Page 1: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

TUNNELS

Page 2: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

TERMINOLOGY for UNDERGROUND STRUCTURES

Adit.....................................galeri Tunnel................................tünel Subway..............................metro Shaft...................................baca Chamber............................oda Portal.................................ana giriş veya çıkış Pilot adit.............................yan galeri, pilot galerisi Centre................................merkez, eksen Face...................................ayna Wall ~ site..........................yan, kenar, duvar Floor...................................taban Roof...................................tavan

Page 3: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

Overbreak.............................aşırı sökülme Excavated profile..................kazı profili Natural archling....................doğal kemerlenme Load......................................yük Support.................................destek, iksa Failure...................................yenilme, çökme Gentle failure........................yavaş yenilme Rock burst............................kaya patlaması Squeezing ground................sıkışan zemin Swelling ground....................şişen zemin Clay-filled joint.......................kil dolgulu eklem Long term stability.................uzun süreli duraylılık Ground treatment..................zemin iyileştirmesi Support before excavation....kazı öncesi destekleme

Page 4: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

Jet grouted roof cover..............jet grouting ile iyileştirilmiş tavan örtüsü

Shotcrete initial lining..............püskürtme beton başlangıç çizgisi

Jet grouted floor cover............jet grouting ile iyileştirilmiş döşeme

Top heading............................kalot (Crown) Invert.......................................stros (Bottom excavation) Bench......................................üzengi çizgisi Final concrete lining................sonuncu beton kaplama

(nihai beton kaplama çizgisi) SHIELD tunnelling method..............KALKAN Yöntemi CUT & COVER tunnelling method....AÇ-KAPA Yöntemi TBM (Full face ~ Total Boring Machine).....TÜM KESİT

KAZI MAKİNASI

Page 5: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

TERMINOLOGY for EXCAVATIONS of ROCKS & SOILS

DRILLING....................Sondalama Hardness.........................Sertlik Toughness.......................Dayanım – direnç Abrasiveness...................Aşındırıcılık Structure..........................Jeolojik yapı Drilkling fluids..................Sondaj sıvısı

AUGERING..................Burgulama MACHINE BORING.....Mekanize tünel açma

Total Boring Machine (TBM) Full face excavation

BLASTING...................Patlatma

Page 6: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

SCRAPING...................Kazıma (makinayla) RIPPING.......................Kırarak kazıma DIGGING......................Kazma GROUND WATER........yeraltısuyu

Control of groundwater Groundwater flow Rate of flow Volume of flow Boundaries

Page 7: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

TUNNEL DESCRIPTION

1. Made into natural material (rocks)

2. Empty inside

3. Carry the loads itself

4. Both ends are open to atmosphere

5. Generally horizontal

6. Thick walled structure looks like cylinder

Page 8: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro
Page 9: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

1- Kilit (anahtar) taşı........................Key stone

2- Kemer...........................................Arch

3- Ayak (duvar)................................Wall

4- Taban...........................................Floor

5- Üzengi..........................................Bench

6- Üzengi çizgisi (düzeyi)...............Bench line or plane

7- Kalot............................................Top heading

8- Stros............................................Invert

9- Ano..............................................Ano (unit)

Page 10: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

Tunnel Section for Swelling Ground

1- Digging section

2- Support

3- Swelling section

4- Pressurized area

5- Flow direction of water

Page 11: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

SURFACE EXCAVATIONS

Deformation & failure

Page 12: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

UNDERGROUND EXCAVATIONS In Rock In Sediment

Stability & Arching Water

Dry tunnel...............above water table Wet tunnel..............below water table

Gases Carbon dioxide (CO2) Carbon monoxide (CO) Methane (CH4)

Hydrogen sulphide (H2S) Other gases

Page 13: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

Gas bursts......................gaz patlaması Rock falls........................kaya düşmesi Rock bursts....................kaya fırlaması Squeezing ground..........şişen – kabaran zemin Temperature Subsidence

Page 14: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

EXPLORATION & INVESTIGATIONS RELATED of SLOPE STABILITY

Geomorphologic maping and preparation of longitudinal & cross sections

Geological maping & surveyings (aerial photographs)

Geophysical surveyings Underground explorations, boreholes Ground water surveyings Laboratory tests Model studies

Page 15: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

SURFACE EXCAVATIONS

Permanent Short term excavations

Page 16: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

SUBSURFACE EXCAVATIONS

1. GEOLOGY1. Soil profile or hard rock geology

2. Structure

3. Ground water (hydrogeology)

4. Stability

Page 17: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

2. INVESTIGATIONS1. Mapping (Topographic, geologic, etc...)

2. Geophysical surveying (especially seismic velocity of rocks)

3. Trial pits & boreholes

4. General and local stability analysis

5. Decide to excavation method

Page 18: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro
Page 19: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

UNDERGROUND EXCAVATIONS

Adit, shaft, incline, large chamber Tunnel Subway ~ metro Underpass Shelter Power house Ware house, store, mining ...etc

Page 20: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

GASES (can be lethal or burst)

