tsx-v: oco frankfurt: or6

14
TSX-V: OCO Frankfurt: OR6 www.orocoresourcecorp.com

Upload: zoe-underwood

Post on 16-Jan-2016

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TSX-V: OCO Frankfurt: OR6

TSX-V: OCO

Frankfurt: OR6

www.orocoresourcecorp.com

Page 2: TSX-V: OCO Frankfurt: OR6

DIRECTORS

Stephen M. Leahy, Executive Chairman, Director

• Founder of North American Tungsten

• Over 26 years of experience in venture capital

• Chairman, CEO, Director of North American Tungsten Ltd.

Ken Thorsen, President and CEO, Director

• Over 40 years of experience in the mining business

• 8 years with Selection Trust; 3 years with Cameco

• 21 years with Teck Corporation and 7 years as a consultant

• Senior Exploration Executive at Teck Cominco

including 2 year period as President of Teck Exploration Ltd.

Robert Friesen, Director

• Over 40 years of experience in mining and minerals exploration

• 7 years as Chief Geologist with Noranda Group

• 5 years as a Project Geologist with Teck Exploration Ltd.

Casey Forward, Director and Chief Financial Officer

• Over 25 years of accounting experience in North America and the

United Kingdom with numerous public companies

Page 3: TSX-V: OCO Frankfurt: OR6

CAPITAL STRUCTURE AND CORPORATE DIRECTORY

Shares Issued and Outstanding

Incentive Stock Options @ $0.55 for 5 years

Common Share Purchase Warrants@ $0.90 until Sept 12, 2009:

Common Share Purchase Warrants@ $0.55 until Sept 12, 2009:

Shares Issued and Outstanding Fully Diluted

Address: Suite 789999 W. Hastings St.Vancouver, BCCanada V6C 2W2T:604-688-6200F:[email protected]

Web Site: www.orocoresourcecorp.com

27,593,521

Management holdings and escrowedand pooled shares, subject to 3 year escrowand pooling restrictions (10,620,000)

2,650,000

4,101,760

800,000

35,145,281

Auditors: Dale Matheson Carr-Hilton Labonte LLP

Legal Counsel: Morton & Company

Stock Transfer Agent: Olympia Trust Company

Common Share Listing: TSX.V:OCO Frankfurt: OR6

Page 4: TSX-V: OCO Frankfurt: OR6

PROJECT LOCATIONS

Page 5: TSX-V: OCO Frankfurt: OR6

CERRO PRIETO MINE LOOKING NORTH

• Mining friendly Mexico; low costs, strong mining history

• Good paved road system in place

• Regional labor supply in nearby towns

• Property located next to National Power Grid and paved highway

• Within reach of local water supply

• Railway and deep water ports within trucking distance in state of Sonora

Page 6: TSX-V: OCO Frankfurt: OR6

CERRO PRIETO PROJECT SURFACE PLAN

2008, Phase 1 Exploration Program Overseen by Ing. Antonio Montante

• 6,000 meter diamond drilling

• Twenty-Two diamond drill holes completed

• 100% success rate in hitting mineralized structure

• Program included mapping, surface trenching and sampling along strike

• $1,000,000 program completed on time and on budget.

Page 7: TSX-V: OCO Frankfurt: OR6

CERRO PRIETO PROJECT MINERALIZATION

Page 8: TSX-V: OCO Frankfurt: OR6

CERRO PRIETO PROJECT LONGITUDINAL SECTION

Page 9: TSX-V: OCO Frankfurt: OR6

$1 MILLION PHASE 1 PROGRAM COMPLETED WITH EXCELLENT RESULTS

NI 43-101 COMPLIANT 25.3 MILLION TONNE INDICATED RESOURCE AND 4.7 MILLION TONNE INFERRED RESOURCE

Resource TONNES GOLD Grade SILVER Grade LEAD Grade ZINC Grade

Category (Millions) (ounces) (g/t) (ounces) (g/t) (M lbs) (%) (M lbs) (%)

