turn rip rap bank away from river to prevent scouring

6
125

Upload: others

Post on 11-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TURN RIP RAP BANK AWAY FROM RIVER TO PREVENT SCOURING

125

Page 2: TURN RIP RAP BANK AWAY FROM RIVER TO PREVENT SCOURING

DRAWN BY: DATE:

CHECKED BY: DATE:

APPROVED BY: DATE:

APPROVED BY: DATE: SHEE

T:

ofAPPROVED BY: DATE:

REVISED BY: DATE: SUMMARYFresno Tailwaters FAS Erosion Control

J. Renenger 12/23/2020

62

P. Jagoda 12/31/2020

NOTES:1) EXISTING ROCK STOCK PILES ESTIMATED QUANTITIES:

A. 60 CUBIC YARDS CLASS II RIP RAPB. 110 CUBIC YARDS CLASS III RIP RAPC. 85 CUBIC YARDS OVERSIZED RAILROAD BALLAST

2) EXISTING CLASS II RIP RAP AND OVERSIZED BALLAST TO BE USEDTO ARMOR UPSTREAM FILL AREAS.

3) AERIAL IMAGERY IS OUTDATED AND DOES NOT ACCURATELY DEPICTTHE CURRENT RIVER CONDITIONS.

4) RAW SURVEY DATA WILL BE PROVIDED TO SHOW EXISTING TOPOGRAPHYAS OF NOVEMBER 2020.

5) DEWATERING AND DIVERSION DAMS WILL BE REQUIRED FOR COMPACTIONOF FILL BELOW CURRENT WATER LEVEL.

6) FILL SHALL BE PLACED AND COMPACTED IN LIFTS NOT GREATER THAN 12".7) FILL FROM RIVER ISLAND SHALL BE STOCKPILED AND DRIED TO MIX WITH

IMPORTED FILL.8) RIP RAP SHALL BE PLACED WITH LARGEST ROCKS AT THE TOE OF THE SLOPE.9) FINAL CLEANUP SHALL INCLUDE GRADING THE EXISTING RAILROAD BALLAST RAMP.

126

Page 3: TURN RIP RAP BANK AWAY FROM RIVER TO PREVENT SCOURING

EXISTING ROCK STOCKPILES

CONSTRUCT RIP RAP BANK -185 LFAPPROX. 350 CYAPPROX. 185 CY BELOW OHWM

BACKFILL EXISTING SCOUR HOLEAPPROX. 1280 CYAPPROX. 900 CY BELOW OHWM

STRIP +/- 1.5' TO EXISTINGBED SURFACE ELEVATIONAND SALVAGE FILL FROM ISLANDAPPROX. 300 CY BELOW OHWM

GRADE EXISTINGRAILROAD BALLAST RAMP

TURN RIP RAP BANK AWAY FROMRIVER TO PREVENT SCOURING

DRAWN BY: DATE:

CHECKED BY: DATE:

APPROVED BY: DATE:

APPROVED BY: DATE: SHEE

T:

ofAPPROVED BY: DATE:

REVISED BY: DATE: SITE PLANFresno Tailwaters FAS Erosion Control 6

3P. Jagoda 12/31/2020

J. Renenger 12/23/2020

127

AutoCAD SHX Text
MH
Page 4: TURN RIP RAP BANK AWAY FROM RIVER TO PREVENT SCOURING

DIRECTION OF FLOW

COMPACTED FILLELEV. 2505'W/ TOPSOIL

SHAPE FILL TO EXISTING GRADEMAX 2 :1 SLOPE

SHAPE FILL TO EXISTING GRADEMAX 2 :1 SLOPE

NON-WOVEN GEOTEXTILEDIG IN - SEE RIP RAP DETAIL

ROUGHEN FILL SURFACEWITH CLASS II RIP RAPAND RAILROAD BALLAST

DRAWN BY: DATE:

CHECKED BY: DATE:

APPROVED BY: DATE:

APPROVED BY: DATE: SHEE

T:

ofAPPROVED BY: DATE:

REVISED BY: DATE: SITE PLAN TOPOGRAPHYFresno Tailwaters FAS Erosion Control 6

4P. Jagoda 12/31/2020

J. Renenger 12/23/2020

128

AutoCAD SHX Text
MH
Page 5: TURN RIP RAP BANK AWAY FROM RIVER TO PREVENT SCOURING

RIP RAP BANK STABILIZATION CROSS SECTION

2.00'

EXISTING GRADE AT TOP OF BANK2507.00'

ORDINARY HIGHWATER MARK2501.00'

BOTTOM OF SCOUR HOLE2492.50'

INSTALL CLEAN FILL

ARMOR BANK WITHCLASS III RIP RAPSEE DETAIL - SHEET 6

EXISTING ISLANDAT NORMAL FLOWS

VARIES

VARIES

WATER ELEVATIONAT TIME OF SURVEY2497.00'

TOP OF COMPACTED FILL2505.00'

6" TOPSOIL2505.50'

DRAWN BY: DATE:

CHECKED BY: DATE:

APPROVED BY: DATE:

APPROVED BY: DATE: SHEE

T:

ofAPPROVED BY: DATE:

REVISED BY: DATE: BANK STABILIZATION CROSS SECTIONFresno Tailwaters FAS Erosion Control 6

5P. Jagoda 12/31/2020

J. Renenger 12/23/2020

129

Page 6: TURN RIP RAP BANK AWAY FROM RIVER TO PREVENT SCOURING

RIP RAP SECTION NOTES:

1. Riprap Materials: Provide in accordance with State of Montana Transportationstandards for Class III Riprap.2. Provide stone that is hard, durable and angular in shape, resistant to water actionand weathering, free from overburden, spoil, shale, structural defects and organicmaterial.3. Each stone must have its greatest dimension not greater than three times its leastdimension.4. Do not use rounded stone or boulders from a streambed source as rip-rap. Donot use shale or stones with shale seams.5. Angular faces of stones shall inter-lock to provide stable surface.6. Installed Thickness: 4 ft average & 6 ft at toe7. Non-woven geotextile shall be trenched in 2' down at edge of rip rap. Trenching

shall be required at the top of bank and on the upstream edge of fabric.

4'

6'

2'

2' 1

.

5

:

1

S

L

O

P

E

T

Y

P

I

C

A

L

R

I

P

-

R

A

P

A

R

M

O

R

I

N

G

WATER

SURFACE VARIES

EXISTING GROUND

COMPACTEDFILL

NON-WOVEN GEOTEXTILE

RIP RAP BANK DETAIL

TOP OF EXISTING BANKAT SCOUR HOLEELEV. 2507'

TOP OF RIP RAPARMORED BANK ELEV. 2505'

WATER LEVEL AT TIME OF SURVEYELEV. 2497'

TOP OF UPSTREAM BANKELEV. 2501'

TOP OF DOWNSTREAM BANKELEV. 2505' TOP OF RIP RAP

ARMORED BANK ELEV. 2505'

6:1 SLOPE FROM TOP OF ARMOREDBANK TO UPSTREAM SLOPE

SHAPE RIP RAP BANK TO MEET EXISTINGSLOPE AT DOWNSTREAM END

DIRECTION OF FLOW

RIP RAP BANK DETAIL DRAWN BY: DATE:

CHECKED BY: DATE:

APPROVED BY: DATE:

APPROVED BY: DATE: SHEE

T:

ofAPPROVED BY: DATE:

REVISED BY: DATE: RIP RAP DETAILFresno Tailwaters FAS Erosion Control 6

6P. Jagoda 12/31/2020

J. Renenger 12/23/2020

130