EXECUTION OF IMMERSED TUNNELS ANDEXECUTION OF IMMERSED TUNNELS AND
RELEVANT EXAMPLESRELEVANT EXAMPLES
ITA/AITESITA/AITES TrainingTraining CourseCourseTUNNEL ENGINEERINGTUNNEL ENGINEERING
ITA/AITESITA/AITES
7 May 2005 1/1/8787
Prepared byPrepared by J.B.M. AdmiraalJ.B.M. Admiraal
IstanbulIstanbul -- 20052005
-
8/13/2019 Tun imers
2/87
5ConclusionsConclusions andand ReferencesReferences
Execution of Immersed TunnelsExecution of Immersed Tunnels
Design ConsiderationsDesign Considerations
Introduction and OverviewIntroduction and Overview
Lessons Learned and Special CasesLessons Learned and Special Cases
Index
2
3
4
1
2/2/8787Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples
-
8/13/2019 Tun imers
3/87
Introduction and Overview
Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples 3/3/8787
22
33
44
55
11
-
8/13/2019 Tun imers
4/87
-
8/13/2019 Tun imers
5/87
DUTCH TULIP FIELDSDUTCH TULIP FIELDS
-
8/13/2019 Tun imers
6/87
WINDMILLS KINDERDIJKWINDMILLS KINDERDIJK
-
8/13/2019 Tun imers
7/87
-
8/13/2019 Tun imers
8/87
IMMERSED TUNNELS IN EUROPEIMMERSED TUNNELS IN EUROPE
1 2
1
29
3
3
3
5
2
1
-
8/13/2019 Tun imers
9/87
Execution of Immersed Tunnels
Basic Principle
Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples 9/9/8787
22
33
44
55
11
-
8/13/2019 Tun imers
10/87
Execution of Immersed Tunnels
Production of TunnelElements
Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples 10/10/8787
22
33
44
55
11
-
8/13/2019 Tun imers
11/87
CASTING BASIN BARENDRECHT (NL)CASTING BASIN BARENDRECHT (NL)
-
8/13/2019 Tun imers
12/87
CASTING BASIN BARENDRECHT (NL)CASTING BASIN BARENDRECHT (NL)
-
8/13/2019 Tun imers
13/87
CASTING BASIN BARENDRECHT (NL)CASTING BASIN BARENDRECHT (NL)
-
8/13/2019 Tun imers
14/87
PRODUCTION WITH TEMPORARYPRODUCTION WITH TEMPORARY
STORAGE (G)STORAGE (G)
-
8/13/2019 Tun imers
15/87
PRODUCTION WITH TEMPORARYPRODUCTION WITH TEMPORARY
STORAGE (G)STORAGE (G)
-
8/13/2019 Tun imers
16/87
USE OF DRY DOCK FACILITY (NL)USE OF DRY DOCK FACILITY (NL)
-
8/13/2019 Tun imers
17/87
ELEMENT CASTINGELEMENT CASTING
-
8/13/2019 Tun imers
18/87
PRODUCTION FACILITYPRODUCTION FACILITY
-
8/13/2019 Tun imers
19/87
PRODUCTION FACILITYPRODUCTION FACILITY
E ec tion of Immersed T nnels
-
8/13/2019 Tun imers
20/87
Execution of Immersed Tunnels
Construction Details
Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples 20/20/8787
22
33
44
55
11
-
8/13/2019 Tun imers
21/87
IMMERSION JOINTIMMERSION JOINT
-
8/13/2019 Tun imers
22/87
BULKHEADBULKHEADOUTSIDE VIEWOUTSIDE VIEW
Nose
Door
GinaBallast-water pipes
Air- vent pipe
-
8/13/2019 Tun imers
23/87
BALLAST TANKSBALLAST TANKS
Ballast tank
Bulkhead
Intake ballast water
-
8/13/2019 Tun imers
24/87
ACCESS SHAFTACCESS SHAFT
Door
Closing the door
A view inside the access shaft
-
8/13/2019 Tun imers
25/87
SURVEY POLESURVEY POLE
Sensor
-
8/13/2019 Tun imers
26/87
PROTECTION GINA SEALPROTECTION GINA SEAL
-
8/13/2019 Tun imers
27/87
FLOODING OF THE BASINFLOODING OF THE BASIN
Execution of Immersed Tunnels11
-
8/13/2019 Tun imers
28/87
Execution of Immersed Tunnels
Transport
Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples 28/28/8787
22
33
44
55
11
-
8/13/2019 Tun imers
29/87
TRANSPORTTRANSPORT
-
8/13/2019 Tun imers
30/87
TRANSPORTTRANSPORT
Unit
Crane barge
Tugboat
-
