turkey-the strategic energy connector ok
TRANSCRIPT
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 1
T U R K E Y
THE STRATEGIC ENERGY CONNECTOR BETWEEN
EUROPEAN UNION AND
GREATER CASPIAN SEA REGION
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 2
SECURING THE ENERGY SUPPLIES FROM THE
CASPIAN SEA TO THE EUROPEAN UNION
• HOW CAN WE FIX THIS PROBLEM ON
LONG – TERM BASIS?
• HOW CAN WE ELIMINATE THE ACTUAL
MONOPOLE AND THE POLITICAL PRICE?
• CAN WE DEVELOPE A COMMON EU
STRATEGY ?
• ARE THE EU CITIZENS READY TO INVEST
IN THE FUTURE OF THEIR COMMON
HOUSE?
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 3
Sources of Natural Gas Supply 2005 - European Union
2004
- Indigenous Production 55%
- Net Imports 45%
2005
- Indigenous Production 52%
- Net Imports 48%
55,0%
13,3%
52,0%
14,0%
18,3%
0,3% 3,4%
Source: EUROGAS
Import Norway
Import Russia
Import Algeria
Import Others
IndigEnous Production
12,5% 12,3%
18,9%
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 4
NORWAY
(0%)
SWEDEN
(35.3%)
GERMANY
(40.5%)
POLAND
(98.1%)
CZECH
REP.
(94.2%)
BELGIU
M
(41.9%)
NETHERLAN
DS
(31.0%)
AUSTRIA
(46.1%)
DENMA
RK
(2.1%)
SLOVAKIA
(100%)
HUNGARY
(93.1%) SWISS
(0%)
ITALY
(26.1%)
FINLAND
(79.8%)
FRANCE
(23.1%)
“FRIENDSHIP”
(“DRUJBA”) OIL
PIPELINE
30% OF THE OIL IMPORTED BY EUROPE (1.2MBPD) COMES FROM RUSSIA. HALF OF THAT TOTAL IS PUMPED THROUGH BELARUS VIA THE “Friendship” (“drujba”) pipeline. In paranthesis are the percentages of oil supplied by russia in 2005 to various european countries. . source: bank austria creditanstalt
EU – 15:
27.1% (2005)
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 5
Greater CASPIAN REGION major OIL PIPELINES
Aktau-Baku
(proposed)
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 6
CEYHAN OIL TERMINAL
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 7
4,000 bcm
~83 years s
47,570 bcm
~80 years
1,770 bcm
~22 years s
33,530 bcm
~183 year s
4,520 bcm
~43 years s
Gas Reserves around Europe
47,570 bcm / 80 years (40% - from
turkmeNISTAN)°
33,530 bcm / 183 y 4,520
Bcm / 43 y
1,770 bcm / 22 y
4,000 bcm / 83 y
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 8
BTC Pipeline
Aktau-BTC Project
Natural Gas Pipeline
Türkmenbasi
aktau
horasan
erzurum
ceyhan
sivas
kayseri
B t e
baku
B t c
Trans - caspian
Pipeline project
T c p
Greater caspian region:
major implemented energy corridors
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 9
Baku
Tbilisi
Erzurum
Aktau
Ashkelon
B T E
NABUCCO Vienna BLUE
STREAM
Turkmenbashi
ROTRAZ
GU-EU
CONNECTING CASpian REGION WITH EU: THE BACKBONE OF GAS PIPELINES GRID
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 10
1. A new energy policy for europe
PROPOSAL FOR THE DECALOGUE of the EU energy package
(I)
In practice that means for europe:
TAXING “DIRTY” ENERGY AND INVESTING IN NEW, CLEAN TECHNOLOGIES; PHASING OUT SUBSIDIES AND INCENTIVES BINDING SECTORAL TARGETS CREATING A DEDICATED EU LEGISLATIVE AND BUDGET FRAMEWORK
