader033.vdocuments.site/reader033/viewer/2022042122/5e9d46af0cca0645621668fa/html5/thumbnails/8.jpg)
Dog Bone Seal Splice Thickness
• C Zone Splice • B Zone Splice • A Zone Splice
A Zone Thickness not
measured during failure analysis
8
![Page 9: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary](https://reader033.vdocuments.site/reader033/viewer/2022042122/5e9d46af0cca0645621668fa/html5/thumbnails/9.jpg)
Dog Bone Seal Splice
• Single steps instead of multistep
• Prepared ends do not meet.
Splice Transition to seal
Failed Seal
Splice
New Seal
Splice
First Cut Second Cut
9
![Page 10: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary](https://reader033.vdocuments.site/reader033/viewer/2022042122/5e9d46af0cca0645621668fa/html5/thumbnails/10.jpg)
After Vulcanization
Dog Bone Seal Splice
Original Seal Cap Strip Replacement Seal Cap Strip
10
Indicates insufficient compression during vulcanization
Smooth transition between cap strip and seal surface
![Page 11: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary](https://reader033.vdocuments.site/reader033/viewer/2022042122/5e9d46af0cca0645621668fa/html5/thumbnails/11.jpg)
Dog Bone Seal Inspections
• Visual Inspections of splice and locations on each wall each refueling outage– Cracks
– Blisters
– Delamination
– Bulging
• Durometer deadings of 4 walls and splice each refueling outage
• Future: Microwave scanning of splice inspecting for voids.
11
![Page 12: TVA Watts Bar Nuclear Plant Dog Bone Seal Failure ...fsrug.org/Presentations2016/26.pdfDog Bone Seal Failure •Watts Bar –2 unit, 4 Loop Westinghouse PWR. –TVA designed Secondary](https://reader033.vdocuments.site/reader033/viewer/2022042122/5e9d46af0cca0645621668fa/html5/thumbnails/12.jpg)
Dog Bone Seal
Questions???12