8/13/2019 Tun imers
31/87
TRANSPORTTRANSPORT
-
8/13/2019 Tun imers
32/87
NAVIGATIONNAVIGATION
Buoys
Automated system by DGPS
Visual navigation using buoys
Execution of Immersed Tunnels11
-
8/13/2019 Tun imers
33/87
Immersing
Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples 33/33/8787
22
33
44
55
11
-
8/13/2019 Tun imers
34/87
IMMERSION PRINCIPLEIMMERSION PRINCIPLE
-
8/13/2019 Tun imers
35/87
IMMERSIONIMMERSION -- OVERVIEWOVERVIEW
Survey pole
Access shaft
Pontoon
Head winchCables
-
8/13/2019 Tun imers
36/87
IMMERSION JOINTIMMERSION JOINT
Bulkhead
End frame
Gina-sealOmega-seal
Nose Chin
-
8/13/2019 Tun imers
37/87
HORIZONTAL POSITIONINGHORIZONTAL POSITIONING
Cables
100 tons bollardFloating winch
Bank winch Pulley-block
Gemini buoy
-
8/13/2019 Tun imers
38/87
VERTICAL POSITIONINGVERTICAL POSITIONING
Pontoon
Suspended cables Lifting lugs
Crane barge and spreader
-
8/13/2019 Tun imers
39/87
SURVEY SCREENSURVEY SCREEN
Movement of the unit
-
8/13/2019 Tun imers
40/87
IMMERSION PONTOONIMMERSION PONTOON
-
8/13/2019 Tun imers
41/87
PLACING PONTOON ON ELEMENTPLACING PONTOON ON ELEMENT
-
8/13/2019 Tun imers
42/87
IMMERSION USING CRANE BARGEIMMERSION USING CRANE BARGE
-
8/13/2019 Tun imers
43/87
COMBINING CRANE BARGE &COMBINING CRANE BARGE &
PONTOONPONTOON
Pontoon
Crane barge
-
8/13/2019 Tun imers
44/87
IMMERSION WITH FLOATINGIMMERSION WITH FLOATING
DERRICKSDERRICKS
-
8/13/2019 Tun imers
45/87
EQUIPMENTEQUIPMENT
Anchor handling vessel Winch on pontoon
Winch on bank Winch pontoon on water
-
8/13/2019 Tun imers
46/87
IMMERSION LINEIMMERSION LINE
Ballast-tank
Survey pole
Bottom
Nose
Chin
-
8/13/2019 Tun imers
47/87
NOSE & CHIN DETAILNOSE & CHIN DETAIL
Nose
Chin
Execution of Immersed Tunnels11
-
8/13/2019 Tun imers
48/87
Foundation
Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples 48/48/8787
22
33
44
55
-
8/13/2019 Tun imers
49/87
TEMPORARY FOUNDATIONTEMPORARY FOUNDATION
-
8/13/2019 Tun imers
50/87
TEMPORARY FOUNDATIONTEMPORARY FOUNDATION
A
B
A. Jacks
B. Concrete slabs
-
8/13/2019 Tun imers
51/87
TEMPORARY FOUNDATIONTEMPORARY FOUNDATION
200 tons hydraulic jack
-
8/13/2019 Tun imers
52/87
SAND FLOW METHODSAND FLOW METHODa sand pumping device
b sand supply barge
c pipelined cast-in sand supply pipe
AA
BBCC
DD
-
8/13/2019 Tun imers
53/87
SANDJETTING METHODSANDJETTING METHOD
-
8/13/2019 Tun imers
54/87
SAND SUPPLY SUCTION UNITSAND SUPPLY SUCTION UNIT
-
8/13/2019 Tun imers
55/87
GRAVEL BED METHODGRAVEL BED METHOD
tolerance +/_ 25 mm
resund Tunnel
2nd Benelux Tunnel
-
8/13/2019 Tun imers
56/87
GRAVEL BED METHODGRAVEL BED METHOD
The principle of scrading
Gravel bed lay-out
Multi-Purpose Pontoon
-
8/13/2019 Tun imers
57/87
PILE FOUNDATIONPILE FOUNDATION
Transit box
Rubber cuffHead plate
Revolving pile cover
Pile
Execution of Immersed Tunnels11
-
8/13/2019 Tun imers
58/87
Secondary End
Correction
Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples 58/58/8787
22
33
44
55
-
8/13/2019 Tun imers
59/87
SECONDARY END CORRECTIONSECONDARY END CORRECTION
Flat jack
Shim plateIron pipe
Immersion joint
Execution of Immersed Tunnels11
-
8/13/2019 Tun imers
60/87
Closure-Joint
Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples 60/60/8787
22
33
44
55
-
8/13/2019 Tun imers
61/87
CLOSURE JOINT PRINCIPLECLOSURE JOINT PRINCIPLE
-