2. GAS & ELECTRICITY INFRASTRUCTURE
3. INTERNAL MARKET FOR GAS & ELECTRICIty
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 11
4. RENEWABLE ENERGY ROADMAP
5. BIOFUELS
6. LIMITING GLOBAL CLIMATE CHANGE TO 2°C
7. TECHNOLOGY ACTION PLAN
8. SUSTAINABLE FOSSIL FUELS
9. ENERGY SECTOR INQUIRY RESULTS
PROPOSAL FOR THE DECALOGUE of the EU energy package
(II)
10. NUCLEAR POWER
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 12
10. NUCLEAR POWER
REPRESENT ONE ENERGY OPTION WITH A MAJOR ROLE TO PLAY IN THE FIGHT AGAINST CLIMATE CHANGE
NUCLEAR IS ONE OF THE CHEAPEST LOW – CARBON ENERGY SOURCES
THE DECISION ON WHETHER OR NOT TO USE NUCLEAR POWER RESTS WITH MEMBER STATES
THE COMMISSION should DRAW UP A NEW NUCLEAR ENERGY FRAMEWORK TO HELP MEMBER STATES WHICH CHOOSE NUCLEAR
IN PARTICULAR, NEW RULES ARE NEEDED FOR WASTE MANAGEMENT AND DECOMMISSIONING FUNDS
EU should CONTINUE ITS WORK TO DEVELOP NUCLEAR FUSION
PROPOSAL FOR THE DECALOGUE of the EU energy package (IIi)
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 13
2
china
japan
South korea
taiwan
india
9
56
20
6
15
3
2
8
canada
usa
18
104
2
2
uk
sweden
lituania
23
1
2 1
1
ukraine
finland 4 russia 31 4
2
armenia
hungary
slovenia
Czech r.
germany
switzerland
spain
france
belgium
netherlands 1
7
59
9
5
17
6
1
4
iran 1
pakistan
2
1
bulgaria 4 2
romania 1 1
slovakia 6
South africa 2
15
10
brasil
argentina
mexico
9 3 china
japan 56 1
20 South korea
taiwan 6 2
india 15 8 2
2
1
18
1 1
23 23
1
443 nuclear reactor units under operation in 32
countries generates a quantity of 370 Gigawatts, representing
17% of the world electricity
The world map of energy generation by nuclear technologies
1
Nuclear energy quota in
electrical energy production
1. France
78% 3. germany
28%
2. suisse
40%
4. japan
23%
5. u.k.
22%
6. U s a
19%
443
27 Nuclear reactors under
construction
Nuclear reactors in operation
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 14
To sum up, EU foreign policy - REGARDING THE PROMOTION OF ALTERNATIVE ENERGY CORRIDORS FOR EUROPE, AVOIDING THE ACTUAL EXISTING SITUATION OF ENERGY MONOPOLE - SHOULD BE founded on:
• permanent support FOR Kazakhstan & Azerbaijan TO develop their oil and natural gas industries
• thIS development will bring economic growth AND
PROSPERITY, EU DUTY BEING to help them to become totally independent energy suppliers
• FULL support FOR EU companies involved in Central Asia in oil & GAS as well as in construction of pipelines
• Finally, EU should aims at reinforcing the role of Turkey in
the region AS A MAJOR STABILITY FACTOR, while at
the same time maintaining the policy of STOPPING NUCLEAR AMBITIONS of Iran
DEFINING A UNIQUE EU FOREIGN POLICY ON
ENERGY
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 15
EU MAJOR TASK: THE ENERGY
SECURITY
