  • 7/21/2019 Tunnel asdas

    1/28

    TUNNEF A I L U R ESubmitted by :

    Karan Desai AP 14299

    Manan Desai AP 14300aynei! Desai AP 1430"

    aimin Pate! AP 1439"

    Ab#ina$ A%ar&a! AP 1439'

  • 7/21/2019 Tunnel asdas

    2/28

    Hard Rock Tunnels

    Deep tunnels above sea level,

    predominantly on rock and generallywithin less developed areas

  • 7/21/2019 Tunnel asdas

    3/28

    S o f t / m i x e d g r o u n d T u n n e l s

    hallow tunnels !"#$m below ground%

    generally below water table in urbanareas

  • 7/21/2019 Tunnel asdas

    4/28

    Types of failure

  • 7/21/2019 Tunnel asdas

    5/28

    Soil flowing in tunnel

    &wo di'erent diameter o( tunnels Une)pected ground (ailure

    *ap e)isting between two stages o(

    tunnels

  • 7/21/2019 Tunnel asdas

    6/28

    Failure due to water

    +ater inow into the tunnel(eas)ns &he tunnel intersected the bottom o( an

    abandoned well &he tunnel passed through a shallow

    anticline and intersected a -ssure

  • 7/21/2019 Tunnel asdas

    7/28

    Water flowing into Tunnel

  • 7/21/2019 Tunnel asdas

    8/28

    Sinkholes

    (eas)ns

    .verstressing o( the sprayed

    concrete temporary lining &hin weathered rock cover

    Inow o( soil and groundwater

    /igh groundwater pressure

  • 7/21/2019 Tunnel asdas

    9/28

    /igh permeability soil

    Layer o( marl separating

    groundwater bearing layers wasmuch thinner than originallyassumed

    0ossible 1rock slippage2

    Under designed rock bolts due toincreased span

    Sinkholes

  • 7/21/2019 Tunnel asdas

    10/28

    Failure due to Sinkholes

  • 7/21/2019 Tunnel asdas

    11/28

    Failure due to Sinkholes

  • 7/21/2019 Tunnel asdas

    12/28

    Sinkholes

    (emedia! Measures

    3oid was back-lled with crushed rock andcement and pressure grouted

    4ack-lling the crater with soil (ollowed bycement grouting and chemical grouting

    4ored5pile wall to (orm a sha(t

    E)cavation inside the sha(t (or rescue

  • 7/21/2019 Tunnel asdas

    13/28

    Sinkholes

    (emedia! Measures

    &unnel driven using compressed air

    teel rings installed in tunnel either side o(

    the collapse Road resur(acing

    A curtain o( piles ahead o( the collapsed

    (ace &he void was back-lled with o( glass5sand

    !recycled glass%

  • 7/21/2019 Tunnel asdas

    14/28

  • 7/21/2019 Tunnel asdas

    15/28

    Deformation

  • 7/21/2019 Tunnel asdas

    16/28

    Deformation

    &unnel subsidence at sur(ace +ater 6 soil ! can lead to 7899 liters:min into the

    tunnel%

    (eas)n

    Fluctuation o( groundwater level caused by tidale'ects results in vertical movement o( thetunnel tube causing opening o( ;oints

    (emedia!

    *round (ree

  • 7/21/2019 Tunnel asdas

    17/28

    Ground freeing

  • 7/21/2019 Tunnel asdas

    18/28

    !low out crater

    Insu=cient overburden above thetunnel

    /igh pressure within tunnel causingblow out (ailure

  • 7/21/2019 Tunnel asdas

    19/28

    Failure of diaphragm wall

    Rapid uctuation o( groundwater levelcaused movement o( unidenti-ed graveland sand strata

    Additional loading on diaphragm notconsidered in design

    (emedia!

    4ack-lling o( e)cavation pit

    ubsoil grouting

    Diaphragm wall strengthening

  • 7/21/2019 Tunnel asdas

    20/28

  • 7/21/2019 Tunnel asdas

    21/28

    Failure of Diaphragm WallSingapore MRT, 20 April 20

  • 7/21/2019 Tunnel asdas

    22/28

    *a+,%r)und> An open cut tunnel e)cavated (or ingapore

    ?R&@s new ircle Line

    > E)cavated trench o( B$m wide and CCm deepmainly in marine clay with some uvial claysupported by 95B9m thick diaphragm wallwhich is C$5$m deep without rock socket

    > teel strutsG 5$m hori Het grouted base slabs

    > Layer B5B$m thick at #$m below ground

    > Layer #5Cm thick at CC$m below ground

    Singapore MRT, 20 April 20

  • 7/21/2019 Tunnel asdas

    23/28

    T#e -ai!ure th level o( struts being installed when

    collapse took place

    Unusual cracking and groaning noisesheard early in the morning !8 hours%

    Loud cracking noise heard in thea(ternoon, B$minutes be(ore collapse

    ollapse plan area was B99m by BC9m ettlement up to B$m

    Diaphragm walls displaced

    teel struts mangled

    Singapore MRT, 20 April 20

  • 7/21/2019 Tunnel asdas

    24/28

  • 7/21/2019 Tunnel asdas

    25/28

    P)ssib!e +auses )- -ai!ure

    0oor construction Kuality

    Ine'ective instrumentation and monitoring

    system Failure to implement risk management

    Singapore MRT, 20 April 20

  • 7/21/2019 Tunnel asdas

    26/28

    (emedia! measures

    Rescue and back-lling

    tructurally disconnected the ?erdeka

    4ridge All contracts o( the ircle Line put on hold

    All contracts to carry out checks and

    review o( design and construction o(temporary works

    Singapore MRT, 20 April 2

  • 7/21/2019 Tunnel asdas

    27/28

    (emedia! measures

    All 0ro(essional Engineers to con-rm inwriting the adeKuacy o( their designs

    All designs to be independently checkedby the 4uilding

    onstruction Authority

    Singapore MRT, 20 April 2

  • 7/21/2019 Tunnel asdas

    28/28

    Thank you