Indicated 25.3 422,145 0.52 6,981,641 8.6 189.2 0.34 567.6 1.02

Inferred 4.7 25,635 0.17 2,925,313 19.4 54.8 0.53 174.7 1.69

$1.06

Page 10: TSX-V: OCO Frankfurt: OR6

Contained Metal per Issued Share

Contained Metal per $1 of Market Capitalization*

*Market Capitalization based on I&O shares and closing price on February 6, 2009

Resource Gold Silver Lead + Zinc

Category grams/share grams/share lbs./share

Indicated 0.480 7.87 27.43

Inferred 0.029 3.29 8.320

Resource Gold - g/$1 of Silver - g/$1 of Lead + Zinc lbs.

Category market cap.* market cap.* /$1 of market cap*

Indicated 2.643 43.72 152.37

Inferred 0.161 18.32 46.21

Page 11: TSX-V: OCO Frankfurt: OR6

PHASE 2 AND 3 PROGRAM AND BUDGET 2009/2010 C$

Drill Program (Includes Total Costs For Infill Drilling 1,000,000And Drilling At 100 Meter Intervals Along Strike)

Preliminary Environmental, Engineering and Metallurgy 250,000

Pre-Feasibility Study 3,750,000

Prefeasibility Study TOTAL $5,000,000

Page 12: TSX-V: OCO Frankfurt: OR6

THE CERRO PRIETO POLYMETALLIC PROJECT: HIGHLIGHTS

• FAVOURABLE LOCATION AND MINING LAWS

• 100% OWNERSHIP INTEREST 27 SQ. KM OF CONCESSIONS CONTAINING SEVERAL KM OF STRIKE LENGTH OF MINERALIZED STRUCTURE

• SUCCESSFUL PHASE ONE EXPLORATION PROGRAM COMPLETED OCTOBER, 2008 43-101 COMPLIANT : 30 MILLION TONNE GOLD, SILVER, LEAD AND ZINC RESOURCE

• OXIDE MINERALIZATION FROM SURFACE TO MAXIMUM DEPTH OF 350 METERS

• LOW DISCOVERY COSTS, MINERALIZATION OPEN ON STRIKE TO NORTH AND SOUTH AND TO DEPTH A PHASE 2 PROGRAM DESIGNED TO INCREASE RESOURCE

• POTENTIAL FOR LOW COST, OPEN PIT MINE, PRELIMINARY MINING PLAN UNDERWAY

Page 13: TSX-V: OCO Frankfurt: OR6

DISCLAIMER

Some of the statements contained herein may be forward-looking statements which involve known and unknown risks and uncertainties. Without limitation, statements regarding potential mineralization and resources, exploration results, and future plans and objectives of the Company are forward looking statements that involve various degrees of risk. The following are important factors that could cause the Company’s actual results to differ materially from those expressed or implied by such forward looking statements: changes in the world wide price of mineral commodities, general market conditions, risks inherent in mineral exploration, risks associated with development, construction and mining operations, the uncertainty of future profitability and the uncertainty of access to additional capital.

Contained herein are references to historical resource estimates. Confirmation drilling proposed in the Company’s Phase I exploration program will test the reliability of these historical estimates which, under the current definitions of resources and reserves as stated in National Instrument 43 - 101 would correlate to the inferred resource category. Note that these historical estimates are not being treated as current estimates and the historical estimates should not be relied upon as current estimates. These historical estimates were prepared prior to the implementation of the Standards of National Instrument 43-101. As the exploration program for the Company is preliminary in nature the company does not have sufficient data to outline a reserve or resource to the standards of National Instrument 43-101. For further details please refer to the Company’s prospectus, news releases and Technical Report (NI 43-101) at www.sedar.com.

Page 14: TSX-V: OCO Frankfurt: OR6

TSX-V: OCO

Frankfurt: OR6

www.orocoresourcecorp.com