3 MAIN DIRECTIONS OF ACTIVITIES: 1. STRENGTHENING THE COOPERATION WITH RUSSIA ON MARKET ECONOMY BASIS & promoting «win – win» mutually agreed solutions (long-term «FUTURE» commercial contracts, linking the price with int’l stock exchange quotation, eu - BASED ENERGY COMPANIES PARTICIPATION IN «Blue stream» project)
2. CREATING A REAL COMPETITION BY Developing NEW alternative energy corridors CONNECTING caspian sea area to europe; TO REACH THIS TARGET, EU SHOULD
GRANT HIS SUPPORT TO BOTH AZERBAIJAN & KAZAHSTAN to become real PLAYERS on the energy market, FULLY ASSISTING THEIR ECONOMICAL AND SOCIAL EFFORTS
3. LARGE – scale promotion of nuclear energy
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 16
Major INVESTMENT PROJECTS
“Nabucco” PROJECT – THE NEW TRANSIT CORRIDOR FOR THE TRANSPORT OF NATURAL GAS BETWEEN CASPIAN SEA AND eu zone
“Nabucco” back – up: proposing to finqnce two NEW MAJOR GAS PIPELINES - as back-up of “nabucco”
Development of OIL MAJOR PIPELINE Constanta – Omisalj – Trieste
INCREASING THE UNDERGROUND STORAGE CAPACITY OF NATURAL GAS
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 17
”Nabucco” project
New gas supply route
To Europe - from Turkey
To Austria - via Bulgaria,
Romania & Hungary
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 18
BERLIN
WARSAW
PRAGUE
KIE
V
VIENNA BRATISLAVA
BUDAPEST
LJUBLJAN
A
ZAGRE
B
BELGRAD
E
BUCHAREST
SARAJEV
O SKOPJ
E
SOFIA
ROM
E
TIRAN
A
ISTANBUL
ANKARA
TUNI
S
ATHEN
S
ANKARA
VIENNA
SOFIA
BUCHAREST
ISTANBUL
BRATISLAVA
“Nabucco” Gas Pipeline Proposed Route
? ? ? budapest
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 19
“Nabucco” Gas Pipeline Figures
Length of the Pipeline est. 3,400 km
Capacity:
- Total capacity Turkey 25 - 30 bcmy -
Expected OFFTAKE 8 - 10 bcmy
in Transit countries - Total
capacity to Austria 17 - 20 bcmy
BAUMGARTEN TERMINAL
Total Investment for plateau level : euro 4.4 Billion
Start of operation : end 2011
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 20
Conducta
Transalpine
(tal)
GUEU – RO
???
NOVOROSSI
ISK
TENGIZ
OIL FIELDS
PITES
TI
EXPORT
TO
BOSNIA
NOVI SAD
TERMINAL
SISAK
TERMIN
AL
EXPORT
VIA DRUjBA
ROMANI
A
BURGA
S VLORE
ALEXANDROP
OLIS
CEYHA
N
BRO
DI
CPC
B T C
AMBO
DRUjBA
GDAN
SK
CONSTAN
TA
TERMINA
L
TRIESTE
erzurum
BTe gas pipeline Operational: Feb. 2007
2007: 8 BCMY
2012: 20 BCMY
T c p
Gas pipeline gueu
OMISALJ PANCE
VO
TERMIN
AL
SUPS
A
ADRIA
TRANSALPIN
E
operational pipelines
new projects
CONSTANTA - trieste
OIL PIPELINE CONSTANTA-PANCEVO-OMISALJ-
TRIESTE IN THE ASSEMBLY OF THE EUROPEAN OIL
HIGHWAYS NETWORK
EXPOR
T VIA
TAL
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 21
Gur-eu supsa
BTE
GASODUC
T TBILISI
Gr-eu
Gu-eu CONSTANT
A
ERZURUM
AUSTRIA,
hUNGARy,
Slovakia, suisse
GERMANy, POLand, czech republic
INSULA
SERPILOR
ODESSA
NABUCCO
TURKEY - GREECE – ITALY INTER-CONNECTOR /
16BCMY
PropOSAL1: TO INCREASE quantitIES, RELIAbilitY AND SECURITY LEVEL OF GAS SUPLIES TO EU
COUNTRIES BY IMPLEMENTING A SYSTEM OF 3 PARALLEL PIPELINES, COMPLEMENTARY (“back-up”)
TO “NABUCCO”
