tug, aashto, ttf primer class roger e. bierbaum (ttf member from iowa) october 12, 2004

21
TUG, AASHTO, TTF TUG, AASHTO, TTF Primer Class Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

Upload: annabella-ryan

Post on 02-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

TUG, AASHTO, TTFTUG, AASHTO, TTF Primer ClassPrimer Class

Roger E. Bierbaum(TTF Member from Iowa)

October 12, 2004

Page 2: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

Trns•port Task ForceTrns•port Task Force (TTF)(TTF)

• 7 members– Cross-section of users and IT support staff– Cross-section of Trns•port usage

• Resumes solicited from all licensing agencies

• Recommended by current TTF• Approved by SCOJD of AASHTO

(Special Committee of Joint Development)

Page 3: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

Trns•port Task ForceTrns•port Task Force

• Determines when new products should be developed

• Determines appropriate software platforms• Long Range Work Plan (LRWP)• Annual Maintenance Support and

Enhancement (MSE) contract with contractor

Page 4: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

Long Range Work PlanLong Range Work Plan

I. Strategic PlanII. Strategic SolutionsIII. Five Year Cost and Revenue SummaryIV. Licenses and Revenue ProjectionsV. Long Range Work Plan Items - Sorted by

PriorityAPPENDIX (ballot items)

http://www.cloverleaf.net/products/trnsport/secure_docs/lrwp.pdf

Page 5: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

MSE DocumentMSE Document

1. Overview

2. Maintenance and Support Services

3. Maintenance and Support Budget

4. Enhancement Work Items

5. Shared Products

6. Service Unitshttp://www.cloverleaf.net/products/trnsport/secure_docs/mse.pdf

Page 6: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

PlatformsPlatforms

• Certified vs. Validated

• Supported vs. Unsupported

http://www.cloverleaf.net/support/documents/platform_2.pdf

Page 7: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

Service UnitsService Units

• Contracting through AASHTO rather than sole source contracting to Info Tech

• Services in $13,500 units• Support activities include

– Installing Trns•port and setting system parameters– Customizing screens and report templates– Converting data and populating the Trns•port database, – Analyzing differences between Trns•port and current

agency practices– Providing orientation and training – Funding Enhancements

Page 8: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

Task Force MeetingsTask Force Meetings

• 5 meetings per year– Sept / December / January / April / June

• MANY E-Mail exchanges• Frequent conference calls• Lots of work done in subgroups

Page 9: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

September TTF MeetingSeptember TTF Meeting

• Primary Objective– Strategic Planning

• Additional Objectives– Prepare for TUG– Review results of previous FY MSE

• Normally held in Gainesville – More attendees from ITI’s staff

Page 10: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

December MeetingDecember Meeting

• Primary Objective– Start preparation of LRWP and MSE

• Review enhancement ballot results– Ask ITI to more refined estimates of TTF

selected enhancements

Page 11: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

January TTF MeetingJanuary TTF Meeting

• Primary Objective– Finalize LRWP and MSE

• Determine enhancements• Prepare for Annual Chairs Meeting

– Meeting of all AASHTOWare Task Force Chairs with SCOJD

Page 12: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

April TTF MeetingApril TTF Meeting

• React to directions received at Annual Chairs Meeting

• Review status of current MSE – Enhancements– Budget concerns

Page 13: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

June TTF MeetingJune TTF Meeting

• Year end “stuff”– June software releases– Final adjustments to next FY MSE

Page 14: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

Technical Review Teams Technical Review Teams (TRTs)(TRTs)

• Appointed by TTF– Assist TTF in working with contractor in

development of new product/enhancement

• 3 to 5 members– Users familiar with product/functions– Agencies contributing funding

• Business normally conducted by e-mail or conference calls

• Chaired by TTF member

Page 15: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

TRTsTRTs

• Review software prototypes as software is developed

• Provides contractor guidance on user needs• Reviews and recommends acceptance of

results of the software testing

Page 16: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

Testing of SoftwareTesting of Software

• Contractor’s QC/QA

• Alpha testing

• Beta testing

• Release testing (by Info Tech)

• Warranties

Page 17: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

Alpha TestingAlpha Testing

• Formalized testing at a controlled site– Required by AASHTOWare guidelines

• Normally at contractors offices• Normally performed by contractor

– Can utilize agency users

• Test results reviewed and accepted by TTF

Page 18: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

Beta Test SitesBeta Test Sites

• User agency testing prior to release of new enhancements– Required by AASHTOWare guidelines

• Number of sites based on magnitude of the enhancement– Multiple sites (on different platforms) for complex

enhancements– Beta sites selected by TTF

• 30-60 day Beta testing typical• Test results reviewed and accepted by TTF

Page 19: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

Beta Test SitesBeta Test Sites

• Need commitment from user agencies to perform adequate pre-release testing– Necessary third party software– Commitment of staff– Coordinate with Trns•port contractor

Page 20: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

WarrantiesWarranties

• 120 days on enhancements– Longer for special cases

• Includes fixing things broken in the release

Page 21: TUG, AASHTO, TTF Primer Class Roger E. Bierbaum (TTF Member from Iowa) October 12, 2004

Trns•port Task ForceTrns•port Task Force

Left to RightRoger Bierbaum (Iowa)

Paul Neumann (Colorado)

Loren Lemmen (Michigan)

Jim Johnson (Florida)

Denis Glascock (Missouri)

Todd Bergland (Minnesota)