Carbon monoxide (CO) 0.97 of air Carbon dioxide (CO2) 1.53 of air Methane (CH4) 0.55 of air

(Highly explosive with air) marsh gas

Hydrogene sulphide (H2S) 1.19 of air (Highly toxic and explosive)

Sulphur dioxide (SO2)

Page 21: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

ROCK FALL

SQUEEZING GROUND (sand, silt, shale, clay)

ROCK BURST

BULKING (Increase in volume, 10-40%)

Page 22: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

FACTORS EFFECTING EXCAVATION of ROCKS

Mineralogical composition of rocks Texture & fabric Petrographic features Structure Rock mass Strike & dip of beds in relation to face of

excavation Intensity of tectonic disturbances Degreee of weathering

Page 23: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

RESISTANCE of ROCKS to EXCAVATION

Loose soils Soil easy to spade (bel ile kazmak) Soil easy to dig Crumbling weak rocks (ufalamak) Rocks easy to blast Rocks difficult to blast Rocks very difficult to blast

Page 24: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

TUNNELLING METHODS

Page 25: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

SHIELD TUNNELLING METHOD

This method involves the use of shield machine to drive the tunnels below the ground.

After completion of a work shaft, the shield machine is lowered into the shaft and assembled there before excavation and construction of the tunnels using precast concrete lining segments of about 1.2 meter width.

This construction method causes minimal disruption to traffic and the environment because all the work takes place below ground and the ground level environment is unaffected.

Page 26: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro
Page 27: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

CUT and COVER TUNNELLING METHOD

This construction method, whereby the site is fully excavated, the structure built and then covered over, uses diaphragm walls as temporary retaining walls within the site area.

Step one :Construction of diaphragm walls, pin piles, and decking.

Step two :Excavation within the diaphragm walls, installing struts as work progresses.

Step three :Construction of permanent floor slabs and walls.

Step four : Fitting out the internal structures, backfilling, and reinstating the surface structures.

Page 28: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro
Page 29: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

TBM (Tunnel Boring Machine)

1. Mechanical-support TBM

2. Compressed-air TBM

3. Slurry shield TBM

4. Earth pressure balance machine

5. Mixed-face shield TBM

Page 30: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

1- Mechanical Support TBM

A mechanical-support TBM has a full-face cutterhead which provides face support by constantly pushing the excavated material ahead of the cutterhead against the surrounding ground.

Page 31: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

2- Compressed-Air TBM

A compressed-air TBM can have either a full-face cutterhead or excavating arms. Confinement is achieved by pressurizing the air in the cutter chamber.

Page 32: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

3- Slurry Shield TBM

A slurry shield TBM has a full-face cutterhead. Confinement is achieved by pressurizing boring fluid inside the cutterhead chamber.

Page 33: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

4- Earth Pressure Balance Machine

An earth pressure balance machine has a full-face cutterhead. Confinement is achieved by pressurizing the excavated material in the cutterhead chamber.

Page 34: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

5- Mix-Face Shield TBM

Mix-face shield TBMs have full-face cutterheads and can work inclosed or open mode and with different confinement techniques.

Page 35: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

EFFECT of GEOLOGICAL STRUCTURES to TUNNEL EXCAVATION

Effect of soil layers: horizontal, vertical and inclined layers have different kinds of loading conditions for tunnels.

Page 36: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

Effect of faults: the relation between the fault slope direction and the tunnel direction, width of the fault zone, type and thickness of the fill material and the hydrostatic pressures in both sides of the fault are some problems in the tunnelling.

Relation between the fault zone and the tunnel

Page 37: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

Tunnel excavations in the slopes: the discontinuities (layers, fissures) inclined inside or outside of the slope are very important regarding the stress and strength of the tunnel.

Page 38: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

Effect of the folds: While tunnel is excavated in an area that contains folded rocks, different stresses and conditions may occur depending on the fold type.

Fold axis and the tunnel direction is vertical

Fold axis and the tunnel direction is parallel

Page 39: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

CLASSIFICATION of ROCKS for TUNNELING

PURPOSES

Page 40: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

Classification of rocks for engineering purposes is needed in analyzing the project costs and to obtain an economic and reliable solution.

The classification of the rocks, that the tunnel will be constructed in, is first done by Terzaghi. But, it is too general and gives qualitative results.

Page 41: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

TUNNEL ROCK CLASSIFICATION by TERZAGHI

Page 42: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

Laufer classified tunnel rocks to 7 groups according to stand-up time

Page 43: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

Rock classification and determination of unsupported span

Page 44: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

URFA IRRIGATION TUNNEL

Page 45: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro
Page 46: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

ONE of the LONGEST IRRIGATION TUNNELS in the WORLD

Page 47: TUNNELS. TERMINOLOGY for UNDERGROUND STRUCTURES Adit.....................................galeri Tunnel................................tünel Subway..............................metro

Consist of two concrete lined tunnels each of which is 7.62 m in diameter and

26.4 km in length discharging water from the reservoir of Atatürk Dam.