  • 8/18/2019 Tunnel Gantry Pgm

    1/5

     A TUNNEL LENGTH

    B TOTAL FACES

    C FINISHED DIAMETER

    D SHAPE

    E DESCRIPTION

    E.1 LENGTH / DEPTH

    E.2 PERMANENT SUPPORT

    E.3 EXCAVATION DIAMETER

    E.4 LINING THICKNESS

    E.5 WORK STATUS

    E.6 DISTANCE B/W GANTRY AND BLASTING FACE

    E.7 PLAN

    E.8 PROGRESS CONSIDERED

    E.9 VEHICLE MOVEMENT DURING CONCRETING

    E.10 MAX. DIMENSION OF VEHICLE

    E.11 MAJOR VEHICLE MOVEMENT

  • 8/18/2019 Tunnel Gantry Pgm

    2/5

    SNC POWER CORPORA

    UPPER BHADRA PR

    DETAILS FOR PROCUREMEN

    7034.00 m

    4.00

    7.20 m

    HORSE SHOE

    FACE - 1 FACE - 2

    2100.00 m 950.00 m

    NOT EXPECTED 7% OF LENGTH

    7.7 7.7

    250 mm 250 / 400 mm

     YET TO START UNDER PROGRESS

    LINING CONC

    235.00 m PER MONTH 237.00 m PER MONTH

     YES YES

    BHARATH

    BOOMER, DUMPER, TRANSIT MIXER

  • 8/18/2019 Tunnel Gantry Pgm

    3/5

    ION PRIVATE LIMITED

      JECT, PACKAGE - III

     OF TUNNEL LINING GANTRY

    SHAFT

    48.27.00 m

    9.00

    400 mm / SHAFT PLUG TO BE CONSIDERED

    COMPLETED

    300.00 m

    ETING TO BE DONE WHILE EXCAVATION UNDER PROGRESS

     YES

     ENZ / AMW DUMPERS. L - 7.50 m. W - 2.50 m. H - 3.50 m

    BOOMER, DUMPER, SHOTCRETING MACHINE

  • 8/18/2019 Tunnel Gantry Pgm

    4/5

    FACE - 3 FACE - 4

    1450.00 m 2534.00 m

    5% OF LENGTH 60% OF LENGTH

    7.7 7.9

    250/400 mm 400 mm

    UNDER PROGRESS UNDER PROGRESS

    207.00 m PER MONTH 230.00 m PER MONTH

     YES YES

    DRILL JUMBO, DUMPER

  • 8/18/2019 Tunnel Gantry Pgm

    5/5