tunnel gantry pgm
TRANSCRIPT
-
8/18/2019 Tunnel Gantry Pgm
1/5
A TUNNEL LENGTH
B TOTAL FACES
C FINISHED DIAMETER
D SHAPE
E DESCRIPTION
E.1 LENGTH / DEPTH
E.2 PERMANENT SUPPORT
E.3 EXCAVATION DIAMETER
E.4 LINING THICKNESS
E.5 WORK STATUS
E.6 DISTANCE B/W GANTRY AND BLASTING FACE
E.7 PLAN
E.8 PROGRESS CONSIDERED
E.9 VEHICLE MOVEMENT DURING CONCRETING
E.10 MAX. DIMENSION OF VEHICLE
E.11 MAJOR VEHICLE MOVEMENT
-
8/18/2019 Tunnel Gantry Pgm
2/5
SNC POWER CORPORA
UPPER BHADRA PR
DETAILS FOR PROCUREMEN
7034.00 m
4.00
7.20 m
HORSE SHOE
FACE - 1 FACE - 2
2100.00 m 950.00 m
NOT EXPECTED 7% OF LENGTH
7.7 7.7
250 mm 250 / 400 mm
YET TO START UNDER PROGRESS
LINING CONC
235.00 m PER MONTH 237.00 m PER MONTH
YES YES
BHARATH
BOOMER, DUMPER, TRANSIT MIXER
-
8/18/2019 Tunnel Gantry Pgm
3/5
ION PRIVATE LIMITED
JECT, PACKAGE - III
OF TUNNEL LINING GANTRY
SHAFT
48.27.00 m
9.00
400 mm / SHAFT PLUG TO BE CONSIDERED
COMPLETED
300.00 m
ETING TO BE DONE WHILE EXCAVATION UNDER PROGRESS
YES
ENZ / AMW DUMPERS. L - 7.50 m. W - 2.50 m. H - 3.50 m
BOOMER, DUMPER, SHOTCRETING MACHINE
-
8/18/2019 Tunnel Gantry Pgm
4/5
FACE - 3 FACE - 4
1450.00 m 2534.00 m
5% OF LENGTH 60% OF LENGTH
7.7 7.9
250/400 mm 400 mm
UNDER PROGRESS UNDER PROGRESS
207.00 m PER MONTH 230.00 m PER MONTH
YES YES
DRILL JUMBO, DUMPER
-
8/18/2019 Tunnel Gantry Pgm
5/5