8/13/2019 Tun imers
62/87
FLOOR PANELFLOOR PANEL
-
8/13/2019 Tun imers
63/87
SIDE PANELSSIDE PANELS
Wedges
Design Considerations11
-
8/13/2019 Tun imers
64/87
Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples 64/64/8787
22
33
44
55
-
8/13/2019 Tun imers
65/87
PRO &PRO & CONCONSS
Shallow position
Short rampstructures Perfect fit to traffic enveloppe
Cost effective
Proven technology Risk control
Investment low
-
8/13/2019 Tun imers
66/87
DESIGN LIMITATIONSDESIGN LIMITATIONS
Deepest tunnel up to now: -25 m water
depth (to bottom of tunnel)
Two tunnels are in design for depth upto
-50 m: Bosphorus Turkey
Busan Geoje Link - Korea
-
8/13/2019 Tun imers
67/87
LIMITING FACTORSLIMITING FACTORS
Strength
Water tightness
Dredging/excavation of trench
Immersion process
Lessons Learned and Special Cases11
-
8/13/2019 Tun imers
68/87
Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples 68/68/8787
22
33
44
55
Lessons Learned and Special Cases11
-
8/13/2019 Tun imers
69/87
Lessons Learned
Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples 69/69/8787
22
33
44
55
THING THAT CAN GO WRONG
-
8/13/2019 Tun imers
70/87
THING THAT CAN GO WRONGTHING THAT CAN GO WRONG
Water splashing out ofthe Inspection shaft
THINGS THAT CAN GO WRONG
-
8/13/2019 Tun imers
71/87
THINGS THAT CAN GO WRONGTHINGS THAT CAN GO WRONG
Nose
Chin
Jamming
THINGS THAT CAN GO WRONG
-
8/13/2019 Tun imers
72/87
THINGS THAT CAN GO WRONGTHINGS THAT CAN GO WRONG
GINA OUT OFF CLAMP STRIP
Lessons Learned and Special Cases11
-
8/13/2019 Tun imers
73/87
CASE HSL
Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples 73/73/8787
22
33
44
55
CASE HIGH SPEED LINK
-
8/13/2019 Tun imers
74/87
CASE HIGH SPEED LINKCASE HIGH SPEED LINK
High speed rail link between Amsterdam
and Paris
Two immersed tunnels in alignment
Severe tolerances because of high speedrequirement
TWO IMMERSED TUNNELS
-
8/13/2019 Tun imers
75/87
TWO IMMERSED TUNNELSTWO IMMERSED TUNNELS
DESIGN REQUIREMENTDESIGN REQUIREMENT
-
8/13/2019 Tun imers
76/87
DESIGN REQUIREMENTDESIGN REQUIREMENT
An Allowable Differential Deformation
Between the Elements Due To Train Loads of0.75 mm
TUNNEL OUDE MAAS (JUNE 2003)TUNNEL OUDE MAAS (JUNE 2003)
-
8/13/2019 Tun imers
77/87
TUNNEL OUDE MAAS (JUNE 2003)TUNNEL OUDE MAAS (JUNE 2003)
TUNNEL DORDTSCHE KIL (JUNE 2003)TUNNEL DORDTSCHE KIL (JUNE 2003)
-
8/13/2019 Tun imers
78/87
TUNNEL DORDTSCHE KIL (JUNE 2003)TUNNEL DORDTSCHE KIL (JUNE 2003)
TRANSITION CUT & COVERTRANSITION CUT & COVER --
-
8/13/2019 Tun imers
79/87
IMMERSEDIMMERSED
TUNNEL PROFILETUNNEL PROFILE
-
8/13/2019 Tun imers
80/87
DIFFERENTIAL SETTLEMENTDIFFERENTIAL SETTLEMENT
-
8/13/2019 Tun imers
81/87
REDUCTIONREDUCTION
DOWELS BETWEEN ELEMENTS
DIFFERENTIAL SETTLEMENTDIFFERENTIAL SETTLEMENT
-
8/13/2019 Tun imers
82/87
REDUCTIONREDUCTION
DOWELS - FEMALE
FINISHED CONCRETE DOWELFINISHED CONCRETE DOWEL
-
8/13/2019 Tun imers
83/87
Male Side
Bearing
Bearing
Female Side
IMMERSING OUDE MAAS TUNNELIMMERSING OUDE MAAS TUNNEL
-
8/13/2019 Tun imers
84/87
OTHER ADDITIONALOTHER ADDITIONAL
-
8/13/2019 Tun imers
85/87
CONSIDERATIONSCONSIDERATIONS
Soil Shaft
Internal 8.3 m Internal 5.3 mSliding Plate
9980
14000
17700
Airshaft
Conclusions and references11
-
8/13/2019 Tun imers
86/87