PROJECT TO BE implemented: (1) eastern EXTENSION OF bte GAS PIPELINE STARTING FROM erzurum;
(2 + 3) extending THE georgia – uKRAINe (GUR-EU) “UNDER – THE - BLACK SEA” GAS PIPE ALSO to
romania BY USING THE ROCKY “SNAKE ISLAND” (“insulA serpilor”) AS splittinging point & AS MAIN BASE
FOR THE INSTALLATION OF PUMPING equipment; (4) inCREASe THE ALLOCATED QUANTITIES FOR THe
NEW GAS HIGHWAY FROM SHAH DENIZ FIELD BY A COMMERCIAL ARRANGEMENT WITH AZERBAIJAN gaS PIPE 1: bTe / erzerum, TURKEY - greEcE – fyrom – albania – croatia - italY
gaS PIPE 2: GR – eu / constanta, ROMANIA – HungarY – austria – slovaKia – SWITZERLAND
gaS PIPE 3: gu – eu / odessa, UKRAINE – polAND – germanY – Czech republic
Developing the east – west energy corridor “GUr – EU”
(supsa – “under –the-BLACK-SEA” PIPELINE – split on
SNAKE’S ISLAND – to: CONSTANTA & ODESSA)
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 22
ODESSA
SUPS
A
GUR – EU 12…16 BCMY
GU – EU 6…8 BCMY
GR – EU 6…8 BCMY
INSULA SERPILOR
SUPPLYING CASPIAN GAS TO EUROPE VIA GEORGIA - BLACK SEA SUBMARINE PIPELINE – UKRAINE &
ROMANIA
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 23
DEVELOPING THE EAST – WEST ENERGY CORRIDOR VIA TURKEY GAS
PIPELINES GRID & “TR – EU” BLACK SEA SUBMARINE PIPELINE
ZONGULDAK - CONSTANTA BLUE
STREAM
BTE
ERZURUM
ZONGULDAK
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 24
TR – EU 12…15 BCMY
Constanta
Zonguldak
UE /8…12 BCMY
From Erzurum BTE
A NEW EAST – WEST ENERGY CORRIDOR VIA TURKEY GAS PIPES GRID &
“TR – EU” UNDER - THE - BLACK SEA PIPELINE ZONGULDAK – CONSTANTA (II)
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 25
“rotraz” Gas Pipeline
Market Shares result from . . .
Cost competitiveness vis-a-vis other new
projects for Large gas fields in Central
Asia / Middle East Supply diversity –
relative to already linked sources
rotraz partners take-off gas to partially
meet their future gas demands
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 26
“ROTRAZ” Gas Pipeline
Strategic Goals of Project
Gas supply for Europe from Caspian
Region / Central Asia / Middle East via
Turkey – Botas Grid
Raise transit role of participating
countries
Contribution to security of supply for
partner countries and for Europe as a
whole
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 27
“ROTRAZ” Gas Pipeline Figures
Underwater Length of the Pipeline: est. 320 km
Capacity (Only Shah Deniz – Phase II):
Total capacity to Turkey 15 - 20 bcmy
Expected Off-take 7 - 10 bcmy
(in Transit Countries)
Total capacity to Austria 8 - 10 bcmy
(Baumgarten Terminal)
Investment for Under-The-Sea pipeline : euro 0.8 BN
Start of operation : end 2012
10TH EURASIAN ECONOMIC SUMMIT - ISTANBUL 2007
May 2 - 4, 2007 organizer: marmara group foundation 28
ITALY
(26.1%) Constanta
POTENTIAL MAJOR PIPELINES SUPPLYING NATURAL GAS FROM
GREATER CASPIAN REGION TO CENTRAL & EASTERN EU COUNTRIES
INPUTS
CONSTANTA
ROMANIA
FROM ERZURUM - ZONGULDAK