Admiraal, J.B.M. 2003. An Exploration of Contemporary UndergroundSpace Use. Proceeding of the First Indonesian TunnellingConference, Jakarta, Indonesia.
Gursoy, A. et al. 1997. State-Of-The-Art-Report: ITA WG11 - Immersed
and Floating Tunnels. Tunnelling and Underground Space Technology
12(2).Geel, J.W.A. and Hakkaart, C.J.A.. 2003. Immersed Tunnels in the High
Speed Railway Link in the Netherlands. Proceedings ITA WTC 2003(Re)claiming the Underground Space: 265.
Hakkaart, C.J.A. and t Hart, W. 2003. Dutch High Speed Railway
Immersed Tunnel Projects. Proceedings ITA WTC 2003 (Re)claimingthe Underground Space: 291.
Material provided by: Volker Stevin Construction Europe, HSLBouwcombinatie Drechtse Steden, TEC Tunnel Engineering
Consultants, Department of Public Works and Water Management
Civil Engineering Division.
86/86/8787Execution of Immersed Tunnels and Relevant ExamplesExecution of Immersed Tunnels and Relevant Examples
22
33
44
55
ITA/AITESITA/AITES
Clause de non-responsabilit pour les rapports des groupes de travail de l'AITES
-
8/13/2019 Tun imers
87/87
87/87/8787
LAssociation Internationale des Travaux en Souterrain (AITES) publie ce rapport, conformment ses Statuts, pour faciliter les changes dinformations afin :
dencourager lutilisation du sous-sol au profit du grand public, de lenvironnement et du dveloppement durable;
de promouvoir les progrs dans la planification, le projet, la construction, lentretien, la rhabilitation et la scurit des tunnels et de lespace souterrain en
rassemblant et confrontant les informations, ainsi quen tudiant les questions qui sy rapportent.
Cependant, lAITES dcline toute responsabilit en ce qui concerne les informations publies dans ce rapport.
Ces informations :
sont exclusivement de nature gnrale et ne visent pas la situation particulire dune personne physique ou morale;
ne sont pas ncessairement compltes, exhaustives, exactes ou jour ;
proviennent parfois de sources extrieures sue lesquelles les services de lAITES nont aucun contrle et pour lesquelles lAITES dcline toute responsabilit ;
ne constituent pas un avis professionnel or juridique (si vous avez besoin davis spcifiques, consultez toujours un professionnel dment qualifi).
Disclaimer for the reports of ITA working groups
The International Tunnelling Association (ITA) publishes this report to, in accordance with its statutes, facilitate the exchange of information, in order:
to encourage planning of the subsurface for the benefit of the public, environment and sustainable development
to promote advances in planning, design, construction, maintenance and safety of tunnels and underground space, by bringing together information thereon and
by studying questions related thereto.
However ITA accepts no responsibility or liability whatsoever with regard to the material published in this report.
This material is:
information of a general nature only, which is not intended to address the specific circumstances of any particular individual or entity;
not necessarily comprehensive, complete, accurate or up to date;
sometimes collected from external sources over which ITA services have no control and for which ITA assumes no responsibility;
not professional or legal advice (if you need specific advice, you should always consult a suitably qualified professional).